42
H-1 SHEET NO. WILSON RD SHELTER FLOOR PLAN STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION SICN SITE NAME FINANCIAL PROJECT ID COUNTY \\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd 424401-2-93-03 FLORIDA DEPARTMENT OF TRANSPORTATION 605 SUWANNEE ST. MS 90 TALLAHASSEE, FL 32399-0450 PH.(850)-410-5600 FAX.(850)-410-5501 CONTRACT PLANS RECORD REV. DATE DESCRIPTION REV. DATE DESCRIPTION F 6 T P F -48VDC RACK NOKIA 7705 RACK FDOT FIBER RACK -48VDC BATTERY PLANT WILSON RD SHELTER FLOOR PLAN GENERATOR ROOM WILSON RD: A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES B1. NOKIA MPR-9500 RADIO SHELF B2. FUTURE NOKIA MPR-9500 RADIO SHELF C. NOKIA 7705 SAR-18 ROUTER D. TELCO SYSTEMS ACCESS60 CHANNEL BANK E. DPS TELECOM LINE PROTECTOR 48 SPD F. NETGUARDIAN RTU G. 4-WIRE EM JACKFIELD H. DIN RAIL WITH GIGABIT ETHERNET, 4WEM SPD I. RELOCATED NOKIA NFM-P FROM DISTRICT 6 RTMC J. NOKIA 7750 SR-a8 A B1 G H 9500 MPT- HLC 9500 MPT- HLC 9500- MPT 9500 MPT- HLC 9500 MPT- HLC 9500- MPT o I I o I o B2 C D F DPS TELECOM LINE PROTECTOR 48 E NOKIA 7750 SR-a8 RELOCATED NOKIA NFM-P I J WILSON RD 7705 RACK NOTES: 1. 7705 SAR-18 INSTALLED AND IN OPERATION. 2. CUT-OVER NOKIA NFM-P AND 7750 SR-A8 IN ACCORDANCE WITH EQUIPMENT INSTALLATION CUT-OVER SEQUENCING PLAN, SHEETS A-5 AND A-6; AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS. EQUIPMENT TO BE INSTALLED FUTURE INSTALLATION EXISTING FDOT EQUIPMENT LEGEND: Attachment 1 8

WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-1

SHEET NO.WILSON RD SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

-48V

DC

RA

CK

NO

KIA

7705

RA

CK

FDO

TFI

BE

RR

AC

K

-48VDC BATTERY PLANT

WILSON RD – SHELTER FLOOR PLAN

GENERATOR ROOM

WILSON RD:

A. FUSE PANEL WITHAPPROPRIATELY SIZED FUSES

B1. NOKIA MPR-9500 RADIO SHELFB2. FUTURE NOKIA MPR-9500

RADIO SHELFC. NOKIA 7705 SAR-18 ROUTERD. TELCO SYSTEMS ACCESS60

CHANNEL BANKE. DPS TELECOM LINE

PROTECTOR 48 SPDF. NETGUARDIAN RTUG. 4-WIRE EM JACKFIELDH. DIN RAIL WITH GIGABIT

ETHERNET, 4WEM SPDI. RELOCATED NOKIA NFM-P

FROM DISTRICT 6 RTMCJ. NOKIA 7750 SR-a8

A

B1

G

H

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

Fan FilterRelease

FanModule

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

A12-S

DI

Stat

Pwr

Act

Port

Ports 4-6

Ports 1-3

Ports 10-12

Ports 7-9

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

Port1

Call

Port2

Call

Port3

Call

Port4

Call

Port5

Call

Port6

Call

A6-E

&M

Pwr

Stat

A8-1GB-SFP

Stat

Pwr

12

34

76

58

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

-48V/24V

A8-P

MC

Pwr

Stat

MW

3

LnkAct

MW

4

LnkAct

5

LnkAct

6

LnkAct

7

LnkAct

8

LnkAct

LnkM

W1

ActLnk

MW

2Act

-48V/24V

B2

C

D

F

DPS TELECOM LINE PROTECTOR 48E

NOKIA 7750 SR-a8

RELOCATEDNOKIA NFM-P

I

J

WILSON RD – 7705 RACK

NOTES:

1. 7705 SAR-18 INSTALLED AND IN OPERATION.

2. CUT-OVER NOKIA NFM-P AND 7750 SR-A8 IN ACCORDANCE WITHEQUIPMENT INSTALLATION CUT-OVER SEQUENCING PLAN, SHEETS A-5AND A-6; AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

EQUIPMENT TO BE INSTALLED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 8

Page 2: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

Microwave RadioDVM6-45

Milton DOT

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

EasternResearch

DACC

(20) T1 to Chipley

01.03.02

01.02.05

P12 Access 60Channel Bank

Nokia 7705

(7) T1 to Milton DOT

T1 Aggregation

Site Equipment

H-2

SHEET NO.PENSACOLA NETWORK DIAGRAMS

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Milton DOT

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

BPS 2000

(1) DS3

EasternResearch

DACC

(23) T1 to Tallahassee

FHP

01.03.04

01.02.07

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

Site Equipment

PENSACOLA – AS-BUILT

PENSACOLA – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-3.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

GPSNOTE 2

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 9

Page 3: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

7705 Rack

NR-4-48 VDC

DistributionRack

+

-48 Volt D

CBatteryPlant

Fiber Rack

NR-2DVM6-45XLMicrowaveTerminal

Radio Rack

WoodenDesk

Passport15k

Rack

Unk-1For 47 MHzRepeater

Unk-2ForestryRadio

NR-6Channel Bank

Rack

NR-5Network &

DACC Rack

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANEL, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

DS-1 CABLE

-48VDC CABLES

ENTRY PORT

GPS ANTENNA

SPD

NOTE 4

NOTE 1

NOTE 2

NOTE 3

PENSACOLA 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

F

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL D

E

H-3

SHEET NO.PENSACOLA SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

PENSACOLA – SHELTER FLOOR PLANPENSACOLA – 7705 RACK

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 10

Page 4: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-4

SHEET NO.CHIPLEY AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Caryville Marianna FHP

M121

M122

M123

M124

M125

M126

M127

BM23

M121

M122

M123

M124

M125

M126

M127

AM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

B1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

A1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Pensacola(23) T1 to Lake City

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

01.03.02

01.02.05

01.04.03

SITEEQUIPMENT

CHIPLEY – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 11

Page 5: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-5

SHEET NO.CHIPLEY PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Caryville Marianna FHP

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

01.03.02

01.02.05

01.04.03

EasternResearch

DACC

(20) T1 to Pensacola

(20) T1 to Tallahassee FHP

P12

(7) T1 to Caryville

Access 60Channel Bank

Nokia 7705

T1 Aggregation

Site Equipment

(7) T1 to Marianna

CHIPLEY – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-6.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

GPSNOTE 2

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 12

Page 6: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

7705 Rack

H-6

SHEET NO.CHIPLEY SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Woo

den

Shel

fw

/Dra

wer

MAS Call Box Base Station Rack (FR1)

-48 VDCPower

Distribution Rack

Channel Bank Rack (FR6)

ASN / DACCRack (FR5)

DVM6-45MW TerminalRack (FR2)

DVM6-45MW TerminalRack (FR3)

FDOT 47 MHzGE MASTRIIBase Station

Passport 15000Rack (FR4)

NOTE 1

DS-1 CABLE

GPS COAXIAL

FLOOR ENTRY PORT

SPD

GPS ANTENNA

TRANSMISSIONLINE BRIDGE

NOTE 2

CHIPLEY – 7705 RACKCHIPLEY – SHELTER FLOOR PLAN

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH FLOOR ENTRY PORT.

A

B

C

D

F

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

CHIPLEY - 7705 RACKA. FUSE PANEL WITH

APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

NOTE 4

NOTE 3

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 13

Page 7: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Quincy FHP Monticello DOT

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Chipley(23) T1 to Lake City

01.03.04

01.02.07

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

01.05.03

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

Nortel ERS 8606

SITEEQUIPMENT

H-7

SHEET NO.TALLAHASSEE AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

TALLAHASSEE – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 14

Page 8: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-8

SHEET NO.TALLAHASSEE PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Quincy Monticello

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

EasternResearch

DACC

(20) T1 to Chipley (20) T1 to Lake City

01.02.07

P12

(7) T1 to Quincy

Access 60Channel Bank

Nokia 7705

01.05.0301.03.04

T1 Aggregation Site Equipment

(7) T1 to Monticello

Nortel ERS 8606

TALLAHASSEE – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-9.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 15

Page 9: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-9

SHEET NO.TALLAHASSEE SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

FDOT 47 MHzGE MASTR II Base Station

ChannelBankRackBR4

DVM6-45Terminal

Radio RackBR6

DVM6-45Terminal

Radio RackBR5

MACBS

DACSForestry

VHF Radio

Tabl

e

-48 Volt DCBatteryPlant

+

Workstation DeskCPU

&UPS

CPU&

UPS

ASN/DACC Rack

-48 VDCDistribution

Rack

Passport15000

Rack (FR4)

ITS WAN Rack

7705 RACK

DS-1 CABLE

-48VDC CABLES

GPS ANTENNA

TRANSMISSIONLINE BRIDGE

FLOOR ENTRY PORT

SPD

NOTE 1

NOTE 2

NOTE 3

TALLAHASSEE 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

D

F

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

TALLAHASSEE - 7705 RACK

GPS COAXIAL

TALLAHASSEE – SHELTER FLOOR PLAN

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH FLOOR ENTRY PORT.

NOTE 4

Attachment 1 16

Page 10: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-10

SHEET NO.LAKE CITY AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

(027)

Microwave RadioDVM6-45

(029)

SR 136 Sanderson

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

BPS 2000

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Tallahassee

FHP

(23) T1 to Jacksonville

FHP

01.03.04

01.02.07

P12

Microwave RadioDVM6-45

(027)

US 41

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

(23) T1 to Wildwood

CAC Wide Bank 28

Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

01.05.03

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

01.05.04

SITEEQUIPMENT

(1) DS3

LAKE CITY – AS-BUILTEQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 17

Page 11: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-11

SHEET NO.LAKE CITY PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

(027)

Microwave RadioDVM6-45

(029)

SR 136 Sanderson

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

EasternResearch

DACC

(20) T1 to Tallahassee

FHP

(20) T1 to Jacksonville FHP

01.02.07

P12

Microwave RadioDVM6-45

(027)

US 41

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

(20) T1 to Wildwood

(7) T1 to US 41(7) T1 to SR 136

(7) T1 to Sanderson

Access 60Channel Bank

Nokia 7705

01.05.03

01.03.04

01.05.04

T1 Aggregation

SITEEQUIPMENT

LAKE CITY – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-12.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 18

Page 12: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-12

SHEET NO.LAKE CITY SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

-48VDCBatteryPlant

-

+

HON DeskModel P3262

DVM6-45Microwave

Rack

15K Rack-48VDC

DistributionRack

MAS + RWISCall Box

Base Station Rack

47 MHzEricsson Base

TDM/Channel Bank

Rack/DACCS

Bookcase

Network Management

Rack

DVM6-45Microwave

Rack

DVM6-45Microwave

Rack

ITS WAN8606

7705 Rack

GPS ANTENNA

SPD

ENTRY PORT

DS-1 CABLE

NOTE 2

NOTE 2

GPS COAXIAL

-48VDC CABLES

NOTE 3

NOTE 1

NOTE 4

LAKE CITY 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

D

F

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

7705 DSX-1 PANEL

B

D

E

LAKE CITY – SHELTER FLOOR PLAN

LAKE CITY – 7705 RACK

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 19

Page 13: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-13

SHEET NO.WILDWOOD AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Ocala DOT Saint Catherine

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioConstellation

Wildwood FTE

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

BPS 2000

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Lake City (23) T1 to Tampa Maintenance

01.03.04

01.02.07

P12

(5) T1 to Stuart Maintenance

CAC Wide Bank 28

Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

01.05.03

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

01.05.04

SITEEQUIPMENT

(1) DS3

Larus Clock

WILDWOOD – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 20

Page 14: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Ocala DOT Saint Catherine

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioConstellation

Wildwood FTE

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

EasternResearch

DACC

(20) T1 to Lake City(20) T1 to Tampa

Maintenance

P12

(26) T1 to Wildwood Turnpike

(7) T1 to Ocala (7) T1 to Saint Catherine

Access 60Channel Bank

Nokia 7705

T1 Aggregation

SITEEQUIPMENT

Larus Clock

H-14

SHEET NO.WILDWOOD PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

WILDWOOD – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-15.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1 NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 21

Page 15: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-15

SHEET NO.WILDWOOD SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

7705 Rack

-48VDCBatteryPlant

-

+

DVM6-45 MWTerminal Rack

(Q1)

DVM6-45 MWTerminal Rack

(Q2)

Channel Bank and DACC

Rack

DVM6-45 RackMAS Call Box Base Station

Rack

Passport 15kRack

-48 VDCDistribution

Rack

GPS ANTENNA

SPD

ENTRY PORT

DS-1 CABLE

NOTE 2

NOTE 2

NOTE 2

NOTE 3

NOTE 1

NOTE 4

WILDWOOD 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

D

F

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

7705 DSX-1 PANEL

B

D

E

WILDWOOD – SHELTER FLOOR PLAN

WILDWOOD – 7705 RACK

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 22

Page 16: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-16

SHEET NO.TAMPA MAINTENANCE AS-BUILT NETWORK

DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Temple Terrace Ruskin

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioDVM10-8T

Tampa DOT/FHP

C

M121

M122

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

CM23

28-T1 TDMMultiplex C

BPS 2000

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Wildwood

(23) T1 to Jacaranda

Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

SITEEQUIPMENT

Telco Systems T-Metro TM-100

TAMPA MAINTENANCE – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 23

Page 17: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-17

SHEET NO.TAMPA MAINTENANCE PROPOSED NETWORK

DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Temple Terrace Ruskin

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioDVM10-8T

Tampa DOT/FHP

C

M121

M122

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

CM23

28-T1 TDMMultiplex C

EasternResearch

DACC

(20) T1 to Wildwood(20) T1 to Jacaranda

P12

(7) T1 to Tampa DOT/FHP

(7) T1 to Temple Terrace

(7) T1 to Ruskin

Access 60Channel Bank

Nokia 7705

T1 Aggregation

SITEEQUIPMENT

TAMPA MAINTENANCE – PROPOSEDNOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-18.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 24

Page 18: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-18

SHEET NO.TAMPA MAINTENANCE SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

7705 Rack

+

-48 Volt DCBatteryPlant

DVM6-45XLMicrowaveTerminal

Radio RackU1

DVM10-8TMicrowaveTerminal

Radio RackU2

DVM6-45XLMicrowaveTerminal

Radio RackU3

MASCall Box

Base Station Rack

Network Management

Rack

-48VDCDistribution

Rack

Passport 15kRack

Channel Bank &DACC Rack

U4

Book

shel

f

GPS ANTENNA

SPD

ENTRY PORT

NOTE 3

DS-1 CABLE

NOTE 2 NOTE 2 NOTE 2

NOTE 1

NOTE 4

TAMPA MAINTENANCE 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

D

F

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

7705 DSX-1 PANEL

B

D

E

TAMPA MAINTENANCE – SHELTER FLOOR PLAN

TAMPA MAINTENANCE – 7705 RACK

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 25

Page 19: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-19

SHEET NO.JACARANDA AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

(027)

Microwave RadioDVM6-45

(029)

Fruitville Port Charlotte

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

01.03.04

01.02.07

01.05.03

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Tampa Maintenance

(23) T1 to Naples

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

SITEEQUIPMENT JACARANDA – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 26

Page 20: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-20

SHEET NO.JACARANDA PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Fruitville Port Charlotte

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

EasternResearch

DACC

(20) T1 to Tampa Maintenance (20) T1 to Naples

P12

(7) T1 to Fruitville

Access 60Channel Bank

Nokia 7705

T1 Aggregation

Site Equipment

(7) T1 to Port Charlotte

01.03.02

01.02.05

01.04.03

JACARANDA – PROPOSEDNOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-21.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 27

Page 21: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-21

SHEET NO.JACARANDA SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Passport1500

DVM6-45 MW

Terminal Rack (A2)

Channel BankRack

DVM6-45 MW

Terminal Rack (AA1)

RESERVED RACK

DACCsRack

-48 VDC Distribution

RackNOTE 3

NOTE 1

DS-1 CABLE

JACARANDA RESERVED RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

A

B

C

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

-48VDC CABLES

NOTE 2

GPS ANTENNA

SPD

GPS COAXIAL

ENTRY PORT

JACARANDA – SHELTER FLOOR PLANJACARANDA – RESERVED RACK

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18 AND -48VDC FUSE PANEL IN EXISTING RESERVED RACK.

2. INSTALL (2) NEW 7705 DSX-1 PANELS AND SPD’S IN CHANNEL BANK RACK. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

NOTE 4

Attachment 1 28

Page 22: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-22

SHEET NO.NAPLES AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioConstellation

Estero Miles City

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(23) T1 to Jacaranda(21) T1 to McArthur

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

SITEEQUIPMENT

01.03.04

01.02.07

01.05.03

T1s for “Others”

NAPLES – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 29

Page 23: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-23

SHEET NO.NAPLES PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioConstellation

Estero Miles City

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

01.03.02

01.02.05

01.04.03

EasternResearch

DACC

(20) T1 to Jacaranda

(18) T1 to McArthur

P12

(7) T1 to Estero

Access 60Channel Bank

Nokia 7705

T1 Aggregation

Site Equipment

(7) T1 to Miles City

T1s for “Others”

NAPLES – PROPOSED NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-24.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 30

Page 24: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-24

SHEET NO.NAPLES SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

-48 VDC

Harris MWConst. Rack

-48VDC Rectifier

Rack

Harris MWDVM-65

Rack

DACCs Rack

Channel Bank Rack

5200 Rack

Reserved RackM/A-COM M/A-COM M/A-COM M/A-COM

UPS

-48 VDCDistributionBatteries

15K Rack

GPS ANTENNA

SPD GPS COAXIAL DS-1 CABLE

NAPLES RESERVED RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. EXITING FIBER OPTIC

A

B

C

D

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

D

E

NAPLES RESERVED RACK

Corning Cable Systems

LAN CORNING

F

NOTE 1

NOTE 3

-48VDC CABLES

ENTRY PORTNOTE 2

NAPLES – SHELTER FLOOR PLAN

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTES:

1. INSTALL NOKIA 7705 SAR-18, DSX-1 PANELS, SPD’S, AND -48VDC FUSE PANEL IN EXISTING RESERVED RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN CHANNEL BANK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 1 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

NOTE 4

Attachment 1 31

Page 25: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-25

SHEET NO.MCARTHUR AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Andytown

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex C

M121

M122

M123

M124

M125

M126

M127

BM23

Fiber MUX Terminal

01.03.04

01.02.07

01.05.03

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(22) T1 to Naples(5) T1 to Stuart Maintenance

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

SITEEQUIPMENT

B1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

P11

McArthur Interchange

MCARTHUR – AS-BUILTEQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

F.O.C. Patch Panel

Attachment 1 32

Page 26: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

Microwave RadioDVM6-45

Andytown

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

M121

M122

M123

M124

M125

M126

M127

BM23

Fiber MUX Terminal

McArthur Interchange

B1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

EasternResearch

DACC

(18) T1 to Naples

P12

(7) T1 to Andytown

Access 60Channel Bank

Nokia 7705

T1 Aggregation

Site Equipment

01.03.02

01.02.05

01.04.03

P11

H-26

SHEET NO.MCARTHUR PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

MCARTHUR – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-27.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

3. INSTALL 10GBPS SM FIBER OPTIC TO MCARTHUR INTERCHANGE IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2GPS

F.O.C. Patch Panel

2 SM 10Gbps Fiber Optic to McArthur Interchange

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 33

Page 27: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-27

SHEET NO.MCARTHUR SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

7705 Rack

Channel BankRack

HarrisConstellation

Rack

NMS/DACCs Rack

-48 VDCRectifier

Rack

-48 VDCBattery Bank

FiberRack

Passport15000

Rack (FR4)

47 MHz Repeater

GPS ANTENNA

SPD ENTRY PORT

GPS COAXIAL

-48VDC CABLES

DS-1 CABLE

NOTE 3

NOTE 2

NOTE 1

MCARTHUR 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

F

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL D

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

MCARTHUR – 7705 RACK

MCARTHUR – SHELTER FLOOR PLAN

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN CONSTELLATION RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTE 4

Attachment 1 34

Page 28: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-28

SHEET NO.STUART MAINTENANCE AS-BUILT NETWORK

DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Fort Pierce Maintenance

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex C

BPS 2000

(1) DS3

EasternResearch

DACC

(22) T1 to June Park

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

Site Equipment

Fiber MUX Terminal

Stuart Interchange

C

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

CAC Wide Bank 28

P11

Leased T1 to Lake Worth

(1) DS3

(5) T1 to McArthur

(5) T1 to Wildwood

STUART MAINTENANCE – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

F.O.C. Patch Panel

Attachment 1 35

Page 29: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-29

SHEET NO.STUART MAINTENANCE PROPOSED NETWORK

DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Fort Pierce Maintenance

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

EasternResearch

DACC

(19) T1 to June Park

01.03.02

01.02.05

P12 Access 60Channel Bank

Nokia 7705

(7) T1 to Ft. Pierce Maintenance

T1 Aggregation

Site Equipment

Fiber MUX Terminal

Stuart Interchange

C

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

STUART MAINTENANCE – PROPOSED

NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-30.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

3. INSTALL 10GBPS SM FIBER OPTIC TO STUART INTERCHANGE IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

4. INSTALL PPP T-1 FOR EXISTING LEASED CIRCUIT IN ACCORDANCE WITH SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

F.O.C. Patch Panel

2 SM 10Gbps Fiber Optic to Stuart Interchange

PPP T-1Leased T1

To Lake Worth New DPS Telecom Netguardian 216T

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

NOTE 4

Attachment 1 36

Page 30: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-30

SHEET NO.STUART MAINTENANCE SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

7705 Rack

MAS Call Box Base

StationRack

DVM6-45MW

Terminal Rack (F1)

Channel Bank Rack

(F2)

DACCsRack

-48 VDCBattery Bank

-48 VDCDistribution

RackGE MasterLow Band

FX1

Passport15K Rack

GPS ANTENNA

SPD

ENTRY PORT

GPS COAXIAL

-48VDC CABLES

NOTE 4

NOTE 3

NOTE 2

NOTE 1

STUART MAINTENANCE 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. DSX JACKFIELD – 32 CKTSE. DIN RAIL WITH T-1 SPDS –

28 CKTSF. 19 INCH RELAY RACK

A

B

C

F

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt BStat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

E

D

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

STUART MAINTENANCE – 7705 RACKSTUART MAINTENANCE – SHELTER FLOOR PLAN

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANEL LOCATED IN THE DVM6-45 RACK RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 37

Page 31: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-31

SHEET NO.JUNE PARK AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Cocoa FHP Brevard County Line

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

01.03.04

01.02.07

01.05.03

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

(1) DS3(1) DS3

CAC Wide Bank 28

EasternResearch

DACC

(22) T1 to Port Orange(22) T1 to Ft. Stuart

Maintenance

P12

Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

SITEEQUIPMENT JUNE PARK – AS-BUILT

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 38

Page 32: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-32

SHEET NO.JUNE PARK PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Cocoa FHP Brevard County Line

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

EasternResearch

DACC

(19) T1 to Port Orange (19) T1 to Stuart

Maintenance

P12

(7) T1 to Cocoa FHP

Access 60Channel Bank

Nokia 7705

T1 Aggregation

Site Equipment

(7) T1 to Brevard County Line

01.03.04

01.02.07

01.05.03

JUNE PARK – PROPOSED NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-33.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1NOTE 2 GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 39

Page 33: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-33

SHEET NO.JUNE PARK SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

7705 Rack

Passport15K Rack

DVM6-45MW

TerminalRack(AU1)

DVM6-45MW

TerminalRack(A1)

MASCall Box

BaseStationRack

DACCsand

Channel BankRack

-48VDCBatteryPlant

- +

-48 VDCDistribution

Rack

GPS ANTENNA

SPD

ENTRY PORT

DS-1 CABLE

-48VDC CABLES

GPS COAXIAL

JUNE PARK 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTER

D. RELOCATED NETGUARDIAN, RESIZED FOR 19-INCH RACK

E. DSX JACKFIELD – 32 CKTSF. DIN RAIL WITH T-1 SPDS –

28 CKTSG. 19 INCH RELAY RACK

A

B

C

E

G

F

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

E

F

JUNE PARK - 7705 RACK

D

NOTE 4

NOTE 1

NOTE 2

NOTE 3

JUNE PARK – SHELTER FLOOR PLAN

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 19-INCH EQUIPMENT RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANEL TO DVM6-45 DSX-1 PANELS LOCATED IN EACH DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK, AND RELOCATE THE 7705 RACK IN ITS PLACE. THE DPS TELECOM NETGUARDIAN 832A #2 SHALL BE DELIVERED TO THE FDOT. THE DPS TELECOM NETGUARDIAN 832A #1 SHALL BE RELOCATED AND INSTALLED IN THE 7705 RACK.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 40

Page 34: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-34

SHEET NO.PORT ORANGE AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Ormond Beach Edgewater

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

Microwave RadioDVM6-45

Deland DOT

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

BPS 2000

EasternResearch

DACC01.02.07

P12Access 60Channel Bank

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

SITEEQUIPMENT

01.03.04

01.05.0301.05.04

CAC Wide Bank 28

(23) T1 to June Park(24) T1 to Wilson Road

(24) T1 to Jacksonville

PORT ORANGE – AS-BUILTEQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 41

Page 35: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-35

SHEET NO.PORT ORANGE PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Ormond Beach Edgewater

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioConstellation

Deland DOT

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

EasternResearch

DACC

(20) T1 Jacksonville(20) T1 to June Park

01.02.07

P12

(20) T1 to Wilson Road(7) T1 to Deland (7) T1 to

Ormond Beach(7) T1 to Edgewater

Access 60Channel Bank

Nokia 7705

01.05.03

01.03.04

01.05.04

T1 Aggregation

SITEEQUIPMENT

PORT ORANGE – PROPOSED NOTES:

1. INSTALL NOKIA 7705 SAR-18, SEE SHEET H-36.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 42

Page 36: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-36

SHEET NO.PORT ORANGE SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

DVM6-45 Terminal

Rack (AQ1)

DVM6-45 Terminal

Rack (AQ2)

DVM6-45 Terminal

Rack (AQ3)

-48 VDCDistribution

Rack

Reserved Rack

Passport 15K Rack

Channel Bank Rack

-+

-48VDCBatteryPlant

PORT ORANGE 7705 RACK:

A. FUSE PANEL WITH APPROPRIATELY SIZED FUSES

B. FUTURE NOKIA MPR-9500 RADIO SHELF

C. NOKIA 7705 SAR-18 ROUTERD. FUSE PANEL – RELOCATE

EXISTING CIRCUITS TO NEW FUSE PANEL

E. RELOCATED NETGUARDIAN, RESIZED FOR 19-INCH RACK

F. DSX JACKFIELD – 32 CKTSG. DIN RAIL WITH T-1 SPDS –

28 CKTSH. DC-DC CONVERTER

GPS ANTENNA

SPD

ENTRY PORT

NOTE 1

NOTE 3

DS-1 CABLE

NOTE 2

NOTE 2 NOTE 2

A

B

C

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

B

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

FUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANELFUSE PANEL

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

7705 DSX-1 PANEL

7705 DSX-1 PANEL

7705 DSX-1 PANEL

B

D

F

F

F

G

G

G

H

E

PORT ORANGE – SHELTER FLOOR PLAN PORT ORANGE – RESERVED RACK

NOTES:

1. INSTALL NOKIA 7705 SAR-18, -48VDC FUSE PANEL, DSX-1 PANELS, AND SPDS IN NEW 1RESERVED RACK.

2. CONNECT DS-1s FROM NEW 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANEL LOCATED IN EACH DVM6-45 RACK.

3. INSTALL APPROPRIATELY SIZED -48VDC A/B BREAKERS, AND WIRE TO FUSE PANEL IN 7705 RACK. THE BREAKERS SHALL BE THE SAME STYLE AS SHOWN ON FIGURE 2 SHEET E-1.

4. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A #2 SHALL BE DELIVERED TO THE FDOT. THE DPS TELECOM NETGUARDIAN 832A #1 SHALL BE RELOCATED AND INSTALLED IN THE 7705 RACK.

5. INSTALL GPS ANTENNA, COAX TRANSMISSION LINE THROUGH WAVEGUIDE ENTRY PORT.

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

FUTURE INSTALLATION

EXISTING FDOT EQUIPMENT

LEGEND:

NOTE 4

Attachment 1 43

Page 37: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-37

SHEET NO.JACKSONVILLE AS-BUILT NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Baldwin DOT Saint Johns Rest Area

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

28-T1 TDMMultiplex B

Microwave RadioDVM6-45

Yulee

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

BPS 2000

(1) DS3

EasternResearch

DACC

(23) T1 to Lake City (24) T1 to Sanlando Springs

01.02.07

P12 Access 60Channel Bank

CAC Wide Bank 28

Nortel Passsport 15000

DS3 ATM Interface

Gig E 1000 Base SX

Nortel ASN Router

TLANNetPro

Nortel BayStack 106 12-Port 10BaseT Hub

SITEEQUIPMENT

01.03.04

01.05.0301.05.04

Nokia 7705

T1 Aggregation

JACKSONVILLE – AS-BUILT NOTES:

1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.

2. THE EXISTING 24 DS-1 AGGREGATE TO SANLANDO SPRINGS SHALL BE REDESIGNED IN ACCORDANCE WITH THE PROPOSED JACKSONVILLE PHASE II LOW-LEVEL NETWORK DESIGN.

NOTE 1

NOTE 2

GPS

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 44

Page 38: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-38

SHEET NO.JACKSONVILLE PROPOSED NETWORK DIAGRAM

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

Microwave RadioDVM6-45

Microwave RadioDVM6-45

Baldwin DOT Saint Johns Rest Area

B

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

BM23

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

CM23

28-T1 TDMMultiplex C

28-T1 TDMMultiplex B

Microwave RadioDVM6-45

Yulee

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424 28

21 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

EasternResearch

DACC

(20) T1 to Lake City(20) T1 to Port

Orange

01.02.07

P12

(27) T1 to Yulee (7) T1 to SR 136

Access 60Channel Bank

Nokia 7705

01.05.03

01.03.04

01.05.04

T1 Aggregation

SITEEQUIPMENT

(7) T1 to Saint Johns Rest Area

JACKSONVILLE – PROPOSEDNOTES:

1. NOKIA 7705 SAR-18 INSTALLED AND IN OPERATION.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

GPS

NOTE 1

NOTE 2

EQUIPMENT TO BE INSTALLED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 45

Page 39: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-39

SHEET NO.JACKSONVILLE SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

PA

SS

PO

RT

1500

0

-48VDCBATTERY

PLANT

-+

FIB

ER

OP

TIC

S

RA

CK

-48V

DC

RA

CK

NM

SR

AC

KIT

SW

AN

-48

VD

C

DIS

TRIB

-U

TIO

NR

AC

K

FDO

T47

MH

ZR

EP

EA

TER

DV

M6-

45

TER

MIN

AL

RA

CK

AG

3

DV

M6-

45

TER

MIN

AL

RA

CK

AG

2

DV

M6-

45

TER

MIN

AL

RA

CK

AG

1 S

T. J

OH

NS

DA

CC

/C

HA

NN

EL

BA

NK

RA

CK

DDD TE66-6 N

TM

6M

6M

6 MV

MV

MV

M RM

55 5 AL

OP

TIC

SD

ISTR

IBO

ER C

8 SC

EP

EA

TER

4 EK O T AC

/N

E AC BA

KN R

RA

CKI N K77

05 R

AC

K

RACK TO BE USED AS PART OF THIS

PROJECT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

7705 DSX-1 PANEL

7705 DSX-1 PANEL

7705 DSX-1 PANEL

DS-1 CABLE

NOTES:

1. CONNECT DS-1s FROM 7705 DSX-1 PANELS TO DVM6-45 DSX-1 PANELS LOCATED IN THE SPECIFIED DVM6-45 RACKS.

2. AFTER FINAL CUT-OVER, REMOVE THE EQUIPMENT IN THE PASSPORT 15K RACK AND THE 23-IN RACK. THE DPS TELECOM NETGUARDIAN 832A SHALL BE DELIVERED TO THE FDOT.

NOTE 1

JACKSONVILLE – SHELTER FLOOR PLAN

JACKSONVILLE – 7705 RACK

NOTE 2

Attachment 1 46

Page 40: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-40

SHEET NO.SANLANDO SPRINGS NETWORK DIAGRAMS

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

P11

MicrowaveRadio A

Deland DOT

DVM6-45 Terminal

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424

2821 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

Nortel ASN Router

Access 60Channel Bank

P12

Nokia 7705

T1 Aggregation

(24) T1 to D5 Wilson Road

11GHz Microwave to Wilson Rd

P11

MicrowaveRadio A

Deland DOT

DVM6-45 Terminal

A

M121

M122

M123

M124

M125

1

21 3 44 8

21 3 45 9

21 3 412 16

21 3 413 17

2021 3 4

21

21 3 424

2821 3 425

M126

M127

AM23

28-T1 TDMMultiplex A

Access 60Channel Bank

P12

Nokia 7705

T1 Aggregation

(20) T1 to D5 Wilson Road(7) T1 to Deland

SANLANDO SPRINGS – AS-BUILT SANLANDO SPRINGS – PROPOSED

11GHz Microwave to Wilson Rd

BPS 2000

Nortel BayStack 106 12-Port 10BaseT Hub

SITEEQUIPMENT

10 Gbps F.O. to Wilson Rd.

NOTES:

1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.

2. THE EXISTING 24 DS-1 AGGREGATE TO SANLANDO SPRINGS SHALL BE REDESIGNED IN ACCORDANCE WITH THE PROPOSED SANLANDO SPRINGS PHASE II LOW-LEVEL NETWORK DESIGN.

NOTES:

1. THE NOKIA 7705 SAR-18 IS INSTALLED AND IN OPERATION.

2. CUT-OVER DS-1S AND SITE EQUIPMENT IN ACCORDANCE WITH EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, SHEETS A-5, A-6, AND SITE SPECIFIC 7705 CONFIGURATION PARAMETERS.

10 Gbps F.O. to Wilson Rd.

SITEEQUIPMENT

EQUIPMENT TO BE INSTALLED

EQUIPMENT TO BE REMOVED

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 47

Page 41: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-41

SHEET NO.SANLANDO SPRINGS SHELTER FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

- 48 VDCDistribution

Rack

District5Fiber/ Video

Rack#1

BaseStationRack

Channel Bank Rack

DVM6- 45MW

TerminalRack(BA1)

NokiaMicrowave

Rack

SANLANDO SPRINGS

A. FUSE PANELB1. NOKIA MPR-9500 RADIO SHELFB2. FUTURE NOKIA MPR-9500

RADIO SHELFC. NOKIA 7705 SAR-18 ROUTERD. DSX JACKFIELD – 28 CKTSE. DIN RAIL WITH T-1 & GIGABIT

ETHERNET SPDsF. WRITING SHELFG. CORNING FIBER OPTIC SPLICE

TRAY/PATCH PANELH. 19 INCH RELAY RACK

A

B1

C

D

G

H

E

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

9500 MPT-HLC

9500 MPT-HLC

9500-MPT

XMDA 1 XMDA 2 XMDA 3 CSM A CSM BXMDA 4 MDA 1 MDA 2 MDA 3 MDA 4 MDA 5 MDA 6 MDA 7 MDA 8 MDA 9 MDA 10 MDA 11 MDA 12

7705 SAR-18

o I

IoONOFF

IoONOFF

Batt A

Batt B

Fan

Batt A

Batt B

Critical

MajorMinor

BIT S1

BIT S2

AlarmModule

ExternalAlarms

ACO

Alarms

Fan FilterRelease

FanModule

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Stat

Pwr

Act

CS

M-2

Com

pact Flash#1C

ompact Flash#2

Mgm

t PortC

onsoleU

SB

2D C

LEI

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

A12-S

DI

Stat

Pwr

Act

Port

Ports 4-6

Ports 1-3

Ports 10-12

Ports 7-9

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

Lnk1

ActLnk

2Act

Lnk3

ActLnk

4Act

Lnk5

ActLnk

6Act

78

LnkAct

LnkAct

A8-E

TH

Pwr

Stat

Port1

Call

Port2

Call

Port3

Call

Port4

Call

Port5

Call

Port6

Call

A6-E

&M

Pwr

Stat Pwr

StatAct

Port

A32-CH

DS1

-48V / 24V

Ports 1-16Ports 17-32

A8-1GB-SFP

Stat

Pwr

12

34

76

58

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

LnkAct

-48V/24V

A8-P

MC

Pwr

Stat

MW

3

LnkAct

MW

4

LnkAct

5

LnkAct

6

LnkAct

7

LnkAct

8

LnkAct

LnkM

W1

ActLnk

MW

2Act

-48V/24V

A16-CHDS1 V2Stat

Pwr

Act

PortPorts 1-16

-48/24V

A16-CHDS1 V2Stat

Pwr

Act

PortPorts 1-16

-48/24V

B2

G

F

Corning Cable Systems

LANscape CORNING

LANscape SIECOR

Corning Cable Systems

LANscape CORNING

G

30 EAST

30

RACK TO BE USED AS PART OF THIS

PROJECT

SANLANDO SPRINGS – SHELTER FLOOR PLAN

SANLANDO SPRINGS – NOKIA MICROWAVE RACK

Attachment 1 48

Page 42: WILSON RD: B2 APPROPRIATELY SIZED FUSES B1.NOKIA …...nokia 7705 rack fdot fiber rack-48vdc battery plant wilson rd – shelter floor plan generator room wilson rd: a. fuse panel

H-42

SHEET NO.D5 RTMCROOM 511 FLOOR PLAN

STATE OF FLORIDADEPARTMENT OF TRANSPORTATION

SICNSITE NAME FINANCIAL PROJECT IDCOUNTY

\\dotscoteo1\Traffic_Ops_Data\Public\TSMO\Telcom\SICN\SICN Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\2-Hub Sites\H-Hub Sites 20180920.vsd

424401-2-93-03

FLORIDA DEPARTMENT OF TRANSPORTATION605 SUWANNEE ST. MS 90TALLAHASSEE, FL 32399-0450PH.(850)-410-5600FAX.(850)-410-5501

CONTRACT PLANS RECORDREV.DATE DESCRIPTION REV.DATE DESCRIPTION

F6TPF

DACC &Channel Bank

Cabinet

Shelves

Fixed Door

Passport 15K Cabinet

DC Power & NetworkCabinet

Adtran Fiber Splice Tray

Adtran Fiber Mux

RectifierRectifier

DS-1 Cross Connect

District 5 Fiber Patch Panel

DS-3 Interface Panel

Business Policy Switch 2000BPS 2000

Wide Bank 28

D5 RTMC – ROOM 511 FLOOR PLAN

D5 RTMC – DACC & CHANNEL BANK CABINET D5 RTMC – DC POWER & NETWORK CABINET D5 RTMC – PASSPORT 15K CABINET

MultiTech

NOTES:

1. REMOVE THE SPECIFIED EQUIPMENT AND THE ASSOCIATED CABLING FROM THE CABINETS AND DELIVER TO THE FDOT.

2. REMOVE AND PROPERLY DISPOSE OF THE REMAINDER OF THE EQUIPMENT AND EQUIPMENT CABINETS.

EQUIPMENT TO BE REMOVED

EQUIPMENT TO BE DELIVERED TO FDOT

EXISTING FDOT EQUIPMENT

LEGEND:

Attachment 1 49