World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Autoflame AustraliaAutoflame Asia
Autoflame Quote Sheet
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Oz market- a slow start
The AGA (Australian Gas Association)- Autoflame approved globally with UL, cUL, CE, FM- European codes (EN298)- Paper work exercise (so claimed)- Lost documents!!- October 2008 – July 2009- Mk6/mini Mk6 approved
- Mk7 and mini Mk7 unapproved- October 2009 – September 2010
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Australian Code- AS2593
- Single scanner is unacceptable for steam boilers above 1MW (100hp) and high temperature hot water boilers (HTHW)
- Dual scanner requirement- either scanner fails then the boiler shuts down
- Dual scanner requires UV or equivalent- Currently using UV and IR- Self-scanner required with maximum self-checking time of 5s
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Australian Code- AS2593
- Dual low water level control required; primary and secondary- Self-check operation required minimum every 10 minutes,
typically set to 5 minutes- 100% of WL systems are PLC controlled for this reason- Code requires conductivity probes- Capacitance probes require special exemption from code
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Mk7 Mk6 Mini Mk7 evo
Mini Mk5
EGA DTI WL Total Burner0
2
4
6
8
10
12
14
16
18
20
July 08 - June 09
July 09 - June 10
July 10 - June 11
July 11 - June 12
Oz market- current and historical sales (systems)
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
July 08 - June 09 July 09 - June 10 July 10 - June 11 July 11 - June 120
10000
20000
30000
40000
50000
60000
70000
80000
Autoflame
Limpsfield
Oz market- current and historical sales (financials)
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
July 08 - June 09
July 09 - June 10
July 10 - June 11
July 11 - June 12
July 12 - June 13
0
50000
100000
150000
200000
250000
300000
350000
Autoflame
Limpsfield
Oz market- future sales (financials)
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Julia Gillard’s Carbon Tax
The start of huge potential!- Due to be enforced July 2012- Cost per ton of carbon set at $23 (AUD)- 500 companies set to be taxed initially with a further 500
within 2 years of the start- Flyer to be sent to all prospective customers
Minor issue:- Possible change in government- Julia’s popularity lowest ever
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Oz market
Completed projects:- Goodman Fielder- bakery (2 MBtu *3)- Star City Hotel & Casino (12.3 MBtu *4)- Alice Springs hospital (7 MBtu *2)- Steel River Brewery (5 MBtu *1)- Weston Animal Foods (12.3 Mbtu *1)- Tip Top- Blush Tomatoes- D’Vine Ripe
Upcoming projects- Wagga Wagga laundry (2MW)- Prysmian cables (2MW *2- Tamworth and PNG)- Fletcher’s abattoir (10MW & 6MW)- BE Campbell (6MW)
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Star City Casino
Installed October-November 2008Full Autoflame system plus EGA/DTIFirst month- lowest gas consumption since 2003 (opening)Second month- equally good
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
2004 2005 2006 2007 2008 2009 2010 20110
50000
100000
150000
200000
250000
300000
350000
400000
GBP
Limpsfield
GBP
Autoflame
Limpsfield
Year
GBP
Autoflame Asia- overall financials
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
2004 2005 2006 2007 2007 2009 2010 20110.000
50,000.000
100,000.000
150,000.000
200,000.000
250,000.000
300,000.000
Malaysia
Taiwan
China
Singapore
Thailand
Philippines
South Korea
Indonesia
Year
GBP
Autoflame Asia- financials by country
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
OEM’s (boiler)- Mechmar (Malaysia)- MacKenzie (Malaysia)- Mechmar (Indonesia)- Enertech (The Philippines)- Cochran (China)- Fulton (China)
Technology Centre’s- Royalgem (China)- Golden Flying Courser (Taiwan)- International Combustion (Sinagpore)- ESP Enersys (Malaysia)- Innotech (Hong Kong)- PT Cerna (The Philippines)/Cestra (The Philippines)- PT Grand Kartech (Indonesia)- Chung Woo (Korea)
Autoflame Asia- the players
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
In the near future, all heavy oil burners need to be upgraded to operate on natural gas as the primary fuel curve, so a huge potential for Autoflame and Limpsfield
Royalgem- Covering a large area (small company)- Currently using 30-50 systems per year- Language barriers have hindered progress in the market- PetroChina looking to use 57 systems in the next year
GFC- Numerous Autoflame systems in operation in Taiwan, and
Taiwanese companies in China- Now looking at Limpsfield burners and several orders have
been placed in the past 3 months
China & Taiwan
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Burner OEM’s
……
Boiler OEM’s
Most boiler OEM’s have used the Autoflame equipment through a burner OEM, or have at least experienced the equipment in the field
Boiler OEM’s looking for a burner option as well as controls
Combined Autoflame/Limpsfield presentation- Sales/technical complete- Basic sales- complete end of August
Autoflame Asia- working with the OEM’s
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Autoflame Quote Sheet
Based on an audit from site (cost?), typically 5-15 pages depending on site specific requirements and Technology Centre offering
Formalised quotation typically is 4-8 pages, which is too long for the customer and can be hard to comprehend
Aimed to show the customer all the different options that we can offer in the most simple to read format
Looks at several solutions/options available for the client
Options to include MM, EGA, WL, DTI, new burner, e.t.c.
Savings are calculated using the Autoflame Emissions Calculator primarily for fuel savings
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
All formulas are made through excel
Allows us to input all anticipated costs for the project:- Installation- Sundries cost (cable, connectors, brackets, e.t.c.)- Commissioning- Optional service contract
And then review the actual costs post installation:- Where did we lose money?- Where did we make unexpected profits?- What to change going forward?
Autoflame Quote Sheet
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Emissions Calculator Savings
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Quantifying MM and EGA savings
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Variable Speed Drive Savings
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Water and Utility Savings- Improving feed water inlet temperature by temperature
controls- Removing the Oxygen- Correct pipe sizing- DA tank flow and return pipes- Reduce chemical dosing- Measure TDS correctly
Maintenance Savings- Correct PID control for changes in load demand (Autoflame)- Autoflame built-in time clock- Automatic cold start routine- Lead/lag control and automatic changeover
Other Savings- Reduced setpoint control- Night setback- Variable setpoint control based on plant operations- Outdoor reset (outside temperature compensation)
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
World Leaders in Combustion Management Solutions
Introduction Application Return on Investment
Sales Quote
Autoflame Asia
Autoflame Australia
Retrofit
http://www.autoflame.com/
Thank you for your time