INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION FROM: The Acting Secretary MONTHLY OPERATIONAL SUMMARY OF BANK and IDA PROPOSED PROJECTS August 1964 Member State 1,/ CAMEROON (Brazzaville) Amount 2/ & Probable Lender To be de- termined (IDA) Cie des Potasses To be de- du Congo termined Common Services Organisation East African Posts and Telecom- munications Administration (Bank) 30.0 (Bank) 4. 2 (Bank) Project 1/ I. AFRICA Agricultural and road project . Potash mining. Telecommunications equipment. CONFIDENTIAL SecM64-216 September 4, 1964 Present Status Awai ting completion of cocoa rehabilitation and road studies. Awaiting further information . Awaiting further in- orma J. on to comp appraisal report . Preliminary information being considered . 1/ 2/ }I The Government is the proposed borrower, unless otherwise indicated . The amount is in millions of U.S . dollars and is approximate and tentative. The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that information about the project has been revised since the last issue of the Summary . Kenya, Tanganyika and Uganda. Distribution: Executive Directors and Alternates President Vice Presidents Department Heads Assistant Department Heads Division Chiefs Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

World Bank Documentdocuments1.worldbank.org/curated/en/...(Bank) at Yumbo thermal plant). To be determined C0STA RIGA To be de termined (Bank) To be determined To be de termined {Bank)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

    INTERNATIONAL DEVELOPMENT ASSOCIATION

    FROM: The Acting Secretary

    MONTHLY OPERATIONAL SUMMARY OF BANK and IDA PROPOSED PROJECTS

    August 1964

    Member State 1,/

    CAMEROON

    ~ (Brazzaville)

    Amount 2/ & Probable

    Lender

    To be de-termined

    (IDA)

    Cie des Potasses To be de-du Congo termined

    Common Services Organisation

    East African Posts and Telecom-munications Administration

    (Bank)

    30. 0 (Bank)

    4. 2 (Bank)

    Project 1/ I . AFRICA

    Agricultural and road project.

    Potash mining.

    Telecommunications equipment.

    CONFIDENTIAL

    SecM64-216

    September 4, 1964

    Present Status

    Awai ting completion of cocoa rehabilitation and road studies.

    Awaiting further information.

    Awaiting further in-orma J. on to comp

    appraisal report .

    Preliminary information being considered.

    1/ 2/ }I

    The Government is the proposed borrower, unless otherwise indicated. The amount is in millions of U.S . dollars and is approximate and tentative. The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that information about the project has been revised since the last issue of the Summary. Kenya, Tanganyika and Uganda.

    Distribution:

    Executive Directors and Alternates President Vice Presidents Department Heads Assistant Department Heads Division Chiefs

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • Member~]/

    ETHIOPIA

    Imperial Board of Telecommunications in Ethiopia (IBTE)

    GUINEA

    KENYA

    M.ADAGASCA..~

    MALI

    MAURITANIA

    MOROCCO

    Amount 2/ & Proba'.Jle

    Ler.ce,·

    6.0-7. 0

    (Bank)

    - 2 -

    Project)./

    (R) Telecommunications.

    Present Status

    Appraisal report being prepared .

    To be de- (N) Railway and port for Boke Awaiting further termined bau.xite mining operations. information.

    (Uncertain)

    4.5 (IDA)

    Main roads . Appraisal report being prepared .

    2. 8 (R) Smallholder tea Credit signed on Aug. 17. (IDA) cultivation.

    To be de- Roads in tea growing Awaiting further in-mation. termined areas .

    (IDA)

    J.6 (R) Education (Lac Anosy) . (Uncertain)

    Appraisal mission planned for Novo/Dec,

    10.0 (Uncertain)

    Irrigation for rice production in Lac Alaotra area.

    Preliminary information being considered.

    7~0 (R) Road improvement, Appraisal mission planned for Nov./Dec. (Uncertain) Majunga-Tananarive .

    500-7.0

    (IDA)

    7.0 (IDA)

    17.5 (Bank)

    Railroad rehabilitation. Consultants• report being considered.

    (R) Roadsa Appraisal report being considered . Discussions being held with other foreign aid agencies on their possible participation.

    (R) Sidi-Slimane agricultural Loan signed on Augn 26 . development .

    Seep. 1 for footnotes 1./ 3./ and 1J.

  • Member State }/

    NIGERIA

    NORTh'ERN AHD SOUTHERN RHODESIA

    Central Africa Power Corporation

    SIERRA LEONE

    Sierra Leone Electricity Corp.

    SENEGAL

    SOMALIA

    SUDAN

    Amount 2/ & Probc-,ble

    Lender ----·-20.0 (IDA)

    15. 5 (IDA)

    5.o-10.,0 (IDA)

    7.7 (Bank)

    3.8 (Bank)

    3.0 (~~c)

    To be de-termined

    (Bank)

    7.0 (IDA)

    27 oO-30c5

    (Bank)

    To be de-termined

    (Uncertain)

    - 3 -

    Project}./

    (R) Secondar

  • ~mber State ]/

    UGANDA

    JAMAICA

    NEW ZEAL!-,.ND

    NORWAY

    PORTUGAL

    Empresa Termoelec-trica Portuguesa

    TURKEY

    Industrial De-velopment Bank

    UNITED KINGDOM

    Basutoland

    Amount 2/ & Probable

    Len'.:1er --·-To be de-termined

    (IDA)

    5.6 (Bank)

    To be de-termined

    (Bank)

    25.o (Bank)

    To be de-termined

    (Bank)

    14.5 (Bank)

    • (Bank)

    35.o (Bank)

    5.o (IDA)

    4.1 (IDA)

    - 4 -

    Project]/

    Roads.

    II . EUROP#

    Highway and bridge construction.

    Railways.

    (R) Electric Power.

    Ports .

    Electric Power .

    (R) East Coast Expressway.

    (R) Financing of industry.

    (R) Roads .

    See p . 1 for footnotes 1/ 2/ and 3/.

    Present Status

    Awaiting further information.

    Awaiting Govt. decision on scope and timing of project.

    Awai ting Govt. proposal to improve financial position of Railwa:rs,

    Appraisal mission planned for Sept. 15.

    Awaiting further pre-paration of project.,

    Appraisal report being prepared.

    scheduled for Oct.

    Appraisal mission scheduled for Nov.

    Credit signed on Aug. 31.

    Appraisal report being consideredo

    !dl The Department of Operations for Europe handles matters relating to European countries, Australia, New Zealand, and certain of their dependencies, and South Africa, Jamaica, and Trinidad and Tobago.

  • Member State"];/

    YUGOSLAVIA

    Yugoslav Invest-ment Bank

    CHINA

    Taiwan Railway Administration

    China Develop-ment Corp.

    JAPA!J

    Tol0Jo Expressway Corp.

    E!ec c111e rowe1•

    MALAYSIA

    Federal Land Development Authority

    Singapore Public Utilities Board

    Singapore Harbour Board

    Amount y & Pro'b:.'::le

    I,er:dc]"

    To be de-termined

    (Bank)

    3.,7 (Bo.!lk)

    20. 0 (Bank)

    To be de-te:::-mined

    (Banlc)

    25.o (Bank)

    25.o

    16. 0 (Bank)

    - 5 -

    Project'}./

    Railways - II.

    III • FAR EAST

    Harbor improvement.

    (R) Dieselization, rolling stock and improvement of line and control fa-cilities.

    Industrial Finance - II .

    (R) Haneda-Yokohama expressway.

    Kuzuryu hydroelectric

    (R) Muda River irrigation project.

    To be de- (R) Land development program. termined

    (Bank)

    7o0 (Bank)

    21.,0 (Bank)

    (R) Singapore water supply.

    Port development.

    Seep. 1 for footnotes!/~ and]/.

    ) )

    Present Status

    Appraisal report being prepared.

    Appraisal report being prepared.

    Appraisal mission in field.

    Appraisal report and proposals to improve financial position of CDC being considered.

    )Appraisal reports being )prepared.

    Appraisal mission planned in Dec.

    Consultants invited by Govt. to submit pro-posals for preparing project.

    Negotiators invited.

    Awaiting further in-formation from Govt. to complete appraisal.

  • Member State 1/ PHILIPPINES

    National Power Corporation

    THAILAND

    AFGF.ANISTAN

    INDIA

    Amount 2/ & Proba'-:)le

    Lender

    - 6 -

    To be de- (R) ternri.ned

    (Bank)

    Pro.1ect ]/

    Modernization and rehabi-litation of about 750 km. of road in Luzon and Mindanao.

    6.o (Bank)

    11. 5 (Bank)

    (R) Expansion and improvement of facilities of College of Agriculture of Univ. of Philippines.

    (R) Bataan Thermal Power.

    Meklong irrigationo

    To be de- (R) Nan River power and termined irrigation.

    (Bank)

    To be de- (R) Tecl~'1:i.cal and vocational terminzd

    (Bank) education.

    Present Status

    Project in abeyance .

    Negotiations completed; expected to be pre-sented to Exe cu ti ve Directors in Octo

    Awaiting further in-formation from Govt. to complete appraisal.

    Appraisal report being prepared~

    Appraisal mission planned in Dec.

    Appraisal mission planned for Oct.

    7o5 Yanhee Power - Stage III. Appraisal report being (Bank) preparedo __ .....:

    IV. SOUTH ASIA A::JD MIDDLE EAST

    3.5 (IDA)

    3.,0-10.0

    (Uncertain)

    23 . 0 (Bank)

    14.o (Bank)

    (R) Agricultural and voca-tional schools construc-tion and equipment.

    (R) Calcut ta water supply -Stage I .

    Indus Basin equipment.

    (R) Kothagudem power -Stage II.

    Negotiators invitedo

    Appraisal mission scheduled in mid-Sept.

    To be presented to Ex-ecutive Directors after AID and India are ready to sign their loan agreement.

    Negotiators invitedo

    Seep. 1 for footnotes];/~/ and]/.

  • ~ember State y ~ (Cont'd.)

    Tata Iron and Steel Co. (TISCO)

    Indian Iron and Steel Co. (IISCO)

    Hindustan Allied Chemicals Ltd.

    IRAN

    JORDAN

    PAKISTAN

    Amount 2/ & Probable

    Ler..cer ---·-60o0 (IDA)

    25oO (IDA)

    35oO (Bank)

    60,,0 (Bank)

    14.5 (Bank)

    17.0-20.,0

    (Bank)

    30 .. 0 (Bank)

    10.,0-1500

    (Bank)

    s .. o (IDA)

    5. 25 (IDA)

    10.0 (I DA)

    - 7 -

    Project]/

    (R) Railways.

    Bangalore water supply.

    Power transmission.

    Coal mining and improved utilization of steel capacity.

    (R) Improved utilization steel capacity.

    Kothagudem fertilizer project .

    (R) Highway and Feeder roads .

    (R) Highway construction.

    Potash industry.

    Gaja waterlogging and sal1:1i ty control in w. Pakistan.

    (R) Improvement of inland water transport in E. Pakistan.

    (R) Food grain storage .

    of

    To be de- (R) Industrial imports. termined

    (IDA)

    Seep. 1 for footnotes];_/ 'l,j and]./.

    ) ) ) ) ) ) )

    Present Status

    Negotiations to begin on Sept. 14c

    )Appraisal reports being )prepared. ) ) ) ) ) ) )

    Appraisal mission in field.

    Negotiations substan·-tially completed,

    Awaiting further information.

    Govt., reviewing project.

    Credit signed on Aug. 26.

    Appraisal mission scheduled in Nov.

    Preliminary mission's findings being con-sideredo

  • Member State"};_/

    PAKISTAN (Cont'd.)

    Amount 2/ & Probab!e

    Lender

    To be de-termined

    (Uncertain)

    To be de-termined

    (IDA)

    To be de-termined

    (Uncertain)

    - 8 -

    Project J/ Lahore Water Supply and Sewerage.

    East and West Pakistan Education ..

    West Pakistan roads .

    Industrial De-velopment Bank of Pakistan

    To be de- (R) Industrial development.

    ARGENTINA

    BRAZIL

    Centrais Electricas

    Usinas Eletricas do Paranapanema

    CHILE

    termined (Bank)

    To be de-termined

    (Bank)

    45.o (Bank)

    14. 0 (Bank)

    4oO (Bank)

    2.0-400

    (Bank)

    v. rJES'l'ERN HEMISPHERE

    ACIND.AR steel project.

    (R) First stage of Estreito hydroelectric develop-ment.

    (R) Xavantes hydroelectric development .

    (R) Expansion of distribu-tion facilities in Rio de Janeiro and Sao Paulo.

    (R) ENDZSA power facilities.

    (R) Technical and vocational education facilities.

    Seep. 1 for footnotes"};_/~/ and JI.

    ) ) ) )

    Present Status

    )Appraisal missions )planned in fall . ) ) ) ) )

    ) )

    Report being considered by Govt. Project not eA'}Jected to reach active stage during current year.

    In abeyance pending Govtis decision on investment priorities, review of Argentina's economic and financial position, and re-ap-praisal of steel sector.

    )Appraisal m.ission in )field. ) )

    Request withdrawn by Govt.

    Bank planning to invite negotiators ..

    Appraisal mission scheduled for late Sept.

  • Member State"};/

    COLOMBIA

    Empresa Nacional de Telecomunica-ciones

    Amount 2/ & Prob2.ble

    Lender

    10. 0 (Bank)

    26. 0 (Bank)

    - 9 -

    Proje~ ]/

    (R) Private Investment Fund (for Financieras).

    {R) Expansion program.

    eve - eHIDRAL To be de- (R) Power expansion program termined (including fourth unit

    (Bank) at Yumbo thermal plant) .

    To be determined

    C0STA RIGA

    To be de-termined

    (Bank)

    To be determined To be de-termined

    {Bank)

    ECUADOR

    Empresa Electrica QU'.1.to, 5 . A.

    6.o-7 .u

    Autoridad Portua- To be de-ria de Guayaquil termined

    (Uncertain)

    Power int erconnection between Bogota, Medellin, Cali and Manizales.

    Port expansion.

    Two additional units at cumoaya nyaroelectric

    Port improvement, including banana handling f acilities.

    GUATEY1ALA To be de- (R) Expansion of power faci-

    HONDURAS

    t er mined lities. (Bank)

    To be de-ter·nined

    (Bonk)

    4.1 (Bank)

    Mining and processing nickel ore .

    Rehabi litat ion and re-orgaxd.zat i on of Puerto Cortes .

    Seep. l for footnotes ll 3/ and]/.

    ) )

    Present Status

    Proposals of Govt . being examined.

    )Awaiting rate in-)creases before complet-)ing appraisal reports~ ) )

    Awaiting results of con-sultants' studies on engineering and opera-tions .

    Awaiting results of UN Special Fund study of port and railwayso

    Awaiting definite !inancmg plan.

    Feasibility study being reviewed.

    Awaiting further information.

    In abeyance pending receipt of Govt.ts views and further information.

    Govt. to establish Port Authority; draft charter of Authority being reviewed; ap-praisal r eport being updat ed.

  • - 10 -

    Amount 2/ & Pr'obatie

    Member State]:_/ Lender Project]/ Present Status

    HONDURAS (Cont'd . ) To be de- (R) Reconstruction and con- Feasibility studies termined struction of Northern being reviewed; ap-

    (Bank) Highway. praisal mission planned for mid- Sept.

    MEXICO 30.0 (R) Toll transport facili- Appraisal mission (Bank) ties. planned for late

    Sept.

    20 . 0 Federal highways. ) (Bank) )

    ) 15000 Electric power. ) (Bank) )

    )Awaiting completion of To be de- Irrigation. )project studies and terrnined )financing plans.

    (Bank) ) )

    To be de- Agricultural credit . ) termincd )

    (Bank) )

    NICARAGUA i.~ UQ i ;I; ,u;i I, Q Qur.J. c.i~iJHiliA;t )

    (Ban.l{) )Awaiting completion of )feasibility studies.

    To be de- Feeder roads . ) termined )

    (Bank) )

    PANAMA 5.0- Supplementary road Awaiting progress on 7. 0 project. project financed by

    (Bank) existing loan.

    PARAGUAY 3.2 (R) Port improvement and Awaiting further (Bank) development. in.formationo

    2 .. 0 (N) Supplemental highway. Under consideration . (Uncertain)

    See p . 1 for footnotes _1/ 3/ and ]./.

  • Member State ]/

    PERU

    Amount 2/ & Probc:-.ble

    Lender

    Banco de Fomento Agropecuario

    URUGUAY

    Administracion General de las Usinas Electricas del Estado (UTE)

    Corporacion Anonima de Administracion (CADAFE)

    C.A. Telefonos Nacionales de Venezuela (CANTV)

    Institute Nacional de Obras Sani tarias (INOS)

    Bc0-10. 0

    (Bank)

    Be0-12. 0

    (Bank)

    1500-20 . 0

    (Bank)

    5~0-12e0

    (Bank)

    10,,7 (Ban.l{)

    To be de-termined

    (Bank)

    termined (Bank)

    To be de-termined

    (Bank)

    30. 0 (Bank)

    14. 0 (Bank)

    40.0-50.0

    (Bank)

    20.0-30 .. 0

    (Bank)

    - 11 -

    ~ject }/

    Agricultural credit and other facilities to complete colonization of San Lorenzo project area.

    Chira-Piura Irrigation project . (Previously listed as part of above San Lorenzo project.)

    (R) Highway reconstruction.

    Agricultural credit pro-gram.

    Second livestock project.

    Power.

    ' project.

    Zulia flood control and drainage project.

    (R) Second highway project.

    (R) High voltage transmission line .

    Expansion of long-dis-tance telecommunications facilities .

    Caracas water supply.

    See p. 1 for footnotes ll y and ]/.

    ) )

    Present Status

    )Mission to review )status of projects )scheduled in late )Sept. ) ) )

    )

    Technical appraisal mission in field .

    Appraisal report being prepared .

    Appraisal report being preparedo

    Awaiting further in-formation.

    )Preliminary mission )preparing reports . ) ) )

    ) ) ) )Loans signed on )Aug. 28. )

    Appraisal report being prepared.

    Preliminary findings of consulting engineer being reviewed,.