Upload
debasispahi
View
214
Download
0
Embed Size (px)
Citation preview
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
1/10
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
2/10
ANNEXURE-I
ANNEXURE REFERRED TO IN THE REPLY TO PART (a) OF LOK SABHA UNSTARREDQUESTION NO.3622 FOR 14.12.2012 REGARDING FUNDS EARMARKED FOR CORPORATESOCIAL RESPONSIBILITY BY PSUs ASKED BY SHRI YASHBANT N.S. LAGURI AND SHRIRATAN SINGH.
1. Activities undertaken for social welfare, State wise during the last three years and thecurrent year in Hindustan Copper Limited (HCL) is as under:
Work-wise and location-wise details undertaken forCorporate Social Responsibility, during the last three yearsand the current year in Hindustan Copper Limited
ICC,Ghatsila,
Jharkhand
KCC,Khetri,Rajasthan
MCP, Malanjk-hand, MP
Sl.No. Intervention: FY2012-13 (in process) Current Year
1 Livelihood promotion 2 IG activities (Women Empowerment) 3 Conservation / Recharge of ground Water 4 Drinking Water 5 Health and Sanitation 6 Animal Husbandry 7 Plantation & Agricultural Development 8 Skill / Vocational Training & Education 9 Rural Energy supply
10 Village Infrastructure & Construction Sl.No. Intervention Area FY 2011-12 : Last Year
1 Livelihood promotion 2 IG activities (Women Empowerment) 3 Conservation / Recharge of ground Water 4 Water 5 Health and Sanitation
6 Animal Husbandry
7 Plantation & Agricultural Development 8 Skill/Vocational Training 9 Rural Energy supply
10 Education 11 Village Infrastructure & Construction Sl.No. Intervention Area FY 2010-11: Last to last year
1 Livelihood promotion & Capacity building 2 IG activities (Women Empowerment) 3 Sanitaion
4 Drinking Water 5 Health 6 Animal Husbandry7 Plantation & Environment 8 Skill/Vocational Training9 Rural Energy supply
10 Education 11 Village Infrastructure & Construction 12 Sports and culture
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
3/10
Sl.No. Project Highlights of FY 2009-10: Year before last to last year
1Training Centres (Sewing/Embroidery) Opened forSHGs
2 Health Check-up Camps 3 Village Health Committees and Health Groups 4 Training and exposure visit 5 Sports Competition 6 Minor Masonry Work (Public Toilet/ Sewing Centre)
7 Plantation Projects (Jatropha Plantation) 8 Vermicompost (Production of organic manure) 9 Animal Husbandry
10 Water Saving Practices 11 Mobile Medical Unit
Amount of funds earmarked and recorded to be utilized in different Units of HindustanCopper Limited (HCL) during the last three years and the current year:
State &Unit names KCC, Khetri,
RajasthanMCP,
Malanjkhand, MPICC, Ghatsila,
Jharkhand
TCP, Taloja,Maharastra/CO, Kolkata,West Bengal/
OthersFinancial
YearsAllocated Spent
Allocated Spent
Allocated Spent
Allocated Spent
CSR ( in Lakh ) 2009 - 2010 0 4.72 0 0 0 4.72 0 0.502010 - 2011 20.62 21.96 36.00 59.82 44.72 32.86 4.10 7.382011 - 2012 77.95 39.35 130.25 40.80 86.80 66.77 5.00 15.262012 - 2013 217.8 - 214.2 - 198 - 81 -
TotalEarmarked
316.37 380.45 329.52 90.10 1116.44
TotalUtilized
66.03 100.62 104.35 23.14 294.15
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
4/10
2. The work-wise and location-wise details of funds earmarked and utilized by MineralExploration Corporation Limited ( MECL) for Corporate Social Responsibility during the lastthree years including the current year are as under:
Year Work AmountAllocated(Rs)
Amount Spent(Rs) Location of CSR activity
2010-11
Providing drinkingwater
Rs. 5Lakhs
41,666/-- Jaduguda (East SinghbhumDistt., Jharkhand)
Providing educationto children belongingto SC/ST/Weakersections of thesociety
4,03,578/-- Boro & Sayang (Korba Distt.,Chattisgarh), Bikaner, Jaipur(Rajasthan), Needamangalam,(Ramnathpuram Distt. A.P.),Singraul (M.P.), Gare-Palma.Dolesara & Mahatamil(Raigarh Distt., Chattisgarh),Kurla East (Barmer Distt.,Rajasthan), Mulug (WarrangalDistt., A.P)
Providing SewingMachines for womenbelonging toSC/ST/Weakersections of thesociety
50,350/-- Bikaner & Jaipur (Rajasthan),Mahatamil (Raigarh Distt.,Chattisgarh), & Mulug(Warrangal Distt., A.P)
2011-12
Sanitation andPublic Health
Rs. 15Lakhs
7,09,000/-- Ramkola-Tatapani, (AmbikapurDistt., Chattisgarh), Temurda
(Chandrapur Distt.,Maharastra) & Darshanpura(Gulbargha Distt., Karnataka)
Promote educationin children belongingto SC/ST/weakersections
Rs. 15Lakhs
11,37,548/- Dolesara & Mahatamil(Raigarh Distt., Chattisgarh),Jharia 'A' (Dhanbad Distt.,Jharkhand), Barmer(Rajasthan), Ramnand(Ramnathpuram Distt., A.P.) &Rupa (West Kumang Distt.,
A.P.)Providing drinkingwater
Rs. 15Lakhs
9,54,995/- Makri-Barka (Singrauli Distt., A.P.), Sayang (Korba Distt.,Chattisgarh), Mulug (WarangalDistt., A.P.), Ghughra (KorbaDistt., Chattisgarh) & Merta(Nagore Distt., Rajasthan)
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
5/10
2012-13
Sanitation andPublic Health
Rs. 23lakhs
CSR activities atdiffferent identifiedProjects are underexecution, hencetotal exact amountspent so far is notreadily available atthis stage
Karichapar (Raigarh Distt.,Chattisgarh), Makri-Barka(Singraul Distt., M.P.), Banera(Rajasthan),Needamangalam(Ramnathpuram Distt., A.P.),Narwapahar ( Singhbum Distt.,Jharkhand), Jharia 'A'(Dhanbad Distt., Jharkhand),Barmer (Rajasthan) & Ghugra(Korba Distt., Chattisgarh)
Promote educationin children belongingto SC/ST/weakersections
Rs. 21lakhs
Ramkola-Tatapani (AmbikapurDistt., Chattisgarh), Mahuda(Dhanbad Distt., Jharkhand),Sayang & Ghugra (KorbaDistt., Chattisgarh), Patal East(Ramgarh Distt., Jharkhand),Benai/Bhanumoda (Raigarh
Distt., Chattisgarh), Tandur(Adilabad Distt., A.P.),Jaduguda (East SinghbhumDistt., Jharkhand) & Khetri(Rajasthan)
Providing drinkingwater
23 lakhs Dolesara (Raigarh Distt.,Chattisgarh),Chikaldhokra/Bela (NagpurDistt., Maharshtra), Singrauli(M.P.), Turamdih (SinghbumDistt. Jharkhand ) & Banera(Rajasthan)
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
6/10
3. Details of Corporate Social Responsibilities undertaken by National Aluminium CompanyLimited (NALCO) during the last three years and the current year:
NALCO earmarks/spends money on CSR activities in the following ways:
a) 1% of Profit After Tax (PAT) through Rehabilitation and Periphery Development AdvisoryCommittee (RPDAC):
The details of fund allocated under this head for last three years and for the current year are asunder:
Amount Rs. in lakhs
Year Total allocatedfor theCompany (1%
net profit ofprecedingyear)
Funds allocatedfor M & RComplex,
Damanjodi(40% of Col. 2)
Fundsallocated for S& P Complex,
Damanjodi(40% of Col. 2)
Funds callocated forCorporate
level (20% ofCol. 2)
Fundsutilized
2009-10 1272.27 508.91 508.91 254.45 1272.272010-11 814.22 325.69 325.69 162.84 814.222011-12 1069.30 427.72 427.72 213.86 1069.302012-13 849.50 339.80 339.80 169.90 849.50Total 4005.29 1602.12 1602.12 801.05 4005.29
It is mentioned that the RPDACs for Angul and Damanjodi sector are yet to finalize the list of
Peripheral Development projects and its estimates for the period 2009-10 to 2012-13.Therefore it is not possible to mention work-wise allocation of funds. The projects approved byRPDAC in earlier years have however, been under various stages of implementation duringthese years. For Corporate level activities amount have been spent in areas like repair andconstruction of rural roads, culverts, tube wells, community halls, school building, bathing ghats,tanks and water harvesting facilities. The non constructional activities include social forestry,encouragement to agriculture, animal husbandry, poultry, pisiculture, health care, sanitationassistance to educational institutions, rural sports and cultural events.
Further, it is stated that the funds allocated for the financial year are also considered as funds
spent for that year irrespective of works completed or not as RPDACs (Rehabilitation PeripheryDevelopment Advisory Committees) finalizes detail projects and estimates based upon theallocation. Allocation of CSR fund is however non-lapsable
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
7/10
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
8/10
C. Projects in ProgressSl. Projects Details Committed
Amount ( inRs. Lakh.)
AmountSpent (in Rs.
Lakh)1. Funding of Industrial Training Institute (ITI) at
Marichamal408.00 200.00
2. Water and energy study in 142 peripheral villages 10.00 5.003. Economic development through goat rearing in
Bhitargarh and Kassiput
2.46 2.04
D. Projects Yet To StartSl. Projects Details Committed
Amount ( inRs. Lakh.)
AmountSpent (in Rs.
Lakh)1. Construction of checkdam and repair of canal at
Karidiguda26.00 0.00
2. Construction of natural stream based drinking watersystem at Khagodara
3.00 0.00
3. Construction of spring- based drinking water system atBhitarbhejaput, dugwells at Kandhaputaghati andBhitarbhejaput, installation of bore wells in 18 villages
53.00 0.00
4. Training on Integrated Agriculture practices to 250 farmers 3.54 0.005. Renovation Malu Santa Govt. High School 54.25 0.00
Total Projects Cost ( Damanjodi) 845.15 370.492. POTTANGI ( KORAPUT)
A. Completed ProjectsSl. Projects Details Committed
Amount (in Rs.Lakh)
AmountSpent (In Rs.Lakh)
1. Renovation of existing community water structures atBadapadu village
7.95 7.95
2. Renovation of Kanyashram in Nuagaon 7.85 7.853. Setting up of Village Information Centres (VICs) in
Pottangi and setting up of Grain banks0.26 0.26
B. Projects in Progress1. Provision of drinking water through tube well in
Kartalmaudi village0.67 0.51
2. Drinking water provision in Eklavya Model ResidentialSchool ( EMRS), Punger
3.00 3.00
Total Projects Cost at Pottangi 19.73 19.571. ANGUL
A. CompletedSl. Project Details Committed
Amount (in Rs.Lakh)
AmountSpent (in Rs.
Lakh)1 Backyard Poultry farming in Nandichhod village 3.00 3.002 Camps for identification of physically-challenged persons
and distribution of equipment0.47 0.47
3 Health check-up programme for children and women,including expectant mothers
0.22 0.22
B. Yet to Start1 Livelihood intervention through Mushroom Cultivation 6.96 0.00
Total Projects Cost at Angul 10.65 3.69
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
9/10
1. VISAKHAPATNAM A. Projects In Progress Sl. Project Details Committed
Amount (in Rs.Lakh)
AmountSpent (in Rs.
Lakh)1 Provision of drinking water through community-managed
Gravity Fed Water Supply Systems (GFWSS) in Gudem
Kotha Veedhi mandal
33.35 30.01
Total Projects Cost at Visakhapatnam 33.35 30.01
Summary Status of the Projects
Sl. Project Details CommittedAmount (in Rs.
Lakh)
AmountSpent (in Rs.
Lakh)1 Completed Projects (13 numbers) 153.49 141.292 Continuous Projects (4 numbers) 151.16 41.913 Projects In Projects (6 numbers) 457.48 240.564 Yet To Start (6 numbers) 146.75 0.00
Total Cost of All the Projects (29) 908.88 423.76
c) Subsidizing the education of children from periphery villages:
The Company is spending towards providing educational facilities to the children from theperipheral areas as a part of Corporate Social Responsibility. The proportionate school expensesincurred for such non-NALCO children are furnished as below:-
Amount Rs.in Lakhs
Year Proportionate expenses foreducation of children fromperipheral villages of M&RComplex, Damanjodi.
Proportionate expenses foreducation of children fromperipheral villages of S&PComplex, Angul
Total
2009-10 323.28 292.17 615.452010-11 276.15 735.87 1012.022011-12 314.62 778.93 1093.552012-13
(unaudited)159.66
(up to September, 2012)472.27
(up to September, 2012)631.93
Total 1073.71 2279.24 3352.95
8/12/2019 writereaddata-Contentlinks-ce3f56e7e5a0431b9fb1635aca9f8096
10/10
ANNEXURE-II
ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA UNSTARREDQUESTION NO.3622 FOR 14.12.2012 REGARDING FUNDS EARMARKED FORCORPORATE SOCIAL RESPONSIBILITY BY PSUs ASKED BY SHRI YASHBANT N.S.LAGURI AND SHRI RATAN SINGH
1. Details of implementing agencies, as recommended by National Institute of Rural
Development (NIRD), through which funds have been utilized in different units of HindustanCopper Limited (HCL) are as under:-
Unit Partner InstitutionIndian Copper Complex (ICC) GhatsilaJharkhand
Parivesh Society, Ranchi ,
Also project specific collaboration with
Ramakrishna Mission, Ranchi
Birsa Agricultural university, Ranchi
Central Institute of Mining and Fuel Research
(CIMFR)Malanjkhand Copper Project(MCP )BalaghatMadhya Pradesh
Gramin Vikas Trust, Bhopal ,
Also project specific collaboration with
MP Council of Science & Technology, Bhopal
Madhya Pradesh Rajya Van Vikas Nigam Ltd.
Khetri Copper Complex (KCC)JhunjhunuRajasthan
Gramin Vikas Trust, Jaipur, Also project specific collaboration
Central Institute of Mining and Fuel Research
(CIMFR)
Local service oriented organisations
2. The Nodal agencies for implementation of CSR projects of National Aluminium CompanyLimited (NALCO) are as under:
(a) Rehabilitation and Periphery Development Advisory Committee (RPDAC) establishedby the State Government of Odisha:
Govt. of Odisha has constituted Rehabilitation and Periphery Development AdvisoryCommittees (RPDACs) for Damanjodi and Angul under the chairmanship of concerned RevenueDivisional Commissioners. The RPDAC finalizes the annual PD projects and its estimates.
(b) NALCO Foundation established by Nalco as per CSR guidelines issued by Govt. ofIndia:
The CSR activities of the NALCO Foundation are as per the guidelines on CSR for CentralPublic Sector Enterprises (CPSEs), issued by the Department of Public Enterprises,Government of India.
*********
http://www.hindustancopper.com/ICCPlant.asp?lnk=1http://www.hindustancopper.com/ICCPlant.asp?lnk=1http://www.hindustancopper.com/ICCPlant.asp?lnk=1