Upload
duongtram
View
215
Download
2
Embed Size (px)
Citation preview
Information Engineering - Midsummer Day - 20. und 21.06.2017
Project Management & Information Engineering with Epic Sum Up
Andreas HaakenSolution Engineer and CEOAPTIS [email protected]
Information Engineering - Midsummer Day - 20. und 21.06.2017
eTraining● more than 50.000 users
● more than 60 countries
● more than 25 languages
Atlassian Solutions● more than 2000 plugin customers
● JAMES - Jira Managed Services
● Full Service Provider
Support Service● more than 15.000 supported users
● more than 4.500 resolved p.a.
● more than 2.100 hrs support p.a.
Information Engineering - Midsummer Day - 20. und 21.06.2017
Epic Sum UpProject Management & Information Engineering
Information Engineering - Midsummer Day - 20. und 21.06.2017
LightweightProjects
Project-PortfolioEpics Jira-ProjectsIssuesSubTask
Project Sope in Jira
Information Engineering - Midsummer Day - 20. und 21.06.2017
Workflows Properties Easy Creation
Epics as Projects?
Information Engineering - Midsummer Day - 20. und 21.06.2017
Potentials?Worklogs?
Attachments?
Progress?Additional efforts?Remaining Work?
Estimation? Budgets?
Story Points?
Missing Information?
Information Engineering - Midsummer Day - 20. und 21.06.2017
Summary Panel
Summary of any numeric value
- System Time Values
- Custom Time Fields
- Story Points
- Issue Count
- Number Fields
Different Progresses
- Based on Resolution State
- Separated by Status Category
- Weighted by their Value
- See all at once and Compare
Configure on any Level
- Customize Settings even on Epic level
- Choose what to see and what to include
- Set Budgets to Time (more Budgets are coming)
Access all Attachments
- See all Attachments in any Issue
- See a Thumbnail of Images
- all documents at one sight
Information Engineering - Midsummer Day - 20. und 21.06.2017
Detail View
See all Issues at once
- Drilldown of containing Values
- Progress per Issue
- Issue Structure
- Filter out relevant Issues
Inline Editing of Values
- Edit all summable Values inline
- See effects directly
- Plan and Estimate the whole Epic
Create a Timesheet
- Timesheet contains all Logs for the Epic
- Printable
- Coming Soon: Stylable-PDF Export
Collapse Structure
- more control to see details
- Coming Soon: Reorder
- Coming Soon: Create Issues
Information Engineering - Midsummer Day - 20. und 21.06.2017
Progress Bars as Custom Fields
- Default Field Types: Time, SP, Count
- Generic Progress Field: any Value!
- Customizable on any level
Progress Bars
Information Engineering - Midsummer Day - 20. und 21.06.2017
EPIC SUM UP
Summary Panel● Sum Up Any numeric Value
● Configure on any level
● See different progresses
● Access all attachments
Detail View● See all issues at once
● Edit all values inline
● Create Timesheet
● Collapse any level
Progress-Bars● Bars for default values
● Generic Progress Field
● Use Bars on Agile Boards
● Use Bars in Navigator
“Epic Sum Up” supports the work with epics in JIRA. Issues which
belong to an epic, can be now easily considered as a whole and
also evaluated.
This allows simple to plan, to monitor and summarize projects in
a JIRA environment.
Epic Sum Up 3.0
with Epic-likeContainers
Information Engineering - Midsummer Day - 20. und 21.06.2017
Epic Sum Up for Information Engineering
Epics =?
Projects/Containerfor
Dedicated Workflows for Containertypes
Information Engineering
Information Engineering - Midsummer Day - 20. und 21.06.2017
Why Information Engineering?
Why Information Engineering ?
Integration of Teams
Centralisation of Information need for less Tools
Information Engineering - Midsummer Day - 20. und 21.06.2017
WorkshopInformation Engineering mit Epic Sum Up
Information Engineering - Midsummer Day - 20. und 21.06.2017
Example: digital employee files
Container for Employee
Dokuments of Application
Training Tasks
Sick certificate
OnBoarding checklist
Issues can be part of a Container (and only one)
Issues may be from any project(control access and visibililty by project)
Change container by edditing the issue(containment by custom field)
summary functions for attachments(and comments and any other numeric values)
Container work just like Epics
Information Engineering - Midsummer Day - 20. und 21.06.2017
Example: digital employee files
Digital employee file
Epics as projects
Registration for bustravel
MMC PESU Scratch
Vacations
Information Engineering - Midsummer Day - 20. und 21.06.2017
Questions?Feel free to ask…
or contact me by [email protected]