Upload
lifangdavid
View
109
Download
1
Tags:
Embed Size (px)
DESCRIPTION
animation and physical model section are coming soon.
Citation preview
Why choose LIFANG Intl’s digital resolution service?
1. Strong Technical Support -- One of the expert digital suppliers of 2008 Beijing
Olympic Games, with over 900 talented in-house technicians.
2. Best Service -- 7/24 production rota, offering smooth communication and
collaboration at any time -- High efficient and fast turn-around.
3. Competitive Price -- 20%-40% lower than quotation of the local rendering service.
4. One-Stop Service -- The only one CG company in China which you could
get 3d-rendering, architectural animation making and physical model
manufacturing service all together from it, saving your time and money to search for
another animation studio or physical model factory.
Masterplans
Super High-rise Building
Interiors and Exteriors
You could visit our website (http://www.lifang-cg.com/) or our Youtube channel
(http://www.youtube.com/user/LIFANGInternational?feature=BF ) to view more
about our project gallery. You won't regret to do so!
If you have a project that you want us to provide a cost-effective solution and
outstanding result, please don't hesitate to contact me.
David Lee
Project Coordinator
International Cooperation Dept.
LIFANG International Digital Group
Rendering | Animation | Multi-Media | Model Making
Mob: +86-13620405229 Tel: +86-020-38817478-6006
Skype ID: lifang_david Email: [email protected]
Msn: [email protected] Web: http://www.lifang-cg.com
Add: F17 Yinhui Mansion, NO.117 Longyi Rd., Tianhe District, Guangzhou, China.