Existing Station

Location 34 Water StreetBuilt 1950Extended the building front forward 15’ in 19904325 Sq ft 1 story building1/3 Acre site River bank on one sideMasonry wallsWood framed roof

Page 3: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Apparatus Bay

• Existing– 2,422 sq. ft.– 3 bays wide– 2 Overhead doors: 1 -10’ x 11’& 1- 20’ x 11’– 4 trucks total =1,320 sq. ft.– Other miscellaneous equipment

Page 4: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Existing Conditions

• Can’t open doors Tight quarters

Isle Obstructions Firefighter to close to Trucks

Page 5: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Existing Spaces

Training Meeting Space

Kitchen

Office

Page 6: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Existing Parking

Page 7: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Space Needs ProgramOutlined By McGuire Group

2008

• Staffing and Parking• Space Allocations• Apparatus and Support• Public Lobby/Dispatch• Administration• Firefighters Headquarters• Indoor Training• Building Support and Mechanical

Page 8: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Operational Issues

• Overhead doors too narrow and too low• Apparatus bays too narrow and too low• Administrative spaces inadequate• No Day Room for firefighters• Air-Pak filling station in apparatus bay is a hazard• No Decontamination area for Gear and Equipment• Male/ Female Shower rooms non-existent• Kitchen is too small for current staff

Page 9: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Space Deficiencies

• Only one office• No room for new construction print review• No office for Asst. Chief’s / Training , Pre-

Planning fires, Truck & Equipment maintenance records

• No area for code enforcement information• Not adequate space for firefighters

– Locker room – Shower room

Page 10: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Apparatus Bay ComparisonWilliamstown FD Existing

2242 Sq./FtModern Fire Station

6100 Sq./Ft

Page 11: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Apparatus Bay Space Needs

Williamstown FD Existing Modern Fire Station

Page 12: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Administrative Space

Present Conference Rm Present Office

Modern Modern

Page 13: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Training

ModernExisting

Page 14: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

New Apparatus Area

Page 15: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Apparatus

Williamstown 1975 Williamstown 2012

Page 16: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Proposed New Site562-580 Main St

Page 17: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Aerial View of Proposed Site

Page 18: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013
Page 19: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013
Page 20: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013
Page 21: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Size Comparison

ExistingStation

Page 22: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

2009, 2010 & 2011 Calls By Zones

Zone 10, 2%

Zone 9, 4%

Zone 8, 2%

Zone 7, 7%

Zone 6, 9%

Zone 1, 20%

Zone 2, 17%

Zone 3, 9%

Zone 4, 14%

Zone 5, 16%

Page 23: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

2009, 2010 & 2011

Zone 102%

Zone 94%

Zone 82%

Zone 77%

Zone 69%

Zone 516%

Zone 414%

Zone 39%

Zone 217%

Zone 120%

Rt. 2 S. Side, South St. to Stratton Rd., Gale Rd

Rt. 2 N. Side, North St. to Willow Ln., South ofN. Hoosac Rd.

South St. to NW Hill, Thornliebank, Bee Hill toBulkey St.

N. Hoosac & Simonds Rd. Everything N to NE

E. of 460 Main to NA, Stratton Rd. E. to NA

Cold Spring, Bee Hill South to 5 Corners

Beyond 5 Corners, all of Oblong

NW Hill, Petersburg, Bulkley

Blair Rd. to 5 Corners, the Hopper & Mt. Hope

Mutual Aid

Page 24: Williamstown Fire Department Fire Station Feasibility Study 2008 - 2013

Thank You

AnytimeAnywhereAnything