3
Date : 21 st September 2015 To : Dr Md Asrul Nasid Bin Masrom From : Group Maverick construction SDN BHD Subject : Progress of Project Green Park at lake UTHM Work Complete For the work completed, we have completed to established the group and each member have their role to doing the task.Roughly the architecture make some design and we have discuss to choose the best design.Next the Quantity Suveyor have searching the example of bil of quantity and list down some materials that we have to using in the construction. Work in Progress For the task that still in going, we are proceeding our design and make some improvements and fixes.Our group are still considering the materials that we will using. Here are our company logo:

Work Progress

Embed Size (px)

DESCRIPTION

work

Citation preview

Page 1: Work Progress

Date : 21st September 2015

To : Dr Md Asrul Nasid Bin Masrom

From : Group Maverick construction SDN BHD

Subject : Progress of Project Green Park at lake UTHM

Work Complete

For the work completed, we have completed to established the group and each member have their role to doing the task.Roughly the architecture make some design and we have discuss to choose the best design.Next the Quantity Suveyor have searching the example of bil of quantity and list down some materials that we have to using in the construction.

Work in Progress

For the task that still in going, we are proceeding our design and make some improvements and fixes.Our group are still considering the materials that we will using.

Here are our company logo:

Page 2: Work Progress

The design that are still under considering:

The sample of bill of quantity: