Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Embed Size (px)

DESCRIPTION

1. Voltage regulators – April 2 nd 2. Layout of the pipework for the solenoid valves– April 6 th 3. Prototype complete –April 15 th

Citation preview

Page 1: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Ladon

Page 2: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

STATUS REPORT # 5Wildlife deterrent and monitoring system

Team 12Team Members:

Andres Valdez @00838352Alim Kuychiyev @01182936

Andre Rice @00662925John H. Vargas Jr. @01145168

March 31st, 2014

Monitoring system that will make gardening easier and more bountiful

Page 3: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

GOALS TO HELP THE HOME GARDENERS GET BACK THAT WHICH IS LOST TO

WILDLIFE AND BE MORE BOUNTIFUL, COME HARVEST TIME.

1. Voltage regulators – April 2nd

2. Layout of the pipework for the solenoid valves– April 6th

3. Prototype complete –April 15th

Page 4: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Recent Tasks

Testing of the codes to work simultaneously

Testing of mechanical relay vs. transistor switch

Talked to Z-bolt about the laser Choosing the right amount of voltage

Page 5: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Ongoing Tasks Troubleshooting

Making do with the solenoid valves received Testing Bluetooth with the EC-shield to send

data Designing a website Finish writing the first draft of the final

report

Page 6: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Upcoming Tasks

Writing of the code for the EC-shield and speaker

Assembling of the probe for the EC- shield

Soldering of the voltage regulators to the protoboard

Page 7: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Functional Block Diagram

Page 8: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

Schedule

Page 9: Wildlife deterrent and monitoring system Team 12 Team Members: Andres Alim Andre John H. Vargas Jr

The End!