Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop on Strengthening Transport Connectivity among Cambodia, Lao People’s Democratic Republic, Myanmar, Viet Nam and Thailand (CLMV-T) Pilot application of secure cross border transport model along Thailand and Cambodia transport corridor Session 2: Using new technologies in Transit Transport Facilitation

Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Tradelane: PHN(CAM) to BKK(TH)Electronic Cargo Tracking System (ECTS)

Anusorn LovichitIT Advisor TIFFA

Date: 09/10/2018

Workshop on Strengthening Transport Connectivity among Cambodia, Lao People’s Democratic Republic, Myanmar, Viet Nam and Thailand (CLMV-T)

Pilot application of secure cross border transport model along Thailand and Cambodia transport corridor

Session 2: Using new technologies in Transit Transport Facilitation

Page 2: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

High Level Customs MeetingElectronic Cargo Tracking System

Meeting with Cambodia Customs Officers25 September 2018 CAMFFA*

Meeting with Myanmar Customs Officers24 September 2018 MIFFA*

Page 3: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial Scope

"เป็นหน่ึงในองค์กรในประเทศไทยทีช่่วยผลกัดนัการใชร้ะบบอิเล็กทรอนิกส์ในประเทศไปใหถึ้งจุดสูงสดุเพือ่ส่งเสริมการ

พฒันาเทคโนโลยีสารสนเทศของบา้นเราใหเ้ทียบเคียงประเทศเพือ่นบา้นไดอ้ย่างเต็มรูปแบบ"

TIFFA EDI Services Co.,Ltd.13 มกราคม 2542

iSpot Solution

• Prepared Hardware:

• iScout

• SIM Card (M2M)

• Asset: 2 containers

• Tradelane: Phnom Penh (Cambodia) - Bangkok (Thailand)

• Estimate Transit Time: 20 Hr.

• Parties Involved:

• Logistics Provider - Amazing Logistics and Supply Chain

• IT Provider - TIFFA EDI Services

• Cambodia Customs

• Thai Customs

Page 4: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Tradelane: (PHN - BKK)Electronic Cargo Tracking System

Tradelane Selection:Phnom Penh (Cambodia) - Bangkok (Thailand)

Border CrossThailand – Cambodia

Page 5: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial Results

We help to build the electronic community of tomorrow

Page 6: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

1) Entry Trip Information

Information Entry:1) Trip ID2) eSeal ID3) Container No.4) Origin5) Destination

Information from eSeal:1) Seal Date/Time2) Departure Date/Time3) Inspection Date/Time (Optional)

4) Arrival Date/Time

Page 7: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

2) Install eSeal (iScout SI-800)

Page 8: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result

Record: TEST-20180925-0001

Submit Time:25/09/2018 16:23:59

Seal Time:25/09/2018 16:26:04

Departure Time:25/09/2018 16:55:43

Arrival Time:26/09/2018 20:21:38

eSeal No.:6203Container No.:TRLU6715610

Page 9: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Total Transit Time: 27:57:49 ***hh:mm:ss

(25/09/2018 16:23 - 26/09/2018 20:21)

Transit Time in Cambodia : 18:51:48 Transit Time in Thailand : 9:06:01

Record: TEST-20180925-0001

Average Speed: 42.7 KM/HTop Speed: 76 KM/HLow Speed: 4 KM/H

Average Speed: 52.5 KM/HTop Speed: 77.8 KM/HLow Speed: 4.7 KM/H

Delay Issue:

• Driver rest• Trailer change at border

Delay Issue:

• Customs Inspection

Page 10: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0001

Delay Issue: Driver Rest

From: 25/09/2018 22:50

To: 26/09/2018 6:45

Total Delay: 7:54:59 ***hh:mm:ss

Page 11: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0001

Delay Issue: Trailer Change

From: 26/09/2018 10:40

To: 26/09/2018 11:00

Total Delay: 0:22:00 ***hh:mm:ss

Page 12: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0001

Delay Issue: Thai Customs Inspection

From: 26/09/2018 11:35

To: 26/09/2018 14:05

Total Delay: 2:30:00 ***hh:mm:ss

***Officer Time Start at 10:00AM

Page 13: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0002

Submit Time:25/09/2018 16:51:22

Seal Time:25/09/2018 16:52:22

Departure Time:25/09/2018 16:54:37

Arrival Time:26/09/2018 20:17:38

eSeal No.:6197Container No.:TCKU9775345

Page 14: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Total Transit Time: 27:26:02 ***hh:mm:ss

(25/09/2018 16:51 - 26/09/2018 20:17)

Transit Time in Cambodia : 18:21:02 Transit Time in Thailand : 9:05:00

Record: TEST-20180925-0002

Average Speed: 39.5 KM/HTop Speed: 71.4 KM/HLow Speed: 5.7 KM/H

Average Speed: 48 KM/HTop Speed: 75 KM/HLow Speed: 4.1 KM/H

Delay Issue:

• Driver rest• Trailer change at border

Delay Issue:

• Customs Inspection

Page 15: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0002

Delay Issue: Driver Rest

From: 25/09/2018 23:37

To: 26/09/2018 7:37

Total Delay: 7:59:59 ***hh:mm:ss

Page 16: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0002

Delay Issue: Trailer Change

From: 26/09/2018 10:47

To: 26/09/2018 11:00

Total Delay: 0:14:59 ***hh:mm:ss

Page 17: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Trial ResultsElectronic Cargo Tracking System

3) Monitor Result (Cont.)

Record: TEST-20180925-0002

Delay Issue: Thai Customs Inspection

From: 26/09/2018 11:32

To: 26/09/2018 14:02

Total Delay: 2:30:00 ***hh:mm:ss

***Officer Time Start at 10:00AM

Page 18: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Transit Time (PHN-BKK) Delay Issues

Trial ResultsElectronic Cargo Tracking System

Trial Summary:

Recommendation:

Total Transit Time: 27:57:49

Record: TEST-20180925-0001

Total Transit Time: 27:26:02

Record: TEST-20180925-0002

• Driver rest

• Trailer change at border

• Customs Inspection

Driver rest• Take 2 Drivers on trip• Rearrange Load Plan

Trailer change at border • Is it needed?

Customs Inspection • Convince Customs to establish fast lane for

“Secure Container” with eSeal.

Imagine what else “Technology “ can dig up to facilitate trade… the rest is up to you!

Page 19: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Q&A

We help to build the electronic community of tomorrow

What can you expect the next time we meet again?• 10 more containers for PNH – BKK tradelane• 5 containers for YGN – BKK tradelane

Page 20: Workshop on Strengthening Transport Connectivity …...Tradelane: PHN(CAM) to BKK(TH) Electronic Cargo Tracking System (ECTS) Anusorn Lovichit IT Advisor TIFFA Date: 09/10/2018 Workshop

Thank you

We help to build the electronic community of tomorrow