Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Option A
Option B
INSTALLATION INSTRUCTIONS WPC PERGOLA10’x10’
269m
m/10
.59”
269mm/10.59”
Base plate cover
3048mm/120’’
3048mm/120’’3048mm/120’’
2052mm/80.76”
2454mm/96,6” 2454mm/96,6”
2835mm/111.6”
L1: U-clip X16L2: M8 60mm screw bolt X16L3: L-angle clip X105L4: 4.2X25mm screw X270L5: Expansion screw X16L6: M10 treaded rod X12L7: 3.8X25mm screw X40
Base plate cover X4
Drill
Straight line
Straight line
Mark line
The hole size
Mark point
Z=3537mm/139.2''
16 0.629
A:Steel inner post
According to the measurement, please put the steel inner post (A)on the ground. ATTENTION: The ground should be flat.
STEP:1 STEP:2
ZZ
198m
m7.8’
’19
8mm7
.8’’
Betw
een8
0-90
mm
(3
.15’’-3
.55’’)
2501mm/98.4”
2501
mm/98
.4”
2105mm/82.8”21
05mm
/82.8”
attentionNote:Please drill the holes as the diagram shown.
Drill the points
Straight lineStraight line
Straight line
Straight line
Put the posts on the expansion screws (L5)
Fix the expansion screws (L5)
L5Note: Please be careful not to break the base
plate cover.
Put the B over the A. When touching th WPCpart, please wear gloves, in case there is oil on the WPC posts.
Before fixing the posts to the ground, refer to the front page of the guide (option A or option B), using the pre-drilled holes on the end of the posts, choose the orientation of the desired roof structure.
same
STEP:3 STEP:4
STEP:5
2
4
Straight line Straight line
same
Measure and adjust until the following requirements.
Measure the distance between the posts and the length is 2454mm/102”.
1.Use the Level to ensure the a side and b side of the posts must be vertical to the ground.Please adjust if necessary.
Use the wrench to fix the expansion screws (L5)
2.The ground should be flat.
Straight line
Straight line
2454mm/102”
2454
mm/10
2”
5
STEP:6
STEP:7
STEP:8
3
Straight line Straight line
Post Installation A & B
Put the base plate covers (H) on the WPC posts.
6
2454mm/102”2454mm/102”
2454mm/102”
2454mm/102”
Measure again
B
STEP:9
STEP:1
7
Assemble the treaded rod (L6) and the U-Clips (L1) as the diagram shown.
STEP:2Install the cross beams (C) with the treaded rod (L6) and the U-clips (L1).
8 pieces 4 pieces
L6
L1
middle
top
bottom
Note: Please adjust the distance between the posts according to the holes position on the C.
8
L7
L7
L7
Note: Keep the screws (L7) parallel to the cross beam (C).
Keep Parallel
Keep Parallel
L7 L7
Please pre-drill the holes for the screws (L7) with Φ4mm(Φ0.2”) and fix the screws (L7). Please do not pre-drill the inner aluminum.
STEP:3
9
Note :The drain holes must be downwards.
Install the beams 2 (F) to the cross beams (C) with the U-Clips (L1) and the screws bolt (L2).
Note: Please use the wrench tofix the L2 go through the holes of the F tightly.
Beam F installation
10
Note :The drain holes must be downwards.
Pre-drill the holes on the beam 2 (F), please do not pre-drill the inner aluminum.Fixing the U-Clips (L1) and screws (L7) with the holes we pre-drill as the diagram shown.
Use the wrench to install the beam 3 (G) with the screws bolt (L2) tightly.
Fix the beam 3 (G) according to the 6 cuts of the beam 1-2 (E).
L7 L7
L7
L7
Keep Parallel
Keep Parallel
Beam G installation
11
7
D
L4
L3Fix the L-angle clips (L3) and the screws (L4) to the beams (D).
STEP:1Fix the L-angle clips (L3) and the screws (L4) to the beams (D).
Put the beams (D) on the cross beams (C), one piece on each side.
Beam D installation
L4
Aluminium
The hole Φ5mm
WPC
Aluminium
WPC
12
STEP:2
STEP:3
Pre-drill the cross beams (C). ATTENTION: Do not pre-drill the inner aluminum.
Measure the distance of the cross beams (C) as the diagram shown which is 222mm/8.74” and mark the points.
222m
m/8
.74”
222m
m/8
.74”
Fix the screws (L4) on the cross beams (C).
Adjust the distance between the two pieces of the beam 1-2 (E), the distance “P” is 269mm/10.59” and mark the points.
E×7
E
PP
PP
PP
PP
8
STEP:1
There are 6 cuts on each pieces. Please adjust the cuts to fit onto the cross beams (C).
13
Beam (E)
L4
L3Fix the L-angle clips (L3) and the screws (L4) to the beams (E).
Beam E installation
M M
N
Pre-dril the points on the WPC beam and do not pre-drill the inner aluminum.
Fix the screws (L4) and measure again the distance as the Page 1 show.
STEP:2
STEP:3
Aluminium
The hole Φ5mm
WPC
Aluminium
WPC
L4
Fix the screws (L4) on the cross beams (C).
14