Wilkins Engineering Ltd is a Ghanaian organization with over 20 years of experience in expert engineering services across the nation.
We provide grid extension that services including, but notlimited to, design & construction of sub transmission network,power distribution networks, service connections and substation.
We also offer renewable energy services for residential,commercial and industrial clients. We offer complete design,procurement and installation services for all areas of renewablepower.Our aim is to provide electrical solutions that benefit families,organizations and emerging markets to achieve theirpossibilities through generation, transmission and distributionof power.We work with the private and public sector to deliver power in the most cost-effective and reliable manner.
WILKINSE N G I N E E R I N G
W
WILKINSE N G I N E E R I N G
W
Management
Mr. Omane FrimpongChief Executive Officer
Kofi Omane FrimpongHead Of Sales & Marketing
Thamizharasan NatarajanHead Of Operations
Afua Antwiwaa AmofaHead of Human Resource
Matilda TettehHead Of Account & Finance
Adwoa Benewaa BiritwumHead Of Business Development
Certificate & MembershipISSUING BODY CATEGORY/CERTIFICATE
Registrar General Department Certificate of Incorporation
Registrar General Department
Electricity Company Of Ghana
Value Added Tax Service
Construction & Rehabilitation of 33KV Primary SubstationsConstruction of 33KV underground cableConstruction of 33KV/11KV on wood/steel – Distribution works
Certificate of Registration
Certificate of Registration
Certificate to Commerce Business
Internal Revenue Service
Energy CommissionInstallation And Maintenance LicenseImportation License
Ministry Of Works And Housing Certificate Of Classification
MEMBERSHIP & PERSONAL AFFILIATIONS
Associations of Ghana Solar Industries Industrial member
Ghana Electrical Contractors Association Member
Member
Member
Member
Member
Ghana Institution of Engineers
Ghana Employers’ Association
Association of Ghana Industries
Global Off-Grid Lighting Association (GOGLA)
With over 10,000km of electrical distribution and transmission networks constructed for over 2 dec-ades, Wilkins is a reliable partner of utilities and larger EPC firms in Africa. We are poised to deliver on time and in budget.
The need to control and protect an electrical system is very vital. Our unparalleled expertise has elevated as the best in the system control and protection arena. We have led and assisted several projects that require LV & HV panels.
WILKINSE N G I N E E R I N G
W
EPC Grid Project
Wilkins has the expertise in the Engineering (electrical, civil and structural), Procurement, Construction and Project Management of power infrastructure, this enables us to participate in projects as a turnkey or main contractor.
Sub-transmission and Distribution Network
Low Voltage & High Voltage Panels
SubstationWith our first contract to construct a 5MVA substation in 1996, Wilkins has consistently built a team of expert engineers in civil and electrical engineering; Wilkins is able to undertake design and construction of turnkey substation projects
EPC Solar Projects
Car Port Solutions
• No additional land occupa-tion• Shadowing and weather-proofing of cars• Number of packing spaces unchanged
Rooftop Solutions
• Usually fixed-tilt mount-ing• Seamless integration into existing buildings; ballast-ed or anchored• No additional land occu-pation
Residential, Commercial & Industrial Solar
Ground Mount Solutions
• Fixed-tilt single or dual axis tracking• Foundation design deter-mined by site conditions and array set-up• Foundation options driven beams, anchor, ballasts or hybrid racking
NORTHERN, EASTERN, VOLTA RURALELECTRIFICATION PROJECT
LOCATION:NORTHERN REGION – 165 CommunitiesEASTERN REGION – 111 CommunitiesVOLTA REGION – 37 Communities
CUSTOMER:ELECTRICITY COMPANY OF GHANA (ECG)NORTHERN ELECTRICITY DISTRIBUTION COMPANY (NEDCO)
CONTRACTOR:HUNAN CONSTRUCTION ENGINEERING COMPANY LIMITED
OUR ROLE:SUB-CONTRACTORS
PROJECT SCOPE:LOGISTICS AND CONSTRUCTION OF MV AND LV NETWORK LINES
AMOUNT:$6,900,000.00
DATE STARTED: JANUARY 2018
DATE COMPLETED: MARCH 2021
SELF HELP ELECTRIFICATION PROJECT(SHEP-4)
LOCATION:BRONG AHAFO REGION – 158 CommunitiesWESTERN REGION – 382 Communities
CUSTOMER:ELECTRICITY COMPANY OF GHANA (ECG)NORTHERN ELECTRICITY DISTRIBUTION COMPANY (NEDCO)
CONTRACTOR:TECHNOLOGY MANAGEMENT GROUP
OUR ROLE:SUB-CONTRACTORS
PROJECT SCOPE:LOGISTICS AND CONSTRUCTION OF MV AND LV NETWORK LINES
AMOUNT:$2,000,000.00
DATE STARTED: MAY 2014
DATE COMPLETED: DECEMBER 2018
KINTAMPO II SS
LOCATION:KINTAMPO, BRONG AHAFO REGION - GHANA
CUSTOMER:GHANA GRID COMPANY LIMITED (GRIDCO)
CONTRACTOR:ELECNOR S.A
OUR ROLE:CONTRACTOR
PROJECT SCOPE:ELECTROMECHANICAL WORKS AND LOGISTICS
AMOUNT:€187,196.18
DATE STARTED: JUNE 2016
DATE COMPLETED: NOVEMBER 2017
CHARACTERISTICS:• ELECTRICAL INSTALLATIONS OF THE PROJECT• PROVISION OF SECURITY AND TRANSPORT
• Fixed-tilt single or dual axis tracking• Foundation design deter-mined by site conditions and array set-up• Foundation options driven beams, anchor, ballasts or hybrid racking
THE GHANA NORTHERN REGION ELECTRIFICATION PROJECT UNDER THE NATIONAL ELECTRIFICATION SCHEME LOCATION:NORTHERN REGION, GHANA
CUSTOMER:HUNAN CONSTRUCTION ENGINEERING GROUP CORPORATION
OUR ROLE:SUB-CONTRACTORS
PROJECT SCOPE:CONSTRUCTION OF NEW MV & LV OVERHEAD LINES IN THE NORTHERN REGION.
AMOUNT:$ 9,280,909.00
DATE STARTED: JULY 2012
DATE COMPLETED: DECEMBER 2017
LIBERIA ELECTRICITY SYSTEMENHANCEMENT PROJECT (LESEP)
LOCATION:LIBERIA
CUSTOMER:LIBERIA ELECTRICITY COPORATION
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:LOGISTICS AND CONSTRUCTION OF MV AND LV NETWORK LINES
AMOUNT:$892,294
DATE STARTED: AUGUST 2015
DATE COMPLETED: APRIL 2016
LOCATION:LIBERIA
CUSTOMER:LIBERIA ELECTRICITY CORPORATION (LEC)
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:DESIGN, SUPPLY AND INSTALLATION OF MV AND LV NETWORKS TO CONNECT OVER 40 COMMUNITIES TO THE NATIONAL GRID
AMOUNT:$5,040,898.29
DATE STARTED: JANUARY 2020
DATE COMPLETED: ON-GOING
SUPPLY AND INSTALLATION OF 33/0.4KV DISTRIBUTION NETWORKS IN BOMI AND GRAND CAPE MOUNT COUNTIES
LOCATION:LIBERIA
CUSTOMER:RURAL AND RENEWABLE ENERGY AGENCY (RREA)
OUR ROLE:MAIN CONTRACTOR
PROJECT SCOPE:DESIGN, SUPPLY AND INSTLLATION OF MV AND LV NETWORKS TO CONNECT OVER 40 RURAL COMMUNITIES TO THE LOFA HYDROELECTRICITY DAM.
AMOUNT:$5,822,796.62
DATE STARTED: AUGUST 2020
DATE COMPLETED: ON-GOING
SUPPLY AND INSTALLATION OF 33/0.4KV DISTRIBUTION NETWORKS FOR THE LOFA MINI-GRID PLANT
LOCATION:WINNEBA, CENTRAL REGION
CUSTOMER:JUDICIAL SERVICE OF GHANA
FUNDING AGENCY:AUSTRALIAN AID
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:ENGINEERING, SUPPLY AND CONSTRUCTION OF A SOLAR SELFCONSUMPTION SYSTEM WITH BACKUP
AMOUNT:$31,041.42
DATE: FEBRUARY 2018
OVERVIEW:PEAK PV POWER: 22.26 kWpNOMINAL AC POWER OF PV INVERTER: 30KVABATTERY CAPACITY: 57.6 kWh
SOLARIZATION OF COURTS –WINNEBA HIGH COURT PROJECT
LOCATION:AVENOR, GREATER ACCRA REGION
CUSTOMER:Abii NATIONAL SAVINGS AND LOANS
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:ENGINEERING, SUPPLY AND CONSTRUCTION OF A GRID CONNECTEDSOLAR SYSTEM
DATE: FEBRUARY 2018
OVERVIEW:PEAK PV POWER: 60 kWpNOMINAL AC POWER OF PV INVERTER: 50KVAANTICIPATED ANNUAL ENERGY OUTPUT: 75MWH
EPC OF 60 kWp GRID CONNECTED SYSTEM
LOCATION:DANSOMAN, GREATER ACCRA REGION
CUSTOMER:MT. OLIVET METHODIST CHURCH
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:ENGINEERING, SUPPLY AND CONSTRUCTION OF A GRID CONNECTEDSOLAR ROOFTOP PROJECT WITH BACKUP
AMOUNT:US$ 130,329.97
DATE: MARCH, 2017
OVERVIEW:PEAK PV POWER: 37 kWpNOMINAL AC POWER OF PV INVERTER: 40KWBATTERY CAPACITY: 240kWh
EPC OF 37 kWp PV STORAGE SYSTEM
LOCATION:ACCRA, GREATER ACCRA REGION
CUSTOMER:AUSTRALIAN HIGH COMMISSION
OUR ROLE:MAIN CONTRACTORS
PROJECT SCOPE:ENGINEERING, SUPPLY AND CONSTRUCTION OF A HYBRID SOLAR PVSYSTEM
DATE: DECEMBER, 2018
OVERVIEW:PEAK PV POWER: 85.73 kWpNOMINAL AC POWER OF PV INVERTER: 50KWBATTERY CAPACITY: 144kWh
EPC OF 85.73 kWp PV STORAGESYSTEM
©2020 Wilkins Engineering Limited. All Rights Reserved. All trademarks are owned by Wilkins Engineering Limited.All information is preliminary and will need to be confirmed at the time of order.
Wilkins Engineering LimitedB135/22 Obonu CrescentNorth KaneshieP. O. Box 9314Accra, Ghana
wilkinsengineering.comEmail: [email protected]: Ghana +233 302 235 671 / +233 577 887 838/9Tel: Liberia 0777448542 / 0776241423