Work Package 3PROCEDURAL
HARMONISATION
FixO3 General Assembly 14 – 16 October 2014, Heraklion-CRETE
George Petihakis, HCMR
WP3 – Procedural Harmonisation
Task 3.1: Assessment of proceduresHCMR (Lead); CNRS, NERC, INGV, (M0 – M24)
Task 3.2: Principles of “best practice”CNRS (Lead); CNR, HCMR, UiB, IFM-GEOMAR, NERC, IEO, OGS, UPC, INGV, PLOCAN, INDP, UNIABN, 52o NORTH, UAzores, IFREMER, (M0 – M36)
Task 3.3: FixO3 LabelIFREMER(Lead); NERC, OGS, UAzores, (M0 – M48)
Participant
Number
Participant Short Name
Man Months
1 NERC 3.00
2 OGS 2.50
3 HCMR 6.00
5 UiB 0.45
7 PLOCAN 1.00
11 IFREMER 1.50
13 INGV 3.00
15 UNIABDN 3.00
16 CNRS 5.00
17 GEOMAR 0.90
20 IEO 0.50
22 INDP 1.50
23 UPC 1.00
26 52oNorth GmbH 0.50
27 CNR 3.00
29 IMAR 3.50
16 Partners
36.35
No. Del. Title Lead MM Nature Diss Del. Date
D3.1 Common WS on procedures HCMR 7.35 PU PU 18
D3.2 Handbook on Best Practices CNRS 22.00 PP PP 24
D3.3 FixO3 Label IFREMER 7.00 PU PU 36
36.35
Milestone No.
Milestone name WP Lead Del. Date
Comments
MS18 Presentation of FixO3 label, common protocols and standards and best practices for ocean observatory
WP2, WP3 7 46 Relevant reports from workshops and WP4 outputs available on project website
MS20 WP3-WP12 meeting WP12 11 18 INPUT FROM BEST PRACTICES OF WP3
WP3 – Procedural Harmonisation
WP3 – Procedural Harmonisation
Task 2.1 Review of the current status of all fixed observing sites
Task 2.3 Assessment of existing and novel hardware
Task 3.2: Principles of
“best practice”
Task 3.1: Assessment of
procedures
Task 2.4 Harmonization of Data Quality Assurance across fixed platforms
Task 7.3 Ensure interface with ESONET-EMSO label consortium – Promote Label
Task 3.3: FixO3 Label
Task 12.1 Enhancement of CO2 measurement – intercalibration based on the specifications from WP2 & WP3
Task 3.1: Assessment of proceduresAll procedures used within the network on:
maintenance service calibration pre-deployment data transfer etc.
will be documented and assessed
WP3 – Procedural Harmonisation
Task 3.2: Principles of “best practice”This task will describe principles of “best practices” in all phases of the system: pre-deployment test maintenance calibration etc.
covering the entire infrastructural chain of data acquisition from sensor (performance, robustness, accuracy, etc.) to supporting system (cabling, electric and electronic components, etc.).
PROTOCOLS Workshop
WP3 – Procedural Harmonisation
PROTOCOLS Workshop
Presentations by each partner
4-5 Dec. Athens