S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Bridges 900 BRG/900/12Construction of Slab near Arishinagodi Naka Surakoda''s house. 09/02/2009 30/10/2009 1.59 1.56 tUArz
2 Naragunda Buildings 900 BLD/900/54 Construction of Toilet at Vinayaka Nagar. 09/02/2009 24/03/2011 8.55 0.0 tUArz3 Naragunda Buildings 900 BLD/900/55 Construction of Toilet at Kasaba Kondawad. 09/02/2009 24/03/2011 8.55 0.0 tUArz4 Naragunda Buildings 900 BLD/900/56 Construction of Public Toilet Tippusultan Circle. 09/02/2009 24/03/2011 8.55 0.0 tUArz
5 Naragunda Buildings 900 BLD/900/57Construction of Public Toilet at Somapur oni near Tegginamani house. 09/02/2009 24/03/2011 8.55 0.0 tUArz
6 Naragunda Buildings 900 BLD/900/59 Repair of TMC Roof. 09/02/2009 24/03/2011 3.0 3.0 tUArz
7 Naragunda Burial Ground 900 BGD/900/58Formation of Asphalt road from Veternary Hospitla to Collage. 09/02/2009 24/03/2011 5.84 0.0 tUArz
8 Naragunda Burial Ground 900 BGD/900/60Construction of Compound and Garden near Siddeshwara Temple. 09/02/2009 24/03/2011 3.0 0.0 tUArz
9 Naragunda Other Works 900 OWS/900/15Construction of Retaining Wall at behind Venkateswar temple infront of Bhajantri house. 09/02/2009 26/03/2009 1.75 0.0 tUArz
10 Naragunda Other Works 900 OWS/900/19Construction of Retaining wall at ward No.7 Hooli''s Sandhi behind kumbar house. 09/02/2009 26/03/2009 0.38 0.36 tUArz
11 Naragunda Other Works 900 OWS/900/20Construction of Retaining wall at ward No.7 attached to Karegond Road. 09/02/2009 26/03/2009 0.54 0.56 tUArz
12 Naragunda Other Works 900 OWS/900/21Construction of Retaining wall at ward No.7 at Ghatage Sandhi. 09/02/2009 26/03/2009 0.4 0.45 tUArz
13 Naragunda Other Works 900 OWS/900/22Construction of Retaining wall at ward No.8 Near Venkateswara temple road Santara house. 09/02/2009 01/06/2009 0.73 0.72 tUArz
14 Naragunda Other Works 900 OWS/900/51 Construction of Tanti Beli around Arban Burrial ground. 09/02/2009 22/04/2010 1.51 0.0 tUArz
15 Naragunda Other Works 900 OWS/900/53
1. Construction of Draind at Kori Complex to Anegundi house. 2.Formation of Asphalt road from TMC to Sarvajna Circle. 09/02/2009 12/06/2010 15.0 15.0 tUArz
16 Naragunda Other Works 900 OWS/900/62 Reserved for Balance Salary to the Employees. 09/02/2009 10/04/2009 5.0 0.0 tUArz17 Naragunda Other Works 900 OWS/900/63 Amount Reserved for 22.75% 05/09/2009 31/03/2010 60.0 0.0 tUArz
18 Naragunda Roads 900 RDS/900/1Construction of C C Road from TMC main road Gudisagar house to Yallur house. 09/02/2009 15/01/2010 7.98 8.31 tUArz
19 Naragunda Roads 900 RDS/900/16Construction of CC Road at Jamalapur oni Karade house backside to Collage Road. 09/02/2009 08/05/2009 2.46 2.35 tUArz
Work Summary of SFC UNTIED 2008-09 ReportRsinLakhs
20 Naragunda Roads 900 RDS/900/18 Construction of C C Road at Gadi oni. 09/02/2009 08/10/2009 3.74 0.0
gzr g s PAiiAiz Plq itP PjPVz.
21 Naragunda Roads 900 RDS/900/2Construction of C C Road from Ingalalli Vakar to Babu chavan house. 09/02/2009 15/01/2010 7.98 8.32 tUArz
22 Naragunda Roads 900 RDS/900/24Construction of C C road from Chinivalagatti oni Peth Chavadi Bhusare Sandhi cross. 09/02/2009 10/02/2010 6.2 6.36 tUArz
23 Naragunda Roads 900 RDS/900/25Construcion of CC Roa at Chinivalagati oni Hegadal house to Hatti house. 09/02/2009 10/02/2010 6.2 6.36 tUArz
24 Naragunda Roads 900 RDS/900/26Paving of Stone slab at Arban Rajesab Naykar house to Jamadar house. 09/02/2009 10/02/2010 4.19 3.72 tUArz
25 Naragunda Roads 900 RDS/900/27Paving of Stone slab at Ward No.14 Gudaradavar oni Nadaf''s site to Subedar house. 09/02/2009 01/06/2009 1.39 1.5 tUArz
26 Naragunda Roads 900 RDS/900/28 Construcion of CC Road infront of Viraktamath. 09/02/2009 16/03/2009 1.83 1.5 tUArz
27 Naragunda Roads 900 RDS/900/29
Formation of Asphalt road nearPatrivana Siddeswara temple road at Koppanagoudra Oni Joladavar house to near Salibasaveswar Anegn 09/02/2009 02/03/2011 5.7 2.04
gzr g s PAiiAiz Plq itP PjPVz.
28 Naragunda Roads 900 RDS/900/3Construction of C C road from Parvatevva Vagmode house to Subbanavar Oni Cross. 09/02/2009 15/01/2010 7.98 8.3 tUArz
29 Naragunda Roads 900 RDS/900/31Paving of Stone slab and construction of drain at Ward No.19 Pethenavar Sandhi. 09/02/2009 08/05/2009 2.27 2.27 tUArz
30 Naragunda Roads 900 RDS/900/32 Paving of Stone slab around Shankaralinga temple. 09/02/2009 30/10/2009 4.24 4.23 tUArz31 Naragunda Roads 900 RDS/900/34 Formation of Mettling at Saraswati Nagar 09/02/2009 31/07/2009 2.06 2.09 tUArz
32 Naragunda Roads 900 RDS/900/35 Formation of Asphalt road at Guddadakeri Kavali Road. 09/02/2009 31/07/2009 5.46 4.17
gzr g s PAiiAiz Plq itP PjPVz.
33 Naragunda Roads 900 RDS/900/37 Paving of Stone slab from Venkateswar Temple to Masuti. 09/02/2009 10/06/2009 5.37 6.64 tUArz34 Naragunda Roads 900 RDS/900/38 Paving of Stone slab at Dandapur Deshapand eoni. 09/02/2009 16/03/2009 2.57 2.63 tUArz
35 Naragunda Roads 900 RDS/900/4Construction of C C Road from Arabajamadar house to Panchanna Ramadurga house. 09/02/2009 15/01/2010 7.98 8.53 tUArz
36 Naragunda Roads 900 RDS/900/40Formation of Asphalt road at Somapur Basavaraddi house though National High way. 09/02/2009 02/03/2011 7.27 4.14
gzr g s PAiiAiz Plq itP PjPVz.
37 Naragunda Roads 900 RDS/900/41Paving of Stone slab at Ward No.20 around Halepethe Basaveswar Temple. 09/02/2009 08/05/2009 0.38 0.42 tUArz
38 Naragunda Roads 900 RDS/900/42Paving of Stone slab at Ward No.20 Near Basavanna kere Muttappa Kambar house to Dongri house. 09/02/2009 08/05/2009 1.58 1.54 tUArz
39 Naragunda Roads 900 RDS/900/44Formation of Asphalt road from Somapur NH to Maruti Nagara Dasar house. 09/02/2009 10/05/2010 4.34 4.26 tUArz
40 Naragunda Roads 900 RDS/900/47Formation of Asphalt road from Patil house to Kasaba burrial ground. 09/02/2009 02/09/2010 5.21 4.82 tUArz
41 Naragunda Roads 900 RDS/900/49 Formation of Asphalt inside Somapur Burrial gorund. 09/02/2009 02/03/2011 2.59 1.64 tUArz
42 Naragunda Roads 900 RDS/900/5Construction of C C Road Maningappa Navalagund house to Sangappa Navalagund 09/02/2009 15/01/2010 7.98 8.21 tUArz
43 Naragunda Roads 900 RDS/900/50 Formation of Asphalt road at Sompaur Burrial ground. 09/02/2009 22/04/2010 1.84 1.11 tUArz
44 Naragunda Roads 900 RDS/900/6Construction of C C Road from Manohar Huyilgol house to Gouramma Ganiger house 09/02/2009 15/01/2010 7.98 8.24 tUArz
45 Naragunda Roads 900 RDS/900/7Construction of C C Road from Paltanakar house to Dandapur society 09/02/2009 15/01/2010 7.98 8.4 tUArz
46 Naragunda Roads 900 RDS/900/8Construction of C C Road infront of Rokhade Chal Kurubageri cross road to Sangolli Rayanna circle 09/02/2009 13/06/2009 7.98 8.42 tUArz
47 Naragunda Roads 900 RDS/900/9
Construction of stone slab faving road at Ward No.3 Bhajantri oni Devappa Bhajantri house to Kavali road cross. 09/02/2009 22/03/2009 1.05 1.0 tUArz
48 NaragundaStorm Water Drains 900 SWD/900/10
Construction of Drain at Horakeri oni Bhangi Sandhi avatade house to Davalasab Bhangi house 09/02/2009 22/03/2010 0.73 0.87 tUArz
49 NaragundaStorm Water Drains 900 SWD/900/11
Construction of Drain at Ward No.3 Horakeri oni melina mani masuti rajesab Gasti house to Davalasab Bhangi house 09/02/2009 10/06/2010 1.57 1.79 tUArz
50 NaragundaStorm Water Drains 900 SWD/900/13
Construction of RCC Drain Near Horakeri Oni Tippu sultan Circle Konnur house to NHT Mill Cross CD. 09/02/2009 05/03/2012 2.23 2.33 tUArz
51 NaragundaStorm Water Drains 900 SWD/900/14
Construction of Drain Near KEB Grid colony behind Savatagi house. 09/02/2009 30/06/2010 2.9 3.03 tUArz
52 NaragundaStorm Water Drains 900 SWD/900/17
Construction of Drain from Horakeri oni Kumbar house to Tippu Sultan Circle. 09/02/2009 08/05/2009 2.05 2.56 tUArz
53 NaragundaStorm Water Drains 900 SWD/900/23
Repair of RCC drain at Menasinakai oni Basappa Soudatti house to Ramadas Sahukar house. 09/02/2009 08/05/2009 1.41 1.43 tUArz
54 NaragundaStorm Water Drains 900 SWD/900/30
Construcion of Drain from Salibasaveswar temple to Hosakeri Sandhi Hosagoudra house. 09/02/2009 10/06/2009 0.99 0.98 tUArz
55 NaragundaStorm Water Drains 900 SWD/900/33
Construcion of drain and paving of Stone slab at Shankaralingan oni Hugar Sandhi 09/02/2009 15/08/2009 0.68 0.0 tUArz
56 NaragundaStorm Water Drains 900 SWD/900/36
Construction of Drain from Venkateswar temple to Dr:F K Savadatti house. 09/02/2009 20/08/2009 2.95 3.06 tUArz
57 NaragundaStorm Water Drains 900 SWD/900/39
Construcion of Drain and CD at Dandapur Deshapande oni. 09/02/2009 01/06/2009 0.88 0.78 tUArz
58 NaragundaStorm Water Drains 900 SWD/900/43
Repair of RCC drain and construction of slab at Kasaba Devanakonda Complex. 09/02/2009 20/08/2009 0.63 0.64 tUArz
59 NaragundaStorm Water Drains 900 SWD/900/45 Construction of drain at Kanyal oni. 09/02/2009 10/02/2010 0.94 0.81 tUArz
60 NaragundaStorm Water Drains 900 SWD/900/46
Construction of RCC Drain Somapur Karigoudra house attached Rachaiah Nagar to HaleSurakod Raod. 09/02/2009 08/05/2009 4.59 4.65 tUArz
61 NaragundaStorm Water Drains 900 SWD/900/48
Construction of Drain attached to Dandapur Burrial ground. 09/02/2009 22/03/2010 6.98 7.13 tUArz
62 Naragunda Street Lighting 900 SLG/900/61 Installation of Street Lights and 3phase lines in all wards. 09/02/2009 10/12/2010 10.0 9.49 tUArz
63 Naragunda Water Supply 900 WSS/900/52Re-Formation of Drinking Water Supply Pilpelines at Town Limit. 09/02/2009 10/12/2012 25.0 3.5
gzr g s PAiiAiz Plq itP PjPVz.
339.25 196.22Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Bridges 901 BRG/901/10Construcion of CD near collage road Mahadevappa parasanna house. 29/04/2010 29/08/2010 0.51 0.59 tUArz
2 Naragunda Bridges 901 BRG/901/30Paving of Stone Slab at Shiddnabavi oni Ningappa Savadatti house to Kannur goudra house. 29/04/2010 29/08/2010 1.66 1.65 tUArz
3 Naragunda Bridges 901 BRG/901/40 Construction of CD at Adyapaka Nagar 1st Road. 29/04/2010 29/08/2010 0.51 0.47 tUArz4 Naragunda Bridges 901 BRG/901/43 Construction of Road and 2 CD''s at KCC Bank. 29/04/2010 29/08/2010 6.0 5.92 tUArz5 Naragunda Buildings 901 BLD/901/1 Construction of Toilet near karegonda road. 29/04/2010 29/08/2010 8.55 7.73 tUArz6 Naragunda Buildings 901 BLD/901/39 Construction of Toilet and CD at Savadatti Road. 29/04/2010 29/08/2010 0.51 0.46 tUArz
7 Naragunda Buildings 901 BLD/901/46 Construction of Burrial building at Kasaba Khabarasthan. 29/04/2010 29/08/2010 2.76 2.83 tUArz8 Naragunda Buildings 901 BLD/901/47 Repair of TMC Building. 29/04/2010 29/08/2010 2.5 2.5 tUArz
9 Naragunda Other Works 901 OWS/901/2Construction of Retaining wall at guddadakeri oni near Sunagar house. 29/04/2010 25/09/2010 3.0 2.87 tUArz
10 Naragunda Other Works 901 OWS/901/51 Reserved for 22.75% 01/01/2010 31/03/2011 44.62 44.62 tUArz11 Naragunda Other Works 901 OWS/901/52 Spill over works of 2008-09 29/04/2010 31/03/2011 143.19 95.04 tUArz
12 Naragunda Roads 901 RDS/901/12
Construction of Stone slab Faving and CC Drain near Jamalapur Ambabhavani temple Venkappa Dembre house to Hanumanth Temple. 29/04/2010 29/08/2010 2.86 3.18 tUArz
13 Naragunda Roads 901 RDS/901/13Formation of Asphalt road and construction of CD near Desaibhavi Khabarsthan Road. 29/04/2010 15/09/2010 1.0 1.25 tUArz
14 Naragunda Roads 901 RDS/901/14Formation of Asphalt road from Kolakar hospital to Mabusubani Darga. 29/04/2010 15/09/2010 1.49 1.37 tUArz
15 Naragunda Roads 901 RDS/901/15 Construction of Stone slab Faving road at Fatte Masuti. 29/04/2010 04/10/2010 0.75 0.93 tUArz
16 Naragunda Roads 901 RDS/901/16Construction of Stone slab Faving road from savadatti road to Basavanna temple. 29/04/2010 09/10/2010 1.5 1.57 tUArz
17 Naragunda Roads 901 RDS/901/17Construction of Stone slab Faving road from savadatti road Mabusubani Darga. 29/04/2010 04/08/2010 0.48 0.0
gzr g s PAiiAiz Plq itP PjPVz.
18 Naragunda Roads 901 RDS/901/18Construction of Stone slab Faving road and Drain at Subbannavar oni Badiger house sandhi. 29/04/2010 04/09/2010 0.86 0.78 tUArz
19 Naragunda Roads 901 RDS/901/20Construction of Stone slab Faving road around Dyamavvana gudi. 29/04/2010 04/08/2010 0.68 0.51 tUArz
20 Naragunda Roads 901 RDS/901/21Construction of Stone slab Faving road at Koppanagoudra oni Dadibhavi house. 29/04/2010 09/10/2010 0.68 0.82 tUArz
Work Summary of SFC UNTIED 2009-10 ReportRsinLakhs
21 Naragunda Roads 901 RDS/901/22Construction of Stone slab Faving road at Kasaba oni Salibasaveshwar Kalyan mantapa to matapathi house. 29/04/2010 04/08/2010 1.16 1.11 tUArz
22 Naragunda Roads 901 RDS/901/23Paving of Stone slab in Asuti house main drain sandhi main road. 29/04/2010 04/08/2010 0.34 0.39 tUArz
23 Naragunda Roads 901 RDS/901/24 Formation of Mettling Road in Vinayaka Nagar. 29/04/2010 06/10/2010 18.52 17.99 tUArz
24 Naragunda Roads 901 RDS/901/25Formation of Asphalt road from Kamble house to Siddanabavi oddigeri house. 29/04/2010 15/07/2010 5.21 5.59 tUArz
25 Naragunda Roads 901 RDS/901/26 Paving of Stone slab around Mabusubani darga. 29/04/2010 04/10/2010 1.73 1.9 tUArz
26 Naragunda Roads 901 RDS/901/3Construction of Stone slab Faving Road near Agasar house. 29/04/2010 06/08/2010 1.18 0.94 tUArz
27 Naragunda Roads 901 RDS/901/31 Construction of Road at Totad kere. 29/04/2010 04/11/2010 5.0 4.85 tUArz28 Naragunda Roads 901 RDS/901/35 Formation of Asphalt road at Navalagund plot. 29/04/2010 29/08/2010 2.3 2.52 tUArz
29 Naragunda Roads 901 RDS/901/37Formation of Asphalt road from D: Prabhu house to Rokhade house. 29/04/2010 03/04/2011 2.61 2.42 tUArz
30 Naragunda Roads 901 RDS/901/41 Construction of Road at Maruti Nagar. 29/04/2010 29/08/2010 4.0 3.45 tUArz31 Naragunda Roads 901 RDS/901/42 Paving of Stone Slab near Somapur kere. 29/04/2010 29/08/2010 2.0 1.99 tUArz
32 Naragunda Roads 901 RDS/901/45 Paving of Stone slab infront of Udachammana gudi. 29/04/2010 29/08/2010 1.99 1.95 tUArz
33 Naragunda Roads 901 RDS/901/6Construction of Stone slab Faving Road from 1st Galli Nalavadi house to Siddeshwar road. 29/04/2010 29/08/2010 3.27 2.88 tUArz
34 Naragunda Roads 901 RDS/901/7Formation of Asphalt road behind kurubgeri masuti Daragad house to Karemmana katte. 29/04/2010 25/09/2010 4.0 3.36 tUArz
35 Naragunda Roads 901 RDS/901/8 Formation of Asphalt road of Jamalasha Darga Road. 29/04/2010 29/08/2010 2.5 1.43 tUArz
36 NaragundaStorm Water Drains 901 SWD/901/11
Construction of Drain from Husensab Nishandar house to Imamsab bahaddurkhan House. 29/04/2010 07/11/2010 0.38 0.42 tUArz
37 NaragundaStorm Water Drains 901 SWD/901/19
Construcion of Road and Drain near Lodi galli Sunagar house. 29/04/2010 07/11/2010 0.75 0.6 tUArz
38 NaragundaStorm Water Drains 901 SWD/901/27
Construcion of Drain and Paving of stone slab from Rehmanasab Yaligar house to Shankarappa Hooli house. 29/04/2010 14/10/2010 1.06 1.32 tUArz
39 NaragundaStorm Water Drains 901 SWD/901/28
Construcion of Drain from Gangaram Kamble house to National Highway( Behind Janatha Bazar) 29/04/2010 29/08/2010 2.8 1.86 tUArz
40 NaragundaStorm Water Drains 901 SWD/901/29
Construcion of CD and Drain from Shiddanabavi killedar house to Daivad house. 29/04/2010 29/08/2010 1.59 1.56 tUArz
41 NaragundaStorm Water Drains 901 SWD/901/32 Construcion of Drain near Kasaba Jelli Shop. 29/04/2010 29/08/2010 0.55 0.55 tUArz
42 NaragundaStorm Water Drains 901 SWD/901/33 Construcion of Drain from Mane house to Lodi Galli. 29/04/2010 29/08/2010 2.0 2.0 tUArz
43 NaragundaStorm Water Drains 901 SWD/901/34 Construcion of Drain and slab at Shankarling oni. 29/04/2010 29/08/2010 1.05 0.64 tUArz
44 NaragundaStorm Water Drains 901 SWD/901/38 Construction of drain at Vidya Nagar. 29/04/2010 29/08/2010 3.35 3.39 tUArz
45 NaragundaStorm Water Drains 901 SWD/901/49
1) Construction of Drain at Kori Complex Anegundi house bothside. 2) Formation of Asphalt Road from TMC to Sarvajna circle. 29/04/2010 29/08/2010 15.0 15.13 tUArz
46 NaragundaStorm Water Drains 901 SWD/901/5 Construction of Drain at Bhusare sandhi. 29/04/2010 29/08/2010 0.75 0.75 tUArz
47 NaragundaStorm Water Drains 901 SWD/901/9
Construction of Drain from Boite house to Sakkappa House. 29/04/2010 29/08/2010 3.39 3.42 tUArz
48 Naragunda Water Supply 901 WSS/901/36Installation of 3" PVC Pipeline at Dandapur Sosiety to S K Hugar house. 29/04/2010 29/08/2010 0.9 0.85 tUArz
49 Naragunda Water Supply 901 WSS/901/4 Constrction of Water storage tank near Biradevar temple. 29/04/2010 29/08/2010 0.15 0.0 tUArz
50 Naragunda Water Supply 901 WSS/901/44 Purchasing of Pipe(PVC) for Naragund town water supply. 29/04/2010 29/08/2010 12.0 12.11 tUArz
51 Naragunda Water Supply 901 WSS/901/48Installation of RCC Pipes attached to Stadium Paduvagond kere water storage Kaluve. 29/04/2010 29/08/2010 11.5 11.4 tUArz
52 Naragunda Water Supply 901 WSS/901/50Construction of Retaining wall from Devaji Pharasi road to Sarpannavar house. 29/04/2010 29/08/2010 2.25 1.85 tUArz
339.39 285.71Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Bridges 902 BRG/902/19 Construcion of CD near Somapur Canal. 07/04/2011 04/08/2011 3.0 2.45 tUArz2 Naragunda Bridges 902 BRG/902/27 Construcion of CD near Saraswati Nagar Canal. 07/04/2011 04/09/2011 3.0 3.0 tUArz
3 Naragunda Bridges 902 BRG/902/31Conctruction of Compound wall to Public Toilet at Shankaraling oni 07/04/2011 09/01/2012 1.0 0.78 tUArz
4 Naragunda Bridges 902 BRG/902/43 Construction of CD at Somapur near Venkaraddi house 07/04/2011 04/08/2011 0.39 0.35 tUArz
5 Naragunda Bridges 902 BRG/902/8Construcion of Drain near Jamalapur Hanumanth temple from shitole house to up to 7th cross Road. 07/04/2011 18/11/2011 3.18 3.12 tUArz
6 Naragunda Other Works 902 OWS/902/17Construction of structure to burry bodies at Somapur Burrial ground. 29/04/2010 04/09/2011 3.0 0.0
tUArz. (1.84 PU 2011-12
Azjz PUjUU Pjz vz RZ
vjz.)
7 Naragunda Other Works 902 OWS/902/50Formation of Mettling Road from Old Avaradi road NHT Mill cross to Canal. 07/04/2011 10/12/2011 9.05 9.05 tUArz
8 Naragunda Other Works 902 OWS/902/53Shortfall amount towards construction of Siddeswara Samudya Bhavan 07/04/2011 02/08/2011 6.11 6.11 tUArz
9 Naragunda Other Works 902 OWS/902/54 Amount Reserved for 22.75 08/04/2011 31/05/2011 49.62 45.28 tUArz10 Naragunda Other Works 902 OWS/902/55 Amount Reserved for 7.25% 07/04/2011 31/05/2011 15.81 15.81 tUArz11 Naragunda Other Works 902 OWS/902/56 Reserved for Spill over works 07/04/2011 31/05/2011 48.46 30.63 tUArz
12 Naragunda Roads 902 RDS/902/1Formation of Mettling and Asphalting Road from Old APMC yard Samuday Bhavan to old court Building. 07/04/2011 24/03/2012 6.55 6.75 tUArz
13 Naragunda Roads 902 RDS/902/10
Construcion of CC Road from Dandapur veternary Hospital 7th Cross to sri Iranna kulumi shop (Revised Estimation) 07/04/2011 08/09/2011 10.96 10.76 tUArz
14 Naragunda Roads 902 RDS/902/11Formation of Asphalt road near Collage road siddeswara temple road to Jamalapur Naykar house. 07/04/2011 09/10/2011 6.31 7.19 tUArz
15 Naragunda Roads 902 RDS/902/12Formation of Asphalt road nearPatrivana Siddeswara temple road to Hanumanth Temple Janatha plot. 07/04/2011 10/12/2011 7.49 7.08 tUArz
16 Naragunda Roads 902 RDS/902/13 Construcion of CC Road infront of Kalmeswara temple. 07/04/2011 11/12/2011 2.44 2.93 tUArz
17 Naragunda Roads 902 RDS/902/14Construcion of CC Road infront of Arban Mabusubani Darga. 07/04/2011 10/09/2011 4.23 3.74 tUArz
Work Summary of SFC UNTIED 2010-11 ReportRsinLakhs
18 Naragunda Roads 902 RDS/902/18Formation of Asphalt road from Sadu ajjan temple to burrial ground road behind depot cross. 07/04/2011 15/12/2011 6.95 5.48 tUArz
19 Naragunda Roads 902 RDS/902/2Formation of Mettling and Asphalting Road from KT Company to Ratiwell Road. 07/04/2011 05/08/2011 6.67 6.0 tUArz
20 Naragunda Roads 902 RDS/902/20Construcion of RCC Slab near Savadatti road Jogannavar house. 07/04/2011 13/11/2011 1.5 1.52 tUArz
21 Naragunda Roads 902 RDS/902/21Formation of Asphalt road from Horakeri Basaveswara temple to NHT Mill cross. 07/04/2011 18/12/2011 8.18 7.25 tUArz
22 Naragunda Roads 902 RDS/902/22Formation of Asphalt road near NHT Mill Jamadar House to Asuti Jinning Factory cross. 07/04/2011 15/12/2011 4.77 3.78 tUArz
23 Naragunda Roads 902 RDS/902/23 Paving of Stone slab in Hagedakatti oni. 07/04/2011 15/12/2011 1.32 1.34 tUArz
24 Naragunda Roads 902 RDS/902/24 Paving of Stone slab at Dandapur behind Jamadar house. 07/04/2011 16/12/2011 1.14 0.88 tUArz
25 Naragunda Roads 902 RDS/902/29Formation of Mettling and Asphalting Road Dandapur Dandin peth Main road to Kidaki Basaveswara temple. 07/04/2011 19/12/2011 3.05 1.93 tUArz
26 Naragunda Roads 902 RDS/902/3Construction of Retaining Wall near Horakeri Pawar house. 07/04/2011 13/12/2011 1.0 1.0 tUArz
27 Naragunda Roads 902 RDS/902/30 Construcion of CD at Dandapur 1st and 4th Cross Road. 07/04/2011 13/12/2011 1.1 0.73 tUArz
28 Naragunda Roads 902 RDS/902/32Paving of Stone slab at Jamalapur Mullur house to Jamalasha Darga. 07/04/2011 15/12/2011 3.0 2.79 tUArz
29 Naragunda Roads 902 RDS/902/39Paving of Stone slab at Somapur Infront of Goudappa Goudra House. 07/04/2011 15/12/2011 1.42 1.38 tUArz
30 Naragunda Roads 902 RDS/902/4Constrction of Stone slab Faving Road at Horakeri Kudenavar Sandhi. 07/04/2011 15/12/2011 2.11 2.26 tUArz
31 Naragunda Roads 902 RDS/902/40Paving of Stone slab at Somapur beside dyamavva temple. 07/04/2011 15/12/2011 1.33 1.13 tUArz
32 Naragunda Roads 902 RDS/902/41 Paving of Stone slab at Somapur near masuti 07/04/2011 15/12/2011 1.85 1.84 tUArz33 Naragunda Roads 902 RDS/902/44 Construction of RCC Slab on drain in Kanyala oni. 07/04/2011 17/12/2011 0.55 0.57 tUArz
34 Naragunda Roads 902 RDS/902/46Paving of Stone slab and incresing hight of drain and putting RCC Slab at Somapur near masaneyavar oni. 07/04/2011 10/12/2011 0.45 0.13 tUArz
35 Naragunda Roads 902 RDS/902/47 Construction of Public Toilet Tippusultan Circle. 07/04/2011 12/01/2012 0.83 0.0
gzr g s PAiiAiz Plq itP PjPVz.
36 Naragunda Roads 902 RDS/902/48 Construction of CC Road at Kanyal Oni(Revised Estimate) 07/04/2011 03/02/2013 3.62 1.94 tUArz
37 Naragunda Roads 902 RDS/902/49 Construction of drain at Somapur near avatade house. 07/04/2011 10/12/2011 1.0 1.02 tUArz
38 Naragunda Roads 902 RDS/902/51 Construction of CD at Kanyal oni attached to NH Road. 07/04/2011 07/01/2012 0.6 0.0
gzr g s PAiiAiz Plq itP PjPVz.
39 Naragunda Roads 902 RDS/902/52Formation of Mettling and asphalting as Somapur Haligeri Oni. 07/04/2011 06/01/2012 3.49 3.14 tUArz
40 Naragunda Roads 902 RDS/902/6 Construction of CD near Talavayi House at Horakeri oni 07/04/2011 08/09/2011 0.5 0.41 tUArz
41 Naragunda Roads 902 RDS/902/7
Construcion of CC Road from Jamalapur 7th Cross Sri Iranna Kulumi''s Shop to Jamalapur Old Siddeswara Temple 07/04/2011 17/12/2011 9.69 10.58 tUArz
42 Naragunda Roads 902 RDS/902/9 Construction of CD at 7th Cross Road, 07/04/2011 03/12/2011 0.75 0.61 tUArz
43 NaragundaStorm Water Drains 902 SWD/902/15
Construcion of two sides Drain CD From DR:Huruli house to Kurahatti house. 07/04/2011 15/12/2011 3.0 2.07 tUArz
44 NaragundaStorm Water Drains 902 SWD/902/16
Construcion of Drain From Shastri hospital to Jamadar house. 07/04/2011 20/11/2012 3.0 2.72 tUArz
45 NaragundaStorm Water Drains 902 SWD/902/25 Construction of Drain near Dandapur Hanasi house. 07/04/2011 12/09/2011 1.33 1.56 tUArz
46 NaragundaStorm Water Drains 902 SWD/902/26
Construction of Drain in Dandapur near kurubageri masuti from negalur house to vaddar house. 07/04/2011 03/10/2011 1.91 2.2 tUArz
47 NaragundaStorm Water Drains 902 SWD/902/28
Construcion of Drain and CD at Dandapur 7th Cross attached Vetternary hospital vithoba temple. 07/04/2011 07/08/2011 1.75 0.96 tUArz
48 NaragundaStorm Water Drains 902 SWD/902/33
Construcion of Drain at Patrivana Janatha plot near Mulimani house to Niravari Gate. 07/04/2011 28/10/2011 2.5 2.46 tUArz
49 NaragundaStorm Water Drains 902 SWD/902/34
Construction drain and RCC Slab behind Siddanabavi oni road sri vaddigeri house and honnappa gadekar house cross. 07/04/2011 08/10/2011 0.39 0.36 tUArz
50 NaragundaStorm Water Drains 902 SWD/902/35
Construction drain near Kasaba Busstand Inner Road Asuti hospital to Gujumagadi Shop. 07/04/2011 10/12/2011 1.5 1.52 tUArz
51 NaragundaStorm Water Drains 902 SWD/902/36 Construction drain near venkateswara temple. 07/04/2011 08/10/2011 0.67 0.39 tUArz
52 NaragundaStorm Water Drains 902 SWD/902/37
Construction of drain at Shiddanabavi oni Madival house to Killedar house and Misi house to Daivad house. 07/04/2011 31/12/2015 1.21 0.0
gzr g s PAiiAiz Plq itP PjPVz.
53 NaragundaStorm Water Drains 902 SWD/902/38
Construction of drain at Dandapur 2nd Cross near Narashimha temple. 07/04/2011 15/12/2011 0.53 0.52 tUArz
54 NaragundaStorm Water Drains 902 SWD/902/42 Construction of drain at Somapur near Chikamath house. 07/04/2011 15/12/2011 0.9 0.55 tUArz
55 NaragundaStorm Water Drains 902 SWD/902/45 Construction of drain at Somapur Haligeri Oni 07/04/2011 15/12/2011 0.41 0.38 tUArz
56 NaragundaStorm Water Drains 902 SWD/902/5 Construction of Drain at Hosur Oni 07/04/2011 15/12/2011 8.25 8.3 tUArz
274.82 236.73Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Bridges 903 BRG/903/15Construction of RCC Slab over drain at Dandapur 7th Galli Sondur house road. 06/06/2012 01/12/2012 2.25 2.28 tUArz
2 Naragunda Bridges 903 BRG/903/19Construction of CD at near Katnur Basaveswar Matapathi house Savalakar Rava Mill Road. 06/06/2012 08/10/2012 1.5 0.96 tUArz
3 Naragunda Bridges 903 BRG/903/21 Construction of 10 CD''s at Saraswati Nagar. 06/06/2012 10/12/2012 5.0 4.83 tUArz
4 Naragunda Bridges 903 BRG/903/24Construction of CD at Vinayaka Nagar Karnataka Jinning Factory. 06/06/2012 12/12/2012 0.84 0.84 tUArz
5 Naragunda Bridges 903 BRG/903/3Construction of CD at at Siddeshwar temple back side to New collage building cross. 06/06/2012 25/04/2015 1.0 0.92 tUArz
6 Naragunda Bridges 903 BRG/903/31Construction of CD at Hosakeri Sandhi Jain Basadi Temple cross. 06/06/2012 12/12/2012 0.6 0.58
gzr jv QAiiAiU Adgw qAiVz.
7 Naragunda Bridges 903 BRG/903/35 Construction of CD at Arban Sakali and Hadapad''s house. 06/06/2012 12/12/2012 0.72 0.32 tUArz
8 Naragunda Bridges 903 BRG/903/36 Construction of CD at Venkanna Patils house. 06/06/2012 12/12/2012 0.0 0.0gzr jv QAiiAiU
Adgw qAiVz.9 Naragunda Bridges 903 BRG/903/4 Construction of CD at Patrivan Janatha Plot. 06/06/2012 12/12/2012 1.7 1.7 tUArz
10 Naragunda Bridges 903 BRG/903/48Construction of CD at Kasaba Govindappa Gudadari and Shelake Galli 06/06/2012 12/12/2012 1.25 0.91 tUArz
11 Naragunda Bridges 903 BRG/903/8 Construction of 06 CD''s at Mulik Nagar . 06/06/2012 12/12/2012 3.0 3.0 tUArz
12 Naragunda Buildings 903 BLD/903/42Construction of Public Toilet at Jamalapur Mullanavar house. 06/06/2012 06/10/2012 5.0 2.16 UwAiz
13 Naragunda Other Works 903 OWS/903/12Construction of Arch at Halabavi Kere towards Mariyamma Temple Road. 06/06/2012 1.1 0.0 gAg.
14 Naragunda Other Works 903 OWS/903/17 Construction of Tantibeli at Somapur Burrial ground. 06/06/2012 07/10/2012 3.0 3.0 tUArz15 Naragunda Other Works 903 OWS/903/29 Devolopment and design of Arch at Somapur oni 06/06/2012 06/10/2012 1.0 1.0 tUArz16 Naragunda Other Works 903 OWS/903/55 Construction of RCC Platform at Desai Bhavi. 06/06/2012 06/10/2012 4.5 4.45 tUArz
17 Naragunda Other Works 903 OWS/903/56Construction of Retaining wall and stone slazb faving at old siddeswar road Bhantri house. 06/06/2012 06/10/2012 3.0 3.05 tUArz
18 Naragunda Other Works 903 OWS/903/59 Construction of retaining wall around pits at SWM site. 06/06/2012 06/10/2012 5.0 4.88 tUArz19 Naragunda Other Works 903 OWS/903/66 Reserved for Balance salary of Employees. 06/06/2012 31/03/2014 2.5 2.5 tUArz20 Naragunda Other Works 903 OWS/903/67 Reserved for 22.75% Acticities 06/06/2012 31/03/2013 60.96 60.96 tUArz21 Naragunda Other Works 903 OWS/903/68 Amount reserved for 7.25% Activities. 05/09/2012 29/05/2012 19.42 19.42 tUArz
Work Summary of SFC UNTIED 2011-12 ReportRsinLakhs
22 Naragunda Other Works 903 OWS/903/69 Amount reserved for Spill over works. 06/06/2012 08/10/2013 33.75 33.75 tUArz
23 Naragunda Other Works 903 OWS/903/71Construction of Retaining wall at Guddadakeri Devaji Parasi 01/06/2015 25/02/2016 2.5 1.89 tUArz
24 Naragunda Roads 903 RDS/903/1Formation of Mettelling road at Dandapur Ashraya plots through Savadatti Road. 06/06/2012 06/10/2012 11.91 11.91 tUArz
25 Naragunda Roads 903 RDS/903/16 Formation of Mettling road at Maruti Nagar 3 Roads. 06/06/2012 06/10/2012 4.72 4.72 tUArz
26 Naragunda Roads 903 RDS/903/2Formation of Mettelling and Asphalting road at Siddeshwar temple back side to New collage building. 06/06/2012 07/02/2015 2.5 2.21 tUArz
27 Naragunda Roads 903 RDS/903/33 Connstuction of RCC Road at Havaldar Sandhi Road. 06/06/2012 31/03/2015 4.0 3.86 tUArz
28 Naragunda Roads 903 RDS/903/37Construction of Stone slab faving road at Kasaba Kurubar Jiddi Oni. 06/06/2012 06/10/2012 0.6 0.63 tUArz
29 Naragunda Roads 903 RDS/903/39
Construction of Stone slab faving road at Dandapur Kurubageri Neelappa house to Hanamanthappa Gangapur house. 06/06/2012 06/10/2012 1.14 1.14 tUArz
30 Naragunda Roads 903 RDS/903/51Construction of RCC Road infront of Jaibharath Shedaji''''''''s house 06/06/2012 06/10/2012 1.23 1.23 tUArz
31 Naragunda Roads 903 RDS/903/52Construction of Stone slab road near Koopanagoudra oni belakoppa house. 06/06/2012 06/10/2012 2.0 1.99 tUArz
32 Naragunda Roads 903 RDS/903/53Construction of Stone slab road at Siddeswar Temple road to Ettinamani house. 06/06/2012 12/01/2013 0.0 0.0
gzr jv QAiiAiU Adgw qAiVz.
33 Naragunda Roads 903 RDS/903/54Construction of RCC Road at Jamalapur Roshansha Makanadar house to Balekhan house. 06/06/2012 06/10/2012 2.75 2.74 tUArz
34 Naragunda Roads 903 RDS/903/73 Construction of C.C Road at Gadi oni Gadad Sandhi. 01/06/2014 0.52 0.0dP vPgj Az
VvUArz.
35 Naragunda Roads 903 RDS/903/9Construction of CC Road at Imamsab savatagi house to Mabusab Naykar house. 06/06/2012 06/10/2012 2.73 2.73 tUArz
36 NaragundaSolid Waste Management 903 SWM/903/57 Construction of RCC Drain around SWM site. 06/06/2012 06/10/2012 3.0 3.15 tUArz
37 NaragundaSolid Waste Management 903 SWM/903/58 Construction of Segrigation Shed at SWM site. 06/06/2012 06/10/2012 4.0 4.0 tUArz
38 NaragundaSolid Waste Management 903 SWM/903/60 Purchasing of Container and 2 Tractor Trailor 06/06/2012 06/10/2012 4.71 4.71 tUArz
39 NaragundaSolid Waste Management 903 SWM/903/61 Providing Electrification for SWM Site. 06/06/2012 3.75 0.0 UwAiz
40 NaragundaSolid Waste Management 903 SWM/903/62
Purchasing of compost Screening Machine for SWM Landfill site. 06/06/2012 0.0 0.0 UwAiz
41 NaragundaSolid Waste Management 903 SWM/903/63 Purchasing of Sucking and Jetting Machine. 06/06/2012 06/10/2012 3.78 3.78 tUArz
42 NaragundaSolid Waste Management 903 SWM/903/64 Purchasing of PVC Pipeline for town pipeline. 06/06/2012 31/03/2013 10.0 7.0 tUArz
43 NaragundaSolid Waste Management 903 SWM/903/65 Tree Plantation at SWMs Site. 06/06/2012 31/03/2013 0.0 0.0
gzr jv QAiiAiU Adgw qAiVz.
44 NaragundaSolid Waste Management 903 SWM/903/74 Purchase of Tractor 45HP for SWM Activities 15/07/2015 25/02/2016 4.22 4.22 tUArz
45 NaragundaSolid Waste Management 903 SWM/903/75 Installation of 12.5M hight Hih Mast light at SWM site. 19/03/2016 4.0 0.0 tUArz
46 NaragundaStorm Water Drains 903 SWD/903/10
Construction of Drain and RCC Slab at Arban Bolashetti house backside. 06/06/2012 06/10/2012 5.33 5.33 tUArz
47 NaragundaStorm Water Drains 903 SWD/903/11
Construction of Drain and Paving of Stone slab at Shankaraling oni Sureban Totad house and construction of slab over drain at 06/06/2012 06/10/2012 1.31 1.31
dP vPgj Az VvUArz.
48 NaragundaStorm Water Drains 903 SWD/903/13 Repair of Main Drain at Bannebazar right side. 06/06/2012 06/10/2012 2.0 2.0 tUArz
49 NaragundaStorm Water Drains 903 SWD/903/14
Construction of RCC drain at arban Tambe place to desai house. 06/06/2012 2.0 0.0 tUArz
50 NaragundaStorm Water Drains 903 SWD/903/18
Repair of Main Drain at Katnur Basaveswar Huruli House to Matapathi house. 06/06/2012 03/08/2014 2.25 1.64 tUArz
51 NaragundaStorm Water Drains 903 SWD/903/20 Repair of Drains at Somapur oni. 06/06/2012 06/10/2012 5.6 6.15 tUArz
52 NaragundaStorm Water Drains 903 SWD/903/22
Repair of Drain from Chitragar house to Dandin pethe veternary hospital. 06/06/2012 06/10/2012 9.64 9.64 tUArz
53 NaragundaStorm Water Drains 903 SWD/903/23 Construction of RCC Drain and CD at Navalgund plot. 06/06/2012 06/10/2012 1.48 1.48 tUArz
54 NaragundaStorm Water Drains 903 SWD/903/25
Construction of RCC drain and Slab at Vinayaka Nagar Garden. 06/06/2012 06/10/2012 2.96 2.96 tUArz
55 NaragundaStorm Water Drains 903 SWD/903/26
Repair of RCC Drain at Gandhi Chouk bothside roads from sukhachamundi hotel to Habib''''''''s house. 06/06/2012 06/10/2012 3.11 3.11 tUArz
56 NaragundaStorm Water Drains 903 SWD/903/27
Construction of drain at Kallanagoud koppangoudra house to Anegudi house. 06/06/2012 06/10/2012 2.0 2.08 tUArz
57 NaragundaStorm Water Drains 903 SWD/903/28
Construction of drain at Kasaba Koppanagoudra oni Sri. Akki house. 06/06/2012 06/10/2012 1.0 0.97 tUArz
58 NaragundaStorm Water Drains 903 SWD/903/30
Construction of drain at Kidaki basaveswar Temple Sandhi. 06/06/2012 06/10/2012 0.6 0.6 tUArz
59 NaragundaStorm Water Drains 903 SWD/903/32 Connstuction of drain and CD at Havaldar Sandhi 06/06/2012 06/10/2012 5.0 4.95 tUArz
60 NaragundaStorm Water Drains 903 SWD/903/34
Construction of drain at S F Patil house to Parvatiyavar house. 06/06/2012 06/10/2012 1.34 1.34 tUArz
61 NaragundaStorm Water Drains 903 SWD/903/38
Construction of drain at Dandapur Basappa savadatti house to Basappa Bharamannavar house. 06/06/2012 06/10/2012 0.75 0.9 tUArz
62 NaragundaStorm Water Drains 903 SWD/903/40
Construction of drain at Dandapur Shivappa Sajjakal house to Maoulasab Nadaf house. 06/06/2012 06/10/2012 1.0 1.0 tUArz
63 NaragundaStorm Water Drains 903 SWD/903/41
Construction of drain at Husensab Nishandar house to Bahaddurkhan house. 06/06/2012 31/03/2014 0.0 0.0 tUArz
64 NaragundaStorm Water Drains 903 SWD/903/43 Construction of drain at NHT Mill Qtrs No.4 School. 06/06/2012 06/10/2012 3.23 3.23 tUArz
65 NaragundaStorm Water Drains 903 SWD/903/44
Construction of drain and CD at Gadad Masuti Sunagar Bhatti. 06/06/2012 06/10/2012 2.25 2.17 tUArz
66 NaragundaStorm Water Drains 903 SWD/903/45
Construction of drain and Stone slab road at Hasaba Gangappa Shelakenavar house to Naykar house. 06/06/2012 06/10/2012 0.8 0.74 tUArz
67 NaragundaStorm Water Drains 903 SWD/903/46 Constrction of Drain and Slab at Uppin house. 06/06/2012 06/10/2012 0.54 0.54 tUArz
68 NaragundaStorm Water Drains 903 SWD/903/47 Construction of drain and CD at Bilagi Sandhi 06/06/2012 06/10/2012 1.9 1.9 tUArz
69 NaragundaStorm Water Drains 903 SWD/903/49 Constrction of Drain at Kolakar house to Manigar house. 06/06/2012 03/08/2014 0.78 0.41 tUArz
70 NaragundaStorm Water Drains 903 SWD/903/5 Construction of RCC Drain and CD at Matager House. 06/06/2012 06/10/2012 1.0 1.11 tUArz
71 NaragundaStorm Water Drains 903 SWD/903/50
Repair of Main drains at TMC Main road both side from Gudisagar house to Chinivalagatti cross. 06/06/2012 06/10/2012 3.17 3.17 tUArz
72 NaragundaStorm Water Drains 903 SWD/903/6
Construction of RCC Drain and RCC Road at Lodigalli Bairakadar house to Krishna Malinamani house. 06/06/2012 06/10/2012 1.75 1.79 tUArz
73 NaragundaStorm Water Drains 903 SWD/903/7
Repair of RCC Drain at Dandapur 7th Galli Kulumi house to vetarnery hospital. 06/06/2012 06/10/2012 2.24 2.24
74 NaragundaStorm Water Drains 903 SWD/903/70
Construction of Drian and C.D at Kasaba oni Kurahatti Sandhi 01/06/2014 03/03/2016 2.49 1.56
75 NaragundaStorm Water Drains 903 SWD/903/72
Construction of drian from Guddadakeri Bhavanemma temple to Kamalasab Nalaband house. 01/06/2014 03/03/2016 3.06 2.74 tUArz
301.73 280.48Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Bridges 904 BRG/904/12 Construction of CD at Dandapur Burrial ground. 06/02/2013 10/08/2013 2.4 2.05 tUArz
2 Naragunda Buildings 904 BLD/904/1Construction of Public Toilet at Dandapur Hagedakatti Oni. 06/02/2013 30/04/2015 0.0 0.0
gzr jv QAiiAiU Adgw qAiVz.
3 Naragunda Buildings 904 BLD/904/2 Construction of Public Toilet at Jamalapur Oni. 06/02/2013 8.73 4.89 UwAiz
4 Naragunda Buildings 904 BLD/904/3
Construction of Public Toilet at Siddanabavi Oni Kori Complex Compound. (Rs. 3.20 Exp Shoned in 2013-14 Spill over) 06/02/2013 02/07/2016 8.73 5.47 tUArz
5 Naragunda Buildings 904 BLD/904/4Construction of Public Toilet at Vittal Bhusare Shop backside.(Rs. 3.21 Exp Shoned in 2013-14 Spill over) 06/02/2013 28/04/2016 8.73 5.46 tUArz
6 Naragunda Buildings 904 BLD/904/5 Construction of Public Toilet near Balavatagi pond. 06/02/2013 31/03/2015 0.0 0.0gzr jv QAiiAiU
Adgw qAiVz.
7 Naragunda Buildings 904 BLD/904/6 Construction of Public Toilet near Urdu School toilets. 06/02/2013 8.73 6.75 UwAiz
8 Naragunda Buildings 904 BLD/904/7 Construction of Public Toilet near Somapur pond. 06/02/2013 31/03/2014 0.0 0.0gzr jv QAiiAiU
Adgw qAiVz.
9 Naragunda Buildings 904 BLD/904/9Construction of Public Toilet at Shankalingan oni. (Rs. 1.24 Exp Showned in 2013-14 Spill over works) 06/02/2013 8.73 8.17 tUArz
10 Naragunda Other Works 904 OWS/904/28 Reserved for 22.75% Activities 06/02/2013 31/03/2014 67.48 38.78 tUArz11 Naragunda Other Works 904 OWS/904/29 Reserved amount 7.25% 06/02/2013 31/05/2014 21.5 16.34 tUArz12 Naragunda Other Works 904 OWS/904/30 Reserved for 3% Activities 06/02/2013 30/04/2014 8.9 8.9 tUArz13 Naragunda Other Works 904 OWS/904/31 Reserved for Spill over works 06/02/2013 5.11 0.0 UwAiz
14 Naragunda Roads 904 RDS/904/11Formation of Asphalting Road of Dandapur Burrial ground Road. 06/02/2013 28/01/2014 9.67 9.64 tUArz
15 Naragunda Roads 904 RDS/904/32Construction of cc road at kallakutri sandhi saprannavar house to kallakutri house 15/07/2015 3.71 0.0
tUArz lqAiiVg.
16 Naragunda Roads 904 RDS/904/33Construction of C.C Road from Hatti Sandhi Maldar Sandhi. 15/07/2015 1.7 0.0
tUArz lqAiiVg.
17 Naragunda Roads 904 RDS/904/35Construction of C.C. Road from Arban badiger oni Bolashetti house to Sakali house. 15/07/2015 9.15 0.0 UwAiz
Work Summary of SFC UNTIED 2012-13 ReportRsinLakhs
18 Naragunda Roads 904 RDS/904/36
Formation of Mettling from Savadatti road Bolashetti Garage to Totagarike dept. (Rs.4.60 Lakhs Expenditure shown in 2013-14 Spill over works) 15/07/2015 06/05/2016 5.0 0.0
tUArz (zg PUjAi RZ 2013-14
vjz)
19 Naragunda Roads 904 RDS/904/37Construction of C.C. Road from Kasaba killikyatar house to Joda Hanamanth Temple. 15/07/2015 5.43 0.0 UwAiz
20 Naragunda Roads 904 RDS/904/38
Construction of C.C. Road from Jamalapur oni Basappa Mullur house to Jamalasha Darga (Rs. 4.47 lakhs Expeniture shown in 2013-14 Spill over works) 15/07/2015 03/03/2016 5.78 0.0
tUArz (zg PUjAi RZ 2013-14
vjz)
21 NaragundaSolid Waste Management 904 SWM/904/13 Construction of Compound wall at SWM Site. 06/02/2013 07/09/2013 25.0 19.95 tUArz
22 NaragundaSolid Waste Management 904 SWM/904/14 Construction of Watchman Shed SWM Site 06/02/2013 06/10/2013 5.0 4.0 tUArz
23 NaragundaSolid Waste Management 904 SWM/904/15 Construction of RCC Roads inside SWM Site. 06/02/2013 24/08/2013 10.0 9.33 tUArz
24 NaragundaSolid Waste Management 904 SWM/904/16 Construction of Compost Hall at SWM Site 06/02/2013 21/05/2014 4.0 3.5 tUArz
25 NaragundaSolid Waste Management 904 SWM/904/17
Construction of Sanitary Landfill with HDPE Liner at SWM Site. (Rs. 15.04 Lakhs Expenditure shown in 2013-14 Spill over) 06/02/2013 20.0 4.0 tUArz
26 NaragundaSolid Waste Management 904 SWM/904/18 Change of Sand filter bed at Pump House. 06/02/2013 26/07/2013 5.0 5.0 tUArz
27 NaragundaSolid Waste Management 904 SWM/904/19 Reserved amount for electrification for Borewells. 06/02/2013 4.46 0.0 PAiiz q PVz.
28 NaragundaSolid Waste Management 904 SWM/904/20 Nala Cleaning Machine. 06/02/2013 08/10/2013 9.0 9.0 tUArz
29 NaragundaSolid Waste Management 904 SWM/904/21 Trailor (Mesh) 15/07/2015 2.5 0.0 tUArz
30 NaragundaSolid Waste Management 904 SWM/904/22 Push Carts. 06/02/2013 10/10/2013 2.5 2.5 tUArz
31 NaragundaSolid Waste Management 904 SWM/904/23 Container Lifter attachment. 18/04/2016 2.87 0.0 gP Dz q Vz.
32 NaragundaSolid Waste Management 904 SWM/904/24 Purcahse of Auto Tipper. 06/08/2013 10/12/2013 6.0 1.85 tUArz
33 NaragundaSolid Waste Management 904 SWM/904/25 Vehicle Mounted Fogging Machine. 06/08/2013 07/10/2013 5.0 5.0 tUArz
34 NaragundaSolid Waste Management 904 SWM/904/26 Segrigation Bins 1.0 0.0 mAqg QAiAiz.
35 NaragundaSolid Waste Management 904 SWM/904/27 Container. 06/08/2013 06/10/2010 6.5 6.5 tUArz
36 NaragundaStorm Water Drains 904 SWD/904/10 Repair of Drains at Arban Teggin oni. 06/02/2013 25/08/2014 3.0 2.41 tUArz
37 NaragundaStorm Water Drains 904 SWD/904/34 Construction of C.D at Dandapur Belavatagi plot 15/07/2015 0.62 0.0 UwAiz
38 NaragundaStorm Water Drains 904 SWD/904/8 Construction of Drain near Horakeri oni Urdu School. 06/02/2013 31/03/2014 0.0 0.0
gzr jv QAiiAiU Adgw qAiVz.
301.93 179.49Total:
S.No Town Name SectorName Package Work CodeWorkName Work Order
date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Buildings 905 BLD/905/1 Constrction of TMC Office New Building Reserved. 46.61 0.0 Pj Vz2 Naragunda Other Works 905 OWS/905/10 Reserved for 3.00% activities 15/01/2014 5.96 2.38 UwAi
3 Naragunda Other Works 905 OWS/905/11
Reserved for Spill over works. (1.Auto Tipper 12-13 Rs.4.13, Rs. 3.20 Exp of Shiddanabavi oni toilet, Rs.3.21 Exp of Bhusare sandi Toilet.) 05/02/2014 133.17 46.62 UwAi.
4 Naragunda Other Works 905 OWS/905/8 Reserved for 22.75% Activities 20/09/2014 45.22 33.1 UwAi. 5 Naragunda Other Works 905 OWS/905/9 Reserved for 7.25% activities 15/12/2013 01/07/2016 14.41 14.41 UwAi.
6 Naragunda Roads 905 RDS/905/12 Construction of C. C Road around Shankarlinga Temple. 01/07/2015 6.46 4.61 UwAi.
7 Naragunda Roads 905 RDS/905/13Construction of C. C Road from Aliya Nagar Shivappa Chavvan house to Imamsab Navalagund house. 01/07/2015 5.0 0.0 UwAi.
8 Naragunda Roads 905 RDS/905/14Construction of C. C Road at Sompaur NH Road Gudusab Nadaf Shop to Rachayya Nagar Main Road. 01/07/2015 06/05/2016 6.0 4.52 tUArz.
9 Naragunda Roads 905 RDS/905/15Construction of C. C Road Sunagar Batti to Katagar's house. 01/07/2015 03/03/2016 2.54 2.41 tUArz.
10 NaragundaSolid Waste Management 905 SWM/905/2 Construction C.C Road at SWM Site 10/10/2014 05/02/2015 40.92 37.94 tUArz.
11 NaragundaSolid Waste Management 905 SWM/905/3 Purchase of 4.5 Cum Capacity Containers 30/07/2015 25/08/2015 7.5 5.48 tUArz.
12 NaragundaSolid Waste Management 905 SWM/905/4 Purchase of 3.00 Cum Capacity Containers. 30/07/2015 25/08/2015 4.2 3.12 tUArz.
13 NaragundaSolid Waste Management 905 SWM/905/5 Construction of Seggrigation Shed. 5.0 0.0 mAqg QAi irg.
14 NaragundaSolid Waste Management 905 SWM/905/6 Installation of Pipeline at SWM Site. 10/10/2014 05/02/2015 4.0 4.0 tUArz.
15 NaragundaSolid Waste Management 905 SWM/905/7
Construction of 20000 Ltr Capacity Overhead Tank at SWM Site. 5.0 0.0 mAqg PgAiPVz.
331.99 158.59
RsinLakhs
Work Summary of SFC UNTIED 2013-14 Report
Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Other Works 906 OWS/906/20
2013-14 (Spill Over) 20/02/2015 105.82 44.21 UwAi
2 Naragunda Other Works 906 OWS/906/21. / . .22.75
20/02/2015 33.57 31.7 UwAiz.
3 Naragunda Other Works 906 OWS/906/22 .22.75 20/02/2015 10.7 7.28 UwAiz.
4 Naragunda Other Works 906 OWS/906/23 .3 20/02/2015 03/05/2015 4.42 2.21 tUArz.
5 Naragunda Roads 906 RDS/906/1 02/05/2015 04/03/2016 1.61 1.61 tUArz.
6 Naragunda Roads 906 RDS/906/10 . 02/05/2015 06/05/2016 6.44 7.29 tUArz.
7 Naragunda Roads 906 RDS/906/12
02/05/2015 04/03/2016 4.7 4.84 tUArz.
8 Naragunda Roads 906 RDS/906/14 . 02/05/2015 04/03/2016 3.78 3.58 tUArz.
9 Naragunda Roads 906 RDS/906/15 . 02/05/2015 20/09/2015 17.2 17.2 tUArz.
10 Naragunda Roads 906 RDS/906/16
,
. 02/05/2015 20/09/2015 23.07 23.07 tUArz. 11 Naragunda Roads 906 RDS/906/2 . 02/05/2015 06/09/2015 1.4 1.4 tUArz.
12 Naragunda Roads 906 RDS/906/3
. 02/05/2015 15/07/2016 5.0 5.62 UwAiz.
13 Naragunda Roads 906 RDS/906/4 . 02/05/2015 30/08/2015 3.08 3.08 tUArz.
14 Naragunda Roads 906 RDS/906/7 . 15/07/2015 25/02/2016 5.47 4.93 tUArz.
15 Naragunda Roads 906 RDS/906/8 .
, 20/07/2015 11/10/2015 0.19 0.19 tUArz. 16 Naragunda Roads 906 RDS/906/9 . 20/07/2015 15/10/2015 6.55 6.55 tUArz.
17 NaragundaStorm Water Drains 906 SWD/906/13
15/07/2015 14/02/2016 0.58 0.3 tUArz.
18 NaragundaStorm Water Drains 906 SWD/906/17
. 15/07/2015 10/02/2016 1.94 1.58 tUArz.
Work Summary of SFC UNTIED 2014-15 ReportRsinLakhs
19 NaragundaStorm Water Drains 906 SWD/906/18
. . 15/07/2015 25/02/2016 2.25 1.99 tUArz.
20 NaragundaStorm Water Drains 906 SWD/906/19 . 15/07/2015 04/03/2016 5.0 4.83 tUArz.
21 NaragundaStorm Water Drains 906 SWD/906/5
. 20/07/2015 10/10/2015 5.9 5.9 tUArz.
22 NaragundaStorm Water Drains 906 SWD/906/6
. 20/07/2015 10/10/2015 2.92 2.92 tUArz.
23 Naragunda Water Supply 906 WSS/906/11 . 15/07/2015 03/02/2016 1.83 1.67 tUArz.
253.42 183.95Total:
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Other Works 907 OWS/907/1 Reserved for Spillover Works 19/03/2016 63.34 52.59
2 Naragunda Other Works 907 OWS/907/10Construction of Retaining Wall at Venkateswar Temple Old raod Bhajantri house road. 18/04/2016 3.16 0.0 UwAiz
3 Naragunda Other Works 907 OWS/907/17Construction of Retaining Wall at Guddadakeri Kavali attached to Sri:Boodappa Yaligar house. 18/04/2016 4.31 0.0 UwAiz
4 Naragunda Other Works 907 OWS/907/18Construction of Retaining Wall at Guddadakeri Beeradevar Temple attached to Arali Katte. 18/04/2016 1.69 0.0 UwAiz
5 Naragunda Other Works 907 OWS/907/2 Reserved for 24.10% Activities 18/04/2016 46.22 23.8 UwAiz6 Naragunda Other Works 907 OWS/907/3 Reserved for 7.25% Activities 18/04/2016 13.91 6.5 UwAiz7 Naragunda Other Works 907 OWS/907/4 Reserved for 3.00% Activities 18/04/2016 5.75 2.88 UwAiz
8 Naragunda Other Works 907 OWS/907/40 FBAAS Audit fee paid for the year 2008-09 to 2013-14. 11/09/2015 24/09/2015 5.62 5.62 tUArz.
9 Naragunda Roads 907 RDS/907/11Construction of Concrete Road at HOrakeri Oni Tippu Sulthan circle to Ramachandrappa Pawar house. . 18/04/2016 4.65 0.0 UwAiz
10 Naragunda Roads 907 RDS/907/15Construction of Concrete Drain at Horakeri oni Kelagin Masuti Halolli house. 18/04/2016 4.3 0.0 UwAiz
11 Naragunda Roads 907 RDS/907/16Construction of Concrete Road Near Kampagasi Kanti house.. 18/04/2016 1.68 0.0 UwAiz
12 Naragunda Roads 907 RDS/907/21
Construction of Concrete Road from Dandapur Kurubageri oni Fakirappa Gonal house to Kurubageri Masuti. 18/04/2016 13.6 0.0 UwAiz
13 Naragunda Roads 907 RDS/907/24Construction of Concrete Raod and C.D from Lodigalli Moulasab Sunkad's House to Subbannavar oni Road. 18/04/2016 3.83 0.0 UwAiz
14 Naragunda Roads 907 RDS/907/25Contruction of Concrete Road from Lodi Galli Navarasakhan Pthan house to Gasti House. 18/04/2016 1.65 0.0 UwAiz
15 Naragunda Roads 907 RDS/907/28Contruction of Concrete Road infront of Virakt Math Mahadevar Temple behind. 18/04/2016 1.03 0.0 UwAiz
16 Naragunda Roads 907 RDS/907/29Construction of concrete Road from Nadaf house to Basanagouda Patil house. 18/04/2016 1.03 0.0 UwAiz
17 Naragunda Roads 907 RDS/907/31Construction of concrete Road, Drain and C.D at Kasaba Anegundi Guggari house Sandhi. 18/04/2016 03/07/2016 3.08 3.08 tUArz.
18 Naragunda Roads 907 RDS/907/32Construction of concrete Road at Kasaba oni Kurahatti house.. 18/04/2016 30/06/2016 2.92 2.92 tUArz.
19 Naragunda Roads 907 RDS/907/33Construction of Concrete Road and C.D at Shelakenavar oni Bhosale Sandhi. 18/04/2016 28/06/2016 1.81 1.81 tUArz.
RsinLakhs
Work Summary of SFC UNTIED 2015-16 Report
20 Naragunda Roads 907 RDS/907/34Construction of Concrete Road from Savadatti road Yaligar house to Halabavi kere Mariyamma Temple. 18/04/2016 9.89 0.0 UwAiz
21 Naragunda Roads 907 RDS/907/36Construction of Concrete Road from Vinayaka Nagar Sri: Ashok Patri house to Hanamath Temple. 18/04/2016 3.6 0.0 UwAiz
22 Naragunda Roads 907 RDS/907/7Construction of Concrete Road from Pandu Sathe house to Yashavanth Mane house. 18/04/2016 15/08/2016 2.67 2.67 tUArz.
23 Naragunda Roads 907 RDS/907/8Construction of Concrete Road from Shivaji Sathe house to Neelavva Sathe house. 18/04/2016 15/08/2016 2.35 2.35 tUArz.
24 Naragunda Roads 907 RDS/907/9Construction of Concrete Road from Tukaram Sathe house to Ramanna Pawar house. 18/04/2016 1.63 0.84 tUArz.
25 NaragundaStorm Water Drains 907 SWD/907/12
Construction of Concrete Drain from Hosur oni Bhosale house to Diavanasab Killedar house. 18/04/2016 01/07/2016 2.91 2.57 tUArz.
26 NaragundaStorm Water Drains 907 SWD/907/13
Construction of Concrete Drain and Slab at Old Avaradi Road Government School No.4. 18/04/2016 01/07/2016 2.19 1.88 tUArz.
27 NaragundaStorm Water Drains 907 SWD/907/14 Construction of Concrete Drain and C.D at Jamadar plots. 18/04/2016 06/05/2016 6.0 6.09 tUArz.
28 NaragundaStorm Water Drains 907 SWD/907/19
Construction of Concrete Drain at Benne Bazar Shadaji Sandhi. 18/04/2016 0.57 0.0 tUArz.
29 NaragundaStorm Water Drains 907 SWD/907/20
Construction of Concrete Drain from Guddadakeri Kavali Road Water Tank to Gadad Masuti. 18/04/2016 6.14 0.0 UwAiz
30 NaragundaStorm Water Drains 907 SWD/907/23
Construction of Concrete Drain from Fakirbavi Masuti to Katnur BAsaveswar Temple. 18/04/2016 06/05/2016 2.91 2.73 tUArz.
31 NaragundaStorm Water Drains 907 SWD/907/26
Contruction of Concrete Drain from Kasaba Salibasaveswar oni behind Jolad house. 18/04/2016 0.38 0.0 UwAiz
32 NaragundaStorm Water Drains 907 SWD/907/27
Contruction of Concrete Drain near Kasaba Durugmma Temple behind Godi house. 18/04/2016 0.76 0.0 UwAiz
33 NaragundaStorm Water Drains 907 SWD/907/29
Construction of concrete Drain from Prabhu Hiremath house to MAllikarjun Gadekar house both side. 18/04/2016 4.61 0.0 UwAiz
34 NaragundaStorm Water Drains 907 SWD/907/30
Construction of concrete Road from Koppanagoudra oni Mahadevappa Muttavad house to Hatelsab Maniyar house. 18/04/2016 02/07/2016 5.04 5.04 tUArz.
35 NaragundaStorm Water Drains 907 SWD/907/35
Construction of 150 mtr Concrete Drain Near Navodaya school Road. 18/04/2016 01/07/2016 5.12 5.16 tUArz.
36 NaragundaStorm Water Drains 907 SWD/907/37
Construction of Concrete Drain from Vinayaka Nagar Fakirappa Kulageri house to Patil House. 18/04/2016 01/07/2016 2.73 2.15 tUArz.
37 NaragundaStorm Water Drains 907 SWD/907/38
Construction of Concrete Drain behind Vinayaka Nagar Bapugouda Kallanagoudra house to Adiveppa Savadatti house. 18/04/2016 01/07/2016 2.73 2.3 tUArz.
38 NaragundaStorm Water Drains 907 SWD/907/5
Construction of Concrete Drain and Slab near Patrivana Janatha plot Nigappa Badiger house. 18/04/2016 28/04/2016 1.48 1.4 tUArz.
39 NaragundaStorm Water Drains 907 SWD/907/6
Construction of Concrete Drain from Kanakikoppa cross Navalagund plot to Yamanappa Katti house to Moulasab arabajamadar house. 18/04/2016 28/04/2016 2.27 2.54 tUArz.
40 Naragunda Water Supply 907 WSS/907/22 Construction of Doni near Padavagond Kere. 07/04/2016 01/07/2016 1.45 1.45 tUArz.
41 Naragunda Water Supply 907 WSS/907/39Reserved for Installation & Purchase Materials for Hosur Kere Jackwell and 25HP Pump. 4.14 0.0
mAqg QAi irz, mAqg AdgwUV i
fPjU Uz. 255.15 138.37
S.No Town Name SectorName Package Work Code WorkNameWork Order date
Work Completion date
Estimate Cost
Expenditure Cost Remarks
1 Naragunda Buildings 908 BLD/908/7Reserved for Construction of Communitiy Toliets under Swach Bharat Mission. 57.99 0.0
CAzd wPU vAwP CzUV Vz.
2 Naragunda Burial Ground 908 BGD/908/8 Devolpment Works at Kasaba Smashan 10.0 0.0CAzd wPU vAwP CzUV Vz.
3 Naragunda Burial Ground 908 BGD/908/9 Devolpment Works at Dandapur Smashan 10.0 0.0CAzd wPU vAwP CzUV Vz.
4 Naragunda Other Works 908 OWS/908/1 Reserved for Spill over works for 2015-16. 63.78 0.0
5 Naragunda Other Works 908 OWS/908/2 Reserved for 24.10% Activities 30.82 0.0CAzd wPU vAwP CzUV Vz.
6 Naragunda Other Works 908 OWS/908/3 Reserved for 7.25% Activities 9.27 0.0CAzd wPU vAwP CzUV Vz.
7 Naragunda Other Works 908 OWS/908/4 Reserved for 3.00% Activities 3.83 0.0CAzd wPU vAwP CzUV Vz.
8 Naragunda Other Works 908 OWS/908/5 Short foll amount for Construction of Babasaheb Statue. 5.0 0.0CAzd wPU vAwP CzUV Vz.
9 Naragunda Other Works 908 OWS/908/6 Reserved for FBAAS Audit Fee 26/07/2016 26/07/2016 1.0 1.0 tUArz.191.69 1