Page 1: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017 SAFER, SMARTER, GREENERDNV GL © 2017

25 September 2017

World’s First Dual-Fuel Cruise Ship –Challenges and perspectives

1

Anthony Teo ,

Technology and LNG Business Development Director

Page 2: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

About DNV GL

13,000EMPLOYEES

350+OFFICES

100+COUNTRIES

Energy Oil & Gas SoftwareBusiness

AssuranceMaritime

154 Year

History

2

Maritime Services:o Ship & Offshore Classificationo Maritime Advisoryo Verification

Authorised for ACP

5% Revenue allocated to R&I => Innovation & Standards

Page 3: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Content

Technical solution regarding LNG Fuelling onboard AIDAprima

Approval process ports (safety analysis, QRA)

Experience regarding LNG operation

Carnival Maritime LNG perspectives

3

Page 4: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

LNG uptake by vessel segment

4

2 322

3

23

311

1

1

4

4

4

8 59

410

14

12

14

17

21

34

33

11

Updated 1 September 2017Excluding LNG carriers and inland waterway vessels

Page 5: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

AIDAPrima

5

Gross tonnage: 125,000 tons

Length overall: 300 m/ 984 ft

Width: 37.6 m/ 121 ft

No. of decks: 18

No. of staterooms: 1,643 (accommodating up to 3,286 passengers)

Builder : Mitsubishi Heavy Industries ( Nagasaki, Japan)

Delivered : March 2016

Class: DNVGL

Page 6: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

AIDAPrima

First cruise vessel in the world

equipped with a dual fuel main engine

and dual fuel auxiliary boiler to allow

the use of LNG as a fuel source when at

berth

– to generate electricity and

steam/hotwater,

– Gas consumption of the dual fuel

engine is supplied by onshore LNG

truck (no LNG tank onboard).

Regular 7-day-schedule calling

Hamburg, Le Havre, Southampton,

Zeebrugge and Rotterdam throughout

the entire year

6

Page 7: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Technical solution for LNG fuelling

Pressure Build Up as safe & simple transfer

system

7

Reliable, safe fuelling system

Reduction of possible sources of

release next to the vessel (less

flange connections compared to

a pump solution)

Fuel preparation room

Safety zone around the LNG

truck

Page 8: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Safety concept for LNG Fuelling of AIDAPrima

8

Extensive safety concept developed for

LNG fuelling operation (5 s for ESD)

Double walled hose including

monitoring system

LNG tank safety valves connected

with the vent system of the vessel

QCDC couplings and dry break away

coupling for fuelling hose and vent

line

Safety related valves are fail-safe-

close (in case of loss of electrical

energy supply (blackout), service air,

control signals)

Gas detection at the truck manifold

CCTV

Fire fighting equipment

Page 9: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Safety Analysis

Risk analysis for:

– Onboard system

– Transfer System

– Simultaneous operation

Quantitative Risk Assessment

for the different Ports

– Location specific risk

– Societal risk criteria

Dispersion Analysis

9

0.00 0.06

km

Page 10: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

First LNG Fuelling for Aida Prima in Hamburg on 7th of May 2016

10

DNV GL contribution:

– Technical project

management for

AIDA/Carnival Maritime

– Safety studies

– Permission management

with authorities (port

states, flag)

Page 11: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Operator’s Experience

11

Original concept was a pumped solution

– Needed to be changed due to logistics and operational reasons

– Working closely with partners (Marine Services and DNV GL) developed

pressure build up system in short time

– Also required QRAs to be revalidated

Initial safety distances were too large to allow SIMOPS

– Double walled hose and reduced activation ESD solved this

Original supply partners dropped out in late 2015

– Required quick selection of new supplier and haulier

Approval process

– Not consistent despite all ports being in EU

– Different approval process required – complicated by truck to ship delivery

– Different risk acceptance criteria applied

Page 12: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Lessons Learnt

12

Choose partners – LNG supplier, Class, Flag, Ports, etc with care

– Ensure there is shared and common understanding of safety and

environmental objectives

– Be ready to help educate those that are not familiar with LNG

Leverage existing experience in this space.

Regular updates critical

– Make sure that everyone is kept well informed of status of project and critical

deliverable dates etc

Be prepared for setbacks and ready to intervene if necessary

Training, exercises and planning are critical

– Dry runs invaluable. What works on paper does not always work in practice

– Crew training on actual equipment essential, particularly interaction between

ship & truck operators

– Accidents will happen but can be mitigated by training and readiness to act

LNG as fuel is not the same as LNG as Cargo

Page 13: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

The path to becoming ‘LNG Ready’

13

1. STRATEGY – FUEL DECISION

• High level technical feasibility

• Fuel consumption estimates

• Financial feasibility

• Cost, pay-back time and sensitivity analysis

• Fuel availability

2. CONCEPT CAPTURE

• Detailed technical feasibility study

• Performance benchmarking

(Machinery and tank evaluation and

optimization)

• Concept Design Review

(Statement - class acceptance)

• HAZID

CLASS APPROVAL (after vessel is ‘LNG Ready’

3. INITIAL DESIGN

• Approval in Principle

4. RISK ASSESSMENT

• Gas fuel safety risk assessment (mandatory

by IMO)

Decision Points. Proceed with the LNG option or not.

Page 14: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Safety Studies - OUR TRACK RECORD

Segment World wide Safety studies US safety studies.

Regas 56 10

FSRU 19 1

On-shore liquefaction 36 1

FLNG 18 1

LNG Bunkering 45 3

General concept/studies 11 2

Peak shavers 5 4

14

Classed 60% of world LNG Fuelled Vessels in operation

More than 45 LNG Bunkering Risk Studies at ports around the world

Page 15: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

Safety Studies- OUR TRACK RECORD

Recent work in North America

WSF: Security and Risk Assessment, 2012

IMO: LNG Fuel Feasibility Study for North America, 2013

LNG America: LNG Bunkering Feasibility Study in US Gulf, 2013

MARAD: LNG Bunkering Risk Study, 2013

API (Ex ANGA) : SIMOPS study for LNG Bunkering, 2015

15

Page 16: World’s First Dual-Fuel Cruise Ship Challenges and ... · Experience regarding LNG operation ... –Crew training on actual equipment essential, ... FSRU 19 1 On-shore

DNV GL © 2017 25 September 2017

SAFER, SMARTER, GREENER

www.dnvgl.com

Navigating Complexity

16

Anthony Teo

[email protected]

+1-346-333-5397