STEP NO.
3 Adjusting the ladder at a comfortable and stable position
5 De installing the tubelight by removing the side covers
Place the tube gently on the floor where it will not roll or be disturbed for later di
9 Push the tube straight up into the sockets. Ensure the pins on both ends of the tu
the pin hole in the tube
holder. Then rotate it 90 so
that it gets locked.
Operation Transport InspectionTemporary
Storage
Respective Time (sec) 57.75 29.9 0 4.05
7
STEPS
50%
26%
0%
3%
10%
11%
Percentage Time Devoted
Operati
Transpo
Inspecti
Tempor
Perman
Operati
8/11/2019 WSAM Assignment1-Tubelight Installation
2/7
Started
(sec)
Ended
(Sec)
Time Taken
(Sec)PROCESS TYPE
19.5 27.2 7.7 NVA
31.5 44.2 12.7 VA
sposal.
be are aligned to the pin hole in the tube holder. The 65.2 98.5 33.3 VA
Permanent
Storage
Operation &
InspectionActivities
Value
Adding
Necessary
non value
Adding
Non Value
AddingTOTAL
11.2 12.9 Qty 2 6 4 12
TIME 46 32.2 37.6 115.8
NVA49.1 57.2 8.1
on
rt
on
ary Storage
ent Storage
on & Inspection
Value Adding,
46, 40%
Necessary non
value Adding,
32.2, 28%
Non Value
Adding, 37.6,
32%
Time Devoted to Activities
8/11/2019 WSAM Assignment1-Tubelight Installation
3/7
Event Segregation
Operation
Operation
Temp-storage
Operation
8/11/2019 WSAM Assignment1-Tubelight Installation
4/7
STEP NO.
1 Entering the room and switching on the tubelight to find the faulty tubelight2 Looking for the ladder and fetching it near the tubelight
3 Adjusting the ladder at a comfortable and stable position
4 Climb the ladder carefully and stop when reached at a comfortable height
i.e. the eyes of the person are at the same level as that of the tube light.
5 De installing the tubelight by removing the side covers
6 Hold tube carefully in one hand and step down from ladder carefully.
7 Place the tube gently on the floor where it will not roll or be disturbed for later
Bring out the new tubelight from its cover and place the old tubelight in the no
8 Pick the new tube gently in one hand and step up on the ladder slowly upto the
9 Push the tube straight up into the sockets. Ensure the pins on both ends of the t
the pin hole in the tube holder. Then rotate it 90 so that it gets locked.
10 Step down the ladder
11 Switch on the tubelight to check whether the tubelight is installed in a right way
12 Remove the ladder and keep it at its place.
SCOPE To install a new tube light.
FROM switching OFF the light from the main switchboard.
Till installing the new tube light and switching it ON with in the specified time lim
SKILL DOMA Electrician
STEPS
8/11/2019 WSAM Assignment1-Tubelight Installation
5/7
Value Addi Necessary Non Value Adding
isposal.
empty cover
omfortable height.
be are aligned to
it
8/11/2019 WSAM Assignment1-Tubelight Installation
6/7
STEP NO.
1 Switch off the power supply from switchboard.
2 Look for the ladder in the room and position it near the holder.
3 Open the ladder and straighten the latch between its two arms to steadily balance it.
4 Climb the ladder carefully and stop when reached at a comfortable height
i.e. the eyes of the person are at the same level as that of the tube light.
5 Gently support the first tube with both hands keeping your hands close to the ends o
6 Quarter turn the tube in any direction with both the hand.
7 Pull the tube light towards yourself gently so that it comes out from holder.
8 Hold tube carefully in one hand and step down from ladder carefully.
9 Place the tube gently on the floor where it will not roll or be disturbed for later dispo
10 Bring out new tube from its cover by pulling it out gently.
11 Place old tube inside the new tubes cover.
12 Pick the new tube gently in one hand and step up on the ladder slowly upto the com
13 Push the tube straight up into the sockets.
Ensure the pins on both ends of the tube are aligned to the pin hole in the tube hold
14 Then rotate it 90 so that it gets locked.
15 Step down from the ladder and then move towards the switch board.
16 Switch on the power supply on the switchboard.
STEPS
8/11/2019 WSAM Assignment1-Tubelight Installation
7/7
Started Ended Time Taken
f the tube.