Tradelane: PHN(CAM) to BKK(TH)Electronic Cargo Tracking System (ECTS)
Anusorn LovichitIT Advisor TIFFA
Date: 09/10/2018
Workshop on Strengthening Transport Connectivity among Cambodia, Lao People’s Democratic Republic, Myanmar, Viet Nam and Thailand (CLMV-T)
Pilot application of secure cross border transport model along Thailand and Cambodia transport corridor
Session 2: Using new technologies in Transit Transport Facilitation
High Level Customs MeetingElectronic Cargo Tracking System
Meeting with Cambodia Customs Officers25 September 2018 CAMFFA*
Meeting with Myanmar Customs Officers24 September 2018 MIFFA*
Trial Scope
"เป็นหน่ึงในองค์กรในประเทศไทยทีช่่วยผลกัดนัการใชร้ะบบอิเล็กทรอนิกส์ในประเทศไปใหถึ้งจุดสูงสดุเพือ่ส่งเสริมการ
พฒันาเทคโนโลยีสารสนเทศของบา้นเราใหเ้ทียบเคียงประเทศเพือ่นบา้นไดอ้ย่างเต็มรูปแบบ"
TIFFA EDI Services Co.,Ltd.13 มกราคม 2542
iSpot Solution
• Prepared Hardware:
• iScout
• SIM Card (M2M)
• Asset: 2 containers
• Tradelane: Phnom Penh (Cambodia) - Bangkok (Thailand)
• Estimate Transit Time: 20 Hr.
• Parties Involved:
• Logistics Provider - Amazing Logistics and Supply Chain
• IT Provider - TIFFA EDI Services
• Cambodia Customs
• Thai Customs
Tradelane: (PHN - BKK)Electronic Cargo Tracking System
Tradelane Selection:Phnom Penh (Cambodia) - Bangkok (Thailand)
Border CrossThailand – Cambodia
Trial Results
We help to build the electronic community of tomorrow
Trial ResultsElectronic Cargo Tracking System
1) Entry Trip Information
Information Entry:1) Trip ID2) eSeal ID3) Container No.4) Origin5) Destination
Information from eSeal:1) Seal Date/Time2) Departure Date/Time3) Inspection Date/Time (Optional)
4) Arrival Date/Time
Trial ResultsElectronic Cargo Tracking System
2) Install eSeal (iScout SI-800)
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result
Record: TEST-20180925-0001
Submit Time:25/09/2018 16:23:59
Seal Time:25/09/2018 16:26:04
Departure Time:25/09/2018 16:55:43
Arrival Time:26/09/2018 20:21:38
eSeal No.:6203Container No.:TRLU6715610
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Total Transit Time: 27:57:49 ***hh:mm:ss
(25/09/2018 16:23 - 26/09/2018 20:21)
Transit Time in Cambodia : 18:51:48 Transit Time in Thailand : 9:06:01
Record: TEST-20180925-0001
Average Speed: 42.7 KM/HTop Speed: 76 KM/HLow Speed: 4 KM/H
Average Speed: 52.5 KM/HTop Speed: 77.8 KM/HLow Speed: 4.7 KM/H
Delay Issue:
• Driver rest• Trailer change at border
Delay Issue:
• Customs Inspection
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0001
Delay Issue: Driver Rest
From: 25/09/2018 22:50
To: 26/09/2018 6:45
Total Delay: 7:54:59 ***hh:mm:ss
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0001
Delay Issue: Trailer Change
From: 26/09/2018 10:40
To: 26/09/2018 11:00
Total Delay: 0:22:00 ***hh:mm:ss
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0001
Delay Issue: Thai Customs Inspection
From: 26/09/2018 11:35
To: 26/09/2018 14:05
Total Delay: 2:30:00 ***hh:mm:ss
***Officer Time Start at 10:00AM
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0002
Submit Time:25/09/2018 16:51:22
Seal Time:25/09/2018 16:52:22
Departure Time:25/09/2018 16:54:37
Arrival Time:26/09/2018 20:17:38
eSeal No.:6197Container No.:TCKU9775345
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Total Transit Time: 27:26:02 ***hh:mm:ss
(25/09/2018 16:51 - 26/09/2018 20:17)
Transit Time in Cambodia : 18:21:02 Transit Time in Thailand : 9:05:00
Record: TEST-20180925-0002
Average Speed: 39.5 KM/HTop Speed: 71.4 KM/HLow Speed: 5.7 KM/H
Average Speed: 48 KM/HTop Speed: 75 KM/HLow Speed: 4.1 KM/H
Delay Issue:
• Driver rest• Trailer change at border
Delay Issue:
• Customs Inspection
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0002
Delay Issue: Driver Rest
From: 25/09/2018 23:37
To: 26/09/2018 7:37
Total Delay: 7:59:59 ***hh:mm:ss
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0002
Delay Issue: Trailer Change
From: 26/09/2018 10:47
To: 26/09/2018 11:00
Total Delay: 0:14:59 ***hh:mm:ss
Trial ResultsElectronic Cargo Tracking System
3) Monitor Result (Cont.)
Record: TEST-20180925-0002
Delay Issue: Thai Customs Inspection
From: 26/09/2018 11:32
To: 26/09/2018 14:02
Total Delay: 2:30:00 ***hh:mm:ss
***Officer Time Start at 10:00AM
Transit Time (PHN-BKK) Delay Issues
Trial ResultsElectronic Cargo Tracking System
Trial Summary:
Recommendation:
Total Transit Time: 27:57:49
Record: TEST-20180925-0001
Total Transit Time: 27:26:02
Record: TEST-20180925-0002
• Driver rest
• Trailer change at border
• Customs Inspection
Driver rest• Take 2 Drivers on trip• Rearrange Load Plan
Trailer change at border • Is it needed?
Customs Inspection • Convince Customs to establish fast lane for
“Secure Container” with eSeal.
Imagine what else “Technology “ can dig up to facilitate trade… the rest is up to you!
Q&A
We help to build the electronic community of tomorrow
What can you expect the next time we meet again?• 10 more containers for PNH – BKK tradelane• 5 containers for YGN – BKK tradelane
Thank you
We help to build the electronic community of tomorrow