BUILDING STRONG ® NC FEDCON, Wilmington COL Steven Baker Commander, Wilmington District FEDCON OCT 2012 US Army Corps of Engineers BUILDING STRONG ®

Wilmington District Program Review

  • View
    1.159

  • Download
    3

Embed Size (px)

DESCRIPTION

FEDCON Summit

Citation preview

Page 1: Wilmington District Program Review

BUILDING STRONG®

NC FEDCON, Wilmington

COL Steven Baker

Commander, Wilmington District

FEDCON

OCT 2012

US Army Corps of Engineers

BUILDING STRONG®

Page 2: Wilmington District Program Review

BUILDING STRONG®

Charlotte

Manteo Greensboro

Asheville Raleigh

Morehead

City

Roanoke

VA

NC

Washington

Wilmington District Boundaries

Norfolk District

Huntington

District

Nashville

District

Wilmington

District Office

Charleston

District

Ft Bragg

MOTSU

Page 3: Wilmington District Program Review

BUILDING STRONG® 3

New Acquisition Tools Needed for

FY14 and beyond

3 - >$10M Vertical Construction A/E CTs for future

MILCON support

2 - >$10M MATOCs for CW & MILITARY O&M

support

1 - >$10M JOC for minor construction support at

MOTSU

Replacement Environmental A/E CTs for those

expiring in FY14 & FY15

Replacement O&M Service CTs for those expiring in

FY14 & FY15

1 Geo-tech A/E CT

Page 4: Wilmington District Program Review

BUILDING STRONG®

Support to Military Customers:

Project & Construction Mgmt (inc. Contract Award)

Military support to Fort Bragg – Special Operations

Command

Projects under construction – (34) at $372M

FY13 Projects under design – (5) at $100M

FY14-17 Future planned projects – (32-36) at $600-700M

Military Support to Military Ocean Terminal, Sunny

Point

Projects under construction – (13) at $65M

FY13-17 Future planned projects – (35) at $60M

Page 5: Wilmington District Program Review

BUILDING STRONG®

PN PROJECT Est. Cost ($)

ACQ

Strategy ADV

69382 CAB OPS >10M MATOC Apr 2013

69493 Spt Brigade Com >10M SB - MATOC Apr 2013

69287 BN Ops Facility >10M MATOC Apr 2013

65052 Medical Addition 1M-5M SB - MATOC Apr 2013

Expected Fiscal Year 2013 Work

Military Program 1 of 2

5

Page 6: Wilmington District Program Review

BUILDING STRONG®

PN PROJECT Est. Cost ($)

ACQ

Strategy ADV

79655 Training Facility 1M-5M SB -MATOC Jan 2013

O&M USACSOC & JSOC >10M

SB –

SATOC+MATOC Aug 2013

O&M Ft. Bragg >10M TBD Aug 2013

O&M MOTSU 5M-10M

SB –

SATOC+MATOC Aug 2013

Dredging MOTSU 5M-10M IFB Jan 2013

Expected Fiscal Year 2013 Work

Military Program 2 of 2

6

Page 7: Wilmington District Program Review

BUILDING STRONG®

PN PROJECT Est. Cost ($)

ACQ

Strategy ADV

61064 Upgrade Training Fac >10M SB - MATOC Feb 2014

68526 Engineer Training FAC 5M-10M SB - MATOC Feb 2014

76375 Civil Affairs BN Complex >10M MATOC Feb 2014

76376

Regional Studies & ED

Center >10M MATOC Feb 2014

79438

Combat Medic Skills

Sustain Bldg 5M-10M SB - MATOC Feb 2014

Expected Fiscal Year 2014 Work

Military Program 1 of 2

7

Page 8: Wilmington District Program Review

BUILDING STRONG®

PN PROJECT Est. Cost ($)

ACQ

Strategy ADV

O&M USACSOC & JSOC >10M

SB –

SATOC+MATOC Aug 2014

O&M Ft. Bragg >10M TBD Aug 2014

O&M MOTSU 5M-10M

SB –

SATOC+MATOC Aug 2014

Dredging MOTSU 5M-10M IFB Jan 2014

Expected Fiscal Year 2014 Work

Military Program 2 of 2

8

Page 9: Wilmington District Program Review

BUILDING STRONG®

Flood Risk Management

Navigation (Deepdraft and

Shallowdraft)

Coastal Storm Damage Reduction

Ecosystem Restoration

Environmental Restoration

Hydropower

Recreation

Water Supply

Water Resources Development

Planning, Design, Construction and

Operations & Maintenance

Page 10: Wilmington District Program Review

BUILDING STRONG®

PROJECT Est. Cost ($)

ACQ

Strategy ADV

Morehead City Ocean Bar Dredging 1M-5M UR Oct 12

AIWW, Thru Channels/Inlet Crossings, Dredging 1M-5M SB Nov 12

Manteo (Shallowbag) Bay, Interior Channels, Dredging 1M-5M SB Nov 12

Carolina Beach and Vicinity and Wilmington Harbor Inner

Ocean Bar >10M UR Sep 12

Wilmington Harbor Eagle Island Improvements 5M-10M SB Jul 12

Concord Streams Ecosystem Restoration 1M-5M SB Jul 12

Expected Fiscal Year 2013 Work

Civil Works 1 of 2

10

Page 11: Wilmington District Program Review

BUILDING STRONG®

PROJECT Est. Cost ($)

ACQ

Strategy ADV

Philpott Powerhouse, Generator Exciter Replacement 500K-1M UR Nov 2012

Philpott Powerhouse, Generator Governors Replacement 250K-500K UR Nov 2012

Philpott Powerhouse, HVAC Renewal 100K-250K SB Apr 2013

Philpott Powerhouse, Switchgear Replacement 1M-5M UR Oct 2012

BE Jordan and Falls Lake Boundary Line Remarking 100K-250K SB Oct 2012

John H Kerr Lake Toe Drain Repair 100K-250K SB Aug 2013

Falls Lake Drain Lake and Toe Drain Repair 100K-250K SB Sep 2012

Expected Fiscal Year 2013 Work

Civil Works 2 of 2

11

Page 12: Wilmington District Program Review

BUILDING STRONG®

PROJECT Est. Cost ($)

ACQ

Strategy ADV

Wilmington Harbor, Inner Ocean Bar, Dredging >10M UR Jul 2014

Wilmington Harbor, Anchorage Basin, Dredging 1M-5M SB Jul 2014

Morehead City Harbor, Inner Ocean Bar Dredging 1M-5M SB Oct 2013

Wilmington Harbor and Morehead City Harbor, Ocean Bar,

Dredging 1M-5M UR Aug 2013

W. Kerr Scott, O&M Contract 500K-1M SB Apr 2014

Philpott Lake, O&M Contract 500K-1M SB Mar 2014

Expected Fiscal Year 2014 Work

Civil Works 1 of 1

12

Page 13: Wilmington District Program Review

BUILDING STRONG®

Contact Information • System For Award Management - SAM

► www.sam.gov

► Must be registered before getting contract award

► SAM Handbook@ www.sam.gov

• Federal Business Opportunities ► www.fedbizopps.gov

► Advertises Federal Government Procurement opportunities over $25,000

• Wilmington District Contracting link ► www.saw.usace.army.mil

► Link “Contracting Opportunities” (SAW)

• Donna Walton, Deputy for Small Business (910)251-4452 e-mail: [email protected]