Overview of HDM-4

Henry KeraliLead Transport SpecialistThe World Bank

Page 2: Why HDM-4?

Transport and Development

Transport sector is vital for economic & social developmentRoads constitute largest component of transportRoads require a balance of:

Maintenance (or Preservation)Development (or Improvement)

Objective of Road ManagementConsistent and Rational Policy ObjectivesSufficient and Reliable FundingEffective Procedures & Management Tools (e.g. HDM-4)

Page 3: Why HDM-4?

Maintenance Expenditure

In many developing and emerging economies, actual expenditure on road preservation and maintenance is between 25 ~ 60% of need.

Page 4: Why HDM-4?

HDM-4 Concept

Predicts road network performance as a function ofTraffic volumes and loading

Road pavement type and strength

Maintenance standards

Environment / Climate

Quantifies benefits to road users from:Savings in vehicle operating costs (VOC)

Reduced road user travel times

Decrease in number of accidents

Environmental effects

Page 5: Why HDM-4?

OptimumTotal

Road User

Road Works

Cost

Design Standards

Optimum Transport Costs

Page 6: Why HDM-4?

Road Management

Purpose: To optimise the overall performance of the network over time in accordance with POLICY OBJECTIVES and within budgetary constraints

Typical objectives:Minimise transport costs

Preserve asset value

Provide and maintain accessibility

Provide safe and environmentally friendly transport

Page 7: Why HDM-4?

Road Management Functions

PlanningSetting standards and policiesLong term estimates of expenditure

ProgrammingMedium term work programmes

PreparationDetailed project design and work packaging

OperationsImplementation of works in field

Page 8: Why HDM-4?

Role of HDM-4

Management Function HDM-4 Application

Planning Strategy Analysis

Programming Programme Analysis

Preparation Project Analysis

Page 9: Why HDM-4?

HDM-4 Applications

Road sector policy studies

Strategic planning of road network development, improvement & maintenance

Determination of funding requirements

Preparation of multi-year road work programmes

Economic appraisal of individual road projects

Research studiesRoad pricing

Vehicle regulations

Pavement design standards

Page 10: Why HDM-4?

Standards & Policies

Road pricingroad use costs (to define fuel levies)congestion chargesweight-distance charges

Vehicle regulationsaxle load limitsenergy consumption, vehicle emissions & noise

Engineering Standardssustainable road network sizepavement design and maintenance standards

Page 11: Why HDM-4?

Strategy Analysis

Objectives:Determine budget allocations for road maintenance and improvementPrepare for work programmesDetermine long term network performanceAssess impact on road users

Strategy analysis is concerned with the analysis of entire road networks to determine funding needs and/or to predict future performance under budget constraints

Page 12: Why HDM-4?

Strategic Planning

Forecast scenarios of revenues & available budgetAssess current condition of assetsForecast traffic demands (from road network plan)Evaluate impact of strategies on performance and costs - using predictive modelOptimize strategies under alternative budget scenarios - maximize NPV for each scenarioDetermine multi-year program allocations & performance

Page 13: Why HDM-4?

Strategic Analysis ApproachRoad NetworkRoad Network G F P

LMHMatrixMatrix

Resource Constraints

PreservationEvaluation

OptimizationModule

Optimal Strategy underBudgetary Constraints

Revenues, Sector budgets

Development Candidates

Page 14: Why HDM-4?

Budget Allocation

Routine maintenance needs based on road lengths under each category of roadsRecurrent maintenance needs based on pavement surface condition Periodic maintenance needs based on economic indicatorsImprovement needs based on economic indicators

Page 15: Why HDM-4?

Budget Summary

Maintenance Budget ($m)Primary Roads

Flexible Gravel

Secondary Roads

Flexible GravelRegion

North

East

South

West

45.9 18.7

34.6 13.5

52.1 21.0

27.2 20.4

34.5 21.8

24.9 11.8

45.0 21.8

19.5 12.3

Page 16: Why HDM-4?

Effect of budget levels

2.0

3.0

4.0

5.0

6.0

2000 2001 2002 2003 2004 2005 2006

Aver

age

Rou

ghne

ss (I

RI)

$20m

$15m

$10m

AnnualBudget

Target = 3.5 IRI

Primary Roads

Page 17: Why HDM-4?

Road Network Performance

3.0

4.0

5.0

6.0

7.0

2003 2004 2005 2006 2007 2008 2009

Ave

rage

Rou

ghne

ss (I

RI) Feeder

Roads$30m/yr

SecondaryRoads$35m/yr

PrimaryRoads$20m/yr

Budget Allocations

Page 18: Why HDM-4?

Optimal budget requirements

0

50

100

150

200

250

2003 2004 2005 2006

US

$ m

/yea

r . DevelopmentImprovementPeriodicRoutine

Page 19: Why HDM-4?

Programme Analysis

Objective: prioritise candidate road projects in each year within annual budget constraintAnnual budgets obtained from strategic maintenance plan

Concerned with the preparation of single or multi-year road work and expenditure programmes under

specified budget constraints.

Page 20: Why HDM-4?

Procedure .

Use specified standards to screen network & identify candidate projects, e.g.

road sections which exceed specified conditionroads with inadequate capacitypavements which need strengtheningupgrade pavements with high traffic volumes

Page 21: Why HDM-4?

Procedure ..

Determine maintenance or improvement optionsSpecify budget limits & periodsOptimise using selected objectiveProduce optimal list of projects for budget period

Page 22: Why HDM-4?

Work Programme Output

Priority Road Length Province Type of Scheduled Cost CumulativeRank Section (km) or District Road Work Year $m S$m

1 N1-2 20.5 2 Resealing 2000 5.4 5.42 N4-7 23.5 7 Overlay 40mm 2000 10.9 16.33 N2-5 12.5 5 Reconstruct 2000 8.6 24.94 R312-1 30 4 Widen 4 lane 2000 31.4 56.35 R458-3 36.2 3 Overlay 60mm 2000 16.3 72.6

: : : : : : : :1 N4-16 32.1 6 Reconstruct 2001 22.8 22.82 R13-23 22.4 4 Overlay 40mm 2001 9.7 32.53 N521-5 45.2 2 Widen 4 lane 2001 41.3 73.8

: : : : : : : :1 N1-6 30.2 4 Resealing 2002 8.2 8.22 N7-9 17.8 3 Overlay 60mm 2002 9.2 17.43 F2140-8 56.1 1 Reconstruct 2002 34.9 52.3

: : : : : : : :

20032003200320032003

200420042004

200520052005

Page 23: Why HDM-4?

Project Appraisal

Project typesNew construction, upgrading

Reconstruction, resealing

Widening, lane addition

Non-Motorised Transport lanes

Economic indicatorsNet Present Value (NPV)

Economic Rate of Return (ERR)

Benefit Cost Ratio (BCR), NPV/C

First Year Rate of Return (FYRR)

Page 24: Why HDM-4?

Economic Decision Criteria

NPV IRR3 NPV/C FYRRProject economic validity V.Good V.Good V.Good PoorMutually exclusive projects V.Good Poor Good PoorProject timing Fair Poor Poor GoodProject screening 1 Poor V.Good Good PoorUnder budget constraint 2 Fair Poor V.Good Poor

Notes:1. check for robustness to changes in key variables (sensitivity analysis)2. with incremental analysis3. IRR may be indeterminate with NONE or MANY solutions.

Page 25: Why HDM-4?

Project Level Outputs

Sensitivity analysis resultsScenario analysisRoad condition indicatorsRoad user cost detailsEnergy & emissions

Page 26: Why HDM-4?

HDM-4 as a Decision Support Component of Road Management Systems

Page 27: Why HDM-4?

Data Data CollectionCollection DatabaseDatabase DecisionDecision

SupportSupportManagementManagementInformationInformation

InventoryConditionStructuresTrafficFurnitureUnit CostsStandards

RDBMS(RIMS)

Life CycleAnalysis(HDM-4)

Standard& CustomReports

Components of a Road Management System

Page 28: Why HDM-4?

Management Information

Starting point in implementation“Must be relevant to the decision-making process with little or no further processing”

Determine:Purpose/use of the management informationCorrespondence with management structureKey reports to be produced by Decision Support systemReports Formats

Page 29: Why HDM-4?

Decision Support SystemTransparency of analysisLife cycle analysis capable of:

Short, Medium & Long term analysesWhat-if analysis, Performance indicators

Management must understand analysis frameworkAvailability of local technical expertiseDefault data sets

HDMHDM--44

Page 30: Why HDM-4?

HDM Technology Set

KnowledgeBase Software

ModelsSEERDWE

RUE

Page 31: Why HDM-4?

HDM Series

Page 32: Why HDM-4?

Conclusions – Why HDM-4?

Transparency of analysis

Economic analysis capable of:Short, Medium & Long term analyses

What-if analysis

Internationally accepted analysis framework

Availability of technical expertise

Local calibration

Page 33: Why HDM-4?

Web sites:

http://hdm4.piarc.orghttp://www.bham.ac.uk