Wimberley Market Days Progress Report Site Addressing and Management Analysis

Wimberley Market Days Progress Report Site Addressing and Management Analysis

Embed Size (px)

Citation preview

Page 1: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Wimberley Market Days

Progress ReportSite Addressing and Management Analysis

Page 2: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Task : data Collection • CAD file – provided by the Lion’s club• GPS points• Updated booth inventory attribute list• Current photos of every booth within the market• USGS orthophoto image (Feb 2006) with a 2 foot

resolution• NAIP (National Agricultural Imagery Program) digital

orthophoto image (July 2004) with a 1 meter resolution• Hays county parcel boundaries

Page 3: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Task: Addressing System•Work completed:

• Literature Review• Final Draft of Addressing System

• Sections• Numbering - 2 options• Keep current street names

•Future work:• Finalize addressing system after consulting with the

Wimberley Lions Club

Page 4: Wimberley Market Days Progress Report Site Addressing and Management Analysis
Page 5: Wimberley Market Days Progress Report Site Addressing and Management Analysis
Page 6: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Task: Map Design

• base map is still under construction and currently in GIS format• The main features of Lion Field have been georeferenced and digitized.• Each booth will need to be linked to our database containing booth elements and a photograph.

Page 7: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Database:

We have done an extensive amount of research on database management and implementation. Our initial plan was to design a database to implement within our website, so that prospective day vendors can find a booth with their needs (i.e. a booth with tables or racks). So far, we are on track to complete that portion of our database.

Cont..

Page 8: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Database:

We met with Rebecca, Webmaster for www.ShopMartketDays.com, the week before Spring Break to discuss our options and figure out what direction we should be headed. She agreed to help us with some of our tougher tasks, mainly the database design.

As of this moment, we have a model in progress, but are awaiting input from Rebecca. We are confident that we are on track with our timeline.

Page 9: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Task: Website Development

• Development of the GeoGurus home page is 80% complete.

Problems: 1. The elements used in the creation of the webpage were distorted and/or pixilated. 2. Animation was not a smooth flow. Solution: Resized pictures and changed the resolution of some of the graphic elements

Page 10: Wimberley Market Days Progress Report Site Addressing and Management Analysis

Conclusion:

• The Wimberley Market Days Site Addressing and Mapping project for the Wimberley Lions Club is in progress and on schedule according to the accepted proposal.

• The greatest remaining challenge is the integration of the maps with the database, to create a dynamic mapping system