APWA & PNS North American Snow Conference April 2011 1 Winter Operations Survival 101 Overview Policies and Procedures Levels of Service New Technologies Training Opportunities Snow Policy and Training Before Winter Mark DeVries Roadway Treatment Goals Level of Service Measurement Training Material Storage Field Testing Application Guidelines Follow-up Snow and Ice Plan Components Level of Service Expectations Before Winter

Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

APWA & PNS North American Snow Conference

April 2011

1

Winter Operations Survival 101

Overview

Policies and Procedures

Levels of Service

New Technologies

Training Opportunities

Snow Policy and Training

Before Winter

Mark DeVries

�Roadway Treatment Goals�Level of Service�Measurement�Training

�Material Storage�Field Testing

�Application Guidelines�Follow-up

Snow and Ice Plan Components

Level of Service

Expectations

Before Winter

Page 2: Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

APWA & PNS North American Snow Conference

April 2011

2

Roadway Treatment GoalsRoad Condition Rating for Sand Treatment Points LOS

Rating

100% of roadway has sand present 3 C+

50% or more of roadway has sand present 3.5 C

All emphasis areas have sand present 4 D+

50% or more of emphasis areas have sand present 5 F+

50% or less of emphasis areas have sand present 5.9 F

Unable to evaluate - -

Road Condition Rating for Chemical Treatment Points LOS Rating

Bare Pavement 1 A+

Patches of frost, black ice, slush, or compact. 1.5 A

Wheel tracks bare, frost, snow, or ice encountered. 2 B+

50% of roadway with compact snow and ice. 3 C+

Entire roadway covered with compact snow & ice. 4 D+

Unable to evaluate - -

Ratings and Levels of Service

LACK OF COMMUNICATION BETWEEN OPERATORS

New Technologies

Prototype PlowsHenderson Henke

Monroe Truck Flink

Page 3: Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

APWA & PNS North American Snow Conference

April 2011

3

New Automated Blending System

AVL with Extras!! Chehalis Salt Brine FacilityChehalis Salt Brine Facility

Starts Now

NASTY STORMS

Page 4: Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

APWA & PNS North American Snow Conference

April 2011

4

0

5

10

15

20

25$0

$10

$20

$30

$40

$50

Nov. 21st. 2010 Storm Zoomed with Treatment Data

New FLIR Camera

Page 5: Winter Maintenance Survival 101 - pnsassociation.orgpnsassociation.org/.../Winter_Survival_101.pdf · Winter Operations Survival 101 Overview Policies and Procedures Levels of Service

APWA & PNS North American Snow Conference

April 2011

5

Alaska’s Smart Vehicle SystemAlaska’s Smart Vehicle System

Training

Certification

Granular CalibrationDickey John:

•Select, set, and record the applicable gate opening; Connect key board perform system response / granular; zero the scale;

•Select cal / granular / salt, sand, or salt sand mix; touch R and fill the box;

•enter lbs dropped;

•touch D / y / operate / gran configuration and record the new cal number.

• Repeat twice for each granular product to verify an average value.

Force:

•Select, set, and record gate setting;

•enter the calibrate mode;

•rotate knob to “set granular”;

•enter 360 pulses per rev (if using the Dickey John style meter);

•set auger min. Set auger max. record the maximum rpm attained;

•select calibrate salt; adjust % to 100, push spreader knob, fill the scale box then push spreader knob to stop the delivery;

• record # of turns; enter pounds dropped, calculate and record the

lbs / rev as the new cal #;

• repeat this procedure twice for each granular product the unit is

programmed to deliver.

THANK YOU!THANK YOU!Mark DeVriesMcHenry County DOT(815) 334-4975