Page 1: Wide Area Workload Management Work Package DATAGRID project

Wide Area Workload ManagementWork Package

DATAGRID project

Page 2: Wide Area Workload Management Work Package DATAGRID project

Tasks List:Job description and resource specJob decomposition partitioningScheduling

Co-allocator+adv reservationResource management

Services and access control

Page 3: Wide Area Workload Management Work Package DATAGRID project

Scheduling

Definition of scheduling policies in orderto find the best match between jobrequirements and available resources

NetworkStorageCpu

Page 4: Wide Area Workload Management Work Package DATAGRID project

DeliverablesD1.1 (Report) Month 3: Report on current technologyD1.2 (Report) Month 6: Definition of architecture , technical plan and evaluation criteria for scheduling , resource management.security and job description.D1.3 (Prototype) Month 9: Components and documentation for the 1st release: Initial workload management system integrating existing technology and implementing computing resources brokerage.D1.4 (Report) Month 18: Definition of the architecture, technical plan and evaluation criteria for the resource co-allocation framework and mechanisms for parallel job partitioning.D1.5 (Prototype) Month 21: Components and documentation of the workload management system implementing code migration , user interface for task management., services for logging and bookkeepingD1.6 (Prototype) Month 33: Components and documentation for theworkload management system implementing data migration and remote access, co-allocation of resources, job description and users interface, services for bookkeeping and accounting and mechanism to specify job flowsD1.7 (Report) Month 36: Final evaluation report.

Page 5: Wide Area Workload Management Work Package DATAGRID project

Milestones and expected resultM1.1 Month 9: Components and documentation for the 1 release: Initial workload management system based on existing technology integrationM1.2 Month 21:Components and documentation for the 2 release: Workload management scheduling implementing code migrationM1.3 Month 33:Components and documentation for the final releaseWorkload management scheduling implementing data migration and remote access

Page 6: Wide Area Workload Management Work Package DATAGRID project

1 Release PM 9Job and resource required description:

using class-ads language.a possible high level interface based on XML will be investigated.first release of command line tool for job management (to submit, cancel, monitor jobs).

job policy and admission control.policies on resource usage based on user and usercommunity identity.

Page 7: Wide Area Workload Management Work Package DATAGRID project

1 Release PM 9available resource selection using code migration paradigm. This selection will take into account:

available CPU in different farms spread in different sites.location of input data.cost of executable migration.available resources (disk space) for output data.

first release of accounting and bookkeeping services:monitoring of job status about processed data,output data produced, processing evaluation.

The globus GRAM protocol is the uniform interface to the localresources. The local resources are "cluster" of nodes, mainly PCs,managed by the PBS, LSF, Condor etc. software.The basicinformation system for this release is the Grid InformationService by the Globus project.

Page 8: Wide Area Workload Management Work Package DATAGRID project

2 Release PM 21

Improvement of the first release also for high performance jobs takinginto account:

job monitoring dataresources (Computing, Storage, Network) monitoring dataperformance predictioncost of data migrationfault tolerance

The scheduling activity will also consider co-allocation of multipleresources, cost of data movement/replication,remote data access.Improvement of the high level job description interface and user services interface.Evaluation and adoption of a proper security framework for allocationand authentication of resources usage.

Page 9: Wide Area Workload Management Work Package DATAGRID project

3 Release PM 33

Exploitation of data/task parallelismAdvance reservation of resourcesOptimal scheduling or rescheduling using performance monitoring tools