ExoMars 2018 Rover Operations Control Centre
Plans for rover operations training at ROCC
M. Cinato
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Inform you about ROCC training approach
Receive your comments and suggestions
Propose next steps and deadlines
Objectives
Dec 2014 Page 2
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Positions considered for training: Training Lead Instructor Payload or Rover Subsystem Training Responsible Simulation Director Simulation Operator Trainee
Training Positions
Dec 2014 Page 3
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
It is a formal declaration that the operator successfully completed a training covering all his/her tasks during the mission
Certifications are tailored to each position, with common and specific areas
Due to the short duration of the ExoMars mission certifications expirations are not considered
Certification
Dec 2014 Page 4
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
A formal process will be set up
A Learning Management System will store all certification records
The Mission Director will sign the documents
The Training Responsible will help collecting, assembling and verifying all certification materials
Certification
Dec 2014 Page 5
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
It is defined by the ROCC Training Plan document
A first issue will be available on April 2015
Defines the approach, the lessons catalogue, the users and the certification requirements
It is prepared by the ROCC Training Lead
Training Approach
Dec 2014 Page 6
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Columbus ESA training for ground operators is organized with classroom lessons at Cologne and Munich
This provides a possibility for setting up contacts with other sites’ operators
Arranging suitable dates for many operators is not easy and sometimes long waiting lists are required
Columbus did not require to build up the whole team in a short time as ExoMars
Columbus Training Approach
Dec 2014 Page 7
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
ExoMars training should be efficient to assemble a full team in time for a condensed mission
First training phases may overlap with last payload development stages
Operators may have limited booking time for training during this period
Lessons should then be remotely available as an option
ExoMars Training Approach
Dec 2014 Page 8
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Many theoretical lessons may be delivered using an e-learning infrastructure
This allows on-demand delivery removing location and timing contraints
Operators can recall lessons at any time to refresh knowledge
Some common lessons will be delivered on-site to allow direct interaction with instructors and other operators
ExoMars Training Approach
Dec 2014 Page 9
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
The Learning Management System (LMS) will be available soon
Lessons description, Operators certification information and training catalogues will be available
Sensible and private information will be protected
LMS and Collaboration (1 / 2)
Dec 2014 Page 10
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
The LMS will act as a common repository where operators are invited to share material useful for training
Payload training responsibles will coordinate this data collection
Wikis and forums will be available for discussions
News about ExoMars training will be available on the LMS as prime distribution medium
LMS and Collaboration (2 / 2)
Dec 2014 Page 11
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
The amount of lessons required for certification is related to mission tasks assigned to the position
Lessons are implemented with increasing specialization
Material will be available for refresh at any time using the LMS, with cue cards and quizzes
Lessons Allocation
Dec 2014 Page 12
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Simulations are organized for operators certification
Operators are declared mission ready after completion of theoretical lessons as well as simulation sessions
Effort on simulations is maximized, focusing on operational and troubleshooting skills
Simulations
Dec 2014 Page 13
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Simulations will be organized to deliver multiple products: Certification of ExoMars operators Validation of ground infrastructure Development of a planning library that will be the input for
strategic plans Development of a knowledge base of failures and replannings
Simulations Products
Dec 2014 Page 14
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Organizes the ROCC training catalogue to define the certification process
Defines the training requirements for each ROCC operator
Prepares the high level definition of lessons and simulations
Verifies fulfillment of certification requirements
Manages lessons evaluations and updates
Training Lead
Dec 2014 Page 15
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
The Columbus project defined a training point of contact in each scientific group
It was very useful and should be defined for ExoMars as well
The position should support the ROCC Training Lead in training preparation and certification activities
Payload or Rover Training Responsible (1 / 2)
Dec 2014 Page 16
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Provides support for: Information management about operators and payloads Documents retrieval to assemble specialistic lessons about
payloads and experiments Information retrieval to set up simulations and certifications News distribution and delivery verifications
Payload or Rover Training Responsible (2 / 2)
Dec 2014 Page 17
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
We are not going to teach you about your instrument
However, we are teaching you something about the other experiments
We would like you to support us to prepare the instructional material about your experiment
Final Considerations
Dec 2014 Page 18
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Short term (March 2015): Appoint a training responsible in each payload team Estimate the number of operators to certify (placeholders are
ok, names are not mandatory) Provide any material considered useful for training preparation
(draft information and notes are ok)
Proposed Schedule (1 / 3)
Dec 2014 Page 19
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Medium-term (End 2015 – Jan 2016): Provide a first set of operators candidates and references Provide a first batch of payload material for training
development Receive first training sessions for training responsibles Inform future candidates about lessons availability and
Learning Management System use
Proposed Schedule (2 / 3)
Dec 2014 Page 20
All r
ight
s re
serv
ed ©
201
4 - A
ltec
www.altecspace.it Ref. Nr.
Simulations and Final Training with launch scheduled on May 2018 Anticipated Training: July to December 2017 Pre-launch Training: January to May 2018 Post-launch Training: June to December 2018
Facilities Availability ROCS software V2 October 2016, V3 March 2017 Rover Operational Simulator ROSEX TAPS
V3 February 2017, V4 June 2017 Terrain Simulator: May 2017
Proposed Schedule (3 / 3)
Dec 2014 Page 21