Procurement Plan
I General
1 Project Information
Project Name: Integrated Irrigation Improvement & Management Project (Mahmoudia Component)
Country: Arab Republic of Egypt
Project ID: P073977
Loan/Credit Numbers: EGT-7291
2 Bank's approval date of Procurement Plan Original:28/2/2008
Revision 1:3/12/2008
Update 16/11/2011; and 10/Sept/12
3 Date of General Procurement Notice 1 May 2005
II Goods, Work and Non-Consulting Services Thresholds
1
1a Procurement Category Prior Review Threshold (USD) Comments
Goods more than or equal 250,000
Works more than or equal 500,000
1b Procurement Method
Procurement Method Threshold
(USD) Comments
ICB (Goods) more than or equal 500,000
NCB (Goods) Less than 500,000
Shopping (Goods) Less than or equal 20,000
ICB (Works) More than or equal 10,000,000
NCB (Works) Less than 10,000,000
Prior Review Threshold Procurement Decisions subject to Prior Review by the Bank as stated in the Loan Agreement
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Procurement Plan for Electrification Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Procure
ment
method
StatusEstimated
CostCurrency
Review by
Bank
(prior/post)
Domestic
Preference
(yes/no)
Bid
Closing
(Date)
Contract Signing
(Date)
Contract ValueContract
Currency
Name, City, and Country of
Contractor
Contract
Completion
(Date)
Planned 02-Jan-10 1/Jan/12
Revised
Actual 12/Aug/09 02-Jan-10
Planned 01-Feb-10 01-Jan-12
Revised
Actual 3/Sep/09 02-Jan-10
Planned 01-Jul-10 21-Dec-11
Revised
Actual 01-Mar-10 22-Jun-10
Planned 1/Jul/10 15/Apr/11
Revised
Actual 27/Jun/10 16/Oct/10
Planned 01-Feb-11 2/Dec/11
Revised
Actual 18-Aug-10 3/Dec/10
Planned 01-May-11 19/Apr/12
Revised 1/Oct/11 19/Oct/12
Actual 8/Sep/10 20/Apr/11
Planned 13/Nov/11 01-Dec-12
Revised 29/Apr/12 Cancelled
Revised 9/Mar/14
Actual
Planned 15/Jan/12 1/Feb/12
Revised 20/Jul/12
Actual N/A
Planned 1/Mar/12 24/Mar/14
Revised 29/Mar/13
Actual
Planned 1/Apr/12 31/Mar/14
Revised 1/Apr/13
Actual
The High Dam Company
for Electrical Projects
EGP
EGP
EGP
n/a No
n/a No
No
10IIIMP/IIS/MAHM/EL
RAMLE/L-V-04-2012El Raml
Low Volt Electrification for El
Ramal Mariot El Mostagada
Mesqa
NCB
9IIIMP/IIS/MAHM/ELM-
05-2012
Medium Volt Electrification
for El Ramal Mariot El
Mostagada Mesqa
NCBEl Raml
n/a7
No
No 5,670,000.00
El RamlIIIMP/IIS/MAHM/EL
RAMLE/L-V-03-NCB
Low Volt Electrification for El
bida canal
1IIIMP/IIS/MAHM/ELM-
01-2009
5
6IIIMP/IIS/MAHM/ELM-
04-2011
Mahmoudia
El Raml4
El Raml
IIIMP/IIS/MAHM/EL
RAMLE/L-V-02-2010
Medium Volt Electrification
for El Mahmoudia District
Low Voltage network for
Abies El-Khadima
Medium Volt Electrification
for Abis el Qadema , Abis El
Gededa and El Saarania
canals
NCB
NCB
NCB
NCB
Medium Volt Electrification
for king Osman & El bida&
Gezirt El-Gamea & El Raesia
El Kadima &El-Melaha
canals
2
n/a
Mahmoudia
3
Low Volt Electrification for
Abies El- Gedida canalNCB
Prior
El Raml
IIIMP/IIS/MAHM/EL
RAMLE/L-V-01-2010
n/a
n/a
El Raml
n/a
The Genaral Company for
engineering and
contracting (ELEJECT)
IIIMP/IIS/MAHM/ELL-
02-2009
Low Volt Electrification for El
Mahmoudia District
NCB
IIIMP/IIS/MAHM/ELM-
03-2010
No
No
6,588,334.60No
No 1,061,689.00
8 n/aVarious
Electric connections for the
Ultrasonic equipment sites at
Behera
Direct
Updated 10/9/2012
The High Dam Company
for Electrical Projects12,835,885.00 EGPNon/a
The Genaral Company for
engineering and
contracting (ELEJECT)
EGP13,415,732.40
EGP
The Genaral Company for
engineering and
contracting (ELEJECT)
The Genaral Company for
engineering and
contracting (ELEJECT)
17,065,940.54
Procurement Plan for Main Canal Rehabilitation Works (Mahmodia Area)Updated 10/9/2012
P073977
SL No District
Package reference
No/
Contract No
Description of Works
Procureme
nt
method
StatusEstimated
Cost
Currenc
y
Review by
Bank
(prior/post
)
Domestic
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of Contractor
Contract
Completion
(Date)
Planned 2/Mar/11 1/Apr/11 6/Jul/13
Revised 20/Mar/12 1/Jul/12
Actual 20/Mar/12 7/Jul/12
Planned 1/Mar/11 1/Apr/11 26/Jan/12
Revised 30/Jul/12 29/Aug/12 13/Sep/13
Actual 30/Jul/12
Planned 2/May/11 1/Jun/11 13/Jul/13
Revised 21/Mar/12 1/Jul/12
Actual 21/Mar/12 9/Jul/12
Planned 2/May/11 1/Jun/11 6/Jul/13
Revised 22/Mar/12 1/Jul/12
Actual 22/Mar/12 7/Jul/12
Planned 2/May/11 1/Jun/11 6/Jul/13
Revised 24/Mar/12 1/Jul/12
Actual 24/Mar/12 7/Jul/12
Planned 2/Mar/11 1/Apr/11 22/Sep/12
Revised 15/Oct/12 14/Nov/12 22/Feb/14
Actual
Planned 1/Feb/11 1/Mar/11 29/Jul/11
Revised 15/Nov/12 15/Dec/12 30/Dec/13
Actual
The name of contract number IIIMP/MAIN-CANAL/MAHM/6-2012, changed slightly from "Remodel canal, sheet pile protection km 0-0.7 and removal of bridge pier and abutments at km 0+500" to be as shown above,
as the seet piles replaced by bored piles
Prior No
Shaaban Hamza
for Contracting El
Behera
Lwaa El Hamed
Company for
Contracting
Lwaa El Hamed
Company for
Contracting
No EGP5,551,810.00
7IIIMP/MAIN-
CANAL/MAHM/7-2012
Raise, Widen Embankment and Put
Asfalt Layer on Embankment of
Mahmodia Canal in Different Locations
from Km 5.500 to Km 36.800
NCB
No
EGP3,854,000.00 No
Mahmoudia,
Abo Hommos
PS
PriorIIIMP/MAIN-
CANAL/MAHM/6-2012
Remodel canal, bored pile protection km
0-0.7 and removal of bridge pier and
abutments at km 0+500
NCB
NCB
Remodel Mahmoudia Canal from km
29.930 - 42.890
8,904,700.00 Abo Hommos EGPPrior No
Kafr El Dawar Prior5IIIMP/MAIN-
CANAL/MAHM/5-2012
Remodel Mahmoudia Canal from km
15.350 - 29.930NCB
EGP
El Karakat
Egyptian
Company
Prior No
No 1,620,130.00
Prior
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
1 Mahmoudia,
Abo Hommos
Remove old swing bridges at km 8.48
(Ashour), Km 15.53 (Elzawia) and km
27.04 (Abo Hommos) and replace with
pontoon foot bridges
NCBIIIMP/MAIN-
CANAL/MAHM/1-2012Prior
2IIIMP/MAIN-
CANAL/MAHM/2-2012
3IIIMP/MAIN-
CANAL/MAHM/3-2012
Mahmoudia
Mahmoudia
NCBRehabilitate Lock at Km 0+000
4IIIMP/MAIN-
CANAL/MAHM/4-2012
6
Remodel Mahmoudia Canal from km 0.7-
15.35NCB
Mahmoudia
Procurement Plan for Branch Canal Rehabilitation Works (Mahmodia Area)Updated 10/9/2012
P073977
District
Package reference
No/
Contract No
Description of Works
Procureme
nt
method
StatusEstimated
Cost
Curren
cy
Review by
Bank
(prior/post)
Domestic
Preference
(yes/no)
Bid
Closing
(Date)
Contract Signing
(Date)Contract Value
Contract
Currency
Name, City, and Country of
Contractor
Contract
Completion
(Date)
Planned 15-Aug-07 24-Oct-07 14-Mar-09
Revised
Actual 01-Mar-08 12-May-08 14-Oct-09
Planned 15-Aug-07 24-Oct-07 14-Mar-09
Revised
Actual 01-Mar-08 12-May-08 14-Mar-09
Planned 15-Aug-07 24-Oct-07 14-Mar-09
Revised
Actual 02-Mar-08 12-May-08 14-Oct-09
Planned 15-Aug-07 24-Oct-07 14-Mar-09
Revised
Actual 02-Mar-08 12-May-08 14-Oct-09
Planned 15/Apr/11 15/May/11 19/Mar/12
Revised 15/Oct/11 19/Jun/12
Actual 19/May/11 20/Sep/11 19/Jun/12
Planned 1/Jun/11 1/Jul/11 4/Jan/12
Revised 14/Apr/12 1/Jul/12 12/May/13
Actual 11/Apr/12
Planned 16/Oct/11 14/Nov/12
Revised 14/Nov/12 14/Dec/12 17/Oct/13
Actual
Planned 21/Oct/11 20/Nov/11 19/Nov/12
Revised 30/Nov/12 30/Dec/12 3/Oct/13
Actual
Planned 20/Nov/11 19/Dec/12
Revised 14/Dec/12 13/Jan/13 17/Oct/13
Actual
Planned
Revised
Actual
Planned 16/Nov/11 15/Dec/12
Revised 30/Nov/12 30/Dec/12 3/Oct/13
Actual
Planned 30/Apr/12 30/May/12 30/May/13
Revised 14/Dec/12 13/Jan/13 17/Oct/13
Actual
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
2,371,475.00
2,014,300.00
3,128,525.00
2,351,875.00
EGP
Adel Abdel Azez El-
Shahawy CompanyEGP
EGPAdel Abdel Azez El-
Shahawy Company
Adel Abdel Azez El-
Shahawy CompanyEGP
Raml Prior No
Included in
other
Contract
Included in
other
Contract
Prior No
No
Prior No
NoPrior
Post
Mahmoudia
IIIMP/IIS/MAHM/W1
1
El Nasry and Other Branch
Canals Rehabilitation9
No
Adel Abdel Azez El-
Shahawy Company
Mesqa Intakes along Nekla &
Sawaki Al-Hadid
IIMP/IS/MAHM/W07-
2011
Preparation of civil works for
ultrasonic flow meters and water
levels equipment along El
Mahmoudia canal and its
Branches
Various
6
697,510.00
6,971,000.00 EGP
Sherif Hassan
Kheiry&Mohamed Fathy Said
for Contracting
Al- Mohamadia for
Contracting Mahamed Abd El
Khalek Amara
Prior
No
1
7
5
NCB
IIIMP/IIS/MAHM/W0
1-2008
2
EGP
No
Prior
No
NCB Prior
Prior
Prior
No
Mesqa Intakes along Direct
Mahmoudia Right SideMahmoudia
NCBMahmoudia
IIIMP/IIS/MAHM/W0
9
El-Baradi and Other Branch
Canals RehabilitationMahmoudia
IIIMP/IIS/MAHM/W0
5-2008
NCBMesqa Intakes along Hamid
Menisi
NCBMesqa Intakes along Direct
Mahmoudia Left Side
Raml
Abis ElQadema +Abis El
Gededa and its Branchs
Rehabilitation
11
Abis ElQadema and its Branchs
Rehabilitation10
Mahmoudia
MahmoudiaIIIMP/IIS/MAHM/W0
3-2008
IIMP/IIS/MAHM/W02-
2008
Abo Homoss +
kafr El Dawar
IIIMP/IIS/MAHM/W-
08/2012
Besentway and Other Branch
Canals Rehabilitation
NCB
NCB
3
4
12 NCB
NCB Prior No
NCB8
Prior No
Mahmoudia
IIIMP/IIS/MAHM/W1
0
Hamd Mensi and its Branches
Rehabilitation
RamlEl Beda and Other Branch
Canals Rehabilitation
Planned 30/Jun/12 30/Jul/12 30/Jul/13
Revised 3/Feb/13 5/Mar/13 7/Dec/13
Actual
Planned 31/Jul/12 30/Aug/12 30/Aug/13
Revised 28/Feb/13 30/Mar/13 31/Jan/14
Actual
Planned 31/Jul/12 30/Aug/12 30/Aug/13
Revised 2/Apr/13 2/May/13 3/Feb/14
Actual
Planned 30/Aug/12 29/Sep/12 29/Sep/13
Revised 1/May/13 1/Jun/13 5/Mar/14
Actual
Planned 14/May/12 13/Jun/12 20/Jun/13
Revised
Actual
Planned 14/May/12 13/Jun/12 20/Jun/13
Revised
Actual
Planned 6/May/12 5/Jun/12 5/Jun/13
Revised
Actual
Planned 15/May/12 14/Jun/12 14/Jun/13
Revised
Actual
Planned 1/Jun/12 1/Jul/12 1/Jul/13
Revised
Actual
Planned 5/Jun/12 5/Jul/12 5/Jul/13
Revised
Actual
Planned 10/Jun/12 10/Jul/12 10/Jul/13
Revised
Actual
Planned 15/Jun/12 15/Jul/12 15/Jul/13
Revised
Actual
Planned 2/Oct/12 1/Nov/12 1/Nov/13
Revised
Actual
Planned 7/Oct/12 6/Nov/12 6/Nov/13
Revised
Actual
Planned 11/Oct/12 10/Nov/12 10/Nov/13
Revised
Actual
Planned 14/Oct/12 13/Nov/12 13/Nov/13
Revised
Actual
Planned 19/Oct/12 18/Nov/12 18/Nov/13
Revised
Actual
Planned 1/Mar/12 31/Mar/12 31/Mar/13
Revised 1/Sep/12 1/Oct/12 5/Jul/13
Actual
EdkoEl Raesaa El Qadema and its
Branches Rehabilitation15 NCB
RamlEl Melaha and and its Branches
Rehabilitation14 NoPrior
Included in
other
Contract
Prior No
RamlMariot El Mostgada and its
Branches Rehabilitation16
Abo Homss
IIIMP/IIS/MAHM/W1
3
BC Rehabilitation contract 1 in
Abo Homss District17 NCB
NCB Prior No
Prior No
NCBAbo Homss
IIIMP/IIS/MAHM/W1
4
BC Rehabilitation contract 2 in
Abo Homss District18 Prior No
NCB
Prior No
Kofr El Dowar
IIIMP/IIS/MAHM/W1
6
BC Rehabilitation contract 2 in
Kofr El Dowar District20 Prior No
Kofr El Dowar
IIIMP/IIS/MAHM/W1
5
BC Rehabilitation contract 1 in
Kofr El Dowar District19 NCB
Abo Homss
IIIMP/IIS/MAHM/W1
8
BC Rehabilitation contract 4 in
Abo Homss District22 Prior No
Abo Homss
IIIMP/IIS/MAHM/W1
7
BC Rehabilitation contract 3 in
El Abo Homss District21 NCB
NCB
Prior No
NCB
Prior No
Kofr El Dowar
IIIMP/IIS/MAHM/W2
0
BC Rehabilitation contract 4 in
Kofr El Dowar District24 Prior No
Kofr El Dowar
IIIMP/IIS/MAHM/W1
9
BC Rehabilitation contract 3 in
Kofr El Dowar District23 NCB
Abo Homss
IIIMP/IIS/MAHM/W2
2
BC Rehabilitation contract 6 in
Abo Homss District26
Abo Homss
IIIMP/IIS/MAHM/W2
1
BC Rehabilitation contract 5 in
Abo Homss District25 NCB
Mahmoudia
IIIMP/IIS/MAHM/W0
4
Nekla Br. Canal Rehabilitation 30
NCB Prior
Kofr El Dowar
IIIMP/IIS/MAHM/W2
5
BC Rehabilitation contract 7 in
Kofr El Dowar District29
Kofr El Dowar
IIIMP/IIS/MAHM/W2
4
BC Rehabilitation contract 6 in
Kofr El Dowar District28
NCB Post No
NoNCB Prior
Prior No NCB
No
No
Kofr El Dowar
IIIMP/IIS/MAHM/W2
3
BC Rehabilitation contract 5 in
Kofr El Dowar District27
NCB Prior
Included in
other
Contract
No
Prior No
PriorRamlGezert El Gamaa and Other
Branch Canals Rehabilitation13
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Planned 19-Apr-08 04-May-09 21-Apr-10
Revised 16-Jun-09 16-Sep-09 21-Jun-10
Actual 16-Jun-09 03-Aug-09 21-Jun-10
Planned 18-Feb-09 22-Apr-09 21-Apr-10
Revised 22-Aug-09 01-Jun-10
Actual 15-Jun-09 22-Aug-09 21/Jun/10
Planned 18-Apr-10 15-Jun-10 14/Aug/10
Revised 14/Oct/10
Actual 08-Aug-09 14-Oct-09
Planned 19-Apr-09 04-Jul-09 7/May/10
Revised
Actual 09-Aug-09 01-Sep-09 21-Jun-10
Planned 27-Sep-09 17-Nov-09 7/Jul/10
Revised
Actual 10-Aug-09 01-Sep-09 07-Jul-10
Planned 20-Dec-09 18-Feb-10 4/Aug/10
Revised 4/Apr/11
Actual 04-Oct-09 17-Nov-09
Planned 18-Apr-10 15-Jun-10 10-Sep-10
Revised 01-Dec-09 09-Jan-10 10-Nov-10
Actual 01-Dec-09 28-Dec-2009 10-Nov-10
Planned 18-Apr-10 15-Jun-10 4/Aug/10
Revised
Actual 07-Oct-09 17-Nov-09 04-Oct-10
Planned 24-Feb-10 22-Apr-10 4/Aug/10
Revised 4/Apr/11
Actual 05-Oct-09 17-Nov-09
Planned 2/Nov/09 12/Dec/09 25/Sep/10
Revised 02-Dec-09
Actual 02-Dec-09 11-Jan-10 25-Sep-10
6,677,055.00
NCB
NCB
NCB
NCB NoPrior
EGP
EGP
Al Kholy Company
for contracting and
Engineering
Works
NCB No
No
No
EGP
EGP
4,314,345.00 NCB
Prior
EGP
6,528,043.15
No EGP
EGP
EGP
Heraa` Contracting
Office
Algamea Al-
Taawonia Al-
Intagia for modern
construction
Prior
Prior
Al Kholy Company
for contracting and
Engineering
Works
Prior
No
Al-Amro Office for
Contracting
No
Al-Sesy Group for
Contracting
Company
1,034
Meska Improvement Works in El-
Sant,
G. Arimon and Zarkoon Al-
Sharkia Branch Canals
1,365
Meska Improvement Works for
Hamad Menisi Branch Canal
Right Bank from intake to Km
3.030
1,257
1,008
Meska Improvement for Nekla
Branch Canal Right Bank from
the Intake to End
Meska Improvement Works in
Rayah Zarkoon Branch Canal4,929,535.00
5,365,060.00
Prior
Prior
Prior
Abdalla El Kholy
and his partners
for General
contracting
Heraa` Contracting
Office
5
8
6
7
EGP
6,079,620.00
Al-Amro Office for
Contracting
Heraa` Contracting
Office NCB
NCB
No
Prior
NCB
Prior
Mahmoudia
2
4
3
Mahmoudia
NCB
4,945,610.00
10
9
IIIMP/IIS/MAHM/MQ 03-
2009
IIIMP/IIS/MAHM/MQ 05-
2009
IIIMP/IIS/MAHM/MQ 09-
2009
IIIMP/IIS/MAHM/MQ 08-
2009
IIIMP/IIS/MAHM/MQ 04-
2009
Mahmoudia
Mahmoudia
Mahmoudia
IIIMP/IIS/MAHM/MQ 06-
2009
Meska Improvement Works for
Hamed Menisi Branch Canal (2)
Left Bank from Km 3.800 to Km
6.365
EGP
Updated 10/9/2012
Mahmoudia1 990
6,188,537.40
Mahmoudia
Mahmoudia
Mahmoudia
Mahmoudia
IIIMP/IIS/MAHM/MQ 02-
2009
1,269
1,317
Meska Improvement Works in G.
Shebrakhiet, G. Kafr El-
Rahmania and Al-Moorda Branch
Canals
824
Meska Improvement Works in
Nasry Branch Canal
IIIMP/IIS/MAHM/MQ 01-
2008
Meska Improvement Works for
Ganabiet Hamad Menesi Canal
No
5,230,820.00No
Meska Improvement Works for Al-
Hakim Branch Canal
IIIMP/IIS/MAHM/MQ 01-
2009
Meska Improvement Works for
Swaki Al Hadid Branch Canal969
IIIMP/IIS/MAHM/MQ 07-
2009
5,977,910.00
1,295
Sheet Mesqa Improvement, page 6 of 16
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Updated 10/9/2012
Planned 21-Apr-10 18-Jun-10 19-Nov-10
Revised 19/Jan/11
Actual 28-Jan-10 13-Mar-10
Planned 19-Nov-09 22-Jan-10 26/Nov/10
Revised 19-Jan-10 22-Mar-10 26/Mar/11
Actual 27-Jan-10 15-Mar-10 26/Jan/11
Planned 18-Apr-10 15-Jun-10 31-Jan-11
Revised
Actual 26-Jan-10 23-Mar-10 30/Jan/11
Planned 18-May-08 18-Aug-08 09-Oct-09
Revised
Actual 08-Oct-08 01-Dec-08 07-Dec-09
Planned 01-Aug-10 12/Jun/11
Revised 31/May/13 30/Jun/13 11/May/14
Actual
Planned 01-Sep-10 13/Jul/11
Revised 31/May/13 30/Jun/13 11/May/14
Actual
Planned 01-Oct-10 12/Aug/11
Revised 31/May/13 30/Jun/13 11/May/14
Actual
Planned 26-Nov-10
Revised 26/Jan/11
Actual 28-Dec-09 19-Jan-10 26/Jan/11
Planned 01-Oct-10 11/Dec/11
Revised 01-Jul-11
Actual 29/Jan/11 14/Jun/11
No EGP
IIIMP/IIS/MAHM/El Raml /
D&MQ01-2009NCB
NCB
1,603
1,258
IIIMP/IIS/MAHM/W 06-
2008
12
IIIMP/IIS/MAHM/RAML
/MQ - 03/02-2011
NCB
NCB
832
1,255 NCB
NCB
1,049
1,111
13
15
14 Mahmoudia
Meska Improvement Works for El-
Awqaf El-Sharqiya, El-Awqaf El-
Gharbiya, Ezab El-Awqaf and
Silika branch canals
Mahmoudia
Mahmoudia
Mahmoudia IIIMP/IIS/MAHM/MQ 15Mesqa improvement Works in
Hamad Menesi Branch Canal (6)
IIIMP/IIS/MAHM/MQ 11-
2009
IIIMP/IIS/MAHM/MQ 12-
2009
IIIMP/IIS/MAHM/MQ 13
16
17
18
El Raml
El Raml
19
NCB
NCB
Improvement of mesqas and
delivery works for El Bida 2 from
6.005 to 10.280 R
Meska Improvement Works in
area of Abies El-Qadima Branch
canal
Prior
Prior
Prior
Prior
Prior
NCB
1,580
5,156,555.00
Meska Improvement Works in
Nekla Branch Canal - Left Bank
Mesqa improvement Works in
Hamad Menesi Branch Canal (4)1,077
PriorHeraa` Contracting
Office
3,224,300.00
11IIIMP/IIS/MAHM/MQ 10-
2009
Office of engineer
shaban Hamzah
Ghurab
EGP
EGP
EGP
Abdalla El Kholy
and his partners
for General
contracting
EGP
Al-Amro Office for
Contracting
EGP
1,050 6,029,138.00Prior
Prior 8,536,740.00
No
No
No
Heraa` Contracting
Office
El Sahaba for
contracting
Company
Prior
No
Mahmoudia
Mahmoudia
Mahmoudia
8,436,370.00
No
No
No 8,274,495.00
IIIMP/IIS/MAHM/MQ 14Mesqa improvement Works in
Hamad Menesi Branch Canal (5)
Combined SSD and Mesqa
improvement in G. El-Bably + G.
Sharaf + G. El-Baradi
Meska Improvement Works for
Hamad Menisi Branch Canal (3)
Right bank from Km 3.700 to Km
8.950
No
Sheet Mesqa Improvement, page 7 of 16
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Updated 10/9/2012
Planned 31/Dec/10 30/Jan/11 4/Oct/11
Revised 1/May/12 3/Jan/13
Actual 23/Feb/11
Planned 01-May-11 16/Sep/11
Revised 01-Aug-10
Actual 6/Nov/10 17/Jan/11
Planned 01-May-11 30-Aug-11
Revised 01-Aug-10 2/Mar/12
Actual 31-Aug-10 23-Oct-10
Planned 01-May-11 30-Aug-11
Revised 01-Oct-10 30/Nov/11
Actual 1/Sep/10 01-Nov-10
Planned 01-Jun-11 16/Sep/11
Revised 13-Nov-10 01-Nov-10 16/Mar/12
Actual 13/Nov/10 11/Jan/11
Planned 01-Dec-11 16/Sep/11
Revised 14-Nov-10 10/Jan/11
Actual 14-Nov-10 11/Jan/11
Planned 31/Dec/10 30/Jan/11 22/Aug/11
Revised 15/Dec/10 22/Nov/11
Actual 17/Oct/10 16/Dec/10
Planned 31/Dec/10 30/Jan/11 22/Aug/11
Revised 15/Dec/10
Actual 18/Oct/10 16/Dec/10
Planned 01-Jun-11 31-Aug-11
Revised 30/Nov/12 30/Dec/12 3/Sep/13
Actual
EGP7,126,780.00
EGP
EGP
No 8,289,000.00
No
7,347,816.77
No
Al-Amro Office for
Contracting 1,200
Improvement of mesqas and
delivery works for Gad El-Haq
Branch Canal, km 6.890 (LS)
Improvement of mesqas and
delivery works for Abies El-
Gedida from 4.400 to 7.925 (RS)
No
No
Prior
25
24
No
8,217,320.92
IIIMP/IIS/MAHM/RAML /
MQ - 02/05-2010El Raml
Kafr EL Dawar
IIIMP/IIS/MAHM/RAML /
MQ - 02/04-2010
IIIMP/IIS/KDWR/S/MQ4-
2010 NCB
Prior
Prior
Prior
No
No
No
28
23
21
El Raml
El Raml
El Raml
El Raml
27
1,538
IIIMP/IIS/MAHM/RAML
/MQ - 03/04-2011
Improvement of mesqas and
delivery works for El Bida 4 from
6.700 to 11.865 El RamlDistrict
26
IIIMP/IIS/MAHM/El Raml /
MQ - 02/03-2010
NCB
Kafr EL Dawar
22
El Raml
El Raml20
IIIMP/IIS/MAHM/RAML /
MQ - 02/1-2010897
Improvement of mesqas works
for Abies El- Gedida from head
to 6.750 (Left Side)
Al-Amro Office for
Contracting
EGP
EGPMohamed El Said
Moustafa
EGP
Al-Amro Office for
Contracting
Al-Amro Office for
Contracting
Al-Sesy Group for
Contracting
Company
Abdalla El Kholy
and his partners
for General
contracting
Algamea Al-
Taawonia Al-
Intagia for modern
construction
Prior
Prior
Prior
Prior EGP
EGP
5,368,848.70
Prior
1,309
NCB
NCB
NCB
1,708
Improvement of mesqas and
delivery works for Abies El-
Gedida (2/6) from2.605 to 10.100
R
NCB
NCB
NCB
925
5,283,240.84
9,716,975.85
5,500,784.35
Meska Improvement Works for El
Saarania LS Direct, km 11.600 to
end
1,350
NCB
Improvement of mesqas and
delivery works for Abies El-
Gedida from km 10.850 to 10.860
LS
Improvement of mesqas and
delivery works for Abies El-
Gedida from km 7.820 to 10.800
L
IIIMP/IIS/MAHM/RAML
/MQ - 02/02-2010
IIIMP/IIS/KDWR/S/MQ5-
2010
Meska Improvement Works for El
Saarania RS Direct, km 11.600 to
end
1,555
1,915Updated 10/9/2012
Sheet Mesqa Improvement, page 8 of 16
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Updated 10/9/2012
Planned 01-Aug-11 14-Sep-11
Revised 30/Nov/12 30/Dec/12 3/Sep/13
Actual
Planned 01-Sep-10 01-Feb-12
22/Feb/11
Revised 31/Jan/13 2/Mar/13 4/Nov/13
Actual
Planned 01-Nov-10 01-Feb-12
21/Feb/11
Revised 3/Mar/13 2/Apr/13 5/Dec/13
Actual
Planned 01-May-10 31-Dec-11
Revised 13/Feb/13 15/Mar/13 17/Nov/13
Actual
Planned 01-Jun-10 15-Jan-12
Revised 18/Feb/13 20/Mar/13 22/Nov/13
Actual
Planned 01-Jul-10 31-Jan-12
Revised 16/Mar/13 15/Apr/13 18/Dec/13
Actual
Planned 01-Feb-11 15/Dec/11
Revised 2/Apr/13 2/May/13 4/Jan/14
Actual
Planned 1/Apr/11 15/Dec/11
Revised 4/May/13 3/Jun/13 5/Feb/14
Actual
Planned 01-Mar-10 6/Dec/11
Revised 19/May/13 18/Jun/13 20/Feb/14
Actual
Planned 01-Jul-11 31-Jan-12
Revised 31/May/13 30/Jun/13 4/Mar/14
Actual
No
No
No
No
Prior
No
Prior
Prior
No
No
NCB
1,340
36
No
No
Prior NoMeska Improvement Works in El
Bida 1 from intake to km 6.250 R1,100
El Raml33
NCB
NCB
NCB
Prior
NCB
35
El Raml
El Raml
34
31
El Raml
32
38
30
Edko
37
El Raml
El Raml
El Raml
Meska Improvement Works in
Gezirt El-Gamea 2 from 3.250 to
end R
Meska Improvement Works in
Gezirt El-Gamea 3 from 3.250 to
end L
29
Prior
Prior745
Meska Improvement Works in El-
Melaha 1 from intake to 3.80
Improvement of mesqas and
delivery works for Abies El-
Gedida (2/7) from 1.610 to 2.605
br. El Mohandseen
Meska Improvement Works in El
Bida 3 from 2.225 to 6.35 L
Meska Improvement Works in
Gezirt El-Gamea 1 from intake to
3.250 R&L
Prior
Prior
Meska Improvement Works in El
Raesia El Kadima 2 + Direct
Mahmoudia km 49.00 to km
54.125
1,450 NCB
NCB
Edko
Meska Improvement Works in El-
Melaha 2 from 3.8 to end
Meska Improvement Works in El
Raesia El Kadima 1 km 51.16
NCB900
1,000
El Raml
753
1,142
1,125
1,240
NCB
NCB
Prior
Sheet Mesqa Improvement, page 9 of 16
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Updated 10/9/2012
Planned 01-Apr-10 15/Mar/12
Revised 16/Mar/13 15/Apr/13 18/Dec/13
Actual
Planned 01-Jun-11 01-Mar-12
Revised 6/Apr/13 6/May/13 8/Jan/14
Actual
Planned 01-Mar-12 9/Jan/13
Revised 16/Mar/13 15/Apr/13 18/Dec/13
Actual
Planned 01-May-11 10/Mar/12
Revised 30/Nov/12 30/Dec/12 3/Sep/13
Actual
Planned 19/May/12 18/Jun/12 20/Feb/13
Revised 16/Apr/13 16/May/13 18/Jan/14
Actual
Planned 01-Jun-11 10/Apr/12
Revised 14/May/13 13/Jun/13 15/Feb/14
Actual
Planned 01-Jun-11 10/Apr/12
Revised 29/May/13 28/Jun/13 2/Mar/14
Actual
Planned 01-Sep-13 12/Jul/14
Revised 14/Jun/13 14/Jul/13 18/Mar/14
Actual
Planned 11/Oct/11
Revised 31/Dec/12 30/Jan/13 4/Oct/13
Actual
Planned 28/Aug/11
Revised 31/Dec/12 30/Jan/13 4/Oct/13
Actual
Planned 1/Jun/11 1/Jul/11 26/Apr/12
Revised 31/Dec/12 30/Jan/13 12/Oct/13
Actual
No
No
NoPrior
No
No
NoPrior
El Raml NCB
NCB
42
Improvement of mesqas and
delivery works for Mariot (B) br.
(1) LS km 9.437
41
40 NCB
39
Meska Improvement Works in G.
El-Qodah Qebly & Bahary R(1)
km 51.200
850El Raml
Prior
Prior
Prior
Prior
NCB
Prior
No
No
NCB
Improvement of mesqas and
delivery works for Mariot br. (3)
km 13.650 from Intake to km
1.625
1,000
925
1,144
1,125
Improvement of mesqas and
delivery works for Mariot br. (3)
km 11.250
1,167
1,145
Improvement of mesqas and
delivery works for Mariot (A) br.
(2) LS km 11.25
1,326
Meska Improvement Works in
king Osman + G. Nazer + G. Kafr
El Dowar (1) km 49.000
Improvement of mesqas and
delivery works for Mariot (A) br.
(1) RS km 9.437
NCB
NCB
NCB
Post49 Abo HomossIIIMP/IIS/MAHM/IIP1-MQ-
01
43
44
No
No46
Improvement of mesqas and
delivery works for Mariot br. (3)
km 1.625 to End
45 El Raml
47
Meska Improvement Works for
Yousry (2) Branch canal from km
1.55 to End
48
Meska Improvement Works for
Ganabiet Saarania from intake to
end
1,313 NCB
NoMeska Improvement Works at
IIP1NCB
890 Prior
Prior
NCB
Prior
kafr El Dawar
kafr El Dawar
El Raml
El Raml
El Raml
El Raml
El Raml
Sheet Mesqa Improvement, page 10 of 16
Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procurem
ent
method
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior/pos
t)
Domesti
c
Preferen
ce
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Updated 10/9/2012
Total Area KfW 36,730
19,490
Grand Total Area 56,220
Total Area IBRD
Sheet Mesqa Improvement, page 11 of 16
Procurement Plan for Drainage Rehabilitation Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No DistrictPackage reference No/
Contract NoDescription of Works
Area
(fed)
Procure
ment
method
StatusEstimate
d Cost
Curren
cy
Review by
Bank
(prior/pos
t)
Domestic
Preference
(yes/no)
Bid
Closing
(Date)
Contract
Signing
(Date)
Contract ValueContract
Currency
Name, City, and
Country of
Contractor
Contract
Completion
(Date)
Planned 01-Feb-09 20-Apr-10
Revised 01-Mar-09
Actual 17-Feb-09 21-Apr-09 28-Dec-09
Planned 29/Feb/12
Revised 1/Mar/11 31/May/12
Actual 26-Sep-10 1/Mar/11
Planned 24-Sep-07 20-Sep-09
Revised
Actual 24-Mar-08 21-Sep-08 24/May/11
Planned 24-Sep-07 20-Mar-10
Revised 20-Jun-10
Actual 26-Mar-08 19-Aug-08 20-Mar-10
Planned 01-Feb-09 31-Dec-11
Revised 01-Jun-10 31/Mar/12
Actual 28-Sep-09 1/Jul/10
Planned 13-Dec-09 14-Jul-12
Revised 01-Jun-10
Actual 27-Sep-09 11/Jul/10
Planned 01-Oct-10 14/Dec/11
Revised 30-Nov-10 14/Mar/12
Actual 10-Jun-10 15/Dec/10
3,401,750.00 EGPMohamed Ahmad
Mousa El Sakran
El-Rashedia
Company for
General
Contracting
Al - Eman
company for
contracting
EGP
EGP
Replacement and Rehabilitation of
Subsurface Drainage Works in Part
of Al-Lawia 1st Command Area of
Ryah Zarkoon 1600 feddan
Mahmoudia Command Area
NoNCB
2,400 NCB
1,600
3,450 NCB
Updated 10/9/2012
1 MahmoudiaIIIMP/EPAD/MAHM/W0
3-2008
Embankment Protection for El-Atf,
El-Bably and Omleet DrainsNCB 2,610,250.00
Al Phara'na office
for Contracting Prior EGPNo
Eng. Ahmed
Hassan Al -Shendy
2,112,000.00
1,951,450.00 EGP
EGP
Mohammed
Badawy
Mohammed
3 Abu Hommos1IIIMP/EPAD/MAHM/W
01-2007
IIIMP/EPADP/MAHM/W
04-2010
Deepening and Widening of
Zawiet ghazal open drainNCB Prior
IIIMP/EPAD/MAHM/W0
2-2007
Rehabilitation of civil works for
Abo hommos II
No
NoPrior
5,611,262.40
4
5IIIMP/EPAD/MAHM/SSD
01- 2009
Rehabilitation of Subsurface
Drainage Networks in Abo
Hommos 3 Area
Prior
Prior No
2 Mahmoudia
Pitching Abo hommos drain NCB
El-Rashedia
Company for
General
Contracting
Prior No 8,255,950.00 EGP
Prior No 3,633,470.00
6 Abu Hommos
Abu Hommos
Abu Hommos
IIIMP/EPAD/MAHM/SSD
02 2009
Subsurface Drainage Networks in
Abo Hommos 2 Area
7 MahmoudiaIIIMP/EPADP/MAHM/SS
D03-2009NCB
Planned 01-Apr-10 12/Mar/12
Revised 30-Nov-10
Actual 20-Jun-10 13/Dec/10
Planned 01-Apr-10 12/May/12
Revised 21-Nov-10
Actual 22-Jun-10 13/Nov/10 10/Apr/11
Planned 17-Jun-10 21/Feb/14
Revised 20/May/12 15/Aug/12
Actual 20/Jun/12
Planned 17-Jun-10 9/Dec/11
Revised 20/May/12 15/Aug/12 21/Feb/14
Actual 24/Jun/12
Planned 01-Dec-10 14/May/12
Revised 30/Nov/12 30/Dec/12 6/Jan/14
Actual
Planned 14/Apr/12 14/May/12 20/Nov/13
Revised 14/Apr/12 10/Aug/12 16/Feb/14
Actual 21/Apr/12
Planned 14/Apr/12 14/May/12 20/Nov/13
Revised 14/Apr/12 10/Aug/12 16/Feb/14
Actual 21/Apr/12
Planned 31/May/12 30/Jun/12 6/Jan/14
Revised 30/Nov/12 30/Dec/12 4/Jan/15
Actual
Planned 30/Jun/12 30/Jul/12 6/Aug/14
Revised 31/Aug/12 30/Sep/12 15/Oct/14
Actual 30/Sep/12
Planned 01-Apr-13 30/Sep/14
Revised 9/Jul/13 8/Aug/13 14/Feb/15
Actual
IIIMP/EPADP/MAHM/SS
D09-B
Abu Hommos
5,479,414.90 EGP
5,110,485.00
Replacement and Rehabilitation of
Subsurface Drainage Works in El
Bably 1st (B)
2,200
EGP
6,353,400.00
Prior No
NoPrior
2,320
NoPrior2,650 NCB
6,122,930.50
Abdalla El Kholy
and his partners
for General
contracting
5,494,539.60
NCB
NCB
No EGP
Prior No 6,636,105.00
3,800 NCB
NCB
Egyptian Company
for Irrigation and
Drainage
NoPrior EGP
EGP
Mohamed Lotfy
Mahmoud Abo-
Elnile for
contracting
NCB Prior No
Prior No
3,400 NCB
IIIMP/EPADP/MAHM/SS
D10-A
Replacement and Rehabilitation of
Subsurface Drainage Works in
Zawiet Naem (A)
IIIMP/EPADP/MAHM/SS
D8-2012
10 MahmoudiaIIIMP/EPADP/MAHM/SS
D06A/2012
12
15
Replacement and Rehabilitation of
Subsurface Drainage Works in
Zawiet ghazal
Replacement and Rehabilitation of
Subsurface Drainage Works in El-
Lawia (2)-A
IIIMP/EPADP/MAHM/SS
D11-2012
Replacement and Rehabilitation of
Subsurface Drainage Works in
Sharaf drain at Hammad menisi
end
IIIMP/EPADP/MAHM/SS
D09-A-2012
2,100Cancelle
d
Mahmoudia
13
16
Mahmoudia
8
Replacement and Rehabilitation of
Subsurface Drainage Works in El
Bably 1st (A)
IIIMP/EPADP/MAHM/SS
D06B/2012
Replacement and Rehabilitation of
Subsurface Drainage Works in El-
Lawia (2)-B
MahmoudiaIIIMP/EPADP/MAHM/W
05
Pitching works along Lawia,
Rahmania & Gesr El Aswad
9 MahmoudiaIIIMP/EPADP/MAHM/SS
D05-2010
Replacement and Rehabilitation of
Subsurface Drainage Works in Al-
Atf the 2nd (B) 3400 feddan
Mahmoudia Command Area
IIIMP/EPADP/MAHM/SS
D04-2010
Replacement and Rehabilitation of
Subsurface Drainage Works in Al-
Atf the 2nd (A) El Mahmoudia
Command Area
17
1,850 NCB
Prior
Prior
El Salam for
general
contracting
No
Abdalla El Kholy
and his partners
for General
contracting
3,400
2,500 NCB EGP
Mahmoudia
Mahmoudia
11
Mahmoudia
Mahmoudia
14
Prior No
EGP
EGP
EGP
Abdalla El Kholy
and his partners
for General
contracting
EGP
Planned 01-Apr-13 30/Sep/14
Revised 9/Jul/13 8/Aug/13 14/Feb/15
Actual
Planned 14/Jul/12 13/Aug/12 19/Feb/14
Revised 30/Aug/13 29/Sep/13 7/Apr/15
Actual
Planned 14/Jul/12 13/Aug/12 19/Feb/14
Revised 30/Aug/13 29/Sep/13 7/Apr/15
Actual
Planned 31/Oct/12 30/Nov/12 8/Jun/14
Revised 30/Jan/13 1/Mar/13 7/Sep/14
Actual
Planned 30/Nov/12 30/Dec/12 8/Jul/14
Revised 30/Nov/13 30/Dec/13 8/Jul/15
Actual
Planned 31/Dec/12 30/Jan/13 8/Aug/14
Revised 30/Jan/13 1/Mar/13 7/Sep/14
Actual 8/Nov/12
Planned 14/May/13 13/Jun/13 20/Dec/14
Revised 31/Dec/12 30/Jan/13 8/Aug/14
Actual
Planned 14/May/13 13/Jun/13 20/Dec/14
Revised 31/Dec/12 30/Jan/13 8/Aug/14
Actual
Planned 21/Mar/13 20/Apr/13 27/Oct/14
Revised
Actual
Prior EGP
21 Abu HommosIIIMP/EPADP/MAHM/SS
D13
Replacement and Rehabilitation of
Subsurface Drainage Works in Abo
El - Einen (1)
No
No
No
No
Cancelle
d
19
Abu HommosIIIMP/EPADP/MAHM/SS
D12-B
NCBAbu Hommos
Abu HommosIIIMP/EPADP/MAHM/SS
D10-B
22 Abu HommosIIIMP/EPADP/MAHM/SS
D14
IIIMP/EPADP/MAHM/SS
D12-A
Replacement and Rehabilitation of
Subsurface Drainage Works in Abo
Hommos 1st (A)
2,700
3,50020
Replacement and Rehabilitation of
Subsurface Drainage Works in
Zawiet Naem (B)
1,850
Replacement and Rehabilitation of
Subsurface Drainage Works in Abo
Hommos 1st (B)
23
24 Abu HommosIIIMP/EPADP/MAHM/SS
D16A
Replacement and Rehabilitation of
Subsurface Drainage Works in
Mahalet Keel (2) A
MahmoudiaIIIMP/EPADP/MAHM/SS
D15-2012
Replacement and Rehabilitation of
Subsurface Drainage Works in Abo
El - Einen (3)
Replacement and Rehabilitation
of Subsurface Drainage Works in
Abo El - Einen (2)
5,300
2,650 NCB NoPrior
Prior
5,200
No
PriorNCB
PriorNCB
NCB
2,150 NCB NoPrior
1,400 NCB
NCB Prior
18
Prior
NoPrior
No
25
26 Abu HommosIIIMP/EPADP/MAHM/SS
D17A
Replacement and Rehabilitation of
Subsurface Drainage Works in
Waslat El Zeiny (2) A
Abu HommosIIIMP/EPADP/MAHM/SS
D16B
Replacement and Rehabilitation of
Subsurface Drainage Works in
Mahalet Keel (2) B
2,650
Planned 19/May/13 18/Jun/13 25/Dec/14
Revised
Actual
Planned 9/Nov/13 9/Dec/13 17/Jun/15
Revised
Actual
Planned 9/Nov/13 9/Dec/13 17/Jun/15
Revised
Actual
Planned 17/Jul/13 16/Aug/13 22/Feb/15
Revised
Actual
28 Abu HommosIIIMP/EPADP/MAHM/SS
D18A
Replacement and Rehabilitation of
Subsurface Drainage Works in
Zeiny (1) A
3,200
Abu HommosIIIMP/EPADP/MAHM/SS
D17B
Replacement and Rehabilitation of
Subsurface Drainage Works in
Waslat El Zeiny (2) B
2,150 NCB
30 Abu HommosIIIMP/EPADP/MAHM/SS
D19
Replacement and Rehabilitation of
Subsurface Drainage Works in
Mahalet Keel (1)
2,600 NCB
PriorNCB
NCB
NoPrior
Prior No
No
Abu HommosIIIMP/EPADP/MAHM/SS
D18B
Replacement and Rehabilitation of
Subsurface Drainage Works in
Zeiny (1) B
3,200
27
29
Prior No
Procurement Plan for Miscellaneous Works (Mahmodia Area)
Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008
P073977
SL No District
Package reference
No/
Contract No
Description of Works
Procur
ement
metho
d
StatusEstimated
Cost
Currenc
y
Review
by
Bank
(prior /
post)
Domestic
Preferen
ce
(yes / no)
Bid
Closing
(Date)
Contract Signing
(Date)
Contract ValueContract
Currency
Name, City, and Country of
Contractor
Contract
Completion
(Date)
Planned 9/Jan/10
Revised
Actual 26/Jul/09 10-Sep-09 9/Jan/10
Planned
Revised
Actual 01-Dec-08 Completed
Planned 9/Mar/10
Revised
Actual 26/Jul/09 10-Sep-09 15/Jul/10
Planned
Revised
Actual 14-Jan-08 Completed
Planned
Revised
Actual 13-Jan-08 Completed
Planned
Revised
Actual 22-Jan-09 Completed
Planned
Revised
Actual 11-Mar-09 Completed
Planned
Revised
Actual 26-Jan-09 Completed
Planned
Revised
Actual 25-Jan-09 Completed
Planned 15/Feb/11 15/Mar/11 11/Sep/11
Revised 30/Jan/12 29/Feb/12 27/Aug/12
Actual
Planned 24/Jun/11
Revised
Actual 21/Nov/10 25/Jan/11
Planned 24/Jun/11
Revised
Actual 25/Jan/11
Updated 10/9/2012
EGPEl Magek Tash for
construct
725,659.00
EGP
505,344.00
El Masaria with construct
and building
EGPEl Masaria with construct
and building
508,587.00
EGP384,821.25
7IIIMP/IS/MAHM/MIS
07 2009Civil works for consultative office
Shoppi
ng
6
5
Edko
3IIIMP/IS/MAHM/MIS
03 2009
4IIIMP/IS/MAHM/MIS
05 2009
Abo Homoss
El Behira
Shoppi
ng
Civil works and preparation of
Integrated Irrigation district +
Supply and installation of
ceramic and marble +Supply
and installation of lighting and
electricity toolsin
IIIMP/IS/MAHM/MIS
06 2009
Civil works of Integrated
Irrigation district in Rashed
Civil works and preparation of
Integrated Irrigation district
No
No
No
No
No
Post
Civil works for training center
NCB
Post
El Masaria with construct
and building
EGPMohamed Ibrahem +
Mohamed Abo Oga
EGP
EGP
Abd El Wahed El
Habashe - Kafr El Dowar -
El Beheira
Post 391,970.00No
No
310,135.00
El Masaria with construct
and building
El Feke or construct
officeEGP NCB
151,773.00Post
Kafr El dawar EGP Amad El ShenawyShoppi
ng
IIIMP/IS/MAHM/MIS
08 2009
84,997.00
5,335.00
Kafr El dawar No
Nomake signboard
El Behira
Post
Post
11IIIMP/IS/MAHM/MIS-
10-2010
Civil works and preparation of
Integrated Irrigation district El Behira
Damanhour/
Kafr El
Dawar
IIIMP/IS/MAHM/MIS-
11-2010
530,978.00 EGPYousrry Farag Habashe
Mathana
EGP
EGPCancel
led
PostCivil works and preparation of
Integrated Irrigation district NCB
Shed for 2.5 bar-PVC Pipe
Protection
Yousrry Farag Habashe
MathanaPost No
NoPost
Post No
Prior
NCB Post2
El Raml1IIIMP/IS/MAHM/MIS
02 2009
Civil works of Integrated
Irrigation district
9
IIIMP/IS/MAHM/MIS
04 2009
Civil works of Integrated
Irrigation district
8
NCBCivil works and preparation of
Integrated Irrigation district
NCB
NCB
NCB
Mahmoudia
Rashed
12 Kafr El dawar
10IIIMP/IS/MAHM/MIS-