Wolverhampton City Centre Metro Extension

Wolverhampton City Centre Metro Extension. Introduction Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Embed Size (px)

Citation preview

Page 1: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Wolverhampton City Centre Metro Extension

Page 2: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Introduction

Background• New Tram and Depot Extension• Birmingham City Centre Extension• Original Wolverhampton City Centre Loop • New Wolverhampton City Centre Extension• Wolverhampton Interchange

Scope of Project

Impact to Cyclists

Timescales

Next Steps

Page 3: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Centro have procured a new fleet of trams. They are 20% larger and more passenger friendly.

To accommodate these larger trams the tram depot at Wednesbury has been extended.

The first tram was unveiled 16th October and the new depot opened The new fleet will enter service from April 2014

Project Background – New Trams and Depot.

Page 4: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

There are also plans to extend

the Metro further from New Street to

Centenary Square this is planned to be

completed in 2018. There are further plans to extend the Metro to the East Side of Birmingham to connect with HS2.

Project Background - Birmingham City Centre Extension. Work is already taking place on the first phase of the extension which will link Snow Hill and New Street stations in Birmingham with services commencing in 2015.

Page 5: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

One way loop along Market Street and Lichfield Street with a spur to the Rail Station.

Due to high costs and disruption to local businesses this was not progressed.

Background – Wolverhampton Original City Centre Loop

Page 6: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton
Page 7: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Since then a simplified more direct route has been developed. This places twin tracks along Pipers Row The tram will then turn right onto Railway Drive There will be a terminating stop at the Rail Station. The stop at St Georges will be retained for some off peak services.

Background – Wolverhampton City Centre Extension

Page 8: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton
Page 9: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

The Wolverhampton Interchange is a mixed public and private sector development based in Wolverhampton

This will encourage much needed private investment in the area The development includes:

• A new state of the art rail station• Leisure offering - 57,000 square feet and a 100 room hotel• Grade A offices - 297,000 square feet• Expansion of the multi-storey car park to 1000 new spaces

This represents over £100m worth of investment and is forecasted to bring 1400 jobs

The first phase of this should commence on site in 2014

Wolverhampton Interchange

Page 10: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton
Page 11: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton
Page 12: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Utilities will have to be diverted on Pipers Row. • BT • Gas • Sewers

Main works including: • Formation including Concrete Slabs• Track Installation • OLE including Poles and Wires • Platforms• Highways alterations and reinstatement

Traffic Management - to limit disruption to traffic during construction, Centro are proposing to construct one track at a time and will put in place a one way traffic flow. Bus service access and emergency vehicles would therefore be retained on Pipers Row.

Metro Extension – Main Construction Activities.

Page 13: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Question and Answers

Page 14: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton
Page 15: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Timescales

Project Commencement Date Completion Date

Public Realm completion:

October 2013 September 2015

Rail Station and Multi Story Car Park Development completion:

Summer 2014 Late 2015/2016

Banana Yard – Mixed use/ Leisure

2016 2019

Metro Extension - Public Consultation on revised alignment

-Advance Works including Utility Diversions

-- Metro Service Commencement

Start 2013

Summer 2016

Start 2013

Winter 2016

Winter 2018

Page 16: Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton

Note of this Meeting and Points arising Public Consultation Funding Finalised Environmental Impact Assessment Transport and Works Act Order Submission for Powers Attend Next quarterly Cycle Forum

Next Steps