16
Procurement Plan I General 1 Project Information Project Name: Integrated Irrigation Improvement & Management Project (Mahmoudia Component) Country: Arab Republic of Egypt Project ID: P073977 Loan/Credit Numbers: EGT-7291 2 Bank's approval date of Procurement Plan Original:28/2/2008 Revision 1:3/12/2008 Update 16/11/2011; and 10/Sept/12 3 Date of General Procurement Notice 1 May 2005 II Goods, Work and Non-Consulting Services Thresholds 1 1a Procurement Category Prior Review Threshold (USD) Comments Goods more than or equal 250,000 Works more than or equal 500,000 1b Procurement Method Procurement Method Threshold (USD) Comments ICB (Goods) more than or equal 500,000 NCB (Goods) Less than 500,000 Shopping (Goods) Less than or equal 20,000 ICB (Works) More than or equal 10,000,000 NCB (Works) Less than 10,000,000 Prior Review Threshold Procurement Decisions subject to Prior Review by the Bank as stated in the Loan Agreement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized

World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Embed Size (px)

Citation preview

Page 1: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan

I General

1 Project Information

Project Name: Integrated Irrigation Improvement & Management Project (Mahmoudia Component)

Country: Arab Republic of Egypt

Project ID: P073977

Loan/Credit Numbers: EGT-7291

2 Bank's approval date of Procurement Plan Original:28/2/2008

Revision 1:3/12/2008

Update 16/11/2011; and 10/Sept/12

3 Date of General Procurement Notice 1 May 2005

II Goods, Work and Non-Consulting Services Thresholds

1

1a Procurement Category Prior Review Threshold (USD) Comments

Goods more than or equal 250,000

Works more than or equal 500,000

1b Procurement Method

Procurement Method Threshold

(USD) Comments

ICB (Goods) more than or equal 500,000

NCB (Goods) Less than 500,000

Shopping (Goods) Less than or equal 20,000

ICB (Works) More than or equal 10,000,000

NCB (Works) Less than 10,000,000

Prior Review Threshold Procurement Decisions subject to Prior Review by the Bank as stated in the Loan Agreement

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Electrification Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Procure

ment

method

StatusEstimated

CostCurrency

Review by

Bank

(prior/post)

Domestic

Preference

(yes/no)

Bid

Closing

(Date)

Contract Signing

(Date)

Contract ValueContract

Currency

Name, City, and Country of

Contractor

Contract

Completion

(Date)

Planned 02-Jan-10 1/Jan/12

Revised

Actual 12/Aug/09 02-Jan-10

Planned 01-Feb-10 01-Jan-12

Revised

Actual 3/Sep/09 02-Jan-10

Planned 01-Jul-10 21-Dec-11

Revised

Actual 01-Mar-10 22-Jun-10

Planned 1/Jul/10 15/Apr/11

Revised

Actual 27/Jun/10 16/Oct/10

Planned 01-Feb-11 2/Dec/11

Revised

Actual 18-Aug-10 3/Dec/10

Planned 01-May-11 19/Apr/12

Revised 1/Oct/11 19/Oct/12

Actual 8/Sep/10 20/Apr/11

Planned 13/Nov/11 01-Dec-12

Revised 29/Apr/12 Cancelled

Revised 9/Mar/14

Actual

Planned 15/Jan/12 1/Feb/12

Revised 20/Jul/12

Actual N/A

Planned 1/Mar/12 24/Mar/14

Revised 29/Mar/13

Actual

Planned 1/Apr/12 31/Mar/14

Revised 1/Apr/13

Actual

The High Dam Company

for Electrical Projects

EGP

EGP

EGP

n/a No

n/a No

No

10IIIMP/IIS/MAHM/EL

RAMLE/L-V-04-2012El Raml

Low Volt Electrification for El

Ramal Mariot El Mostagada

Mesqa

NCB

9IIIMP/IIS/MAHM/ELM-

05-2012

Medium Volt Electrification

for El Ramal Mariot El

Mostagada Mesqa

NCBEl Raml

n/a7

No

No 5,670,000.00

El RamlIIIMP/IIS/MAHM/EL

RAMLE/L-V-03-NCB

Low Volt Electrification for El

bida canal

1IIIMP/IIS/MAHM/ELM-

01-2009

5

6IIIMP/IIS/MAHM/ELM-

04-2011

Mahmoudia

El Raml4

El Raml

IIIMP/IIS/MAHM/EL

RAMLE/L-V-02-2010

Medium Volt Electrification

for El Mahmoudia District

Low Voltage network for

Abies El-Khadima

Medium Volt Electrification

for Abis el Qadema , Abis El

Gededa and El Saarania

canals

NCB

NCB

NCB

NCB

Medium Volt Electrification

for king Osman & El bida&

Gezirt El-Gamea & El Raesia

El Kadima &El-Melaha

canals

2

n/a

Mahmoudia

3

Low Volt Electrification for

Abies El- Gedida canalNCB

Prior

El Raml

IIIMP/IIS/MAHM/EL

RAMLE/L-V-01-2010

n/a

n/a

El Raml

n/a

The Genaral Company for

engineering and

contracting (ELEJECT)

IIIMP/IIS/MAHM/ELL-

02-2009

Low Volt Electrification for El

Mahmoudia District

NCB

IIIMP/IIS/MAHM/ELM-

03-2010

No

No

6,588,334.60No

No 1,061,689.00

8 n/aVarious

Electric connections for the

Ultrasonic equipment sites at

Behera

Direct

Updated 10/9/2012

The High Dam Company

for Electrical Projects12,835,885.00 EGPNon/a

The Genaral Company for

engineering and

contracting (ELEJECT)

EGP13,415,732.40

EGP

The Genaral Company for

engineering and

contracting (ELEJECT)

The Genaral Company for

engineering and

contracting (ELEJECT)

17,065,940.54

Page 3: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Main Canal Rehabilitation Works (Mahmodia Area)Updated 10/9/2012

P073977

SL No District

Package reference

No/

Contract No

Description of Works

Procureme

nt

method

StatusEstimated

Cost

Currenc

y

Review by

Bank

(prior/post

)

Domestic

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of Contractor

Contract

Completion

(Date)

Planned 2/Mar/11 1/Apr/11 6/Jul/13

Revised 20/Mar/12 1/Jul/12

Actual 20/Mar/12 7/Jul/12

Planned 1/Mar/11 1/Apr/11 26/Jan/12

Revised 30/Jul/12 29/Aug/12 13/Sep/13

Actual 30/Jul/12

Planned 2/May/11 1/Jun/11 13/Jul/13

Revised 21/Mar/12 1/Jul/12

Actual 21/Mar/12 9/Jul/12

Planned 2/May/11 1/Jun/11 6/Jul/13

Revised 22/Mar/12 1/Jul/12

Actual 22/Mar/12 7/Jul/12

Planned 2/May/11 1/Jun/11 6/Jul/13

Revised 24/Mar/12 1/Jul/12

Actual 24/Mar/12 7/Jul/12

Planned 2/Mar/11 1/Apr/11 22/Sep/12

Revised 15/Oct/12 14/Nov/12 22/Feb/14

Actual

Planned 1/Feb/11 1/Mar/11 29/Jul/11

Revised 15/Nov/12 15/Dec/12 30/Dec/13

Actual

The name of contract number IIIMP/MAIN-CANAL/MAHM/6-2012, changed slightly from "Remodel canal, sheet pile protection km 0-0.7 and removal of bridge pier and abutments at km 0+500" to be as shown above,

as the seet piles replaced by bored piles

Prior No

Shaaban Hamza

for Contracting El

Behera

Lwaa El Hamed

Company for

Contracting

Lwaa El Hamed

Company for

Contracting

No EGP5,551,810.00

7IIIMP/MAIN-

CANAL/MAHM/7-2012

Raise, Widen Embankment and Put

Asfalt Layer on Embankment of

Mahmodia Canal in Different Locations

from Km 5.500 to Km 36.800

NCB

No

EGP3,854,000.00 No

Mahmoudia,

Abo Hommos

PS

PriorIIIMP/MAIN-

CANAL/MAHM/6-2012

Remodel canal, bored pile protection km

0-0.7 and removal of bridge pier and

abutments at km 0+500

NCB

NCB

Remodel Mahmoudia Canal from km

29.930 - 42.890

8,904,700.00 Abo Hommos EGPPrior No

Kafr El Dawar Prior5IIIMP/MAIN-

CANAL/MAHM/5-2012

Remodel Mahmoudia Canal from km

15.350 - 29.930NCB

EGP

El Karakat

Egyptian

Company

Prior No

No 1,620,130.00

Prior

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

1 Mahmoudia,

Abo Hommos

Remove old swing bridges at km 8.48

(Ashour), Km 15.53 (Elzawia) and km

27.04 (Abo Hommos) and replace with

pontoon foot bridges

NCBIIIMP/MAIN-

CANAL/MAHM/1-2012Prior

2IIIMP/MAIN-

CANAL/MAHM/2-2012

3IIIMP/MAIN-

CANAL/MAHM/3-2012

Mahmoudia

Mahmoudia

NCBRehabilitate Lock at Km 0+000

4IIIMP/MAIN-

CANAL/MAHM/4-2012

6

Remodel Mahmoudia Canal from km 0.7-

15.35NCB

Mahmoudia

Page 4: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Branch Canal Rehabilitation Works (Mahmodia Area)Updated 10/9/2012

P073977

District

Package reference

No/

Contract No

Description of Works

Procureme

nt

method

StatusEstimated

Cost

Curren

cy

Review by

Bank

(prior/post)

Domestic

Preference

(yes/no)

Bid

Closing

(Date)

Contract Signing

(Date)Contract Value

Contract

Currency

Name, City, and Country of

Contractor

Contract

Completion

(Date)

Planned 15-Aug-07 24-Oct-07 14-Mar-09

Revised

Actual 01-Mar-08 12-May-08 14-Oct-09

Planned 15-Aug-07 24-Oct-07 14-Mar-09

Revised

Actual 01-Mar-08 12-May-08 14-Mar-09

Planned 15-Aug-07 24-Oct-07 14-Mar-09

Revised

Actual 02-Mar-08 12-May-08 14-Oct-09

Planned 15-Aug-07 24-Oct-07 14-Mar-09

Revised

Actual 02-Mar-08 12-May-08 14-Oct-09

Planned 15/Apr/11 15/May/11 19/Mar/12

Revised 15/Oct/11 19/Jun/12

Actual 19/May/11 20/Sep/11 19/Jun/12

Planned 1/Jun/11 1/Jul/11 4/Jan/12

Revised 14/Apr/12 1/Jul/12 12/May/13

Actual 11/Apr/12

Planned 16/Oct/11 14/Nov/12

Revised 14/Nov/12 14/Dec/12 17/Oct/13

Actual

Planned 21/Oct/11 20/Nov/11 19/Nov/12

Revised 30/Nov/12 30/Dec/12 3/Oct/13

Actual

Planned 20/Nov/11 19/Dec/12

Revised 14/Dec/12 13/Jan/13 17/Oct/13

Actual

Planned

Revised

Actual

Planned 16/Nov/11 15/Dec/12

Revised 30/Nov/12 30/Dec/12 3/Oct/13

Actual

Planned 30/Apr/12 30/May/12 30/May/13

Revised 14/Dec/12 13/Jan/13 17/Oct/13

Actual

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

2,371,475.00

2,014,300.00

3,128,525.00

2,351,875.00

EGP

Adel Abdel Azez El-

Shahawy CompanyEGP

EGPAdel Abdel Azez El-

Shahawy Company

Adel Abdel Azez El-

Shahawy CompanyEGP

Raml Prior No

Included in

other

Contract

Included in

other

Contract

Prior No

No

Prior No

NoPrior

Post

Mahmoudia

IIIMP/IIS/MAHM/W1

1

El Nasry and Other Branch

Canals Rehabilitation9

No

Adel Abdel Azez El-

Shahawy Company

Mesqa Intakes along Nekla &

Sawaki Al-Hadid

IIMP/IS/MAHM/W07-

2011

Preparation of civil works for

ultrasonic flow meters and water

levels equipment along El

Mahmoudia canal and its

Branches

Various

6

697,510.00

6,971,000.00 EGP

Sherif Hassan

Kheiry&Mohamed Fathy Said

for Contracting

Al- Mohamadia for

Contracting Mahamed Abd El

Khalek Amara

Prior

No

1

7

5

NCB

IIIMP/IIS/MAHM/W0

1-2008

2

EGP

No

Prior

No

NCB Prior

Prior

Prior

No

Mesqa Intakes along Direct

Mahmoudia Right SideMahmoudia

NCBMahmoudia

IIIMP/IIS/MAHM/W0

9

El-Baradi and Other Branch

Canals RehabilitationMahmoudia

IIIMP/IIS/MAHM/W0

5-2008

NCBMesqa Intakes along Hamid

Menisi

NCBMesqa Intakes along Direct

Mahmoudia Left Side

Raml

Abis ElQadema +Abis El

Gededa and its Branchs

Rehabilitation

11

Abis ElQadema and its Branchs

Rehabilitation10

Mahmoudia

MahmoudiaIIIMP/IIS/MAHM/W0

3-2008

IIMP/IIS/MAHM/W02-

2008

Abo Homoss +

kafr El Dawar

IIIMP/IIS/MAHM/W-

08/2012

Besentway and Other Branch

Canals Rehabilitation

NCB

NCB

3

4

12 NCB

NCB Prior No

NCB8

Prior No

Mahmoudia

IIIMP/IIS/MAHM/W1

0

Hamd Mensi and its Branches

Rehabilitation

RamlEl Beda and Other Branch

Canals Rehabilitation

Page 5: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Planned 30/Jun/12 30/Jul/12 30/Jul/13

Revised 3/Feb/13 5/Mar/13 7/Dec/13

Actual

Planned 31/Jul/12 30/Aug/12 30/Aug/13

Revised 28/Feb/13 30/Mar/13 31/Jan/14

Actual

Planned 31/Jul/12 30/Aug/12 30/Aug/13

Revised 2/Apr/13 2/May/13 3/Feb/14

Actual

Planned 30/Aug/12 29/Sep/12 29/Sep/13

Revised 1/May/13 1/Jun/13 5/Mar/14

Actual

Planned 14/May/12 13/Jun/12 20/Jun/13

Revised

Actual

Planned 14/May/12 13/Jun/12 20/Jun/13

Revised

Actual

Planned 6/May/12 5/Jun/12 5/Jun/13

Revised

Actual

Planned 15/May/12 14/Jun/12 14/Jun/13

Revised

Actual

Planned 1/Jun/12 1/Jul/12 1/Jul/13

Revised

Actual

Planned 5/Jun/12 5/Jul/12 5/Jul/13

Revised

Actual

Planned 10/Jun/12 10/Jul/12 10/Jul/13

Revised

Actual

Planned 15/Jun/12 15/Jul/12 15/Jul/13

Revised

Actual

Planned 2/Oct/12 1/Nov/12 1/Nov/13

Revised

Actual

Planned 7/Oct/12 6/Nov/12 6/Nov/13

Revised

Actual

Planned 11/Oct/12 10/Nov/12 10/Nov/13

Revised

Actual

Planned 14/Oct/12 13/Nov/12 13/Nov/13

Revised

Actual

Planned 19/Oct/12 18/Nov/12 18/Nov/13

Revised

Actual

Planned 1/Mar/12 31/Mar/12 31/Mar/13

Revised 1/Sep/12 1/Oct/12 5/Jul/13

Actual

EdkoEl Raesaa El Qadema and its

Branches Rehabilitation15 NCB

RamlEl Melaha and and its Branches

Rehabilitation14 NoPrior

Included in

other

Contract

Prior No

RamlMariot El Mostgada and its

Branches Rehabilitation16

Abo Homss

IIIMP/IIS/MAHM/W1

3

BC Rehabilitation contract 1 in

Abo Homss District17 NCB

NCB Prior No

Prior No

NCBAbo Homss

IIIMP/IIS/MAHM/W1

4

BC Rehabilitation contract 2 in

Abo Homss District18 Prior No

NCB

Prior No

Kofr El Dowar

IIIMP/IIS/MAHM/W1

6

BC Rehabilitation contract 2 in

Kofr El Dowar District20 Prior No

Kofr El Dowar

IIIMP/IIS/MAHM/W1

5

BC Rehabilitation contract 1 in

Kofr El Dowar District19 NCB

Abo Homss

IIIMP/IIS/MAHM/W1

8

BC Rehabilitation contract 4 in

Abo Homss District22 Prior No

Abo Homss

IIIMP/IIS/MAHM/W1

7

BC Rehabilitation contract 3 in

El Abo Homss District21 NCB

NCB

Prior No

NCB

Prior No

Kofr El Dowar

IIIMP/IIS/MAHM/W2

0

BC Rehabilitation contract 4 in

Kofr El Dowar District24 Prior No

Kofr El Dowar

IIIMP/IIS/MAHM/W1

9

BC Rehabilitation contract 3 in

Kofr El Dowar District23 NCB

Abo Homss

IIIMP/IIS/MAHM/W2

2

BC Rehabilitation contract 6 in

Abo Homss District26

Abo Homss

IIIMP/IIS/MAHM/W2

1

BC Rehabilitation contract 5 in

Abo Homss District25 NCB

Mahmoudia

IIIMP/IIS/MAHM/W0

4

Nekla Br. Canal Rehabilitation 30

NCB Prior

Kofr El Dowar

IIIMP/IIS/MAHM/W2

5

BC Rehabilitation contract 7 in

Kofr El Dowar District29

Kofr El Dowar

IIIMP/IIS/MAHM/W2

4

BC Rehabilitation contract 6 in

Kofr El Dowar District28

NCB Post No

NoNCB Prior

Prior No NCB

No

No

Kofr El Dowar

IIIMP/IIS/MAHM/W2

3

BC Rehabilitation contract 5 in

Kofr El Dowar District27

NCB Prior

Included in

other

Contract

No

Prior No

PriorRamlGezert El Gamaa and Other

Branch Canals Rehabilitation13

Page 6: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Planned 19-Apr-08 04-May-09 21-Apr-10

Revised 16-Jun-09 16-Sep-09 21-Jun-10

Actual 16-Jun-09 03-Aug-09 21-Jun-10

Planned 18-Feb-09 22-Apr-09 21-Apr-10

Revised 22-Aug-09 01-Jun-10

Actual 15-Jun-09 22-Aug-09 21/Jun/10

Planned 18-Apr-10 15-Jun-10 14/Aug/10

Revised 14/Oct/10

Actual 08-Aug-09 14-Oct-09

Planned 19-Apr-09 04-Jul-09 7/May/10

Revised

Actual 09-Aug-09 01-Sep-09 21-Jun-10

Planned 27-Sep-09 17-Nov-09 7/Jul/10

Revised

Actual 10-Aug-09 01-Sep-09 07-Jul-10

Planned 20-Dec-09 18-Feb-10 4/Aug/10

Revised 4/Apr/11

Actual 04-Oct-09 17-Nov-09

Planned 18-Apr-10 15-Jun-10 10-Sep-10

Revised 01-Dec-09 09-Jan-10 10-Nov-10

Actual 01-Dec-09 28-Dec-2009 10-Nov-10

Planned 18-Apr-10 15-Jun-10 4/Aug/10

Revised

Actual 07-Oct-09 17-Nov-09 04-Oct-10

Planned 24-Feb-10 22-Apr-10 4/Aug/10

Revised 4/Apr/11

Actual 05-Oct-09 17-Nov-09

Planned 2/Nov/09 12/Dec/09 25/Sep/10

Revised 02-Dec-09

Actual 02-Dec-09 11-Jan-10 25-Sep-10

6,677,055.00

NCB

NCB

NCB

NCB NoPrior

EGP

EGP

Al Kholy Company

for contracting and

Engineering

Works

NCB No

No

No

EGP

EGP

4,314,345.00 NCB

Prior

EGP

6,528,043.15

No EGP

EGP

EGP

Heraa` Contracting

Office

Algamea Al-

Taawonia Al-

Intagia for modern

construction

Prior

Prior

Al Kholy Company

for contracting and

Engineering

Works

Prior

No

Al-Amro Office for

Contracting

No

Al-Sesy Group for

Contracting

Company

1,034

Meska Improvement Works in El-

Sant,

G. Arimon and Zarkoon Al-

Sharkia Branch Canals

1,365

Meska Improvement Works for

Hamad Menisi Branch Canal

Right Bank from intake to Km

3.030

1,257

1,008

Meska Improvement for Nekla

Branch Canal Right Bank from

the Intake to End

Meska Improvement Works in

Rayah Zarkoon Branch Canal4,929,535.00

5,365,060.00

Prior

Prior

Prior

Abdalla El Kholy

and his partners

for General

contracting

Heraa` Contracting

Office

5

8

6

7

EGP

6,079,620.00

Al-Amro Office for

Contracting

Heraa` Contracting

Office NCB

NCB

No

Prior

NCB

Prior

Mahmoudia

2

4

3

Mahmoudia

NCB

4,945,610.00

10

9

IIIMP/IIS/MAHM/MQ 03-

2009

IIIMP/IIS/MAHM/MQ 05-

2009

IIIMP/IIS/MAHM/MQ 09-

2009

IIIMP/IIS/MAHM/MQ 08-

2009

IIIMP/IIS/MAHM/MQ 04-

2009

Mahmoudia

Mahmoudia

Mahmoudia

IIIMP/IIS/MAHM/MQ 06-

2009

Meska Improvement Works for

Hamed Menisi Branch Canal (2)

Left Bank from Km 3.800 to Km

6.365

EGP

Updated 10/9/2012

Mahmoudia1 990

6,188,537.40

Mahmoudia

Mahmoudia

Mahmoudia

Mahmoudia

IIIMP/IIS/MAHM/MQ 02-

2009

1,269

1,317

Meska Improvement Works in G.

Shebrakhiet, G. Kafr El-

Rahmania and Al-Moorda Branch

Canals

824

Meska Improvement Works in

Nasry Branch Canal

IIIMP/IIS/MAHM/MQ 01-

2008

Meska Improvement Works for

Ganabiet Hamad Menesi Canal

No

5,230,820.00No

Meska Improvement Works for Al-

Hakim Branch Canal

IIIMP/IIS/MAHM/MQ 01-

2009

Meska Improvement Works for

Swaki Al Hadid Branch Canal969

IIIMP/IIS/MAHM/MQ 07-

2009

5,977,910.00

1,295

Sheet Mesqa Improvement, page 6 of 16

Page 7: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Updated 10/9/2012

Planned 21-Apr-10 18-Jun-10 19-Nov-10

Revised 19/Jan/11

Actual 28-Jan-10 13-Mar-10

Planned 19-Nov-09 22-Jan-10 26/Nov/10

Revised 19-Jan-10 22-Mar-10 26/Mar/11

Actual 27-Jan-10 15-Mar-10 26/Jan/11

Planned 18-Apr-10 15-Jun-10 31-Jan-11

Revised

Actual 26-Jan-10 23-Mar-10 30/Jan/11

Planned 18-May-08 18-Aug-08 09-Oct-09

Revised

Actual 08-Oct-08 01-Dec-08 07-Dec-09

Planned 01-Aug-10 12/Jun/11

Revised 31/May/13 30/Jun/13 11/May/14

Actual

Planned 01-Sep-10 13/Jul/11

Revised 31/May/13 30/Jun/13 11/May/14

Actual

Planned 01-Oct-10 12/Aug/11

Revised 31/May/13 30/Jun/13 11/May/14

Actual

Planned 26-Nov-10

Revised 26/Jan/11

Actual 28-Dec-09 19-Jan-10 26/Jan/11

Planned 01-Oct-10 11/Dec/11

Revised 01-Jul-11

Actual 29/Jan/11 14/Jun/11

No EGP

IIIMP/IIS/MAHM/El Raml /

D&MQ01-2009NCB

NCB

1,603

1,258

IIIMP/IIS/MAHM/W 06-

2008

12

IIIMP/IIS/MAHM/RAML

/MQ - 03/02-2011

NCB

NCB

832

1,255 NCB

NCB

1,049

1,111

13

15

14 Mahmoudia

Meska Improvement Works for El-

Awqaf El-Sharqiya, El-Awqaf El-

Gharbiya, Ezab El-Awqaf and

Silika branch canals

Mahmoudia

Mahmoudia

Mahmoudia IIIMP/IIS/MAHM/MQ 15Mesqa improvement Works in

Hamad Menesi Branch Canal (6)

IIIMP/IIS/MAHM/MQ 11-

2009

IIIMP/IIS/MAHM/MQ 12-

2009

IIIMP/IIS/MAHM/MQ 13

16

17

18

El Raml

El Raml

19

NCB

NCB

Improvement of mesqas and

delivery works for El Bida 2 from

6.005 to 10.280 R

Meska Improvement Works in

area of Abies El-Qadima Branch

canal

Prior

Prior

Prior

Prior

Prior

NCB

1,580

5,156,555.00

Meska Improvement Works in

Nekla Branch Canal - Left Bank

Mesqa improvement Works in

Hamad Menesi Branch Canal (4)1,077

PriorHeraa` Contracting

Office

3,224,300.00

11IIIMP/IIS/MAHM/MQ 10-

2009

Office of engineer

shaban Hamzah

Ghurab

EGP

EGP

EGP

Abdalla El Kholy

and his partners

for General

contracting

EGP

Al-Amro Office for

Contracting

EGP

1,050 6,029,138.00Prior

Prior 8,536,740.00

No

No

No

Heraa` Contracting

Office

El Sahaba for

contracting

Company

Prior

No

Mahmoudia

Mahmoudia

Mahmoudia

8,436,370.00

No

No

No 8,274,495.00

IIIMP/IIS/MAHM/MQ 14Mesqa improvement Works in

Hamad Menesi Branch Canal (5)

Combined SSD and Mesqa

improvement in G. El-Bably + G.

Sharaf + G. El-Baradi

Meska Improvement Works for

Hamad Menisi Branch Canal (3)

Right bank from Km 3.700 to Km

8.950

No

Sheet Mesqa Improvement, page 7 of 16

Page 8: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Updated 10/9/2012

Planned 31/Dec/10 30/Jan/11 4/Oct/11

Revised 1/May/12 3/Jan/13

Actual 23/Feb/11

Planned 01-May-11 16/Sep/11

Revised 01-Aug-10

Actual 6/Nov/10 17/Jan/11

Planned 01-May-11 30-Aug-11

Revised 01-Aug-10 2/Mar/12

Actual 31-Aug-10 23-Oct-10

Planned 01-May-11 30-Aug-11

Revised 01-Oct-10 30/Nov/11

Actual 1/Sep/10 01-Nov-10

Planned 01-Jun-11 16/Sep/11

Revised 13-Nov-10 01-Nov-10 16/Mar/12

Actual 13/Nov/10 11/Jan/11

Planned 01-Dec-11 16/Sep/11

Revised 14-Nov-10 10/Jan/11

Actual 14-Nov-10 11/Jan/11

Planned 31/Dec/10 30/Jan/11 22/Aug/11

Revised 15/Dec/10 22/Nov/11

Actual 17/Oct/10 16/Dec/10

Planned 31/Dec/10 30/Jan/11 22/Aug/11

Revised 15/Dec/10

Actual 18/Oct/10 16/Dec/10

Planned 01-Jun-11 31-Aug-11

Revised 30/Nov/12 30/Dec/12 3/Sep/13

Actual

EGP7,126,780.00

EGP

EGP

No 8,289,000.00

No

7,347,816.77

No

Al-Amro Office for

Contracting 1,200

Improvement of mesqas and

delivery works for Gad El-Haq

Branch Canal, km 6.890 (LS)

Improvement of mesqas and

delivery works for Abies El-

Gedida from 4.400 to 7.925 (RS)

No

No

Prior

25

24

No

8,217,320.92

IIIMP/IIS/MAHM/RAML /

MQ - 02/05-2010El Raml

Kafr EL Dawar

IIIMP/IIS/MAHM/RAML /

MQ - 02/04-2010

IIIMP/IIS/KDWR/S/MQ4-

2010 NCB

Prior

Prior

Prior

No

No

No

28

23

21

El Raml

El Raml

El Raml

El Raml

27

1,538

IIIMP/IIS/MAHM/RAML

/MQ - 03/04-2011

Improvement of mesqas and

delivery works for El Bida 4 from

6.700 to 11.865 El RamlDistrict

26

IIIMP/IIS/MAHM/El Raml /

MQ - 02/03-2010

NCB

Kafr EL Dawar

22

El Raml

El Raml20

IIIMP/IIS/MAHM/RAML /

MQ - 02/1-2010897

Improvement of mesqas works

for Abies El- Gedida from head

to 6.750 (Left Side)

Al-Amro Office for

Contracting

EGP

EGPMohamed El Said

Moustafa

EGP

Al-Amro Office for

Contracting

Al-Amro Office for

Contracting

Al-Sesy Group for

Contracting

Company

Abdalla El Kholy

and his partners

for General

contracting

Algamea Al-

Taawonia Al-

Intagia for modern

construction

Prior

Prior

Prior

Prior EGP

EGP

5,368,848.70

Prior

1,309

NCB

NCB

NCB

1,708

Improvement of mesqas and

delivery works for Abies El-

Gedida (2/6) from2.605 to 10.100

R

NCB

NCB

NCB

925

5,283,240.84

9,716,975.85

5,500,784.35

Meska Improvement Works for El

Saarania LS Direct, km 11.600 to

end

1,350

NCB

Improvement of mesqas and

delivery works for Abies El-

Gedida from km 10.850 to 10.860

LS

Improvement of mesqas and

delivery works for Abies El-

Gedida from km 7.820 to 10.800

L

IIIMP/IIS/MAHM/RAML

/MQ - 02/02-2010

IIIMP/IIS/KDWR/S/MQ5-

2010

Meska Improvement Works for El

Saarania RS Direct, km 11.600 to

end

1,555

1,915Updated 10/9/2012

Sheet Mesqa Improvement, page 8 of 16

Page 9: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Updated 10/9/2012

Planned 01-Aug-11 14-Sep-11

Revised 30/Nov/12 30/Dec/12 3/Sep/13

Actual

Planned 01-Sep-10 01-Feb-12

22/Feb/11

Revised 31/Jan/13 2/Mar/13 4/Nov/13

Actual

Planned 01-Nov-10 01-Feb-12

21/Feb/11

Revised 3/Mar/13 2/Apr/13 5/Dec/13

Actual

Planned 01-May-10 31-Dec-11

Revised 13/Feb/13 15/Mar/13 17/Nov/13

Actual

Planned 01-Jun-10 15-Jan-12

Revised 18/Feb/13 20/Mar/13 22/Nov/13

Actual

Planned 01-Jul-10 31-Jan-12

Revised 16/Mar/13 15/Apr/13 18/Dec/13

Actual

Planned 01-Feb-11 15/Dec/11

Revised 2/Apr/13 2/May/13 4/Jan/14

Actual

Planned 1/Apr/11 15/Dec/11

Revised 4/May/13 3/Jun/13 5/Feb/14

Actual

Planned 01-Mar-10 6/Dec/11

Revised 19/May/13 18/Jun/13 20/Feb/14

Actual

Planned 01-Jul-11 31-Jan-12

Revised 31/May/13 30/Jun/13 4/Mar/14

Actual

No

No

No

No

Prior

No

Prior

Prior

No

No

NCB

1,340

36

No

No

Prior NoMeska Improvement Works in El

Bida 1 from intake to km 6.250 R1,100

El Raml33

NCB

NCB

NCB

Prior

NCB

35

El Raml

El Raml

34

31

El Raml

32

38

30

Edko

37

El Raml

El Raml

El Raml

Meska Improvement Works in

Gezirt El-Gamea 2 from 3.250 to

end R

Meska Improvement Works in

Gezirt El-Gamea 3 from 3.250 to

end L

29

Prior

Prior745

Meska Improvement Works in El-

Melaha 1 from intake to 3.80

Improvement of mesqas and

delivery works for Abies El-

Gedida (2/7) from 1.610 to 2.605

br. El Mohandseen

Meska Improvement Works in El

Bida 3 from 2.225 to 6.35 L

Meska Improvement Works in

Gezirt El-Gamea 1 from intake to

3.250 R&L

Prior

Prior

Meska Improvement Works in El

Raesia El Kadima 2 + Direct

Mahmoudia km 49.00 to km

54.125

1,450 NCB

NCB

Edko

Meska Improvement Works in El-

Melaha 2 from 3.8 to end

Meska Improvement Works in El

Raesia El Kadima 1 km 51.16

NCB900

1,000

El Raml

753

1,142

1,125

1,240

NCB

NCB

Prior

Sheet Mesqa Improvement, page 9 of 16

Page 10: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Updated 10/9/2012

Planned 01-Apr-10 15/Mar/12

Revised 16/Mar/13 15/Apr/13 18/Dec/13

Actual

Planned 01-Jun-11 01-Mar-12

Revised 6/Apr/13 6/May/13 8/Jan/14

Actual

Planned 01-Mar-12 9/Jan/13

Revised 16/Mar/13 15/Apr/13 18/Dec/13

Actual

Planned 01-May-11 10/Mar/12

Revised 30/Nov/12 30/Dec/12 3/Sep/13

Actual

Planned 19/May/12 18/Jun/12 20/Feb/13

Revised 16/Apr/13 16/May/13 18/Jan/14

Actual

Planned 01-Jun-11 10/Apr/12

Revised 14/May/13 13/Jun/13 15/Feb/14

Actual

Planned 01-Jun-11 10/Apr/12

Revised 29/May/13 28/Jun/13 2/Mar/14

Actual

Planned 01-Sep-13 12/Jul/14

Revised 14/Jun/13 14/Jul/13 18/Mar/14

Actual

Planned 11/Oct/11

Revised 31/Dec/12 30/Jan/13 4/Oct/13

Actual

Planned 28/Aug/11

Revised 31/Dec/12 30/Jan/13 4/Oct/13

Actual

Planned 1/Jun/11 1/Jul/11 26/Apr/12

Revised 31/Dec/12 30/Jan/13 12/Oct/13

Actual

No

No

NoPrior

No

No

NoPrior

El Raml NCB

NCB

42

Improvement of mesqas and

delivery works for Mariot (B) br.

(1) LS km 9.437

41

40 NCB

39

Meska Improvement Works in G.

El-Qodah Qebly & Bahary R(1)

km 51.200

850El Raml

Prior

Prior

Prior

Prior

NCB

Prior

No

No

NCB

Improvement of mesqas and

delivery works for Mariot br. (3)

km 13.650 from Intake to km

1.625

1,000

925

1,144

1,125

Improvement of mesqas and

delivery works for Mariot br. (3)

km 11.250

1,167

1,145

Improvement of mesqas and

delivery works for Mariot (A) br.

(2) LS km 11.25

1,326

Meska Improvement Works in

king Osman + G. Nazer + G. Kafr

El Dowar (1) km 49.000

Improvement of mesqas and

delivery works for Mariot (A) br.

(1) RS km 9.437

NCB

NCB

NCB

Post49 Abo HomossIIIMP/IIS/MAHM/IIP1-MQ-

01

43

44

No

No46

Improvement of mesqas and

delivery works for Mariot br. (3)

km 1.625 to End

45 El Raml

47

Meska Improvement Works for

Yousry (2) Branch canal from km

1.55 to End

48

Meska Improvement Works for

Ganabiet Saarania from intake to

end

1,313 NCB

NoMeska Improvement Works at

IIP1NCB

890 Prior

Prior

NCB

Prior

kafr El Dawar

kafr El Dawar

El Raml

El Raml

El Raml

El Raml

El Raml

Sheet Mesqa Improvement, page 10 of 16

Page 11: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Meska Improvement Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procurem

ent

method

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior/pos

t)

Domesti

c

Preferen

ce

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Updated 10/9/2012

Total Area KfW 36,730

19,490

Grand Total Area 56,220

Total Area IBRD

Sheet Mesqa Improvement, page 11 of 16

Page 12: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Drainage Rehabilitation Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No DistrictPackage reference No/

Contract NoDescription of Works

Area

(fed)

Procure

ment

method

StatusEstimate

d Cost

Curren

cy

Review by

Bank

(prior/pos

t)

Domestic

Preference

(yes/no)

Bid

Closing

(Date)

Contract

Signing

(Date)

Contract ValueContract

Currency

Name, City, and

Country of

Contractor

Contract

Completion

(Date)

Planned 01-Feb-09 20-Apr-10

Revised 01-Mar-09

Actual 17-Feb-09 21-Apr-09 28-Dec-09

Planned 29/Feb/12

Revised 1/Mar/11 31/May/12

Actual 26-Sep-10 1/Mar/11

Planned 24-Sep-07 20-Sep-09

Revised

Actual 24-Mar-08 21-Sep-08 24/May/11

Planned 24-Sep-07 20-Mar-10

Revised 20-Jun-10

Actual 26-Mar-08 19-Aug-08 20-Mar-10

Planned 01-Feb-09 31-Dec-11

Revised 01-Jun-10 31/Mar/12

Actual 28-Sep-09 1/Jul/10

Planned 13-Dec-09 14-Jul-12

Revised 01-Jun-10

Actual 27-Sep-09 11/Jul/10

Planned 01-Oct-10 14/Dec/11

Revised 30-Nov-10 14/Mar/12

Actual 10-Jun-10 15/Dec/10

3,401,750.00 EGPMohamed Ahmad

Mousa El Sakran

El-Rashedia

Company for

General

Contracting

Al - Eman

company for

contracting

EGP

EGP

Replacement and Rehabilitation of

Subsurface Drainage Works in Part

of Al-Lawia 1st Command Area of

Ryah Zarkoon 1600 feddan

Mahmoudia Command Area

NoNCB

2,400 NCB

1,600

3,450 NCB

Updated 10/9/2012

1 MahmoudiaIIIMP/EPAD/MAHM/W0

3-2008

Embankment Protection for El-Atf,

El-Bably and Omleet DrainsNCB 2,610,250.00

Al Phara'na office

for Contracting Prior EGPNo

Eng. Ahmed

Hassan Al -Shendy

2,112,000.00

1,951,450.00 EGP

EGP

Mohammed

Badawy

Mohammed

3 Abu Hommos1IIIMP/EPAD/MAHM/W

01-2007

IIIMP/EPADP/MAHM/W

04-2010

Deepening and Widening of

Zawiet ghazal open drainNCB Prior

IIIMP/EPAD/MAHM/W0

2-2007

Rehabilitation of civil works for

Abo hommos II

No

NoPrior

5,611,262.40

4

5IIIMP/EPAD/MAHM/SSD

01- 2009

Rehabilitation of Subsurface

Drainage Networks in Abo

Hommos 3 Area

Prior

Prior No

2 Mahmoudia

Pitching Abo hommos drain NCB

El-Rashedia

Company for

General

Contracting

Prior No 8,255,950.00 EGP

Prior No 3,633,470.00

6 Abu Hommos

Abu Hommos

Abu Hommos

IIIMP/EPAD/MAHM/SSD

02 2009

Subsurface Drainage Networks in

Abo Hommos 2 Area

7 MahmoudiaIIIMP/EPADP/MAHM/SS

D03-2009NCB

Page 13: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Planned 01-Apr-10 12/Mar/12

Revised 30-Nov-10

Actual 20-Jun-10 13/Dec/10

Planned 01-Apr-10 12/May/12

Revised 21-Nov-10

Actual 22-Jun-10 13/Nov/10 10/Apr/11

Planned 17-Jun-10 21/Feb/14

Revised 20/May/12 15/Aug/12

Actual 20/Jun/12

Planned 17-Jun-10 9/Dec/11

Revised 20/May/12 15/Aug/12 21/Feb/14

Actual 24/Jun/12

Planned 01-Dec-10 14/May/12

Revised 30/Nov/12 30/Dec/12 6/Jan/14

Actual

Planned 14/Apr/12 14/May/12 20/Nov/13

Revised 14/Apr/12 10/Aug/12 16/Feb/14

Actual 21/Apr/12

Planned 14/Apr/12 14/May/12 20/Nov/13

Revised 14/Apr/12 10/Aug/12 16/Feb/14

Actual 21/Apr/12

Planned 31/May/12 30/Jun/12 6/Jan/14

Revised 30/Nov/12 30/Dec/12 4/Jan/15

Actual

Planned 30/Jun/12 30/Jul/12 6/Aug/14

Revised 31/Aug/12 30/Sep/12 15/Oct/14

Actual 30/Sep/12

Planned 01-Apr-13 30/Sep/14

Revised 9/Jul/13 8/Aug/13 14/Feb/15

Actual

IIIMP/EPADP/MAHM/SS

D09-B

Abu Hommos

5,479,414.90 EGP

5,110,485.00

Replacement and Rehabilitation of

Subsurface Drainage Works in El

Bably 1st (B)

2,200

EGP

6,353,400.00

Prior No

NoPrior

2,320

NoPrior2,650 NCB

6,122,930.50

Abdalla El Kholy

and his partners

for General

contracting

5,494,539.60

NCB

NCB

No EGP

Prior No 6,636,105.00

3,800 NCB

NCB

Egyptian Company

for Irrigation and

Drainage

NoPrior EGP

EGP

Mohamed Lotfy

Mahmoud Abo-

Elnile for

contracting

NCB Prior No

Prior No

3,400 NCB

IIIMP/EPADP/MAHM/SS

D10-A

Replacement and Rehabilitation of

Subsurface Drainage Works in

Zawiet Naem (A)

IIIMP/EPADP/MAHM/SS

D8-2012

10 MahmoudiaIIIMP/EPADP/MAHM/SS

D06A/2012

12

15

Replacement and Rehabilitation of

Subsurface Drainage Works in

Zawiet ghazal

Replacement and Rehabilitation of

Subsurface Drainage Works in El-

Lawia (2)-A

IIIMP/EPADP/MAHM/SS

D11-2012

Replacement and Rehabilitation of

Subsurface Drainage Works in

Sharaf drain at Hammad menisi

end

IIIMP/EPADP/MAHM/SS

D09-A-2012

2,100Cancelle

d

Mahmoudia

13

16

Mahmoudia

8

Replacement and Rehabilitation of

Subsurface Drainage Works in El

Bably 1st (A)

IIIMP/EPADP/MAHM/SS

D06B/2012

Replacement and Rehabilitation of

Subsurface Drainage Works in El-

Lawia (2)-B

MahmoudiaIIIMP/EPADP/MAHM/W

05

Pitching works along Lawia,

Rahmania & Gesr El Aswad

9 MahmoudiaIIIMP/EPADP/MAHM/SS

D05-2010

Replacement and Rehabilitation of

Subsurface Drainage Works in Al-

Atf the 2nd (B) 3400 feddan

Mahmoudia Command Area

IIIMP/EPADP/MAHM/SS

D04-2010

Replacement and Rehabilitation of

Subsurface Drainage Works in Al-

Atf the 2nd (A) El Mahmoudia

Command Area

17

1,850 NCB

Prior

Prior

El Salam for

general

contracting

No

Abdalla El Kholy

and his partners

for General

contracting

3,400

2,500 NCB EGP

Mahmoudia

Mahmoudia

11

Mahmoudia

Mahmoudia

14

Prior No

EGP

EGP

EGP

Abdalla El Kholy

and his partners

for General

contracting

EGP

Page 14: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Planned 01-Apr-13 30/Sep/14

Revised 9/Jul/13 8/Aug/13 14/Feb/15

Actual

Planned 14/Jul/12 13/Aug/12 19/Feb/14

Revised 30/Aug/13 29/Sep/13 7/Apr/15

Actual

Planned 14/Jul/12 13/Aug/12 19/Feb/14

Revised 30/Aug/13 29/Sep/13 7/Apr/15

Actual

Planned 31/Oct/12 30/Nov/12 8/Jun/14

Revised 30/Jan/13 1/Mar/13 7/Sep/14

Actual

Planned 30/Nov/12 30/Dec/12 8/Jul/14

Revised 30/Nov/13 30/Dec/13 8/Jul/15

Actual

Planned 31/Dec/12 30/Jan/13 8/Aug/14

Revised 30/Jan/13 1/Mar/13 7/Sep/14

Actual 8/Nov/12

Planned 14/May/13 13/Jun/13 20/Dec/14

Revised 31/Dec/12 30/Jan/13 8/Aug/14

Actual

Planned 14/May/13 13/Jun/13 20/Dec/14

Revised 31/Dec/12 30/Jan/13 8/Aug/14

Actual

Planned 21/Mar/13 20/Apr/13 27/Oct/14

Revised

Actual

Prior EGP

21 Abu HommosIIIMP/EPADP/MAHM/SS

D13

Replacement and Rehabilitation of

Subsurface Drainage Works in Abo

El - Einen (1)

No

No

No

No

Cancelle

d

19

Abu HommosIIIMP/EPADP/MAHM/SS

D12-B

NCBAbu Hommos

Abu HommosIIIMP/EPADP/MAHM/SS

D10-B

22 Abu HommosIIIMP/EPADP/MAHM/SS

D14

IIIMP/EPADP/MAHM/SS

D12-A

Replacement and Rehabilitation of

Subsurface Drainage Works in Abo

Hommos 1st (A)

2,700

3,50020

Replacement and Rehabilitation of

Subsurface Drainage Works in

Zawiet Naem (B)

1,850

Replacement and Rehabilitation of

Subsurface Drainage Works in Abo

Hommos 1st (B)

23

24 Abu HommosIIIMP/EPADP/MAHM/SS

D16A

Replacement and Rehabilitation of

Subsurface Drainage Works in

Mahalet Keel (2) A

MahmoudiaIIIMP/EPADP/MAHM/SS

D15-2012

Replacement and Rehabilitation of

Subsurface Drainage Works in Abo

El - Einen (3)

Replacement and Rehabilitation

of Subsurface Drainage Works in

Abo El - Einen (2)

5,300

2,650 NCB NoPrior

Prior

5,200

No

PriorNCB

PriorNCB

NCB

2,150 NCB NoPrior

1,400 NCB

NCB Prior

18

Prior

NoPrior

No

25

26 Abu HommosIIIMP/EPADP/MAHM/SS

D17A

Replacement and Rehabilitation of

Subsurface Drainage Works in

Waslat El Zeiny (2) A

Abu HommosIIIMP/EPADP/MAHM/SS

D16B

Replacement and Rehabilitation of

Subsurface Drainage Works in

Mahalet Keel (2) B

2,650

Page 15: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Planned 19/May/13 18/Jun/13 25/Dec/14

Revised

Actual

Planned 9/Nov/13 9/Dec/13 17/Jun/15

Revised

Actual

Planned 9/Nov/13 9/Dec/13 17/Jun/15

Revised

Actual

Planned 17/Jul/13 16/Aug/13 22/Feb/15

Revised

Actual

28 Abu HommosIIIMP/EPADP/MAHM/SS

D18A

Replacement and Rehabilitation of

Subsurface Drainage Works in

Zeiny (1) A

3,200

Abu HommosIIIMP/EPADP/MAHM/SS

D17B

Replacement and Rehabilitation of

Subsurface Drainage Works in

Waslat El Zeiny (2) B

2,150 NCB

30 Abu HommosIIIMP/EPADP/MAHM/SS

D19

Replacement and Rehabilitation of

Subsurface Drainage Works in

Mahalet Keel (1)

2,600 NCB

PriorNCB

NCB

NoPrior

Prior No

No

Abu HommosIIIMP/EPADP/MAHM/SS

D18B

Replacement and Rehabilitation of

Subsurface Drainage Works in

Zeiny (1) B

3,200

27

29

Prior No

Page 16: World Bank Document fileProcurement Plan for Electrification Works (Mahmodia Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

Procurement Plan for Miscellaneous Works (Mahmodia Area)

Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008

P073977

SL No District

Package reference

No/

Contract No

Description of Works

Procur

ement

metho

d

StatusEstimated

Cost

Currenc

y

Review

by

Bank

(prior /

post)

Domestic

Preferen

ce

(yes / no)

Bid

Closing

(Date)

Contract Signing

(Date)

Contract ValueContract

Currency

Name, City, and Country of

Contractor

Contract

Completion

(Date)

Planned 9/Jan/10

Revised

Actual 26/Jul/09 10-Sep-09 9/Jan/10

Planned

Revised

Actual 01-Dec-08 Completed

Planned 9/Mar/10

Revised

Actual 26/Jul/09 10-Sep-09 15/Jul/10

Planned

Revised

Actual 14-Jan-08 Completed

Planned

Revised

Actual 13-Jan-08 Completed

Planned

Revised

Actual 22-Jan-09 Completed

Planned

Revised

Actual 11-Mar-09 Completed

Planned

Revised

Actual 26-Jan-09 Completed

Planned

Revised

Actual 25-Jan-09 Completed

Planned 15/Feb/11 15/Mar/11 11/Sep/11

Revised 30/Jan/12 29/Feb/12 27/Aug/12

Actual

Planned 24/Jun/11

Revised

Actual 21/Nov/10 25/Jan/11

Planned 24/Jun/11

Revised

Actual 25/Jan/11

Updated 10/9/2012

EGPEl Magek Tash for

construct

725,659.00

EGP

505,344.00

El Masaria with construct

and building

EGPEl Masaria with construct

and building

508,587.00

EGP384,821.25

7IIIMP/IS/MAHM/MIS

07 2009Civil works for consultative office

Shoppi

ng

6

5

Edko

3IIIMP/IS/MAHM/MIS

03 2009

4IIIMP/IS/MAHM/MIS

05 2009

Abo Homoss

El Behira

Shoppi

ng

Civil works and preparation of

Integrated Irrigation district +

Supply and installation of

ceramic and marble +Supply

and installation of lighting and

electricity toolsin

IIIMP/IS/MAHM/MIS

06 2009

Civil works of Integrated

Irrigation district in Rashed

Civil works and preparation of

Integrated Irrigation district

No

No

No

No

No

Post

Civil works for training center

NCB

Post

El Masaria with construct

and building

EGPMohamed Ibrahem +

Mohamed Abo Oga

EGP

EGP

Abd El Wahed El

Habashe - Kafr El Dowar -

El Beheira

Post 391,970.00No

No

310,135.00

El Masaria with construct

and building

El Feke or construct

officeEGP NCB

151,773.00Post

Kafr El dawar EGP Amad El ShenawyShoppi

ng

IIIMP/IS/MAHM/MIS

08 2009

84,997.00

5,335.00

Kafr El dawar No

Nomake signboard

El Behira

Post

Post

11IIIMP/IS/MAHM/MIS-

10-2010

Civil works and preparation of

Integrated Irrigation district El Behira

Damanhour/

Kafr El

Dawar

IIIMP/IS/MAHM/MIS-

11-2010

530,978.00 EGPYousrry Farag Habashe

Mathana

EGP

EGPCancel

led

PostCivil works and preparation of

Integrated Irrigation district NCB

Shed for 2.5 bar-PVC Pipe

Protection

Yousrry Farag Habashe

MathanaPost No

NoPost

Post No

Prior

NCB Post2

El Raml1IIIMP/IS/MAHM/MIS

02 2009

Civil works of Integrated

Irrigation district

9

IIIMP/IS/MAHM/MIS

04 2009

Civil works of Integrated

Irrigation district

8

NCBCivil works and preparation of

Integrated Irrigation district

NCB

NCB

NCB

Mahmoudia

Rashed

12 Kafr El dawar

10IIIMP/IS/MAHM/MIS-

09-2010