Dinner Plain Village Green: 2 September 2017 Introduction Why are we here today? Why a Village Green? Overview of consultation process Project overview Works completed to date / Location options / Concept / Benefits / Costs / Impacts / Risks Next steps

Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Embed Size (px)

Citation preview

Page 1: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Introduction • Why are we here today? • Why a Village Green? • Overview of consultation process • Project overview

Works completed to date / Location options / Concept / Benefits / Costs / Impacts / Risks

• Next steps

Page 2: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Why are we here today? To share information and ask you: • Is a Village Green for Dinner Plain important to you? • Do you think that the proposed Village Green project will

benefit the Dinner Plain community? • Would you like the project to proceed based on the

current proposal?

Page 3: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Why a Village Green? • May 2015: Identified as a potential project in Dinner Plain

Master Plan.

• April 2016: Consultation with DP community showed 46% of respondents would like a ‘village green or oval open space area’ developed.

• August 2016: DPAC direction: Investigate potential for event space approximately 1.85ha, including 1.3ha open area, to accommodate Polo and other events.

Page 4: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Project proposal Jun 2016 to Jul 2017

Consultation Aug/Sep 2017

Consider Oct/Nov 2017

Determination (and share outcomes with community) Dec 2017

Finalise planning and approvals (if agreed) Jan 2018 to Jun 2019

Construction (if agreed) 2019/20 to 2020/21

Page 5: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Work completed to date • Preliminary scoping study

• Engineering survey

• Concept design

• Cost estimate

• Flora and fauna assessment including field survey

• Cost benefit analysis

Page 6: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Location options

OPTION LOCATION PREFERRED REASONS N Y

A Lot 1: North east of water tower.

Large area in proximity to village on Council owned land.

Minor impact on existing infrastructure. B Lot 2: (currently used for

waste water irrigation) Additional construction costs as a result of

existing waste water irrigation infrastructure.

Potential restriction on use of the space due to operation of waste water irrigation.

Distance from the established village. C Bottom of ski slope Insufficient space due to existing infrastructure.

D Adjacent to tennis courts High visual impact.

Impact on existing infrastructure.

Impact on tour operators (i.e. sled dogs)

Page 7: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Page 8: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Page 9: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Page 10: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Page 11: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Benefits • Provide a large flat open space suitable for informal

recreation or for cultural and sporting events.

• The Cost Benefit Analysis estimated a cost benefit ratio (CBR) of $1.08 returned for every $1 spent.

Page 12: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Costs – capital outlay

Planning and design (Business case, flora and fauna investigation, cultural heritage, consultation, permits, design and documentation)

$125,000

Purchase of general flora and fauna offsets $17,500

Specific Flora and Fauna Offset Strategy $45,000

Construction (Roadworks, earthworks and drainage, fencing, furniture, signage, service points, public toilet, and landscaping)

$960,000

Contingency $102,500 $1,250,000

Page 13: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Costs – annual costs

Management and maintenance of specific offsets (for ten year period only)

$12,500

Facility maintenance (weed control, minor repairs, utility charges, cleaning)

$20,000

$32,500

Page 14: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Impacts • Ecological impacts.

– Removal of 1.85ha of Sub-alpine Woodland vegetation, including large old trees.

– Habitat for the Victorian Flora and Fauna Guarantee Act 1988 listed species: Alpine Bog Skink.

– Modelled habitat for 27 species, 12 of which require specific offsets.

• Cultural heritage impacts. • Landscape and visual impacts.

Page 15: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Page 16: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Risks • Increased capital costs (negative impact on CBR).

• Securing adequate specific flora and fauna offsets.

• Securing approvals from authorities (eg DELWP).

• Significant cultural heritage value.

• Not suitable for certain events.

• Reduced funds for other projects.

Page 17: Why are we here today? Why a Village Green? Overview … Plain Village Green: 2 September 2017 Introduction • Why are we here today? • Why a Village Green? • Overview of consultation

Dinner Plain Village Green: 2 September 2017

Consultation Submissions close 18 September 2017

Consider Oct/Nov 2017

Determination (and share outcomes with community) Dec 2017

Finalise planning and approvals (if agreed) Jan 2018 to Jun 2019

Construction (if agreed) 2019/20 to 2020/21