Drainage Services Department Why NEC in Hong Kong ? Why NEC in Hong Kong ? Why NEC in Hong Kong ? Why NEC in Hong Kong ? - - - DSD’s experience on NEC DSD’s experience on NEC DSD’s experience on NEC DSD’s experience on NEC Ir. TSUI Wai Ir. TSUI Wai Ir. TSUI Wai Ir. TSUI Wai Deputy Director of Drainage Services Deputy Director of Drainage Services Deputy Director of Drainage Services Deputy Director of Drainage Services 21 November 2012 21 November 2012 21 November 2012 21 November 2012 1

Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Drainage Services Department

Why NEC in Hong Kong ? Why NEC in Hong Kong ? Why NEC in Hong Kong ? Why NEC in Hong Kong ? ---- DSD’s experience on NECDSD’s experience on NECDSD’s experience on NECDSD’s experience on NEC

Ir. TSUI WaiIr. TSUI WaiIr. TSUI WaiIr. TSUI Wai

Deputy Director of Drainage ServicesDeputy Director of Drainage ServicesDeputy Director of Drainage ServicesDeputy Director of Drainage Services

21 November 201221 November 201221 November 201221 November 2012

1

Page 2: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Why NEC? Why partnering?Disputes

No common interests

THE RISK IS YOURS,

Change!Change!Change!Change!

THE RISK IS YOURS, NOT MINE!Adversarial

Claim conscious

2

Page 3: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Why NEC for DSD?� Policy for pilot project

� Our aims:Joint effective problem solving

Less disputesLess disputes

Better project management

Team spirit

NEC

3

Page 4: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Nullah improvement

� History

20072006 2008 2009

Briefing to

Contractors

Documents Consult

HKCA

Tender briefing and

dummy tender exercise

The 1st NEC Pilot Project

Prequalification

20072006

1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

Project selected

as NEC pilot

2008 2009

Option evaluation,

tender preparation,

consultation with

Government

departmentsAppointed NEC

consultant

4

Page 5: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

The 1st NEC Pilot Project� Improvement of Fuk Man Road Nullah in Sai Kung

� Decking of open nullah 180m long 12m wide and road improvement works

� Contract sum $76M; Completion time 33 months (Aug 09 to May 12)

5

Page 6: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

The 1st NEC Pilot Project� NEC Option Selection

� Option C – Target contract with activity schedule

� Pain/gain share mechanism (50:50)

Pain share cap at 110%

6

Page 7: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Training to team members� Realizing Partnering spirit

� Partnering workshops� Joint site office

Experience from Fuk Man Road Project

Joint site office� Joint problem solving

� Contract administration� Proactive participation by Project Manager,

Supervisor and Contractor� Risk management – early warnings and meetings� Open book account – transparent

7

Page 8: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Less disputes

Experience from Fuk Man Road Project

Joint effective problem solving

Less disputes

Better project management

Team spirit

NEC

8

Page 9: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Roundabout reconstruction� Busiest roundabout in Sai Kung

� Completed within 4 daysMaintaining traffic flow

Experience from Fuk Man Road ProjectJoint effective problem solving

� Maintaining traffic flow� Early WarningEarly WarningEarly WarningEarly Warning, , , , Prompt Action Prompt Action Prompt Action Prompt Action & & & & Joint EffortJoint EffortJoint EffortJoint Effort

9

Consult local representatives

Traffic ambassadorsDistributing information leaflets

Page 10: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Less disputes

Experience from Fuk Man Road Project

obstruction

10

Original Contract Drawing Actual Site Condition(Obstructed by existing nullah wall)

� Unforeseen physical condition – Compensation event� < 1 week – trial pit� < 2 weeks – issue design revision� More equitable risk sharing, less disputes

Page 11: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Better project management

100

120

Time for completion of CE (from Contractor's 1st quotation)� Compensation Event

� NEC vs GCC� Quick settlement

Early finalization

Experience from Fuk Man Road Project

11

0

20

40

60

80

0000 20202020 40404040 60606060 80808080 100100100100 120120120120 140140140140 160160160160 180180180180 200200200200

No

. o

f C

E

Days (less than x days)

Average (60)

Average 60 days 60 days 60 days 60 days to settle(from Contractor’s 1st quotation)

� Early finalization(6 months after May 2012 Completion)� 80% CEs agreed at Completion� 100% agreed at

end Nov 2012� Tight time frame

– early settlement of issues

Page 12: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

4.00

4.50

5.00

4.00

4.50

5.00

Team Spirit

Experience from Fuk Man Road Project

2.50

3.00

3.50

4.00

Oct-09

Jan-10

Apr-10

Jul-10

Oct-10

Jan-11

Apr-11

Jul-11

Oct-11

Jan-12

Apr-12

Jul-12

Oct-12

0 = Poor

1 = Fair

2 = Adequate

3 = Good

4 = Very Good

5 = Excellent

2.50

3.00

3.50

4.00

Oct-09

Jan-10

Apr-10

Jul-10

Oct-10

Jan-11

Apr-11

Jul-11

Oct-11

Jan-12

Apr-12

Jul-12

Oct-12

Partnering score of Champion Group Partnering score of Pioneer Group

12

Page 13: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Experience from Fuk Man Road Project

Dragon Boat Sculpture

13

Completion Ceremony

Public Recognition

Dragon Boat Sculpture

– Fuk Man Garden

The Ombudsman’s Award 2012

Maslow’s

Hierarchy of Needs

Page 14: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Team Spirit

Soccer game

Experience from Fuk Man Road Project

14Joint dragon boat

team 2011 and 2012

Joint volunteer team

Page 15: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Observations on Fuk Man Road Project � Benefits

� Time – 6 months ahead� Cost – 5% gain share � Early finalization

� 6 months after completion� 6 months after completion� Good working relationship

� Happier staff

15

Page 16: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Improvements� Collaborative working at frontline

� Early Training� Compensation event

� Time frame – stringent, require more resources

Observations on Fuk Man Road Project

� Time frame – stringent, require more resources� Subcontracting

� Streamline tendering requirements on subcontracting

� More flexibility……

� A small-scale project only� Is NEC really suitable??? 16

Page 17: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Happy Valley Underground Stormwater Storage Scheme

Commencement : 3 September 2012Completion :2 April 2018 (67 mths)

Tender sum $678M(not includingcontingency and price fluctuation)

Option COption COption COption C –––– Target contract with activity scheduleTarget contract with activity scheduleTarget contract with activity scheduleTarget contract with activity schedule� Risk sharingRisk sharingRisk sharingRisk sharing� Incentive for cost savings Incentive for cost savings Incentive for cost savings Incentive for cost savings

17

Page 18: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Before tendering

� Contractor’s forum

� Tender stage

� Tender briefing

Happy Valley – Our Preparation

� Tender briefing

� Enhance understanding

� E.g., Nature of Option C, Fee percentage

� Ensure correct tender submissions

� E.g., Proper pricing documents (Activity Schedule)

� Standard Marking Scheme for evaluation

18

Page 19: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Happy Valley – Our Start

� Partnering

� Start-up workshop

� Time – commissioning before 2018 wet season

� Cost – save 6% of original target

� Joint NEC training

19

� Joint NEC training

Page 20: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Site Office� Joint office set up

� Project Logo

Happy Valley – Our Start

20

Project Logo

Page 21: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Stakeholders engagement workshop� DSD and Contractor DSD and Contractor DSD and Contractor DSD and Contractor � Engage project stakeholders : Jockey Club, LCSD,

Football Club, Schools

Happy Valley – Our Start

� Develop mitigation measures and communication plan

21

Page 22: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Rules of Working on Horse Racing Days

22

Page 23: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� Contractor’s Proposed Alternative Foundation Design

� Option C encourages innovation and drives cost effectiveness

Happy Valley – Our Start

� Liaison meetings with designers, maintenance parties

� Briefing to senior management

� Agreed to carry out detailed design on the alternative proposal

� Potential cost and time savings, and risks reduction

23

Page 24: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Contract No. Contract Title ContractSum

Nature Start / Completion

Option

DC/2008/02 Improvement of Fuk Man Road nullah in Sai Kung (Completed)Consultant-managed / DP

$76M Flood prevention

Aug 2009 / May 2012

C

DC/2012/09 Pak Hok Lam trunk sewer and ShaTau Kok village sewerage Consultant-managed / CM

$187M Village sewerage

June 2012 / Aug 2016

Frame-work B

DC/2012/05 Yuen Long and Kam Tin SewerageConsultant-managed / SP

$145M Village sewerage

Sept 2012 / Sept 2016

D

DC/2012/03 Happy Valley underground $678M Flood Sept 2012 / C

DSD’s NEC Projects

24

DC/2012/03 Happy Valley underground stormwater storage schemeIn-house / DP

$678M Flood prevention

Sept 2012 / Apr 2018

C

DC/2012/07 Lam Tsuen village sewerage** Consultant-managed / PM

$173M Village sewerage

Oct 2012 / Jun 2016

B

DC/2012/01 Building and Civil Maintenance to DSD plant and facilitiesIn-house / HK&I

$160M Maintenance Dec 2012 / Nov 2016

TSC A

Page 25: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

� All founded on

ConclusionsJoint effective problem solving Less disputes

Better project managementTeam Spirit

25

� All founded on Collaboration and Communication

� Has been successful on Fuk Man Road� More NEC projects of different nature

Page 26: Why NEC in Hong Kong ? --- DSD’s experience on NEC- DSD’s … · 2019. 7. 2. · No. of CE. Days (less than x days) Average (60) Average 60 days 60 days 60 days to settle (from

Drainage Services Department

Thank you!