€¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) APPROVED BY: 1 OF 90

MODIFICATION: REV. DATE: HH-PRJ-MPL-01

WORKPLACE HEALTH, SAFETY &

ENVIRONMENT MANAGEMENT PLAN

FOR

WHYTE S GULLY STAGE 2 AND 3 CONSTRUCTION PROJECT NUMBER 13853

Page 2: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90

DOCUMENT REVISION SUMMARY

Rev. No.

Rev. Date Section Revised

Revision Description Prepared By

Checked By

Approved By

A 04.02.2016 Whole Document

Initial Issue SC NOC

B 07.04.2016 F2; F15 2016 WAS revised; Task & Workplace Inspections added

NOC SC NOC

C 15.04.2015 Whole Document

Updated template onto approved Master Word Document Template. Updated page numbers. Reference added for construction work over and near water.

SC NOC NOC

D 22.04.2016 Alignment with WHS requirements RA NOC NOC

1.3; 3.3; 4.22; 7.5

Inclusion of: cease work provisions; union right of entry; workplace facilities; HSE issue resolution.

RA SC NOC

E 04.05.2016 Appendix D Inclusion of glossary of terms NOC NOC NOC

Appendix E Inclusion of RMS mapping sheet. RA JW NOC

F 11.05.2016 Appendix F-L Re-Formatted NOC TL NOC

Sec. 15.2, 15.3

Detail on Workplace and Task Inspections added.

SC NOC NOC

G 19.05.16 Sec 1.3 Project Rules added SC NOC AC

PROJECT REVISION SUMMARY

Rev. No.

Rev. Date

Section Revised Revision Description Prepared By

Checked By

Approved By

A 15022017 Plan First Draft PS JW JW

B 06032017 Plan Second Draft SC PS JW

0 09032017 S&WMP Include soil and water controls

Response to Clients Checklist

PS JW JW

1 14032017 Table 2.1 CLIENT AND SITE SPECIFIC REQUIREMENTS

Included Environmental Harm Reporting

PS NS JW

2 14032017 NSW EPL 5862 L4 Potentially offensive odour

Included Environmental Harm Reporting

PS NS JW

3 22032017 Response to Client Comments

Various PS NS JW

4 29032017 Response to Client Comments

12.1 Incidents

9.1 Fitness

PS NS JW

5 18/04/2017 H.2.5 Amended to reflect new leachate dam works

NS

6 20/04/2017 Scope & H.2.6 Amended to reflect new leachate dam controls

PS NS NS

7 23/05/2017 Update Noise Receivers

Appendix G PS NS NS

8 24/05/2017 Update ERSED plans Appendix H PS NS NS

Page 3: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 3 OF 90

CONTENTS

INTRODUCTION .......................................................................................................................... 8

FOUNDATION 1: LEADERSHIP, ACCOUNTABILITY AND HEALTH & SAFETY CULTURE ..................... 9 1.1 GENERAL OBLIGATIONS ............................................................................................................................... 9 1.2 AT-RISK BEHAVIOUR ..................................................................................................................................... 9 1.3 PROJECT RULES ............................................................................................................................................ 9 1.4 CEASE WORK PROVISION ........................................................................................................................... 10

FOUNDATION 2: PLANNING ...................................................................................................... 10 2.1 CLIENT AND SITE SPECIFIC REQUIREMENTS ............................................................................................... 11 2.2 CORPORATE & PROJECT WHSE TARGETS ................................................................................................... 19 2.2.1 SAFETY AND ENVIRONMENT POLICIES ..................................................................................................................................... 19 2.2.2 KEY PERFORMANCE INDICATORS (KPI) .................................................................................................................................... 20 2.2.3 SAFETY KPI .................................................................................................................................................................... 20 2.2.4 ENVIRONMENT KPI ....................................................................................................................................................... 20

FOUNDATION 3: LEGAL COMPLIANCE ....................................................................................... 20 3.2 RELEVANT LEGISLATION ............................................................................................................................. 22 3.3 FEDERAL SAFETY ACCREDITATION SCHEME ............................................................................................... 23 3.4 UNION RIGHT OF ENTRY (IN STATES GOVERENED BY WHS LEGISLATION) ................................................ 23

FOUNDATION 4: RISK MANAGEMENT ....................................................................................... 23 4.1 PROJECT RISK REGISTER ............................................................................................................................. 23 4.2 PERMITS TO WORK ..................................................................................................................................... 23 4.3 WORKPLACE INSPECTIONS ......................................................................................................................... 24 4.4 SAFETY IN DESIGN ...................................................................................................................................... 24 4.5 PROTECTION OF PUBLIC ............................................................................................................................. 24 4.6 HOUSEKEEPING .......................................................................................................................................... 25 4.7 HIGH RISK ACTIVITIES ................................................................................................................................. 25 4.7.1 TEMPORARY WORKS ..................................................................................................................................................... 25 4.7.2 WORK AT HEIGHTS ........................................................................................................................................................ 25 4.7.3 TILT-UP CONCRETE CONSTRUCTION ............................................................................................................................. 26 4.7.4 POWERED MOBILE PLANT AND EQUIPMENT ................................................................................................................ 26 4.7.5 CLASSIFIED PLANT ......................................................................................................................................................... 27 4.7.6 MECHANICAL HEAVY LIFTING ....................................................................................................................................... 27 4.7.7 ELECTRICAL WORK ........................................................................................................................................................ 27 4.7.8 EXCAVATION GREATER THAN 1.5M ......................................................................................................................................... 28 4.7.9 WORKING WITH LIVE SERVICES ..................................................................................................................................... 29 4.7.10 WORKING WITH LIVE VEHICULAR TRAFFIC .................................................................................................................... 29 4.7.11 DEMOLITION WORK ...................................................................................................................................................... 29 4.7.12 MANAGEMENT OF ASBESTOS CONTAINING MATERIAL ................................................................................................ 29 4.7.13 CONFINED SPACE .......................................................................................................................................................... 29 4.7.14 WORKING OVER OR NEAR WATER ................................................................................................................................ 29 4.7.15 USE OF EXPLOSIVES ....................................................................................................................................................... 30 4.7.16 EXPLOSIVE POWERED TOOLS ........................................................................................................................................ 30 4.7.17 CONTROL OF HAZARDOUS SUBSTANCES AND DANGEROUS GOODS ............................................................................ 30 4.8 WORKPLACE FACILITIES .............................................................................................................................. 30 4.9 ENVIRONMENTAL MANAGEMENT ............................................................................................................. 31 4.9.1 GENERAL ....................................................................................................................................................................... 31 4.9.2 CLEARING ...................................................................................................................................................................... 31 4.9.3 EXCAVATION AND TRENCHING ..................................................................................................................................... 31 4.9.4 DEWATERING ................................................................................................................................................................ 32 4.9.5 BIOSECURITY AND WEED CONTROL .............................................................................................................................. 32 4.9.6 ABORIGINAL HERITAGE & MONITORING....................................................................................................................... 32 4.9.7 WASTE MANAGEMENT ................................................................................................................................................. 33 4.9.8 HYDROCARBON MANAGEMENT ................................................................................................................................... 33 4.9.9 HAZARDOUS MATERIALS MANAGEMENT ..................................................................................................................... 33 4.9.10 DUST, NOISE AND VIBRATION ....................................................................................................................................... 33

Page 4: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 4 OF 90

4.9.11 BUSHFIRE MANAGEMENT ............................................................................................................................................. 33

FOUNDATION 5: SAFE WORK SYSTEMS ..................................................................................... 34 5.1 SAFE WORK METHOD STATEMENT ............................................................................................................ 34 5.2 PERSONAL RISK ASSESSMENT CARD .......................................................................................................... 34

FOUNDATION 6: CHANGE MANAGEMENT ................................................................................ 34 6.1 CHANGE MANAGEMENT ............................................................................................................................ 34

FOUNDATION 7: COMMUNICATION, CONSULTATION AND H&S COMMITTEES .......................... 35 7.1 DAILY PRE START MEETINGS ...................................................................................................................... 35 7.2 TOOLBOX MEETINGS .................................................................................................................................. 35 7.3 SMG MEETINGS .......................................................................................................................................... 36 7.4 WHSE NOTICE BOARDS .............................................................................................................................. 36 7.5 ISSUE RESOLUTION ..................................................................................................................................... 36

FOUNDATION 8: TRAINING AND COMPETENCY ......................................................................... 36 8.1 SITE ACCESS ................................................................................................................................................ 38 8.2 INDUCTION BRIEFING ................................................................................................................................. 38

FOUNDATION 9: FITNESS, HEALTH AND HYGIENE ..................................................................... 39 9.1 ALCOHOL AND OTHER DRUGS.................................................................................................................... 39 9.2 SMOKING .................................................................................................................................................... 39 9.3 FATIGUE MANAGEMENT ............................................................................................................................ 39

FOUNDATION 10: SUBCONTRACTOR AND SUPPLIER RELATIONSHIPS ........................................ 39 10.1 SUBCONTRACTOR DOCUMENTATION GUIDELINES ................................................................................... 39 10.2 SUBCONTRACTOR AND SUPPLIER MANAGEMENT .................................................................................... 40

FOUNDATION 11: PLANT AND EQUIPMENT .............................................................................. 41 11.1 POWERED MOBILE PLANT AND EQUIPMENT ............................................................................................. 41 11.2 ANCILLARY EQUIPMENT ............................................................................................................................. 41 11.3 EQUIPMENT AND TOOLS ............................................................................................................................ 41 11.4 COMPRESSED AIR TOOLS ........................................................................................................................... 41 11.5 MACHINERY GUARDING ............................................................................................................................. 42 11.6 NOISE EMITTING EQUIPMENT.................................................................................................................... 42 11.7 FIRE PREVENTION ....................................................................................................................................... 42 11.8 SAFETY SIGNAGE ........................................................................................................................................ 42 11.9 PERSONAL PROTECTIVE EQUIPMENT (PPE) ............................................................................................... 42 11.10 LASER BEAMS ............................................................................................................................................. 43 11.11 GAS CYLINDERS .......................................................................................................................................... 43 11.12 WELDING SAFETY ....................................................................................................................................... 43 11.13 FIRST AID .................................................................................................................................................... 43 11.14 EQUIPMENT CALIBRATION ......................................................................................................................... 44

FOUNDATION 12: INCIDENT MANAGEMENT ............................................................................. 44 12.1 INCIDENT REPORTING ................................................................................................................................ 44 12.2 INJURY MANAGEMENT AND RETURN TO WORK ....................................................................................... 44 12.3 GENERAL HSE REPORTING .......................................................................................................................... 45 12.4 HAZARD REPORTING .................................................................................................................................. 45

FOUNDATION 13: EMERGENCY PLANNING AND RESPONSE ....................................................... 45

FOUNDATION 14: DOCUMENT AND RECORDS MANAGEMENT .................................................. 46 14.1 DOCUMENT CONTROL ............................................................................................................................... 46 14.2 RECORDS MANAGEMENT ........................................................................................................................... 46

FOUNDATION 15: MONITOR, REVIEW AND IMPROVEMENT ...................................................... 47 15.1 AUDITS........................................................................................................................................................ 47 15.2 TASK INSPECTION ....................................................................................................................................... 47

Page 5: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 5 OF 90

15.3 WORKPLACE INSPECTION ........................................................................................................................... 48

APPENDICES ............................................................................................................................. 49

A APPENDIX - WHSE PLAN ACKNOWLEDGMENT .................................................................. 49

B APPENDIX - WHSE IMPLEMENTATION PLAN ..................................................................... 50

C APPENDIX - ROLES AND RESPONSIBILITIES ....................................................................... 57

D APPENDIX - GLOSSARY OF TERMS .................................................................................... 61

E APPENDIX - FLORA AND FAUNA SUB-PLAN ...................................................................... 67 E.1 SCOPE ......................................................................................................................................................... 67 E.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 67 E.2.1 PROJECT TARGETS ......................................................................................................................................................... 67 E.2.2 CONTROLS USED TO MANAGE FLORA AND FAUNA ....................................................................................................... 68 E.2.3 MONITORING ................................................................................................................................................................ 69 E.2.4 FLORA AND FAUNA MONITORING ................................................................................................................................ 69 E.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 69

F APPENDIX - AIR QUALITY SUB-PLAN ................................................................................. 71 F.1 SCOPE ......................................................................................................................................................... 71 F.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 71 F.2.1 PROJECT TARGETS ......................................................................................................................................................... 71 F.2.2 CONTROLS USED TO MANAGE AIR QUALITY ................................................................................................................. 72 F.2.3 MONITORING ................................................................................................................................................................ 72 F.2.4 AIR QUALITY MONITORING ........................................................................................................................................... 73 F.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 73

G APPENDIX - NOISE AND VIBRATION SUB-PLAN ................................................................. 74 G.1 SCOPE ......................................................................................................................................................... 74 G.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 74 G.2.1 PROJECT TARGETS ......................................................................................................................................................... 74 G.2.2 CONTROLS USED TO MANAGE NOISE AND VIBRATION ................................................................................................. 75 G.2.3 MONITORING ................................................................................................................................................................ 76 G.2.4 NOISE AND VIBRATION MONITORING .......................................................................................................................... 76 G.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 77

H APPENDIX - WATER SOIL AND EROSION MANAGEMENT SUB-PLAN .................................. 78 H.1 SCOPE ......................................................................................................................................................... 78 H.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 78 H.2.1 PROJECT TARGETS ......................................................................................................................................................... 78 H.2.2 CONTROLS USED TO MANAGE WATER SOIL AND EROSION ........................................................................................... 79 H.2.3 MONITORING ................................................................................................................................................................ 80 H.2.4 WATER SOIL AND EROSION MONITORING .................................................................................................................... 80 H.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 82

I APPENDIX - WASTE MANAGEMENT SUB-PLAN ................................................................. 84 I.1 SCOPE ......................................................................................................................................................... 84 I.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 84 I.2.1 PROJECT TARGETS ......................................................................................................................................................... 84 I.2.2 CONTROLS USED TO MANAGE WASTE .......................................................................................................................... 85 I.2.3 MONITORING ................................................................................................................................................................ 86 I.2.4 WASTE MONITORING ................................................................................................................................................... 86 I.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 86

J APPENDIX - CULTURAL, ARCHAEOLOGICAL HERITAGE SITES SUB PLAN ............................. 87 J.1 SCOPE ......................................................................................................................................................... 87 J.2 PROJECT COMPLIANCE REQUIREMENTS .................................................................................................... 87 J.2.1 PROJECT TARGETS ......................................................................................................................................................... 87 J.2.2 CONTROLS USED TO MANAGE ABORIGINAL HERITAGE SITES ....................................................................................... 88

Page 6: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 6 OF 90

J.2.3 MONITORING ................................................................................................................................................................ 88 J.2.4 CULTURAL, ARCHAEOLOGICAL AND HERITAGE MONITORING ...................................................................................... 89 J.2.5 PLAN OF MONITORING LOCATIONS .............................................................................................................................. 89

K APPENDIX SITE LAYOUT AND BOUNDARIES ................................................................... 90

Page 7: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 7 OF 90

LIST OF TABLES

Table 1: Client and Site Specific Requirements .............................................................................................. 11 Table 2: Weighted Average Score Key Performance Indicators ..................................................................... 20 Table 3: Fall and Rigging Gear Testing and Tagging Frequencies ................................................................. 25 Table 4: Electrical Equipment Inspection and Testing Frequencies ............................................................... 28 Table 5: Electrical Equipment Testing and Tagging Frequencies ................................................................... 28 Table 6: Site Registers .................................................................................................................................... 46 Table 7: WHSE Plan Management Acknowledgment ..................................................................................... 49 Table 8: WHSE Implementation Plan Checklist .............................................................................................. 50 Table 9: Roles and Responsibilities ................................................................................................................ 57 Table 10: Flora & Fauna Hazards and Risks................................................................................................... 67 Table 11: Flora & Fauna Project Targets ........................................................................................................ 67 Table 12: Flora & Fauna Risks ........................................................................................................................ 68 Table 13: Flora & Fauna Monitoring ................................................................................................................ 69 Table 14: Air Quality Hazards and Risks ......................................................................................................... 71 Table 15: Air Quality Project Targets ............................................................................................................... 71 Table 16: Air Quality Risks .............................................................................................................................. 72 Table 17: Air Quality Monitoring ...................................................................................................................... 73 Table 18: Noise and Vibration Hazards and Risks .......................................................................................... 74 Table 19: Noise and Vibration Project Targets ................................................................................................ 75 Table 20: Noise and Vibration Risks ............................................................................................................... 75 Table 21: Noise and Vibration Monitoring ....................................................................................................... 76 Table 22: Water Soil and Erosion Management Hazards and Risks .............................................................. 78 Table 23: Water Soil and Erosion Management Project Targets .................................................................... 79 Table 24: Water Soil and Erosion Risks .......................................................................................................... 79 Table 25: Water Soil and Erosion Monitoring .................................................................................................. 80 Table 26: Waste Management Hazards and Risks ......................................................................................... 84 Table 27: Waste Management Project Targets ............................................................................................... 84 Table 28: Waste Management Risks ............................................................................................................... 85 Table 29: Waste Monitoring ............................................................................................................................. 86 Table 30: Cultural, Archaeological Heritage Hazards and Risks .................................................................... 87 Table 31: Cultural, Archaeological Heritage Project Targets .......................................................................... 87 Table 32: Controls Used to Manage Cultural, Archaeological Heritage Risks ................................................ 88 Table 33: Cultural, Archaeological Heritage Monitoring .................................................................................. 89

Page 8: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 8 OF 90

INTRODUCTION Employees and subcontractors conducting any work or activity on any Ertech site must be informed of the requirements stipulated within this WHSE management plan. Clarification is required, and discussion must be conducted during site inductions.

In this plan WHS, WHSE, HSE, WHSE, OHS and OSH are used interchangeably, as appropriate. Meanwhile the state in which the work is being conducted, and the contract in force, determine the applicable legislation (see Sec. 3.1 - Relevant Legislation).

PURPOSE

The Work Health Safety and Environmental Management System is based on a structured set of 15 Foundations. The Foundations are integrated into relevant Work Health Safety and Environmental management procedures. Each Foundation has expectations required to comply with the management system.

The purpose of this plan is to:

Ensure that projects align with the Work Health Safety and Environmental management Foundations structure.

Ensure site specific WHSE goals are achieved.

Provide Managers, Supervisors, Employees and Sub-contractors with the information to enable them to safely and efficiently manage their areas of responsibility.

Provide a reference document to highlight specific requirements of the Principal/Superintendent in regards to Work Health, Safety and the Environment.

Identify High Risk Tasks and manage them through the use of relevant safe work procedures.

Give an understanding, to both Ertech and the Client, of what procedures will be implemented and followed during construction to comply with the contract.

SCOPE OF WORK

The extension of the Wollongong Waste and Resource Recovery Park (WWARRP) is intended to provide for the future 40 years of landfilling for the Wollongong area, and is to be constructed in stages over a number of years. The WWARRP is an operational landfill site.

This contract is for the construction of packages 2 and 3 which form the second of a number of stages to be constructed. The scope includes:

Demolition of slabs, roadways, pits and associated items Surface water management system construction construction of cascade diversion drain construction of perimeter drain construction of piggy-back diversion drain Landfill base liner construction Subgrade and perimeter bund construction including perimeter diversion drains Connection of existing leachate pipes to leachate management system Landfill liner construction works Leachate collection system Rain flap system Landfill piggy back liner construction Subgrade and bund construction Landfill gas venting system construction Landfill liner construction works

Page 9: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 9 OF 90

Leachate collection system Protection material placement Construction of new leachate pond

FOUNDATION 1: LEADERSHIP, ACCOUNTABILITY AND HEALTH & SAFETY CULTURE

1.1 GENERAL OBLIGATIONS

Ertech management teams shall provide and maintain so far as is practicable a workplace that is safe and without risk of harm to its employees, members of the public or the environment in accordance with relevant legislation.

Employees and subcontractors shall comply with:

a) Relevant WHSE/HSE legislation, Codes of Practice and Australian Standards;

b) Company WHSE/HSE management system, WHSE/HSE policies, procedures and standards that apply from time to time; and

c) Any directions relating to WHSE/HSE given by a company management representative.

1.2 AT-RISK BEHAVIOUR

Behaviour demonstrated by any employee, subcontractor or visitor that is a serious breach of work health, safety, environmental, community or quality requirements, or repeated warnings for the same offence, will lead to dismissal from the site.

1.3 PROJECT RULES

All Ertech personnel and sub-contractors shall observe the following rules on site:

Applicable site-specific policies and procedures will be communicated to all employees during the initial HS&E induction and any changes to existing procedures will be notified via site HS&E bulletins, Construction Notices and on-going HS&E meetings.

Responsible persons on site must ensure that personnel who are allocated tasks are competent to complete that task.

The Ertech 3 Commandments are to be abided by at all times.

Alcohol or other drugs (other than prescribed by a medical doctor) shall not be allowed on work sites. Persons under the apparent influence of alcohol or other drugs, or who are found to be under the influence of drugs or alcohol shall not be permitted on the site.

The use of mobile phones at the work location shall be minimised to those personnel approved / authorised to use them.

Cameras are not allowed on site unless authorised by the Construction Manager.

Firearms/offensive weapons shall not be permitted.

Gambling, horseplay and fighting is not permitted.

Page 10: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 10 OF 90

Abuse, theft or destruction of another person's property is an unlawful offence and is liable to be treated by the State Authorities as such.

Employees and sub-contractors shall not take items, other than essentials such as tool boxes, onto the work site.

Failure to adhere to Site HS&E Rules may result in dismissal from Site.

1.4 CEASE WORK PROVISION

All workers and Health and Safety Representatives (HSR) have the right to cease work in the instance of being exposed to immediate or imminent exposure to hazard, with a serious risk to health and safety. Work that has been ceased by workers and/or HSRs must be reported to the relevant supervisor/manager and

must be provided, as required.

FOUNDATION 2: PLANNING Client, partner and other key stakeholder health and safety requirements relevant to the Project shall be clearly identified and addressed. The Work Health Safety and Environmental Management Plan addresses

key stakeholders.

Project safety objectives and targets have been defined for the project and a schedule of internal and external health and safety audits and reviews have been developed.

Page 11: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-7

2305

2017

11 O

F 90

2.1

CLIE

NT

AND

SITE

SPE

CIFI

C RE

QU

IREM

ENTS

Ta

ble

1: C

lient

and

Site

Spe

cific

Req

uire

men

ts

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

Te

nder

No.

T16

/29

- Con

stru

ctio

n of

a N

ew L

andf

ill C

ell a

t Wol

long

ong

Was

te a

nd R

esou

rce

Rec

over

y Pa

rk -

A1

Proj

ect S

peci

ficat

ion

NSW

Env

ironm

ent P

rote

ctio

n A

utho

rity

EP

L 58

62.

Mee

t the

requ

irem

ents

ass

ocia

ted

with

the

EPL

Kee

p a

copy

of E

PL

5862

at t

he c

onst

ruct

ion

site

C

omm

unic

ate

the

limit

cond

ition

s th

at re

late

to E

RTE

CH

Li

mit

Con

ditio

ns L

1 Po

llutio

n of

Wat

ers

Qua

litat

ive

(vis

ual)

insp

ectio

ns d

aily

E

RSE

D c

ontro

ls a

nd d

iver

sion

of s

torm

wat

er

Ope

ratin

g C

ondi

tions

O3

Dus

t Q

ualit

ativ

e (v

isua

l) in

spec

tions

dai

ly

4.0

SIT

E E

STA

BLI

SH

ME

NT

AN

D M

AIN

TEN

AN

CE

Th

e C

ontra

ctor

sha

ll de

linea

te th

e w

ork

area

with

hig

hly

visi

ble

tape

and

pic

kets

and

pr

esen

t thi

s fo

r app

rova

l by

the

Sup

erin

tend

ent a

t lea

st o

ne d

ay p

rior t

o si

te

esta

blis

hmen

t. Th

e C

ontra

ctor

sha

ll ha

ve th

is b

ound

ary

surv

eyed

. P

osse

ssio

n of

site

will

not

be

gran

ted

until

the

Sup

erin

tend

ent h

as re

view

ed a

nd is

sa

tisfie

d w

ith th

e pr

econ

stru

ctio

n su

bmitt

als

and

has

resp

onde

d to

the

Con

tract

or in

w

ritin

g in

dica

ting

acce

ptan

ce o

f the

pla

ns.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.5

PR

OTE

CTI

ON

OF

PU

BLI

C

K A

PPE

ND

IX S

ITE

LA

YO

UT

AN

D B

OU

ND

AR

IES

4.1

Site

Indu

ctio

n A

ttent

ion

is d

raw

n to

the

requ

irem

ent o

f the

Con

tract

Par

ticul

ars

for s

ite in

duct

ion

to

be c

ompl

eted

as

a pr

e-co

nditi

on to

Site

Acc

ess.

R

efer

to th

e fo

llow

ing

sect

ions

of t

his

plan

: 8.

1 S

ITE

AC

CE

SS

8.

2 IN

DU

CTI

ON

BR

IEFI

NG

4.

7 S

ite U

tiliti

es

Sho

uld

gene

ratin

g pl

ant b

e re

quire

d by

the

Con

tract

or fo

r the

sup

ply

of e

lect

ric p

ower

, su

ch e

quip

men

t sha

ll be

sup

plie

d, o

pera

ted

and

mai

ntai

ned

by th

e C

ontra

ctor

at i

ts

own

cost

. A

ppro

pria

te p

otab

le w

ater

, tel

epho

ne a

nd o

ther

ser

vice

s ar

e to

be

supp

lied,

ope

rate

d an

d m

aint

aine

d by

the

Con

tract

or if

nee

ded

at th

e C

ontra

ctor

's o

wn

cost

.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.8

WO

RK

PLA

CE

FA

CIL

ITIE

S

11.2

AN

CIL

LAR

Y E

QU

IPM

EN

T

4.8

San

itary

Acc

omm

odat

ion

The

Con

tract

or s

hall

prov

ide

adeq

uate

, app

rove

d te

mpo

rary

toile

ts (o

f the

che

mic

al

clos

et ty

pe) f

or th

e us

e of

wor

kers

em

ploy

ed o

n th

e si

te. S

uch

toile

ts s

hall

be k

ept

clea

n, ti

dy a

nd d

isin

fect

ed u

ntil

com

plet

ion

of th

e w

orks

whe

reup

on th

ey s

hall

be

rem

oved

and

the

area

rein

stat

ed o

n co

mpl

etio

n of

the

Con

tract

.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.8

WO

RK

PLA

CE

FA

CIL

ITIE

S

5.1

Wor

k M

etho

d S

tate

men

ts

Wor

k M

etho

d S

tate

men

ts a

re to

be

prep

ared

for k

ey a

ctiv

ities

in a

ccor

danc

e w

ith th

e re

quire

men

ts o

f the

Tec

hnic

al S

peci

ficat

ions

and

sub

mitt

ed to

the

Supe

rinte

nden

t for

ap

prov

al p

rior t

o si

te e

stab

lishm

ent,

or s

uch

othe

r tim

e as

agr

eed

by th

e S

uper

inte

nden

t. W

ork

Met

hod

Sta

tem

ents

sha

ll in

clud

e as

a m

inim

um:

D

escr

iptio

n of

the

Wor

ks

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.7

HIG

H R

ISK

AC

TIV

ITIE

S

5.1

SA

FE W

OR

K M

ETH

OD

STA

TEM

ENT

Page 12: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

12 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

Met

hods

to b

e em

ploy

ed to

car

ry o

ut th

e w

ork

activ

ity li

sted

in th

e or

der t

hat t

hey

will

be c

arrie

d ou

t

Mat

eria

ls to

be

inco

rpor

ated

into

the

Wor

ks

R

esou

rces

to b

e us

ed to

com

plet

e th

e W

orks

Env

ironm

enta

l pro

tect

ion

and

Hea

lth a

nd S

afet

y re

quire

men

ts a

s th

ey re

late

sp

ecifi

cally

to e

ach

wor

k ac

tivity

Trai

ning

requ

ired

R

espo

nsib

ilitie

s an

d au

thor

ities

of k

ey p

erso

nnel

Mon

itorin

g of

effe

ctiv

enes

s an

d qu

ality

of t

he w

orks

Cor

rect

ive

actio

ns to

be

take

n w

here

con

trol m

easu

res

are

out o

f com

plia

nce,

or

caus

e ac

tual

dam

age

or n

on-c

ompl

ying

dis

char

ges;

and

Doc

umen

t con

trol,

revi

ew a

nd a

ppro

val p

roce

ss

5.4

Res

pons

ibili

ties

The

Con

tract

or's

resp

onsi

bilit

ies

incl

ude

but a

re n

ot li

mite

d to

the

follo

win

g:

C

ompl

ianc

e w

ith s

ite m

anag

emen

t pla

ns (e

.g.,

Envi

ronm

enta

l Man

agem

ent P

lan,

S

afet

y M

anag

emen

t Pla

n) th

roug

hout

the

dura

tion

of th

e W

orks

;

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

C A

PP

EN

DIX

R

OLE

S A

ND

RE

SP

ON

SIB

ILIT

IES

9.1

Con

stru

ctio

n E

nviro

nmen

tal

Man

agem

ent P

lan

The

Con

tract

or s

hall

prep

are

a de

taile

d C

onst

ruct

ion

Env

ironm

enta

l Man

agem

ent

Pla

n (C

EM

P) f

or th

e W

orks

whi

ch c

ompl

ies

with

the

requ

irem

ents

of t

he C

onst

ruct

ion

Env

ironm

enta

l Man

agem

ent P

lan

Fram

ewor

k, th

e E

nviro

nmen

t Pro

tect

ion

Lice

nse

and

Con

ditio

ns o

f App

rova

l.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.9

EN

VIR

ON

ME

NTA

L M

AN

AG

EM

EN

T

E A

PPE

ND

IX

FLO

RA

AN

D F

AU

NA

SU

B-P

LAN

F

AP

PE

ND

IX

AIR

QU

ALI

TY S

UB

-PLA

N

G A

PP

END

IX

NO

ISE

AN

D V

IBR

ATI

ON

SU

B-P

LAN

H

AP

PE

ND

IX

WA

TER

SO

IL A

ND

ER

OS

ION

MA

NA

GE

ME

NT

SU

B-

PLA

N

I APP

EN

DIX

W

ATS

E M

AN

AG

EM

EN

T S

UB

PLA

N

J A

PP

END

IX C

ULT

UR

AL

AR

CH

AE

OLO

GIC

AL

HE

RIT

AG

E S

ITE

S S

UB

-P

LAN

9.

2 S

urfa

ce W

ater

Man

agem

ent

Pla

n It

is th

e re

spon

sibi

lity

of th

e C

ontra

ctor

to p

repa

re a

Sur

face

Wat

er M

anag

emen

t Pla

n,

incl

udin

g er

osio

n an

d se

dim

enta

tion

cont

rol m

easu

res

for t

he W

orks

, and

to c

ompl

y w

ith th

e P

lan

for t

he d

urat

ion

of th

e W

orks

.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.9.

4 D

EWAT

ER

ING

H

AP

PE

ND

IX

WA

TER

SO

IL A

ND

ER

OS

ION

MA

NA

GE

ME

NT

SU

B-

PLA

N

9.3

Whe

el C

onta

min

atio

n lf

need

ed, t

o pr

even

t was

te o

r soi

l mat

eria

ls fr

om w

heel

s or

und

erca

rria

ge o

f the

C

ontra

ctor

's o

r Sup

plie

r's v

ehic

les

bein

g de

posi

ted

on e

xist

ing

road

s be

yond

the

Site

, th

e C

ontra

ctor

sha

ll be

resp

onsi

ble

for p

rovi

ding

a s

uita

ble

truck

whe

el w

ashi

ng fa

cilit

y at

a lo

catio

n ap

prov

ed b

y th

e S

uper

inte

nden

t. Th

e co

st o

f the

se p

rovi

sion

s sh

all b

e at

ex

pens

e to

the

Con

tract

or

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

E A

PPE

ND

IX

FLO

RA

AN

D F

AU

NA

SU

B-P

LAN

H

AP

PE

ND

IX

WA

TER

SO

IL A

ND

ER

OS

ION

MA

NA

GE

ME

NT

SU

B-

PLA

N

Page 13: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

13 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

10

.0 W

OR

KP

LAC

E H

EA

LTH

A

ND

SAF

ETY

R

EQ

UIR

EM

EN

TS

The

Con

tract

or s

hall,

at a

ll tim

es, t

ake

all n

eces

sary

pre

caut

ions

for t

he s

afet

y of

thei

r em

ploy

ees,

and

sha

ll co

mpl

y w

ith a

ll st

atut

ory

requ

irem

ents

, inc

ludi

ng W

orkC

over

di

rect

ions

, and

with

suc

h di

rect

ions

as

the

Sup

erin

tend

ent m

ay s

erve

from

tim

e to

tim

e.

The

Con

tract

or s

hall

ensu

re th

at a

ll pe

rson

s em

ploy

ed o

n th

e w

orks

site

are

issu

ed

with

and

wea

r app

rove

d pe

rson

al p

rote

ctiv

e eq

uipm

ent

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

1.3

PR

OJE

CT

RU

LES

1.

4 C

EA

SE

WO

RK

PR

OV

ISIO

N

FOU

ND

ATI

ON

3: L

EG

AL

RE

QU

IRE

ME

NTS

8.

1 S

ITE

AC

CE

SS

8.

2 IN

DU

CTI

ON

BR

IEFI

NG

11

.9 P

ER

SO

NAL

PR

OTE

CTI

VE

EQ

UIP

MEN

T (P

PE

)

10.1

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

n Th

e C

ontra

ctor

is re

spon

sibl

e fo

r pre

para

tion

of a

Hea

lth a

nd S

afet

y M

anag

emen

t P

lan

to th

e S

uper

inte

nden

t for

revi

ew a

nd a

ppro

val p

rior t

o si

te e

stab

lishm

ent.

Any

ch

ange

s to

the

Hea

lth a

nd S

afet

y fin

al P

lan

shal

l be

mad

e on

ly a

fter w

ritte

n ap

prov

al

of th

e Su

perin

tend

ent.

The

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

n sh

all i

nclu

de:

O

wne

r per

sonn

el;

P

roje

ct S

uper

inte

nden

t per

sonn

el;

C

ontra

ctor

per

sonn

el;

V

isito

rs to

the

site

;

Traf

fic M

anag

emen

t;

Firs

t Aid

Tra

ined

Per

sonn

el; a

nd

W

ork

met

hod

stat

emen

t for

con

stru

ctio

n ac

tiviti

es.

The

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

n is

requ

ired

to c

lear

ly in

corp

orat

e th

e fo

llow

ing:

Des

igna

ted

wor

k zo

nes

esta

blis

hed

for t

he s

ite; a

nd

Th

e re

quire

men

ts o

f the

Ten

der D

ocum

ents

. Th

e H

ealth

and

Saf

ety

Man

agem

ent P

lan

shal

l inc

lude

a ri

sk a

sses

smen

t und

erta

ken

in a

ccor

danc

e w

ith th

e W

orkp

lace

Hea

lth a

nd S

afet

y R

egul

atio

ns 2

011

and

CO

P H

ow

to M

anag

e W

ork

Hea

lth a

nd S

afet

y R

isks

201

1.

The

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

n sh

all b

e in

the

form

of a

writ

ten

man

ual a

nd

as a

min

imum

sha

ll co

ver p

olic

y, c

onsu

ltatio

n, h

azar

d co

ntro

l, tra

inin

g, in

stru

ctio

ns to

em

ploy

ees

and

sub-

cont

ract

ors.

Fo

r eac

h se

ctio

n of

wor

k w

here

the

risks

cha

nge

subs

tant

ially

, a n

ew s

ite-s

peci

fic ri

sk

asse

ssm

ent w

ill b

e un

derta

ken

to a

ddre

ss th

e ris

ks th

at a

re p

artic

ular

to th

at s

ite.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

1.3

PR

OJE

CT

RU

LES

4.

1 P

RO

JEC

T R

ISK

RE

GIS

TER

4.

7 H

IGH

RIS

K A

CTI

VIT

IES

4.

7.10

WO

RK

ING

WIT

H L

IVE

VE

HIC

ULA

R T

RA

FFIC

5.

1 S

AFE

WO

RK

ME

THO

D S

TATE

ME

NT

6.1

CH

AN

GE

MA

NA

GE

ME

NT

8.1

SIT

E A

CC

ES

S

8.2

IND

UC

TIO

N B

RIE

FIN

G

FOU

ND

ATI

ON

10:

SU

BC

ON

TRA

CTO

R A

ND

SU

PP

LIE

R

RE

LATI

ON

SH

IPS

11

.13

FIR

ST

AID

FO

UN

DA

TIO

N 1

3: E

ME

RG

EN

CY

PLA

NN

ING

AN

D R

ES

PO

NS

E

C A

PP

EN

DIX

R

OLE

S A

ND

RE

SP

ON

SIB

ILIT

IES

K

APP

EN

DIX

SIT

E L

AY

OU

T A

ND

BO

UN

DA

RIE

S

10.2

WH

&S

Mon

itorin

g Th

e C

ontra

ctor

is re

quire

d to

est

ablis

h a

mon

itorin

g pr

ogra

m to

ens

ure

com

plia

nce

with

the

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

n. T

he m

onito

ring

is to

be

carr

ied

out o

n a

regu

lar b

asis

and

mus

t inc

lude

a w

ritte

n re

port

by th

e C

ontra

ctor

pre

pare

d on

a

wee

kly

basi

s an

d su

bmitt

ed to

the

Supe

rinte

nden

t. Th

e re

port

shou

ld a

s a

min

imum

co

ntai

n:

re

ports

of i

ncid

ents

/acc

iden

ts in

clud

ing

any

near

mis

ses;

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

12.1

INC

IDE

NT

RE

PO

RTI

NG

12

.3 G

EN

ER

AL

HS

E R

EP

OR

TIN

G

FOU

ND

ATI

ON

15:

MO

NIT

OR

, RE

VIE

W A

ND

IMPR

OV

EM

EN

T

Page 14: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

14 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

deta

ils o

f the

mon

thly

Hea

lth a

nd S

afet

y st

atis

tics;

info

rmat

ion

in re

gard

s to

regu

lato

ry a

utho

rity

site

vis

its, i

nclu

ding

out

com

es,

notic

es is

sued

etc

.;

a lis

t of t

oolb

ox ta

lks

whi

ch h

ave

take

n pl

ace

on th

e pr

ojec

t, lis

ting

the

nam

es o

f th

e C

ompa

nies

car

ryin

g ou

t the

tool

box

talk

s;

de

tails

of m

ater

ial c

hang

es to

the

Hea

lth a

nd S

afet

y M

anag

emen

t Pla

ns, e

.g.

chan

ges

to s

ite ri

sk a

sses

smen

t, tra

ffic

man

agem

ent p

lan

etc.

;

deta

ils o

f site

insp

ectio

ns c

arrie

d ou

t by

the

Fore

man

/Pro

ject

Man

ager

and

the

Saf

ety

Man

ager

;

deta

ils o

f any

non

-con

form

ance

s, c

opie

s of

repo

rts o

n an

y he

alth

and

saf

ety

or

envi

ronm

enta

l aud

its c

arrie

d ou

t on

the

proj

ect;

and

de

tails

of a

ny s

ub-c

ontra

ctor

s se

lf-au

dits

. W

OR

KS

CO

NTR

AC

T FO

R S

TAG

E 2

- CO

NST

RU

CTI

ON

OF

A N

EW L

AN

DFI

LL C

ELL

AT

WO

LLO

NG

ON

G W

AST

E A

ND

RES

OU

RC

E R

ECO

VER

Y PA

RK

5.

9 P

RO

CE

DU

RE

UP

ON

LO

SS

O

R D

AM

AG

E

If lo

ss o

f or d

amag

e to

any

par

t of t

he W

orks

or a

Sta

ge o

ccur

s w

hils

t the

Con

tract

or

bear

s th

e ris

k of

loss

of o

r dam

age

to th

e W

orks

or t

he S

tage

und

er c

laus

e 5.

1:

th

e C

ontra

ctor

mus

t:

mak

e th

e W

orks

, or t

he S

tage

, and

the

Site

saf

e an

d se

cure

;

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

FOU

ND

ATI

ON

12:

INC

IDEN

T M

ANA

GE

ME

NT

FO

UN

DA

TIO

N 1

3: E

ME

RG

EN

CY

PLA

NN

ING

AN

D R

ES

PO

NS

E

7.1

CO

NTR

AC

TOR

TO

IN

FOR

M IT

SE

LF

(a) W

ithou

t lim

iting

cla

use

7.2,

the

Con

tract

or w

arra

nts

that

it h

as, a

nd it

will

be

deem

ed to

hav

e, d

one

ever

ythi

ng th

at w

ould

be

expe

cted

of a

pru

dent

, com

pete

nt

and

expe

rienc

ed c

ontra

ctor

in:

as

sess

ing

the

risks

whi

ch it

is a

ssum

ing

unde

r the

Con

tract

; and

ensu

ring

that

the

Con

tract

Pric

e co

ntai

ns a

llow

ance

s to

pro

tect

it a

gain

st a

ny o

f th

ese

risks

eve

ntua

ting.

(b

) Loc

atin

g E

xist

ing

Ser

vice

s - T

he C

ontra

ctor

is a

ppoi

nted

as

the

pers

on w

ith

man

agem

ent a

nd c

ontro

l of t

he w

orkp

lace

and

is re

spon

sibl

e fo

r loc

atin

g se

rvic

es,

incl

udin

g un

derg

roun

d es

sent

ial s

ervi

ces,

and

in d

oing

so,

mus

t com

ply

with

the

Wor

kCov

er W

ork

Nea

r Und

ergr

ound

Ass

ets

Gui

delin

e an

d Sa

fe W

ork

Aus

tralia

Cod

e of

Pra

ctic

e M

anag

ing

Ris

ks in

Con

stru

ctio

n.

(c) B

efor

e co

mm

ence

men

t of c

onst

ruct

ion

wor

k, th

e C

ontra

ctor

mus

t est

ablis

h th

e pr

ecis

e lo

catio

ns o

f all

unde

rgro

und

and

othe

r exi

stin

g se

rvic

es a

t the

Site

and

in

area

s ad

jace

nt to

the

Site

that

may

be

affe

cted

by

the

wor

k un

der t

he C

ontra

ct, a

nd:

ob

tain

adv

ice

from

Dia

l Bef

ore

You

Dig

and

the

owne

rs o

f the

ser

vice

s;

en

gage

a s

ervi

ces

loca

tor;

ex

amin

e th

e S

ite a

nd s

urro

undi

ng a

reas

for i

ndic

atio

ns o

f ser

vice

s;

w

here

any

ser

vice

is u

nder

grou

nd, u

se p

ot-h

olin

g (o

r equ

ival

ent n

on-d

estru

ctiv

e te

chni

ques

); an

d

verif

y th

e lo

catio

n of

all

iden

tifie

d se

rvic

es;

m

ark

prom

inen

tly o

n th

e S

ite th

e lo

catio

ns o

f all

serv

ices

; and

docu

men

t the

loca

tions

of s

ervi

ces

on a

site

pla

n an

d pr

ovid

e a

copy

of t

he p

lan

to

each

sub

cont

ract

or b

efor

e th

e su

bcon

tract

or s

tarts

wor

k on

the

Site

.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.7.

9 W

OR

KIN

G W

ITH

LIV

E S

ER

VIC

ES

Page 15: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

15 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

(d

) Dea

ling

with

Exi

stin

g S

ervi

ces

- Exi

stin

g se

rvic

es (s

uch

as d

rain

s, w

ater

cour

ses,

pu

blic

util

ities

, tel

ecom

mun

icat

ions

and

oth

er s

ervi

ces)

obs

truct

ing

the

Wor

ks o

r if

dam

aged

in th

e co

urse

of t

he W

orks

, mus

t be

deal

t with

as

follo

ws:

if th

e se

rvic

e is

to b

e co

ntin

ued:

repa

ir, d

iver

t, re

loca

te a

s re

quire

d;

if

the

serv

ice

is to

be

aban

done

d: c

ut a

nd s

eal o

r dis

conn

ect a

nd m

ake

safe

as

requ

ired.

(e

) Tem

pora

ry S

ervi

ces

- Unl

ess

othe

rwis

e ag

reed

in w

ritin

g, th

e C

ontra

ctor

mus

t m

ake

all a

rrang

emen

ts a

nd p

ay a

ll co

sts

(incl

udin

g fo

r con

nect

ion

and

disc

onne

ctio

n)

asso

ciat

ed w

ith th

e pr

ovis

ion

of te

mpo

rary

ser

vice

s ne

cess

ary

to c

arry

out

and

co

mpl

ete

the

Wor

ks.

8.16

SA

FETY

Th

e C

ontra

ctor

mus

t car

ry o

ut th

e C

ontra

ctor

's A

ctiv

ities

saf

ely

and

so a

s to

pro

tect

pe

rson

s an

d pr

oper

ty.

If th

e C

ontra

ct A

dmin

istra

tor r

easo

nabl

y co

nsid

ers

ther

e is

a ri

sk o

f inj

ury

to p

eopl

e or

da

mag

e to

pro

perty

aris

ing

from

the

Con

tract

or's

Act

iviti

es, t

he C

ontra

ct A

dmin

istra

tor

may

dire

ct th

e C

ontra

ctor

to c

hang

e its

man

ner o

f wor

king

or t

o ce

ase

wor

king

.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

1.3

PR

OJE

CT

RU

LES

1.

4 C

EA

SE

WO

RK

PR

OV

ISIO

N

4.5

PR

OTE

CTI

ON

OF

PU

BLI

C

8.1

SIT

E A

CC

ES

S

8.2

IND

UC

TIO

N B

RIE

FIN

G

8.17

WO

RK

PLA

CE

HE

ALT

H,

SA

FETY

AN

D

RE

HA

BIL

ITA

TIO

N

MAN

AG

EM

EN

T

Con

tract

or's

Act

iviti

es:

Mus

t com

plie

s w

ith a

ll S

tatu

tory

Req

uire

men

ts a

nd o

ther

requ

irem

ents

of t

he C

ontra

ct

for w

orkp

lace

hea

lth, s

afet

y an

d re

habi

litat

ion

man

agem

ent;

and

its s

ubco

ntra

ctor

s co

mpl

y w

ith th

e re

quire

men

ts re

ferr

ed to

in th

is c

laus

e 8.

17;

keep

the

Con

tract

Adm

inis

trato

r ful

ly in

form

ed o

f all

wor

kpla

ce h

ealth

, saf

ety

and

reha

bilit

atio

n m

atte

rs a

risin

g ou

t of,

or in

any

way

in c

onne

ctio

n w

ith, t

he C

ontra

ctor

's

activ

ities

as

soon

as

they

occ

ur;

The

Con

tract

or m

ust i

n re

latio

n to

site

:

prov

ide,

ere

ct a

nd m

aint

ain

suita

ble

barr

icad

es, g

uard

s, fe

ncin

g, te

mpo

rary

ro

adw

ays

and

foot

path

s, s

igns

and

ligh

ting;

and

prov

ide

wat

chm

en a

nd tr

affic

flag

men

; and

rem

ove

them

whe

n no

long

er re

quire

d;

pr

ovid

e te

mpo

rary

pro

tect

ion

for,

and

not i

nter

fere

with

or d

amag

e, a

ny p

rope

rty,

road

way

, foo

tpat

h, d

rain

, wat

er c

ours

e, p

ublic

util

ity a

nd o

ther

ser

vice

whi

ch is

vi

sibl

e or

the

loca

tion

of w

hich

can

be

asce

rtain

ed b

y th

e C

ontra

ctor

from

the

appr

opria

te a

utho

rity

or fr

om C

ounc

il

prev

ent n

uisa

nce

or in

conv

enie

nce

to th

e pu

blic

gen

eral

ly a

nd to

the

owne

rs, o

r oc

cupi

ers

of p

rope

rties

adj

acen

t to

the

Site

;

in p

erfo

rmin

g th

e C

ontra

ctor

's A

ctiv

ities

, com

ply

with

and

sat

isfy

and

, if r

equi

red

by

Cou

ncil,

pro

vide

evi

denc

e th

ereo

f fro

m ti

me

to ti

me

with

all

Sta

tuto

ry

Req

uire

men

ts.

su

bmit

to C

ounc

il a

wor

kpla

ce h

ealth

and

saf

ety

man

agem

ent p

lan

for t

he c

arry

ing

out o

f the

Con

tract

or's

Act

iviti

es id

entif

ying

:

pote

ntia

l ris

k of

inju

ry to

wor

kers

(inc

ludi

ng s

ub-c

ontra

ctor

s or

any

oth

er

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

1.3

PR

OJE

CT

RU

LES

1.

4 C

EA

SE

WO

RK

PR

OV

ISIO

N

FOU

ND

ATI

ON

3: L

EG

AL

CO

MP

LIA

NC

E

4.5

PR

OTE

CTI

ON

OF

PU

BLI

C

4.7.

1 TE

MP

OR

AR

Y W

OR

KS

4.7.

9 W

OR

KIN

G W

ITH

LIV

E SE

RV

ICE

S

4.7.

10 W

OR

KIN

G W

ITH

LIV

E V

EH

ICU

LAR

TR

AFF

IC

FOU

ND

ATI

ON

5: S

AFE

WO

RK

SYS

TEM

S

FOU

ND

ATI

ON

8: T

RA

ININ

G A

ND

CO

MP

ETE

NC

Y

8.1

SIT

E A

CC

ES

S

8.2

IND

UC

TIO

N B

RIE

FIN

G

FOU

ND

ATI

ON

10:

SU

BC

ON

TRA

CTO

R A

ND

SU

PP

LIE

R

MA

NA

GE

MEN

T FO

UN

DA

TIO

N 1

1: P

LAN

T A

ND

EQ

UIP

ME

NT

FOU

ND

ATI

ON

12:

INC

IDEN

T M

ANA

GE

ME

NT

FOU

ND

ATI

ON

13:

EM

EN

RG

EN

CY

PLA

NN

ING

AN

D R

ES

PO

NS

E

FOU

ND

ATI

ON

15

MO

NIT

OR

, RE

VIE

W A

ND

IMP

RO

VE

ME

NT

Page 16: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

16 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

pe

rson

dee

med

to b

e a

wor

ker),

any

vis

itors

to th

e S

ite a

nd m

embe

rs o

f the

pu

blic

in th

e vi

cini

ty o

f the

Site

and

est

ablis

hes

cont

rols

for e

nsur

ing

that

th

e ris

k of

inju

ry is

min

imis

ed;

id

entif

ies

the

type

of e

quip

men

t and

sta

ndar

d op

erat

ion

proc

edur

es

requ

ired

to o

pera

te th

e eq

uipm

ent o

r to

com

plet

e th

e W

orks

in a

saf

e m

anne

r;

iden

tifie

s sa

fe s

yste

ms

of w

ork

to b

e im

plem

ente

d

iden

tifie

s cl

ear g

uide

lines

for r

espo

ndin

g to

wor

kpla

ce h

ealth

and

saf

ety

inci

dent

s

tra

inin

g pr

ogra

ms

whi

ch e

nsur

e th

at p

eopl

e en

gage

d in

the

Con

tract

or's

A

ctiv

ities

are

aw

are

of th

e ris

ks o

f per

sona

l inj

ury

and

the

mea

sure

s ta

ken

to m

inim

ise

thos

e ris

ks; a

nd

F

iden

tifie

s al

l mea

sure

s w

hich

will

be

impl

emen

ted

in o

rder

to c

ompl

y w

ith

Sta

tuto

ry R

equi

rem

ents

;

deve

lop,

doc

umen

t, im

plem

ent a

nd m

aint

ain

wor

kpla

ce h

ealth

and

saf

ety

rule

s w

hich

con

form

to S

tatu

tory

Req

uire

men

ts, a

nd w

hich

are

app

rove

d by

C

ounc

il.

w

hen

dire

cted

by

Cou

ncil,

atte

nd a

cou

rse

cond

ucte

d by

Cou

ncil

abou

t C

ounc

il's s

peci

fic w

orkp

lace

hea

lth a

nd s

afet

y re

quire

men

ts;

P

rovi

de C

ounc

il w

ith:

w

ritte

n hi

stor

y of

the

wor

kpla

ce h

ealth

and

saf

ety

perfo

rman

ce o

ver t

he

prec

edin

g fiv

e ye

ars;

and

all o

f the

Con

tract

or's

em

ploy

ee a

nd tr

aini

ng re

cord

s;

pr

ovid

e C

ounc

il w

ith e

vide

nce

of tr

aini

ng, c

ompe

tenc

y an

d qu

alifi

catio

n fo

r an

y w

ork

whi

ch is

spe

cific

ally

cov

ered

by

a S

tatu

tory

Req

uire

men

t prio

r to

that

wor

k be

ing

unde

rtake

n;

in

cide

nts

invo

lvin

g in

jury

or p

oten

tial i

njur

y

al

low

Cou

ncil

to a

utho

rise

audi

ts to

be

unde

rtake

n of

the

Site

with

out a

ny

prio

r not

ifica

tion

bein

g gi

ven

to th

e C

ontra

ctor

and

pro

vide

acc

ess

to th

e S

ite a

nd th

e W

orks

to e

nabl

e th

ose

audi

ts to

be

unde

rtake

n an

d no

t ob

stru

ct th

e co

nduc

t of t

he a

udits

.

8.19

CLE

AN

ING

UP

In c

arry

ing

out t

he C

ontra

ctor

's A

ctiv

ities

, the

Con

tract

or m

ust:

(a) k

eep

the

Site

and

the

Wor

ks c

lean

and

tidy

and

free

of r

efus

e; a

nd

(b) a

s a

cond

ition

pre

cede

nt to

Com

plet

ion

of th

e W

orks

or a

Sta

ge, r

emov

e al

l ru

bbis

h, m

ater

ials

and

Pla

nt, E

quip

men

t and

Wor

k fro

m th

e pa

rt of

the

Site

rele

vant

to

the

Wor

ks o

r the

Sta

ge.

Ref

er to

the

follo

win

g se

ctio

ns o

f thi

s pl

an:

4.6

HO

US

EK

EE

PIN

G

4.9.

7 W

AS

TE M

AN

AG

EM

EN

T

I APP

EN

DIX

W

AS

TE M

AN

AG

EM

EN

T S

UB

-PLA

N

8.

20 T

HE

EN

VIR

ON

ME

NT

The

Con

tract

or m

ust e

nsur

e th

at in

car

ryin

g ou

t the

Con

tract

or's

Act

iviti

es:

it

com

plie

s w

ith a

ll S

tatu

tory

Req

uire

men

ts a

nd o

ther

requ

irem

ents

of t

he C

ontra

ct

for t

he p

rote

ctio

n of

the

envi

ronm

ent;

FOU

ND

ATI

ON

3: L

EG

AL

CO

MP

LIA

NC

E

4.9

EN

VIR

ON

ME

NTA

L M

AN

AG

EM

EN

T

E A

PPE

ND

IX

FLO

RA

AN

D F

AU

NA

SU

B-P

LAN

Page 17: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

17 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

it do

es n

ot p

ollu

te, c

onta

min

ate

or o

ther

wis

e da

mag

e th

e en

viro

nmen

t; an

d

its s

ubco

ntra

ctor

s co

mpl

y w

ith th

e re

quire

men

ts re

ferr

ed to

in th

is c

laus

e 8.

20; a

nd

m

ake

good

any

pol

lutio

n, c

onta

min

atio

n or

dam

age

to th

e en

viro

nmen

t aris

ing

out

of, o

r in

any

way

in c

onne

ctio

n w

ith, t

he C

ontra

ctor

's A

ctiv

ities

, whe

ther

or n

ot it

ha

s co

mpl

ied

with

all

Sta

tuto

ry R

equi

rem

ents

or o

ther

requ

irem

ents

of t

he

Con

tract

for t

he p

rote

ctio

n of

the

envi

ronm

ent;

and

in

dem

nify

the

Ow

ner f

or th

e fu

ll ex

tent

per

mitt

ed b

y la

w a

gain

st:

an

y lia

bilit

y to

or a

cla

im b

y a

third

par

ty; a

nd a

ll fin

es, p

enal

ties,

cos

ts, l

osse

s or

da

mag

es s

uffe

red

or in

curr

ed b

y th

e O

wne

r, ar

isin

g ou

t of o

r in

conn

ectio

n w

ith

the

Con

tract

or's

bre

ach

of th

is c

laus

e

F A

PP

EN

DIX

A

IR Q

UA

LITY

SU

B-P

LAN

G

AP

PEN

DIX

N

OIS

E A

ND

VIB

RA

TIO

N S

UB

-PLA

N

H A

PP

EN

DIX

W

ATE

R S

OIL

AN

D E

RO

SIO

N M

AN

AG

EM

EN

T S

UB

-P

LAN

I A

PPE

ND

IX

WA

TSE

MA

NA

GE

ME

NT

SU

B P

LAN

J

AP

PEN

DIX

CU

LTU

RA

L A

RC

HA

EO

LOG

ICA

L H

ER

ITA

GE

SIT

ES

SU

B-

PLA

N

8.22

VA

LUA

BLE

OB

JEC

TS

FOU

ND

ON

SIT

E

Any

thin

gs o

f val

ue o

r arc

haeo

logi

cal o

r spe

cial

inte

rest

foun

d on

or i

n th

e S

ite w

ill, a

s be

twee

n th

e pa

rties

, be

the

prop

erty

of t

he O

wne

r. W

here

suc

h an

item

is fo

und

the

Con

tract

or m

ust:

im

med

iate

ly n

otify

the

Con

tract

Adm

inis

trato

r;

prot

ect i

t and

not

dis

turb

it fu

rther

; and

com

ply

with

any

inst

ruct

ions

of t

he C

ontra

ct A

dmin

istra

tor i

n re

latio

n to

the

item

. Th

e C

ontra

ct P

rice

will

be

incr

ease

d by

the

extra

cos

ts re

ason

ably

incu

rred

by th

e C

ontra

ctor

in c

ompl

ying

with

the

Con

tract

Adm

inis

trato

r's in

stru

ctio

ns, a

s de

term

ined

by

the

Con

tract

Adm

inis

trato

r.

J A

PP

END

IX C

ULT

UR

AL

AR

CH

AE

OLO

GIC

AL

HE

RIT

AG

E S

ITE

S S

UB

-P

LAN

8.23

Not

ifica

tion

of

Env

ironm

enta

l Har

m

Env

ironm

enta

l Pro

tect

ion

Lice

nse

5862

Sec

tion

R2

Not

ifica

tion

of E

nviro

nmen

tal

Har

m

If th

ere

is a

n in

cide

nt th

at re

quire

s re

porti

ng u

nder

the

Pro

tect

ion

of th

e E

nviro

nmen

tal

Ope

ratio

ns A

ct 1

997

147

Mea

ning

of m

ater

ial h

arm

to th

e en

viro

nmen

t (1

) For

the

purp

oses

of t

his

Par

t: (a

) har

m to

the

envi

ronm

ent i

s m

ater

ial i

f: (i)

it in

volv

es a

ctua

l or p

oten

tial h

arm

to th

e he

alth

or s

afet

y of

hum

an b

eing

s or

to

ecos

yste

ms

that

is n

ot tr

ivia

l, or

(ii

) it r

esul

ts in

act

ual o

r pot

entia

l los

s or

pro

perty

dam

age

of a

n am

ount

, or a

mou

nts

in

aggr

egat

e, e

xcee

ding

$10

,000

(or s

uch

othe

r am

ount

as

is p

resc

ribed

by

the

regu

latio

ns),

and

(b) l

oss

incl

udes

the

reas

onab

le c

osts

and

exp

ense

s th

at w

ould

be

incu

rred

in ta

king

al

l rea

sona

ble

and

prac

ticab

le m

easu

res

to p

reve

nt, m

itiga

te o

r mak

e go

od h

arm

to

the

envi

ronm

ent.

(2) F

or th

e pu

rpos

es o

f thi

s P

art,

it do

es n

ot m

atte

r tha

t har

m to

the

envi

ronm

ent i

s ca

used

onl

y in

the

prem

ises

whe

re th

e po

llutio

n in

cide

nt o

ccur

s.

The

cont

ract

or w

ill in

form

the

Clie

nts

Rep

rese

ntat

ive

(Sup

erin

tend

ent)

of

any

inci

dent

that

requ

ires

repo

rting

to th

e N

SW E

nviro

nmen

tal P

rote

ctio

n A

utho

rity

Clie

nts

Sup

erin

tend

ent P

adra

ic J

oyce

046

6 42

9 12

4

NSW

EP

L 58

62

L4 P

oten

tially

offe

nsiv

e O

6.8

The

licen

see

mus

t not

exh

ume

any

land

fille

d w

aste

unl

ess

appr

oved

in w

ritin

g by

the

EPA.

S

uper

inte

nden

t.

Page 18: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

13

853-

2017

0406

-PLA

N-W

HSE

MGM

T W

HYTE

S GU

LLY

STG

2 RE

V-8

2405

2017

(REC

OVE

RED)

18 O

F 90

Ref

eren

ce

Clie

nt E

xpec

tatio

n/Pr

ojec

t Spe

cific

Req

uire

men

ts

How

the

od

our

L4.1

The

lice

nsee

mus

t no

t cau

se o

r per

mit

the

emis

sion

of o

ffens

ive

odou

r bey

ond

the

boun

dary

of t

he

prem

ises

.

The

prog

ram

will

pro

vide

the

time

fram

e fo

r the

Clie

nt to

not

ify th

e N

SW

EP

A.

The

area

exp

osed

will

be

min

imis

ed w

hene

ver p

ossi

ble

by a

loca

lised

st

aged

pro

gram

C

over

mat

eria

l sho

uld

be a

pplie

d in

a ti

mel

y m

anne

r to

assi

st w

ith o

dour

co

ntro

l

Dis

cove

ry o

f Con

tam

inat

ed

Land

R

equi

rem

ents

C

EM

PF

Tabl

e 1

C

oA 1

9

If

ther

e is

a d

isco

very

of c

onta

min

ated

land

or a

cid

sulp

hate

soi

ls th

e co

ntra

ctor

will

follo

w th

e re

quire

men

ts a

nd c

ontro

l mea

sure

s as

det

aile

d in

the

CE

MP

F S

ectio

n 3.

7 C

onta

min

ated

Man

agem

ent P

lan

A 6

Pro

ject

App

rova

l Con

stru

ctio

n En

viro

nmen

tal M

anag

emen

t Pla

n

Page 19: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 19 OF 90

2.2 CORPORATE & PROJECT WHSE TARGETS

2.2.1 SAFETY AND ENVIRONMENT POLICIES

SAFETY AND HEALTH POLICY

We are committed to providing and maintaining safe work sites for employees, subcontractors and others affected by our work. We believe that all accidents are preventableò

To meet our commitment and belief we will: Ensure that everyone knows their obligations with senior managers providing

visible leadership and commitment. Provide an OH&S system based on AS/NZS 4801 for identifying, assessing,

reporting and, managing hazards and monitoring compliance. Comply with all applicable legislative standards, Company requirements and

contractual obligations. Maintain a mature safety culture within our organisation. Empower our employees to stop a job where an unsafe condition exists. Ensure effective, transparent and open communication and consultation is

maintained with stakeholders associated with Company activities. Ensure continual improvement by setting of objectives and targets which are

communicated and regularly reviewed. Engage suppliers and subcontractors who commit to and support this policy. Report and thoroughly investigate all incidents and implement corrective

actions to prevent reoccurrences. Ensure employees are assessed for their fitness for work and are protected

from health hazards associated with Company operations. Ensure procedures and resources are in place to effectively respond to crisis

and emergency situations. Implement systems for injury management and workplace rehabilitation. Implement systems and processes which allow our employees and

subcontractors to perform their duties unimpaired by fatigue. encapsulates our commitment

to eliminating harm from our workplace.

ENVIRONMENTAL POLICY

We are committed to conducting our business activities in a way that minimises environmental risks and adverse effects on the environmentò

To meet our commitment we will:

Page 20: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 20 OF 90

Ensure that everyone knows their obligations with senior managers providing visible leadership and commitment.

Provide an Environmental Management System based on AS/NZS ISO 14001 for identifying, assessing, reporting, managing risks and monitoring compliance through internal and third party audits and inspections.

Comply with all applicable legislative standards and contractual obligations. Develop an environmental awareness culture in our organisation through

inductions and training. Ensure continual improvement of environmental performance by setting

objectives and targets which are communicated and regularly reviewed. Engage suppliers and subcontractors who commit to and support this policy.

2.2.2 KEY PERFORMANCE INDICATORS (KPI)

The principal WHSE target for the Project Teams is to complete the project with no work health, safety or environmental incidents.

The Corporate KPIs below are measured on a monthly basis and communicate to site personnel through pre-start or toolbox meetings. These corporate KPIs are applicable to each company contract. Table 2: Weighted Average Score Key Performance Indicators

KPI 1 KPI 2 KPI 3 KPI 4

Task Inspections Workplace Inspections

Closing Action Items Recordable injuries

25% weighting 25% weighting 25% weighting 25% weighting

2.2.3 SAFETY KPI

Complete 2 Task Inspections per month for site management personnel

Complete monthly workplace inspections (Site Supervisor(s) & Site HSE Advisor(S)

Complete weekly toolbox meeting

Close out corrective actions by date due

2.2.4 ENVIRONMENT KPI

One environmental Task Inspection per quarter per eligible person.

One environmental toolbox topic per quarter

No spills over 15 litres

FOUNDATION 3: LEGAL COMPLIANCE Legal and regulatory requirements relating to work health safety and environmental for the project are identified below.

Page 21: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 21 OF 90

A register of legal requirements relating to work health safety and environmental is maintained at a corporate level and distributed when Legal changes occur.

The operational activity program shall be regularly assessed to ensure legal and regulatory requirements relating to health and safety are being met.

Personnel on the site have access to current versions of legislation, standards and codes of practice.

Page 22: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 22 OF 90

3.2 RELEVANT LEGISLATION

The primary legislation for the scope of works is as follows:

New South Wales

1. Work Health and Safety Act 2011

2. Work Health and Safety Regulation 2011

3. The Workers Compensation Act 1987

4. The Workplace Injury Management and Workers Compensation Act 1998

5. The Workers Compensation Regulation 2010

6. Workers Compensation (Bush Fire, Emergency and Rescue Services) Act 1987

7. Contaminated Land Management Act 1997

8. Dangerous Goods (Road and Rail Transport) Act 2008

9. Environmentally Hazardous Chemicals Act 1985

10. Forestry Act 2012

11. National Environment Protection Council (New South Wales) Act 1995

12. Ozone Protection Act 1989

13. Pesticides Act 1999

14. Protection of the Environment Administration Act 1991

15. Protection of the Environment Operations Act 1997

16. Radiation Control Act 1990

17. Recreation Vehicles Act 1983

18. Waste Avoidance and Resource Recovery Act 2001

19. Contaminated Land Management Regulation 2013

20. Dangerous Goods (Road and Rail Transport) Regulation 2009

21. Environmentally Hazardous Chemicals Regulation 2008

22. Pesticides Regulation 2009

23. Protection of the Environment Administration Regulation 2012

24. Protection of the Environment Operations (Clean Air) Regulation 2010

25. Protection of the Environment Operations (General) Regulation 2009

26. Protection of the Environment Operations (Hunter River Salinity Trading Scheme) Regulation 2002

27. Protection of the Environment Operations (Noise Control) Regulation 2008

Page 23: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 23 OF 90

28. Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2008

29. Protection of the Environment Operations (Waste) Regulation 2005

30. Radiation Control Regulation 2013

31. National Parks and Wildlife Act 1974

32. Environmental Planning and Assessment Act 1979

3.3 FEDERAL SAFETY ACCREDITATION SCHEME

Suppliers shall Safety Audit Criteria, as relevant to the scope of its subcontract work.

Project Safety Audit Criteria can be downloaded via www.fsc.gov.au . Subcontractors shall meet the requirements of the Project Safety Audit Criteria (as relevant to scope of works) or adopt the company Standards.

3.4 UNION RIGHT OF ENTRY (IN STATES GOVERENED BY WHS LEGISLATION)

Union members only have the right of entry with a WHS entry permit, and are not able to address IR related

suspected contravention of the Act.

FOUNDATION 4: RISK MANAGEMENT All personnel are responsible to identify, assess and control hazards.

Systematic processes are defined and implemented for identifying health and safety risks at all stages of the Project, including the initial Risk Assessment of the Construction Methodology.

Regular inspections are conducted to monitor compliance and effectiveness of identified controls.

Relevant documents: H-SYS-PRO-084-Manage Risks H-SYS-GDL-013-Guide for Risk Assessment Tools and Methods.

4.1 PROJECT RISK REGISTER

Relevant personnel shall develop a project risk register using the risk and opportunities register in the bid workbook. Major subcontractors shall be required to contribute to the project risk register.

Relevant documents: H-SYS-PRO-084-Manage Risks H-PRJ-TPT-130-BID WORKBOOK

4.2 PERMITS TO WORK

Work permits required are specific to each project. Company pemits are required for the following high risk activities.

Working at heights

Confined space

Hot works

Page 24: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 24 OF 90

Isolations and commissioning

Excavations

Working near overhead electrical networks

Working near underground existing services

Working near water

Relevant documents: H-SYS-PRO-091-Manage Permits to Work. H-SYS-GDL-015-Guide to Managing Permits H-SYS-FOR-098-Working at Heights Permit H-SYS-FOR-091-Confined Space Entry Permit. H-SYS-FOR-092-Hot Works Permit H-SYS-FOR-093-Isolation Permit H-SYS-FOR-097- Excavation Permit H-SYS-FOR-099-Working Near Overhead Electrical Networks Permit H-SYS-FOR-100-Working Near Underground Existing Services Permit

4.3 WORKPLACE INSPECTIONS

Weekly or fortnightly inspections shall be conducted on all sites. Access to subcontractor work areas by company management representatives shall be allowed to conduct workplace inspections.

Workplace inspections must include at least monthly inspections on subcontractor work areas and equipment. Subcontractors shall participate in these workplace inspections.

Relevant documents: H-SYS-FOR-080-Workplace Inspection H-SYS-FOR-079-Workshop Inspection

4.4 SAFETY IN DESIGN

Relevant personnel responsible for design shall provide a project risk register based on the design prior commencement of work.

Where design is provided to the site management team, the Project Manager must request a copy of the design risk assessment. Design risks must be included within the project risk register.

Relevant document: H-PRJ-TPT-130 Bid Workbook

4.5 PROTECTION OF PUBLIC

All relevant personnel shall provide install and maintain all fences, guards, hoardings, warning notices, lighting and other things whatsoever, required by law or where directed by the Project Manager.

The Superintendent shall be notified at least one day prior to site establishment. Site boundaries shall be surveyed. The site possession will not be attained until notification in writing from the Superintendent is achieved.

The site layout and location of work areas are identified in Appendix K of this plan.

Work shall not commence, if persons in the vicinity but not on site could be injured unless:

Works shall be delineated with high visibility tape to identify work areas Hoarding or barricades have been put in place to reduce the risk Gantry is erected to prevent injury from falling objects

Page 25: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 25 OF 90

The design, erection, use and maintenance of a hoarding, barricade or gantry is adequate for the loads placed on it.

Hoarding, barricade or gantry must not be removed or altered without permission from Principal Contractor.

Installation of hoarding or barricades must comply with all requirements.

4.6 HOUSEKEEPING

Employees and subcontractors shall ensure work areas are kept tidy at all times. Subcontractors are responsible to remove all their wastes from sites unless stated in their contract.

4.7 HIGH RISK ACTIVITIES

All high risk activities identified by legislation shall be controlled through appropriate risk mitigation strategies. Safe work method statements are required for all high risk activities.

4.7.1 TEMPORARY WORKS

Temporary works (e.g. formwork, false work, pre-cast, shoring, back propping, temporary structures etc.) must be identified, designed and independently verified by appropriately qualified persons.

The designer must provide certification of the temporary works design that takes into account intended use, load tolerances, lifting calculations, access/egress, and installation and dismantling.

Safe systems of work are to be developed taking into consideration structural alterations that require temporary support to prevent collapse.

Relevant document:

H-SYS-PRT-016 Temporary Works

4.7.2 WORK AT HEIGHTS

Working at heights shall comply with:

AS1657 Fixed platforms, walkways, stairways and ladders - Design, construction and installation; AS/NZS1576 Scaffolding General Requirements;

AS/NZS 4576 Guidelines for Scaffolding;

AS2550.7 Cranes - Safe use - Builders Hoists and associated equipment

AS/NZS 1418.10: Cranes, hoists and winches - Mobile elevating work platforms. For Elevated Work Platforms

AS/NZS 1891 for Fall arrest/ restraint equipment

AS/NZS 1892. For Ladders

AS/NZS 1576, AS/NZS 4576 for Scaffolding

Relevant documents: H-SYS-PRT-012-Working at Height H-SYS-FOR-098-Working at Heights Permit

Equipment shall be checked by competent personnel at interval not exceeding 3 months.

The colour coding periods are: Table 3: Fall and Rigging Gear Testing and Tagging Frequencies

Page 26: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 26 OF 90

Colour Start Month Finish Month

Red January March Green April June Blue July September

Yellow October December

4.7.3 TILT-UP CONCRETE CONSTRUCTION

Design, supply, transport, erection and record-keeping of manufactured tilt-up concrete panels shall comply with current legislation and AS3850 Tilt-up concrete construction.

Employees and subcontractors involved in tilt up or pre cast construction shall:

Hold one pair of either:

CPCCOHS1001A (Work safely in the construction industry)

CPCCM1007A (Carry out tilt up work safely)

Or:

CPCCOHS2001A (Apply OHS requirements, policies and procedures in the construction industry).

CPCCCM2011A (Carry out tilt up work safely).

Personnel that have completed Contribute to Safe Tilt Up Construction are not required to complete new courses.

Supervisors shall have:

CPCCBC4022A (Supervise tilt up work).

Personnel supervising tilt up work or the manufacturing process without completing CPCCBC4022A shall have completed:

CPCCM1007A or

CPCCM2011A or

Contribute to Safe Tilt Up Construction

These personnel supervising shall complete CPCCBC4022A as soon as practicable.

Experienced personnel in erecting concrete elements, given the responsibility for the direction, coordination and erection of concrete work, shall hold an intermediate or advanced rigging licence.

Relevant document: H-SYS-PRT-025-Tilt-up Precast Concrete.

4.7.4 POWERED MOBILE PLANT AND EQUIPMENT

All activities requiring the use of powered mobile plant shall have SWMS developed for the task. For information relating to plant standard refer to Foundation 11 Plant and Equipment.

Relevant document: H-SYS-PRT-027-Mobile Plant and Vehicles H-AST-PRO-058 Perform Plant Onsite Administration, Maintenance and Inspection H-AST-PRO-059 Manage Plant H-AST-FOR-032 Plant On Hire and Off Hire Inspection Form H-AST-FOR-039 Weed Inspection and Clean Down Certificate for Mobile Plant

Page 27: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 27 OF 90

4.7.5 CLASSIFIED PLANT

Classified plant shall comply with the requirements of Part 4 of the Occupational Health and Safety Regulations 1996, relevant Australian Standards in AS2550 (all parts), AS1418 (all parts).

4.7.6 MECHANICAL HEAVY LIFTING

Plant designed to lift equipment or materials shall require:

Competent personnel shall complete a lift risk assessment.

Rigging equipment e.g. slings, chains, spreader bars and the like are to be inspected, tagged and certified for use by a competent person prior to use.

Rated capacity limiter must be fitted to all mobile cranes and in working order determined by a competent person as witnessed by our representative.

Only cranes or hoists are permitted to suspend a load unless an appropriate load chart is provided and lifting is within the SWL

Safe working load limits are to be displayed on plant and attachments.

Slings shall be inspected every 3 months by a qualified person.

Chains shall undergo non-destructive annual testing.

Chains and slings must be place on project registers and tagging kept in date.

No chains or sling are to be used unless appropriately tagged.

Employees and subcontractors involved in mechanical heavy lifting shall complete a lift checklist, permits and calculations as required.

Critical lifts where one or more of the following conditions exist require a critical lift study:

More than one crane is utilised.

Special lifting equipment or non-standard crane configuration used.

Gross load greater than 50 tonnes.

Load capacity greater than 85% of chart capacity.

Relevant documents: H-SYS-FOR-103-Critical Lift Study Checklist H-SYS-FOR-102-Critical Lift Calculation Sheet - Dual Crane Lift H-SYS-FOR-101-Critical Lift Calculation Sheet - Single Crane Lift H-SYS-FOR-099-Working Near Overhead Electrical Networks Permit

4.7.7 ELECTRICAL WORK

Equipment that complies with Australian Electrical Standards AS/NZS3000 and AS/NZS3012 shall only be permitted on site. Installations, in-service safety inspections and the testing of electrical equipment shall comply with AS 3760 and Australian/ New Zealand Wiring Rules.

Inspection, testing and tagging of electrical equipment is carried out as follows:

Page 28: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 28 OF 90

Table 4: Electrical Equipment Inspection and Testing Frequencies

Daily Users of any electrical equipment. Daily check by all users to detect damaged leads or to report faults to competent persons.

Quarterly All portable electrical equipment portable tools extension leads, generators, welders, fixed electrical plant and equipment, installations such as crib huts and workshops.

Yearly Fixed and portable electrical equipment and appliances used in offices.

Tag colours shall comply with those listed below: Table 5: Electrical Equipment Testing and Tagging Frequencies

Colour Start Month Finish Month

Red Dec Feb Green Mar May Blue Jun Aug

Yellow Sep Nov

Generators and power supply units shall have:

Isolation points clearly identified.

Isolation tags along with both master and individual locks provided and used for all electrical isolations.

Approved earth leakage protection for all circuits.

Temporary distribution boards will have appropriate signage and be fixed to the ground, lockable (for isolation purposes) and weatherproof.

Mains boards must include a system circuit map.

Electrical equipment shall not be used without any current test and tag.

Testing and tagging will only be conducted by approved and qualified personnel.

Temporary electrical leads will be secured off the ground by insulated hooks and/or lead stands.

Relevant documents: H-SYS-PRT-023-Electrical. H-SYS-PRT-031-Isolation and Tagging.

4.7.8 EXCAVATION GREATER THAN 1.5M

All excavation greater than 1.5m in depth, require excavation permits and SWMS. The excavation permit identifies the safe slope and benching to be adopted.

Relevant documents: H-SYS-PRT-018 Excavation and Trenching H-SYS-FOR-097- Excavation Permit

Page 29: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 29 OF 90

4.7.9 WORKING WITH LIVE SERVICES

Services shall be accurately located using the DBYD relevant services drawings and the location physically verified when within 2m of any excavation. Work permits are required for working in the vicinity of existing services. Employees and subcontractors must obtain a permit prior commencement of work.

Relevant documents: H-SYS-FOR-100-Working Near Underground Existing Services Permit, H-SYS-FOR-099-Working Near Overhead Electrical Networks Permit

4.7.10 WORKING WITH LIVE VEHICULAR TRAFFIC

Traffic Management Plan (consistent with AS1742.3) shall be developed by a competent traffic engineer for all projects involving interaction with live vehicular traffic.

Employees and subcontractors required to install or inspect traffic plans on live roads shall hold a current Basic Worksite Traffic Management Certificate, personnel controlling traffic shall be accredited Traffic Controllers.

Relevant documents: H-PRJ-POL-038-Traffic Management Policy H-SYS-PRT-026-Traffic.

4.7.11 DEMOLITION WORK

Demolition work shall not commence prior approval by local government and the project manager or delegate. Demolition work shall comply with AS 2601 Demolition of structures, legislation.

Relevant document: H-SYS-PRT-014-Demolition.

4.7.12 MANAGEMENT OF ASBESTOS CONTAINING MATERIAL

Employees and subcontractors shall notify the site Manager or Delegate of the removal of asbestos prior commencement of work.

Management of Asbestos shall comply with the Code of Practices for the Safe Removal of Asbestos and Management and Control of Asbestos in Workplaces.

Relevant document: H-SYS-PRT-015-Asbestos.

4.7.13 CONFINED SPACE

Prior to an employee or subcontractor entering a confined space, a permit shall be in place. Work performed in a confined space shall be in accordance with AS 2865 Confined Spaces, OHS legislation, Management procedure.

Relevant documents: H-SYS-PRT-017-Confined Space. H-SYS-FOR-091-Confined Space Entry Permit.

4.7.14 WORKING OVER OR NEAR WATER

All activities requiring work to be conducted over or near water where there is a risk of drowning shall have SWMS developed for the task.

Relevant document: H-SYS-PRT-03 Construction work In Over or Adjacent to Water

Page 30: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 30 OF 90

4.7.15 USE OF EXPLOSIVES

No explosives or detonating devices are permitted on the site without the written permission of the Project Manager. Use of Explosives shall comply with AS 2187 Explosives - Storage, transport and use

Relevant document: H-SYS-PRT-020-Explosives.

4.7.16 EXPLOSIVE POWERED TOOLS

Explosive power tools must be used in accordance with AS/NZS 1873 Powder-Actuated hand-held fastening tools.

Hazard warning signs (AS1319) must be displayed.

Only persons holding the prescribed certificate of competency must use explosive powered tools.

All explosive charges must be kept in a locked metal box.

Always select power tools that are the most suitable for the job giving consideration to weight, vibration and kickback.

If equipment is hired, check correct type and weight ordered is received.

Do not remove fitted guards or handles from the equipment; it is fitted to prevent injuries.

4.7.17 CONTROL OF HAZARDOUS SUBSTANCES AND DANGEROUS GOODS

All employees and subcontractors shall be provided training in the safe use of hazardous substances

Material Safety Data Sheets (MSDS) for all substances shall be kept on site at all times.

Storage of substances shall comply with the MSDS requirements.

Disposal of substances shall comply with the MSDS recommendations.

A register shall be kept on site of all materials requiring an MSDS

4.8 WORKPLACE FACILITIES

The Project will ensure it provide adequate site facilities, as reasonably practicable, including:

Safe access and egress to and from the workplace

Clear and accessible workspaces, free from obstructions

Adequate workplace space, ventilation and lighting

Suitable floor surfaces

Toilets, drinking water (potable) , and eating facilities

Reasonable temperature

Additional workplace facilities may be required including: Accessible and secure personal storage

Showering facilities

Accommodation

Page 31: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 31 OF 90

4.9 ENVIRONMENTAL MANAGEMENT

4.9.1 GENERAL

The protection of the environment during construction works will be governed by this WHSEMP and associated procedures. The aspects addressed include land disturbance, water, flora, fauna, waste, noise, rehabilitation, indigenous and heritage protection.

Environmental controls will be documented and implemented into daily activities. These controls will be audited on the project to ensure compliance.

The Project General Site Induction will include Project specific environmental requirements. Personnel shall be trained on environmental aspects relevant to the Contract.

Employees and subcontractors shall ensure work is conducted in an environmentally responsible manner to minimise the effects on the environment and community.

Incident reporting and management is addressed in this WHSEMP.

The strategies that will be used to address environmental issues are detailed in the following sections

A copy of the Stage 1 Construction Environmental Management Plan (Whytes Gully New Landfill Cell CEMP 8/6/2016 Number 117625003_155_R_Rev 2) is lodged with the Director General of NSW Department of Planning, a copy of this plan will be kept on site as a reference for mitigation measures of the risks identified in the conditions of approval. This will be referenced in this document as CEMP and section number.

Relevant documents: H-SYS-GDL-014-Guide to Environmental Management

4.9.2 CLEARING

Prior to undertaking any clearing the Site Supervisor shall confirm with the client that clearing areas are correctly defined.

The Site Supervisor is responsible for ensuring that all requirements are adhered to; and that the Project Engineer approves any variations from the client specific requirements and variations are recorded.

The management objective in regards to clearing is to ensure that disturbance to culturally sensitive sites, native vegetation, wildlife habitat and surface and groundwater is avoided or minimised.

4.9.3 EXCAVATION AND TRENCHING

The management objective with regard to excavation and trenching is to ensure that adverse impacts to soil and water and native fauna are minimised.

The Site Supervisor is responsible for ensuring that client specific requirements are adhered to and that proposed deviations obtain approval from the client representative prior to work commencing.

If blasting is necessary, blasting operations shall be monitored to ensure compliance with relevant State legislation and measures such as appropriate blast design, blanketing and collaring shall be employed to minimise impacts on sensitive habitats and fauna.

Trench spoil shall be stockpiled separately from stockpiled topsoil and vegetation and shall not be stockpiled where it has the potential to impede surface drainage or result in sedimentation of watercourses

Plugs and ramps shall be placed at regular intervals along the trench to allow movement of fauna and facilitate the escape of fauna that may fall into the trench. All open trenches will be inspected daily prior to work commencing. Fauna that has been accidentally trapped will be identified where possible and released.

Pipe shall be strung, allowing gaps for vehicles, stock and wildlife access across the line of pipe. Gaps shall coincide with access roads or tracks, stock and wildlife trails, boundary fences and gaps in stockpiled vegetation.

Page 32: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 32 OF 90

4.9.4 DEWATERING

The management objective with regard to dewatering is to ensure that water is appropriately disposed of and that adverse impacts on soil, water and native flora and fauna are minimised.

Suitable options for disposal of water generated by the de-watering process are provided below in order of preference:

Recycling

Recharge of local groundwater

Reuse off site

Irrigation

Discharge to local surface water

Storage of the water for evaporative disposal

Any dewatering that is suspected or confirmed leachate impacted must be disposed of into the sites leachate system. Prior approval from Council required

4.9.5 BIOSECURITY AND WEED CONTROL

The management objectives with regard to biosecurity and weed control are to prevent the introduction of weeds and dieback, prevent the transmission of infectious diseases in crops, natural flora and fauna, livestock, quarantined pests, invasive alien species, and living modified organisms into project disturbed areas.

Where evident transmission sources are present, or suspected to be present, works shall be carried out under strict hygiene controls to prevent any further spread.

4.9.6 ABORIGINAL HERITAGE & MONITORING

The management objectives around aboriginal heritage are:

To minimise disturbance to Aboriginal sites;

To establish appropriate management and protective measures for Aboriginal sites;

To ensure that the disturbance of any site is properly approved consistent with the Heritage Act, 1977 and the wishes of the appropriate Aboriginal heritage custodians and spokespeople;

To manage relationships with Aboriginal people in the region.

The potential impacts of the Project on Aboriginal heritage sites are related primarily to direct disturbance of sites and include:

Damaging sites during construction;

Collecting or excavating artefacts from heritage sites;

Damaging artefacts by off-road use of vehicles; and

Trespassing on sites by unauthorised personnel and culturally inappropriate behaviour (including defacing artefacts or artworks).

Page 33: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 33 OF 90

Controls will consist of the following:

Restricting of land clearing to approved site plans only;

Ensuring that appropriate management and protective measures are established for Aboriginal sites if encountered;

Providing relevant training to site personnel, ensuring that they are made aware of their obligations to report all discoveries of Aboriginal heritage sites to their supervision and the Department of Indigenous Affairs;

4.9.7 WASTE MANAGEMENT

The objective with regard to waste management is to minimise the health and environmental impacts associated with the generation and disposal of waste during construction and operational activities (i.e. disposal of oils, general waste etc.).

All waste materials generated by the project will be adequately contained and regularly removed from the site to the designated recycling and disposal facilities

4.9.8 HYDROCARBON MANAGEMENT

All hydrocarbons and hazardous materials used on-site must be must be kept in a safe isolated environment (e.g. Bunding and hazmat cupboards) consistent with AS/NZ Std 1940 1993 Section 5.9.3.

All hydrocarbons and chemicals (regardless of capacity and volume) must be secondarily contained. This containment must be able to contain 110% of the material stored and prevent pollution in the event of failure of the container.

Spill trays or other secondary containment must be placed under generators, welders, pumps, and other stationary engines at site.

Spill kits should be easily accessible in workshop areas, and on service vehicles. Spill rags should be kept on major machinery.

All spills must be cleaned up immediately. Contaminated soil must be transported to the closest bioremediation facility.

4.9.9 HAZARDOUS MATERIALS MANAGEMENT

No chemicals or materials that are potentially hazardous shall be brought onto site without prior approval of the project manager. A register will be maintained and have Material Safety Data Sheet available for all chemicals brought to site

All substances shall be handled, stored and used in accordance with the relevant Material Safety Data Sheet.

4.9.10 DUST, NOISE AND VIBRATION

Dust, Noise and Vibration are significant hazards to the surrounding stakeholders and general public, as well as the project workforce. As such appropriate effort will be taken to eliminate, mitigate and minimise these hazards during the project.

4.9.11 BUSHFIRE MANAGEMENT

The management objective in regards to fire prevention is to ensure that construction activities minimises the risk of bushfires and that emergency response plans are established to manage bushfires should they occur.

Page 34: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 34 OF 90

Open fires will be banned on the project. This will include open barbecues, bush burning and rubbish burning. Unnecessary build-up of flammable material in working areas will be avoided, with vegetation and other flammable material being stockpiled well clear of hot work areas. Where vegetation is to be stockpiled adequate provisions must be considered to ensure fire breaks are maintained. Where practical a 360° of access around mulch or stripped vegetation stockpiles should be upheld to allow for firefighting in the event of a stockpile fire.

Suitable firefighting appliances shall be ready for use at all times. All vehicles shall be equipped with a 1.5 kg Dry Powder fire extinguisher, earthmoving plant, welder trailer and towing unit shall carry a full Knapsack and hot work locations shall have mobile fire fighting equipment available.

FOUNDATION 5: SAFE WORK SYSTEMS Activities requiring safe work systems are identified and required safe work systems are adopted or developed for the project. Access to safe work systems is established and maintained by the project manager. Safe work systems are regularly reviewed to ensure currency and employees and contractors are trained in relevant safe work systems.

5.1 SAFE WORK METHOD STATEMENT

Relevant personnel shall develop a safe work method statement (SWMS) for all high risk work. Company high risk protocols shall be used in the development of SWMS. It is the responsibility of project teams to ensure that the controls stipulated within the high risk protocols are reflected within SWMS. Guidelines for meeting the high risk protocol requirements can be found on cDMS.

checklist.

Relevant documents: H-SYS-TPT-004-SWMS Template. H-SYS-FOR-087-SWMS Checklist. H-SYS-GDL-018 Guide for High Risk Protocols

5.2 PERSONAL RISK ASSESSMENT CARD

All personnel shall complete personal risk assessment cards prior commencing any task. Personnel risk

Relevant document:

H-SYS-FOR-086-Personal Risk Assessment

FOUNDATION 6: CHANGE MANAGEMENT

6.1 CHANGE MANAGEMENT

The company Manage Change procedure clearly demonstrates how the changes are to be managed effectively.

Changes effecting the construction phase and safety are to be reviewed, assessed, documented, controlled and communicated to field staff. A change that results in a change to the method of work must be reviewed for health safety and environmental impacts.

Relevant document:

H-SYS-PRO-019 Manage Changes

Page 35: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 35 OF 90

FOUNDATION 7: COMMUNICATION, CONSULTATION AND H&S COMMITTEES

This section outlines the requirements and processes for the consultation, communication and the resolution of WHSEC issues between management, employees and subcontractors and community member for all Ertech Holding workplaces.

Relevant documents: H-SYS-PRO-087 Manage HSEC Communication and Consultation H-BDV-PRO-035 Manage Customer Feedback

7.1 DAILY PRE START MEETINGS

Pre-start meetings shall be held prior to the start of each shift.

Discussing:

WHSE issues

Problems with the job or machinery (including servicing)

Job progress

Review SWMS / Hazard reports

Work plan for the day

Mandatory Attendance includes all:

Management

Field employees

Subcontractor personnel

Relevant documents: H-SYS-FOR-083-Pre-Shift Meeting H-SYS-PRO-087 Manage HSEC Communication and Consultation

7.2 TOOLBOX MEETINGS

Project Teams will ensure that WHSE toolbox meetings are held weekly and attendance shall be kept on record.

Mandatory Attendance includes all:

Management

Field employees

Subcontractor personnel

Meetings shall discuss:

Outstanding Action or items from previous meetings

Incidents

Safety Alerts

Page 36: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 36 OF 90

Subcontractor movements

SWMS

New WHSE or site issues

Hazard Trends

Relevant documents: H-SYS-FOR-082-Toolbox Meeting H-SYS-PRO-087 Manage HSEC Communication and Consultation

7.3 SMG MEETINGS

Establish Safety Management Groups (SMG) when sites have 30 personnel or more. Site management shall communicate the purpose of SMG Committee Meetings to the workforce to encourage expression of interest for SMG representatives. In the event of zero volunteer interest or an election decision by the workforce the site supervisor shall identify key workforce personnel to represent in SMG Committee Meetings.

SMG Meetings shall be held Bi-Monthly where required. The SMG shall be recorded and discussed with the workgroup upon completion.

Relevant documents: H-SYS-TPT-166-SMG Template H-SYS-PRO-087-Manage HSEC Communication and Consultation

7.4 WHSE NOTICE BOARDS

The Project Team shall supply a designated WHSE notice board to be displayed in a prominent position, typically crib room(s). The WHSE notice board shall hold relevant WHSE data, and may include:

WHSE alerts and bulletins

Project WHSE statistics

Topical WHSE information

WHSE committee meeting minutes

Emergency communication contacts

Details of any significant events or performance

The Site Supervisor should be responsible to ensure the notice board at that workplace contains up to date information.

7.5 ISSUE RESOLUTION

The Project Team shall ensure that in the event of HSE issues between management, employees, and

Relevant documents:

H-SYS-PRO-087-Manage HSEC Communication and Consultation

FOUNDATION 8: TRAINING AND COMPETENCY Employees and subcontractors shall:

Page 37: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 37 OF 90

Hold appropriate current qualifications and competencies

Submit copies of licenses and certificates

Undertake site inductions

Verification of competence

Undertake additional training as required

Workers shall provide evidence of attending construction industry safety-related training course before starting work.

Activities identified requiring high risk work licences are only to be conducted by personnel holding a licence.

High risk work licences include:

Dogging

Basic, intermediate, advanced rigging

Basic, intermediate, advanced scaffolding

Tower cranes

Self-erecting tower cranes

Derrick cranes

Portal boom cranes

Bridge and gantry cranes

Vehicle loading cranes (10 metre tonnes or greater lifting capacity)

Non-slewing mobile cranes (greater than 3 tonnes lifting capacity)

Slewing mobile cranes (up to and including 20 tonnes lifting capacity, includes CN and CV)

Slewing mobile cranes (up to and including 60 tonnes lifting capacity, includes C2,CN and CV)

Slewing mobile cranes (up to and including 100 tonnes lifting capacity, includes C6,C2,CN and CV)

Slewing mobile cranes (open/over 100 tonnes lifting capacity, includes C1,C6,C2,CN and CV)

Boom type elevating work platforms (boom length 11 metres or greater)

Materials hoists (cantilever platform)

Hoists (personnel and materials, includes HM)

Concrete placing booms

Basic, intermediate, advanced boiler operation

Steam turbine operation

Reciprocating steam engine operation

Forklift truck

Page 38: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 38 OF 90

Order picking for lift truck

All relevant personnel shall be trained in every aspect of work required and provide evidence of competency for each worker.

A training and skills matrix shall be developed and populated appropriate for the project scope of works.

Tickets and certificates of competencies will be retained within site files.

Where training gaps exist training will be scheduled for completion.

8.1 SITE ACCESS

Personnel visiting or working on the site shall complete relevant inductions.

Personnel shall provide information on their experience in the construction industry.

New and inexperienced personnel shall be paired up with an experienced employee for a length of time.

Relevant documents: H-SYS-FOR-084-Site Induction H-SYS-FOR-085-Workshop Induction H-SYS-FOR-106-Visitors Induction and Sign-In Register.

8.2 INDUCTION BRIEFING

Employees and subcontractors shall attend site inductions. Signed completed induction records shall be kept on site at all times.

Outlining:

Relevant personnel

Emergency response information

Site specific hazards

Site environmental conditions

WHSE Compliance requirements

Site KPIs

3 commandments

Equipment requirements

Incident notification

Relevant document: H-SYS-FOR-084-Site Induction

Page 39: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 39 OF 90

FOUNDATION 9: FITNESS, HEALTH AND HYGIENE

9.1 ALCOHOL AND OTHER DRUGS

Employees and subcontractors shall comply with H-SYS-POL-015-Drug and Alcohol Policy.

Drug and Alcohol testing shall comply with AS.NZ 4308, AS 3547 and AS.NZ 4760.

Including:

Random drug and alcohol screening

For cause testing

9.2 SMOKING

Smoking is not allowed in any enclosed area, or within the vicinity flammables or hazardous materials.

Smoking is not permitted within the regulated site area (WWARRP) and may only be conducted within ERTCH's site compound.

9.3 FATIGUE MANAGEMENT

Maximum number of working in one 24 hour period must not exceed 14 hours, including travel to and from work / place of hire.

A 24 hour rest day shall be scheduled following 13 consecutive days of work. Ten hours between each shift shall be allocated for rest.

FOUNDATION 10: SUBCONTRACTOR AND SUPPLIER RELATIONSHIPS

10.1 SUBCONTRACTOR DOCUMENTATION GUIDELINES

Documentation aligned with the standard of this plan to be supplied by Subcontractors includes:

Safe Work Method Statement (SWMS) for High Risk work

Plant Risk Assessment for individual powered mobile plant

Licences, certificates and competencies for all workers

Hazardous Chemicals Register and Material Safety Data Sheets

Safety Plan, Environmental Plan, Quality Plan and/or Inspection and Test Plans where required

All sub-contractor documentation must be reviewed and approved by company management representatives prior to beginning any task on projects.

Sub-contractor documentation may need to be amended to align with company WHSE requirements.

Should sub-contract documentation not be supplied or does not meet the minimum standard of this plan, the subcontractor shall be required to adopt company documentation.

Page 40: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 40 OF 90

10.2 SUBCONTRACTOR AND SUPPLIER MANAGEMENT

Selection processes ensure subcontractors and suppliers meet our minimum WHSE requirements. Subcontractors and suppliers are required to actively participate in WHSE management on the Project. Subcontractors and suppliers are audited and reviewed to assess their performance and compliance with Ertech Holdings minimum WHSE requirements.

Relevant documents: H-PRJ-PRO-036 Identify and Prequalify Suppliers H-PRJ-PRO-073 Review and Approval of Supplier HSECQ Documents H-PRJ-PRO-074 Validate Supplier HSECQ Compliance H-PRJ-PRO-075 Supervise Supplier Hazard ID, Risk Assessment and Control Process H-PRJ-PRO-077 Involve Suppliers in Safety

Page 41: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 41 OF 90

FOUNDATION 11: PLANT AND EQUIPMENT

11.1 POWERED MOBILE PLANT AND EQUIPMENT

Mobile plant entering any company workplace must be inspected upon arrival at the worksite. The Plant On Hire and Off Hire Inspection Forms are to be used. Areas of environmental sensitivity must have weed and seed inspections conducted on mobilisation and demobilisation.

Minimum plant requirements are as follows:

Plant operators must be verified as competent prior to operation of any mobile plant.

Mobile Plant shall only be operated in accordance with manufdesign parameters;

Audible warning devices activate when plant is reversing

Amber flashing lights activate during operation

Pre-start inspections conducted every morning prior to use;

Faulty equipment must not be used. Faults must be reported, recorded and rectified.

Mobile Plant and equipment supplied is compliant with legislation and be serviced and maintained in accordance with manufacturer recommendations.

Have a dry powder type fire extinguisher, amber flashing light, two way radio and a first aid kit.

Relevant document: H-SYS-PRT-027-Mobile Plant and Vehicles H-AST-PRO-058 Perform Plant Onsite Administration, Maintenance and Inspection H-AST-PRO-059 Manage Plant H-AST-FOR-032 Plant On Hire and Off Hire Inspection Form H-AST-FOR-039 Weed Inspection and Clean Down Certificate for Mobile Plant

11.2 ANCILLARY EQUIPMENT

Ancillary must be inspected upon arrival at the worksite. The Ancillary Plant On Hire and Off Hire Inspection Forms are to be used.

Relevant document: H-AST-FOR-033 Ancillary Plant On Hire and Off Hire Inspection Form

11.3 EQUIPMENT AND TOOLS

The Project Team will ensure the provision, selection, inspection, maintenance and use of tools and equipment is appropriate to the task.

The Project Team will monitor compliance with relating to inspection and maintenance of equipment via workplace inspections.

11.4 COMPRESSED AIR TOOLS

Compressed air supplies shall be labelled to ensure correct pressure and air quality for the tools being used.

Page 42: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 42 OF 90

11.5 MACHINERY GUARDING

All electrical, mechanical and pneumatic machinery shall not be operated unless all guarding is in place and in a satisfactory condition. The addition of barricading maybe required if the residual risk is not reduced enough on the risk assessment.

Fail safe switches or devices shall be installed on all manually operated rotating mobile plant and equipment and power tools.

All plant, equipment and machinery shall comply with the emergency stop requirements as set out by the Western Australian Code of Practice: Safeguarding of machinery and mobile plant.

11.6 NOISE EMITTING EQUIPMENT

Industrial noise levels shall comply with AS 2436 Guide to Noise Control on Construction, Maintenance and Demolition Sites and Code of Practice Managing Noise at Workplaces 2002

Noise above the accepted level shall be properly sign posted and exposure times/time weighted averages shall be discussed at pre-start meetings.

11.7 FIRE PREVENTION

Hazardous substances will be stored in accordance with AS 1940.

Sufficient supply and regular maintenance of fire extinguishers shall comply with AS 1841 and AS1850.

Smoking is prohibited in all offices, crib rooms and machine cabs.

Relevant document: H-SYS-PRT-024-Contaminated Flammable Atmosphere

11.8 SAFETY SIGNAGE

Hazards requiring safety signage shall display hazard warning signs that comply with AS 1319 Safety signs for the occupational environment.

11.9 PERSONAL PROTECTIVE EQUIPMENT (PPE)

Employees and subcontractors must wear at all times the PPE as deemed appropriate.

Including:

Safety footwear (AS2210)

Safety helmet (AS1800 and AS1801)

Safety glasses (AS1336, AS1337 and AS1338)

High visibility clothing (AS4602) and materials (AS1906.4)

Long-sleeved shirt

Long trousers

Hearing protection (AS 1269 and AS1270)

Protective gloves (AS2161)

Page 43: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 43 OF 90

Subcontractors shall provide its workers with adequate PPE. Issued PPE must meet the relevant Australian Standard and be worn correctly.

Relevant document: H-SYS-GDL-016-PPE Guideline.

11.10 LASER BEAMS

Laser sources shall only be used by qualified operators. Hazard warning signage shall be erected. Only lasers or laser products labelled in accordance with AS/NZS IEC 60825: Safety of laser products shall be used and operation shall comply with AS 2397 Safe use of lasers in the building and construction industry.

11.11 GAS CYLINDERS

Gas cylinders must be handled and secured during use and storage.

Oxygen and acetylene cylinders in use or being lifted shall be supported in cradles.

Cylinder valves are shut off during periods of non-use and pressure bled from hoses.

Hoses are to be fitted with flash back arrestors at the cylinder and hand piece.

Gas cylinders shall not be located and stored where they will be at risk of vehicular traffic, block stairs, exits, and ladders or walk ways.

Trolleys designed for the handing of cylinders shall be used at all times.

Relevant document:

H-SYS-PRT-021-Pressurised Gas.

11.12 WELDING SAFETY

Work shall be conducted in accordance with AS 1388 Filters for Eye Protectors, AS1674 Safety in Welding and Allied Processes, relevant legislation. A hot works permit shall be required and approved for specific projects.

Relevant document: H-SYS-FOR-092-Hot Works Permit

11.13 FIRST AID

Personnel requiring first-aid treatment must contact our nominated First-Aid Officer.

Injuries occurring on site shall in the first instance be treated.

Injuries will be recorded and investigated.

Injuries that require treatment beyond Basic First Aid personnel shall accompany to a preferred Medical Provider or Hospital (as required).

Subcontractors must provide all-necessary first aid equipment and trained personnel.

First aid kits shall be checked on a fortnightly basis.

Page 44: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 44 OF 90

11.14 EQUIPMENT CALIBRATION

All relevant personnel must identify equipment that needs to be calibrated. Calibration certificates for equipment such as Water, Sewer, Gas gauges, penetrometers, multi-meters etc. are maintained and are available on request.

Calibrated equipment must be kept on the site registers.

Pressure test gauges 1 year

Sewer ovality tool 1 year

Alcolizer HH1 300 tests or 180 days

Alcolizer HH2 900 tests or 180 days

Air receiver 2 years

Torque wrench 1 year

Relevant document: H-SYS-FOR-028-Test Request.

FOUNDATION 12: INCIDENT MANAGEMENT All incidents are followed by appropriate response and notification. All incidents are entered and closed out in the WHSE reporting system. Incident investigations are conducted appropriate to the POTENTIAL severity of the incident. Corrective and preventative actions are taken after incidents, and lessons are shared with other projects and throughout the Ertech Holdings Group. High potential and repeat incidents are regularly reviewed by the project management team.

All personnel conducting incident investigations are trained to competently perform the task. Employees, contractors and visitors have access to medical and first aid services. Injured personnel are actively rehabilitated and effective workers compensation processes are in place.

12.1 INCIDENT REPORTING

Employees and subcontractors shall report an incident immediately or as soon as practicable to the relevant personnel.

The ERTECH Project Manager will report all notable safety, damage to property and environmental incidents

Superintendent as soon as practicable after the incident and in accordance with NSW laws and the contract.

Relevant documents: H-SYS-PRO-062-Report and Investigate Incidents H-SYS-PRT-009-Incident Investigation Authority Notification. H-SYS-PRT-008-Incident Notification Schedule H-SYS-FOR-048-Incident Notification Form H-SYS-FOR-049-Witness Statement.

12.2 INJURY MANAGEMENT AND RETURN TO WORK

Employees and subcontractors with a work related injury or illness shall

Employees and subcontractors shall ensure any worker injured at the workplace returns to safe and meaningful employment as soon as possible.

Page 45: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 45 OF 90

Relevant documents: H-SYS-PRO-063-Manage Injuries and Return to Work H-SYS-POL-035-Injury Management Policy. H-SYS-FOR-050-Incident_Injury Form H-SYS-FOR-053-Return to Work (RTW) Diary.

12.3 GENERAL HSE REPORTING

HSE performance will be reviewed and reported weekly and monthly using the internal dashboard report. The reports will be developed according to the company cycle. Essentially the reports will be developed as 3 weekly reports, then one monthly report, i.e. monthly report generated on a 4 week cycle.

Action plans will be developed to improve performance as required.

Relevant documents:

H-PRJ-GDL-007 Guide to (P6) Dashboard Report Development

12.4 HAZARD REPORTING

All personnel are responsible for reporting hazards on site. One hazard report is required per month form all site personnel as a minimum. A person who identifies the hazard owns the hazard and must rectify hazardous situation if able and safe to do so.

If the identification hazard results in an unplanned event which had the potential to cause harm then

Once the hazard report has been completed hand it to the supervisor or line manager to be signed

The hazard report is to be entered into the incident management system, to track trends

It is important to take action and rectify the hazard wherever possible

FOUNDATION 13: EMERGENCY PLANNING AND RESPONSE A full emergency evacuation will be conducted within the first 6 weeks of project start up and following 6 monthly thereafter or once during the life of the project if shorter than 1 year.

In the event of an evacuation/ emergency the Emergency Coordinator will raise the alarm. It is a requirement that there is an evacuation procedure to be followed in the event of fire or other emergency at the workplace.

All personnel will move directly to the evacuation Muster points. If the Muster point is considered to be unsafe, personnel will be directed to assemble in an alternative location. The Line Manager will ensure all persons under their control are accounted for.

Fire extinguishers and fire hose reels shall be maintained and serviced every six months.

An emergency evacuation shall be conducted within six weeks of mobilisation and every six months after that or once during the life of the project if shorter than one year.

Signage shall be maintained and inspected periodically.

An emergency contact list shall be displayed at all sites.

Page 46: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 46 OF 90

Wollongong City Council will have an Environmental Emergency Management Plan in relation to NSW EPA Environment Protection Licence (EPL) 5862 copies of this plan has been obtained from the council and will be kept on site.

Emergency coordinators shall have:

Senior first aid

Relevant documents: H-SYS-TPT-153-Emergency Poster

FOUNDATION 14: DOCUMENT AND RECORDS MANAGEMENT

14.1 DOCUMENT CONTROL

Current versions of all relevant documents and records are available and controlled. Documents and records are stored in the appropriate systems. Document shall be managed in accordance with Ertech internal procedures.

Relevant Document: H-SYS-PRO-018- Control Documents and Records Procedure

14.2 RECORDS MANAGEMENT

Ertech shall maintain health and safety statistical data and registers to establish trends and to prevent injuries. The health and statistical data include but are not limited to;

Workplace Inspections

Task Inspections

Hazard Reports

Incidents

Potential Incidents (Near Misses)

Man hours

Pre-Start meeting minutes

Toolbox meeting minutes

SMG meeting minutes

HSE corrective actions

Ertech shall maintain a site registers of the following. This will be reviewed and amended as the project develops. Table 6: Site Registers

Incident Register Permit Register

Induction Register Lifting Gear Register (Incl. Harnesses & Rescue)

Page 47: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 47 OF 90

Electrical Equipment Register Ladder Register

Fire Extinguisher Register Test & Calibration Certificate Register

First Aid Kit Location Register Classified Plant Register

SWMS Register WHSE Activity Planner

Medical Condition Register Aboriginal Monitoring Log

Chemical Register (Incl. HAZMAT)

FOUNDATION 15: MONITOR, REVIEW AND IMPROVEMENT

15.1 AUDITS

Audits are undertaken to ensure compliance with the WHSE Management Plan (MP). All audits are undertaken by suitably qualified and experienced personnel. Ertech have developed an Audit Schedule that details the audits to be undertaken for the duration of the contract. Ertech will fully implement its approved Audit Schedule and produce a documented report for each audit. The report will detail the scope of the audit, the audit questions and audit findings. The report will be saved

properly implemented. Ertech reserves the right to conduct internal audits and/or third party audits on any of its subcontractor.

15.2 TASK INSPECTION

TASK Inspections focus on high risk tasks, which are key risks to the business.

Plan Task Inspections to ensure a variety of tasks are being regularly reviewed.

Completion of the Task Inspection can be done in a group or as individuals. Note: only the lead inspector (One Person per Inspection) is recorded against the Weighted Average Score when inspections are completed in groups.

A Task Inspection should take a maximum of 10-20 minutes to complete. The inspection is designed

All site-based & workshop-based management personnel are required to complete Task Inspections. As a minimum, the white collar roles are expected to conduct one Task Inspection per fortnight. (An eligible role is required to complete a Task Inspection for every 76+ hours they work on the project per fortnight. So, for a normal month, 2 Task Inspections are completed a month.)

Eligible roles are:

o Environmental officer

o Graduate engineer

o Site Engineer

o HSE Advisor

o Project Engineer

o Senior Project Engineer

o Project HSE Manager

Page 48: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHSE MANAGEMENT PLAN

13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 48 OF 90

o Project Manager

o Senior Project Manager

o Quality Engineer

o Site Surveyor

15.3 WORKPLACE INSPECTION

This inspection reviews the general site HSE conditions A standard workplace inspection.

Workplace Inspections are to be completed monthly.

A Workplace Inspection is to be completed by an eligible person (Site-Based or Workshop-Based): the site Supervisor, and the site HSE Advisor (where allocated to the project).

The inspection should not take longer than 30 - 60 minutes to complete.

An eligible role is required to complete a Workplace Inspection for every 152+ hours they work on the project per month.

Access to subcontractor work areas by company management representatives shall be allowed to conduct workplace inspections.

Workplace inspections must include at least monthly inspections on subcontractor work areas and equipment. Subcontractors shall participate in these workplace inspections.

Note: 1 Workplace inspection fulfils 1 Task Inspection. So, for a normal month, an eligible role (Supervisor; HSE Advisor) is required to complete only 1 Workplace Inspection and 1 Task Inspection.

Relevant documents: H-SYS-PRO-064-Conduct Internal Audits H-SYS-FOR-088-Audit Opening and Closing Meeting Agenda H-SYS-FOR-001-Audit Notification H-SYS-FOR-045-Project Audit Tool H-SYS-FOR-043-Non Conformance Report (NCR) H-SYS-GDL-028 Conducting Task and Workplace Inspections Guidelines

Page 49: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17 (R

ECO

VERE

D)

49

OF

90

APPE

NDI

CES

A AP

PEN

DIX

- WHS

E PL

AN A

CKN

OW

LEDG

MEN

T

By

sign

ing

you

ackn

owle

dgm

ent t

hat y

ou h

ave

read

and

und

erst

ood

your

resp

onsi

bilit

y fo

r im

plem

entin

g th

e re

quire

men

ts s

tipul

ated

with

in th

is W

HSE

Man

agem

ent P

lan.

Ta

ble

7: W

HSE

Pla

n M

anag

emen

t Ack

now

ledg

men

t

Res

pons

ible

Per

son

(Nam

e)

Posi

tion

Si

gnat

ure

Dat

e

Nat

Ste

vens

Pr

ojec

t Man

ager

9/3/

17

Pete

r She

ehan

Q

&E

Man

ager

9/3/

17

Jaim

e Si

lva

Proj

ect E

ngin

eer

6/

4/17

eilly

ER

TEC

H S

uper

inte

nden

t

11/4

/17

Page 50: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

50 O

F 90

B AP

PEN

DIX

- WHS

E IM

PLEM

ENTA

TIO

N P

LAN

Ta

ble

8: W

HSE

Impl

emen

tatio

n Pl

an C

heck

list

Proj

ect D

etai

ls

Proj

ect T

eam

D

ate

Job

Num

ber

138

53

Proj

ect M

anag

er

Nat

Ste

vens

6/

4/17

Div

isio

n

E

RTE

CH

Pr

ojec

t Sup

ervi

sor

Proj

ect N

ame

& Lo

catio

n

W

hyte

s G

ully

Pk

2&3

Proj

ect E

ngin

eer

Jai

me

Silv

a

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

1.

Pre-

plan

ning

mee

ting

held

and

reco

rded

for r

efer

ence

. PM

Pr

ior t

o jo

b st

art.

Yes

N

o N

A

2.

Man

agem

ent p

lans

are

in p

lace

Si

gnifi

cant

Com

plia

nce

WH

SE M

P in

pla

ce c

lient

spe

cific

requ

irem

ents

ar

e in

clud

ed. M

anag

emen

t pla

n si

gned

and

ack

now

ledg

ed b

y pr

ojec

t te

am.

PM

Star

t of

the

job

Yes

N

o N

A

3.

WH

SE o

bjec

tives

& ta

rget

s es

tabl

ishe

d fo

r the

pro

ject

and

are

they

con

sist

ent

with

WH

SE p

olic

ies

Sign

ifica

nt C

ompl

ianc

e S

epar

ate

obje

ctiv

es fo

r WH

SE a

re d

ocum

ente

d in

the

WH

SE

MP,

dis

play

ed fo

r wor

k cr

ew &

revi

ewed

on

a re

gula

r bas

is.

Ensu

re th

ere

is a

cle

ar li

nkag

e in

iden

tifyi

ng, r

evie

win

g &

com

mun

icat

ing

obje

ctiv

es. (

Crit

eria

C

l.4.3

.3 A

S48

01 &

ISO

1400

1, C

l.5.4

.1IS

O90

01)

PM

Star

t of

the

job

Yes

N

o N

A

4.

WH

SE h

azar

ds/ri

sks

iden

tifie

d an

d do

cum

ente

d R

isks

of i

dent

ified

haz

ards

are

ass

esse

d ha

ving

rega

rd to

the

likel

ihoo

d &

co

nseq

uenc

e of

inju

ry, i

llnes

s or

inci

dent

occ

urrin

g.

Sign

ifica

nt C

ompl

ianc

e - D

ocum

ente

d ris

k as

sess

men

t cle

arly

iden

tifyi

ng

WH

SE ri

sks

sepa

rate

ly a

nd S

WM

Ss

are

cons

iste

nt w

ith C

ompa

ny ri

sk

mat

rix e

.g. E

xtre

me

to lo

w w

ith o

nly

adm

inis

trativ

e co

ntro

ls in

pla

ce is

un

acce

ptab

le.

(Crit

eria

- Cl.4

.3.1

AS

4801

, Cl.4

.3.1

ISO

1400

1)

PM &

PS

St

art o

f th

e jo

b Y

es

No

NA

5.

Safe

ty in

Des

ign

- Ris

k as

sess

men

t con

duct

ed b

y C

onsu

ltant

s/C

lient

/Des

igne

rs h

as b

een

obta

ined

and

ass

ocia

ted

risks

are

PM

St

art o

f th

e jo

b Y

es

No

NA

Page 51: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

51 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

revi

ewed

and

inco

rpor

ated

with

in C

ompa

ny R

isk

Asse

ssm

ent.

Sign

ifica

nt C

ompl

ianc

e - D

ocum

ente

d ris

k as

sess

men

t fro

m

clie

nt/c

onsu

ltant

/des

igne

r has

bee

n ob

tain

ed. R

isks

iden

tifie

d by

them

are

cl

early

inco

rpor

ated

with

in C

ompa

ny ri

sk a

sses

smen

ts. D

emon

stra

te if

the

risk

asse

ssm

ents

con

duct

ed b

y cl

ient

/con

sulta

nt /d

esig

ner w

ere

requ

este

d.

6.

Proj

ect h

azar

d id

entif

icat

ion

& ris

k as

sess

men

t pro

cess

is u

nder

take

n by

co

mpe

tent

per

sonn

el.

Sign

ifica

nt C

ompl

ianc

e P

erso

n co

mpl

etin

g or

sig

ning

off

RAs

, SW

MSs

ha

ve c

ompl

eted

OSH

for s

uper

viso

rs c

ours

e.

PM

Star

t of

the

job

Yes

N

o N

A

7.

Lega

l & o

ther

requ

irem

ents

are

iden

tifie

d Si

gnifi

cant

Com

plia

nce

a.

W

HSE

Pla

ns id

entif

y le

gal r

equi

rem

ents

(inc

ludi

ng C

oP, A

ustra

lian

Stan

dard

s as

iden

tifie

d in

Clie

nts

spec

ifica

tion)

b.

Pr

e-pl

anni

ng m

eetin

g id

entif

ies

licen

se re

quire

men

ts

c.

Lice

nses

are

ava

ilabl

e on

site

d.

St

anda

rds,

CoP

s an

d le

gisl

atio

n ar

e ea

sily

acc

essi

ble.

(C

riter

ia

Cl.4

.3.2

AS

4801

&IS

O14

001,

Cl.7

.2.1

ISO

9001

)

PM

Y

es

No

NA

8.

Man

agem

ent o

f Cha

nge

- Le

gisl

atio

n, s

tand

ards

& o

ther

requ

irem

ents

rele

vant

to W

HS

E ar

e m

onito

red

for c

hang

e Si

gnifi

cant

Com

plia

nce

Upd

ates

are

mon

itore

d th

roug

h W

HS

E M

onito

r em

ails

in S

MG

s -

Des

ign

chan

ges

durin

g th

e co

nstru

ctio

n ph

ase

are

revi

ewed

, ass

esse

d,

docu

men

ted,

con

trolle

d an

d co

mm

unic

ated

to fi

eld

staf

f. Si

gnifi

cant

Com

plia

nce

Man

agem

ent o

f Cha

nge

Form

(H-S

YS-

FOR

-01

1) a

re d

ocum

ente

d si

gned

off

& do

cum

ents

suc

h as

Ris

k As

sess

men

ts

are

revi

ewed

& c

hang

es a

re c

omm

unic

ated

to fi

eld

staf

f.

Sys

tem

s M

anag

er

Ong

oing

Y

es

No

NA

PM

Y

es

No

NA

DO

Page 52: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

52 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

9.

Res

ourc

e M

anag

emen

t -

The

proj

ect i

s ad

equa

tely

reso

urce

d to

mai

ntai

n W

HSE

man

agem

ent

syst

ems

& to

impr

ove

its e

ffect

iven

ess.

Si

gnifi

cant

Com

plia

nce

Pro

ject

Org

Cha

rts, S

taff

resp

onsi

bilit

y st

atem

ents

& re

sour

ce s

ched

ule

are

avai

labl

e.

(Crit

eria

C

l.6.1

ISO

9001

, Cl.4

.1 IS

O14

001

& C

l.4.4

.1.1

AS4

801)

-

Proj

ect i

nfra

stru

ctur

e is

pro

vide

d to

ens

ure

that

the

WH

SE

Man

agem

ent

syst

em is

est

ablis

hed,

impl

emen

ted

& m

aint

aine

d.

Sign

ifica

nt C

ompl

ianc

e O

ffice

s, IT

infra

stru

ctur

e, C

rib R

oom

s, T

oile

ts,

etc.

are

ava

ilabl

e.

(Crit

eria

C

l.6.1

ISO

9001

, Cl.4

.1 IS

O14

001

& C

l.4.4

.1.1

AS4

801)

PM

Y

es

No

NA

PM

Y

es

No

NA

10.

Com

pete

nce,

Aw

aren

ess

& T

rain

ing

- Pe

rson

nel p

erfo

rmin

g w

ork

are

com

pete

nt

Sign

ifica

nt C

ompl

ianc

e W

orke

rs p

erfo

rmin

g hi

gh ri

sk a

ctiv

ities

hav

e ap

prop

riate

cer

tific

atio

n, li

cenc

es, p

erm

its to

wor

k, o

r oth

er s

uita

ble

train

ing.

E.g

. Ope

rato

rs h

old

natio

nal c

ompe

tenc

y tic

kets

, CS

AT C

ards

, O

HS

for S

uper

viso

rs, e

tc. V

erify

reco

rds

agai

nst t

he s

kills

mat

rix.

(Crit

eria

C

l.6.2

.2 IS

O90

01, C

l.4.2

ISO

1400

1, C

l.4.4

.2 A

S480

1)

- Pe

rson

nel p

erfo

rmin

g w

ork

are

mad

e aw

are

of th

e re

leva

nce

& im

porta

nce

of th

eir a

ctiv

ities

. Si

gnifi

cant

Com

plia

nce

Cor

pora

te In

duct

ion

for C

ompa

ny e

mpl

oyee

s,

Site

spe

cific

indu

ctio

n fo

r site

sta

ff, to

olbo

x m

eetin

gs, S

MG

s, P

re-s

tarts

, et

c.

(Crit

eria

C

l.6.2

.2 IS

O90

01, C

l.4.2

ISO

1400

1, C

l.4.4

.2 A

S480

1)

- Tr

aini

ng is

pro

vide

d to

fiel

d st

aff o

n th

e ac

tiviti

es th

ey p

erfo

rm.

Sign

ifica

nt C

ompl

ianc

e

a.

Ope

rato

rs a

re tr

aine

d in

thei

r job

spe

cific

SW

& a

re a

lso

prov

ided

Env

ironm

enta

l tra

inin

g.

b.

Trai

ning

Nee

ds m

atrix

is re

view

ed o

n a

mon

thly

bas

is a

nd tr

aini

ng

is p

rovi

ded

base

d on

the

gaps

iden

tifie

d.

(Crit

eria

C

l.6.2

.2 IS

O90

01, C

l.4.2

ISO

1400

1, C

l.4.4

.2 A

S480

1)

- Ef

fect

iven

ess

of in

tern

al tr

aini

ng is

eva

luat

ed

Sign

ifica

nt C

ompl

ianc

e H

-HR

M-F

OR

-077

-Tra

inin

g Fe

edba

ck is

co

mpl

eted

& s

tore

d on

com

plet

ion

of a

n in

tern

al tr

aini

ng p

rogr

am.

(Crit

eria

C

l.6.2

.2 IS

O90

01, C

l.4.2

ISO

1400

1, C

l.4.4

.2 A

S48

01)

PS

Y

es

No

NA

PS

Y

es

No

NA

PS

Y

es

No

NA

PM /

PS

/ PE

Yes

N

o N

A

Page 53: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

53 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

11.

Com

mun

icat

ion

& C

onsu

ltatio

n -

All c

lient

and

ext

erna

l com

mun

icat

ion

will

be d

irect

ed th

roug

h th

e P

ublic

W

orks

Adv

isor

y P

roje

ct M

anag

er

- St

ruct

ured

com

mun

icat

ion

& c

onsu

ltatio

n pr

oces

ses

are

in p

lace

. Si

gnifi

cant

Com

plia

nce

Indu

ctio

ns, T

oolb

ox m

eetin

gs, D

aily

Pre

-sta

rts,

SMG

s, O

pera

tions

Mee

tings

are

hel

d on

a re

gula

r bas

is a

nd re

cord

s ar

e m

aint

aine

d.

(Crit

eria

C

l.4.4

.3.2

AS

4801

, Cl.4

.4.3

ISO

1400

1 &

Cl.5

.5.3

IS

O90

01)

- In

form

atio

n is

pro

vide

d to

sta

ff on

effe

ctiv

enes

s of

the

WH

SE

Man

agem

ent S

yste

m.

Sign

ifica

nt C

ompl

ianc

e H

azar

d &

Inci

dent

tren

ds, W

HS

E A

lerts

, pe

rform

ance

aga

inst

WH

SE s

yste

m o

bjec

tives

are

dis

cuss

ed w

ith s

ite

staf

f & d

iscu

ssio

n is

min

uted

in th

e m

inut

es

(Crit

eria

C

l.4.4

.3.2

AS

4801

, Cl.4

.4.3

ISO

1400

1 &

Cl.5

.5.3

IS

O90

01)

- C

usto

mer

Com

mun

icat

ion

Effe

ctiv

e ar

rang

emen

ts a

re in

pla

ce to

com

mun

icat

e w

ith c

usto

mer

s in

re

latio

n to

pro

duct

info

rmat

ion,

con

tract

s, e

nqui

ries

(incl

. am

endm

ents

), cu

stom

er fe

edba

ck (i

ncl.

com

plai

nts)

Si

gnifi

cant

Com

plia

nce

Reg

ular

clie

nt m

eetin

gs a

re h

eld,

var

iatio

ns,

tech

nica

l que

ries

& c

lient

feed

back

is d

iscu

ssed

dur

ing

thes

e m

eetin

gs

(Crit

eria

C

l.7.2

.3 IS

O90

01)

- Se

nior

Man

ager

s re

gula

rly v

isit

the

site

and

dis

cuss

the

WH

SE

issu

es

with

the

site

man

agem

ent a

nd e

mpl

oyee

s.

Sign

ifica

nt c

ompl

ianc

e S

enio

r Man

ager

s ar

e pa

rt of

mee

tings

whe

re

WH

SE is

sues

are

dis

cuss

ed, e

.g. S

MG

s, to

olbo

x, e

tc.

PM /

PS

/ PE

Yes

N

o N

A

PM

Y

es

No

NA

PM /P

E

Y

es

No

NA

GM

Yes

N

o N

A

12.

Ope

ratio

nal C

ontro

l Su

pplie

r Man

agem

ent

- Ap

prop

riate

SW

MS

ass

essm

ents

are

don

e fo

r sup

plie

rs e

ngag

ed d

irect

ly

to w

ork

on th

e pr

ojec

t (S

igni

fican

t Com

plia

nce

SW

MSs

are

com

plet

ed b

y su

pplie

r em

ploy

ees

and

revi

ewed

aga

inst

the

H-S

YS-

FOR

-087

-SW

MS

Che

cklis

t. SW

MSs

are

ap

prov

ed b

y th

e C

ompa

ny S

uper

viso

r) (C

riter

ia C

l. 7.

4 IS

O90

01, C

l.4.4

.6

ISO

1400

1, C

l.4.4

.6 A

S48

01)

- Su

pplie

r agr

eem

ents

are

in p

lace

and

are

adh

ered

to

Sign

ifica

nt C

ompl

ianc

e S

uppl

ier a

gree

men

ts a

re c

ompl

eted

& s

igne

d of

f. In

sura

nce

certi

ficat

es a

re m

aint

aine

d.

PM

Y

es

No

NA

PM

Y

es

No

NA

Page 54: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

54 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

(Crit

eria

M

P-7

-60,

Cl.

7.4

ISO

9001

, Cl.4

.4.6

ISO

1400

1, C

l.4.4

.6

AS48

01)

- Ar

e al

l sub

cont

ract

or p

erso

nnel

site

indu

cted

-

have

sig

ned

off o

n at

tend

ance

she

ets

of to

olbo

x m

eetin

gs, S

MG

s, e

tc.

PM

Y

es

No

NA

PS

Y

es

No

NA

Purc

hasi

ng

- Pu

rcha

sed

prod

uct c

onfo

rms

to s

peci

fied

purc

hase

requ

irem

ents

. Si

gnifi

cant

Com

plia

nce

Pur

chas

e or

ders

are

rais

ed, S

uppl

iers

use

d ar

e ap

prov

ed, p

urch

ased

pro

duct

is v

erifi

ed to

ens

ure

it m

eets

requ

irem

ents

e.

g. T

est c

ertif

icat

e fo

r roa

d ba

se m

ater

ial.

WH

SE ri

sks

asso

ciat

ed w

ith

the

prod

uct a

re a

sses

sed

and

cont

rols

are

put

in p

lace

. (C

riter

ia

Cl.7

.4 IS

O90

01)

PE

Y

es

No

NA

Envi

ronm

ent M

anag

emen

t -

Air E

mis

sion

s ar

e co

ntro

lled

(Sig

nific

ant C

ompl

ianc

e D

ust M

anag

emen

t con

tinge

ncie

s in

pla

ce,

Clie

nt s

peci

fic re

quire

men

ts a

re id

entif

ied,

Dus

t cla

ssifi

catio

n is

risk

as

sess

ed, V

ehic

le/P

lant

mai

nten

ance

sch

edul

e is

adh

ered

to, D

ust

supp

ress

ion

tech

niqu

es a

re im

plem

ente

d, e

tc.)

PM

Y

es

No

NA

- N

oise

Em

issi

ons

are

cont

rolle

d Si

gnifi

cant

Com

plia

nce

Noi

se M

anag

emen

t con

tinge

ncie

s is

in p

lace

, C

lient

spe

cific

requ

irem

ents

are

iden

tifie

d, V

ehic

le/P

lant

mai

nten

ance

sc

hedu

le is

adh

ered

to, e

tc.

(Crit

eria

- C

l.4.4

.6 IS

O14

001)

PS

Y

es

No

NA

- M

anag

emen

t of L

and

Sign

ifica

nt C

ompl

ianc

e C

ALM

or C

row

n La

nd is

iden

tifie

d, C

lear

ing

perm

its a

re in

pla

ce &

adh

ered

to, F

enci

ng is

pro

vide

d to

rest

rict

wan

derin

g an

imal

s, D

aily

fenc

e ch

ecks

are

per

form

ed, A

dequ

ate

sign

age

is in

pla

ce fo

r die

back

infe

cted

are

as, E

rosi

on c

ontro

l tec

hniq

ue is

im

plem

ente

d, e

tc.

(Crit

eria

- C

l.4.4

.6 IS

O14

001)

PM

Y

es

No

NA

Page 55: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

55 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

- W

aste

is m

anag

ed to

redu

ce im

pact

on

envi

ronm

ent.

Sign

ifica

nt C

ompl

ianc

e W

aste

is s

egre

gate

d, W

aste

dis

posa

l is

thro

ugh

appr

oved

was

te v

endo

r & th

eir l

icen

ce is

mai

ntai

ned

on s

ite, E

mpl

oyee

s ar

e m

ade

awar

e of

was

te m

anag

emen

t, et

c.

(Crit

eria

- C

l.4.4

.6 IS

O14

001)

PM /

PS

Yes

N

o N

A

- W

ater

em

issi

ons

are

cont

rolle

d Si

gnifi

cant

Com

plia

nce

Dew

ater

ing,

bor

e in

stal

latio

n &

ext

ract

ion

licen

ces

are

in p

lace

and

adh

ered

to, M

etre

s ar

e in

stal

led

on b

ores

, dai

ly

chec

k is

per

form

ed to

con

firm

any

vis

ible

leak

s, q

uant

ity o

f wat

er

extra

cted

is m

onito

red,

etc

. (C

riter

ia -

Cl.4

.4.6

ISO

1400

1)

PM /

PS

Yes

N

o N

A

- Em

erge

ncy

Prep

ared

ness

& R

espo

nse

Pote

ntia

l em

erge

ncy

situ

atio

ns a

re id

entif

ied

and

site

spe

cific

em

erge

ncy

resc

ue p

roce

dure

s / p

lans

are

doc

umen

ted

and

revi

ewed

regu

larly

. Si

gnifi

cant

Com

plia

nce

SW

MS

requ

iring

resc

ue p

roce

dure

s ar

e in

pla

ce

Emer

genc

y R

espo

nse

Post

ers

are

in p

lace

, Mus

ter p

oint

s ar

e id

entif

ied,

an

d E

vacu

atio

n pl

an is

dis

play

ed.

(Crit

eria

4

.4.7

AS4

801

& IS

O14

001)

PM

Y

es

No

NA

- Em

erge

ncy

resp

onse

arr

ange

men

ts a

re c

omm

unic

ated

to a

ll pe

rson

nel &

vi

sito

rs.

PS

Y

es

No

NA

- Em

erge

ncy

drills

are

pla

nned

and

car

ried

out o

nsite

and

des

igna

ted

emer

genc

y pe

rson

nel r

ecei

ve tr

aini

ng to

thei

r allo

cate

d re

spon

sibi

litie

s.

Sign

ifica

nt C

ompl

ianc

e D

rills

are

con

duct

ed a

t a m

inim

um 6

mon

thly

in

terv

al, r

epor

ts a

re id

entif

ied

and

train

ing

as a

ppro

pria

te is

pro

vide

d.

(Crit

eria

- C

l.4.4

.6A

S 48

01)

PS

Y

es

No

NA

- A

dang

erou

s go

ods/

haza

rdou

s su

bsta

nces

man

ifest

or i

nven

tory

sys

tem

is

in o

pera

tion.

Si

gnifi

cant

Com

plia

nce

MSD

S R

egis

ter i

s av

aila

ble,

Haz

chem

is

(C

riter

ia -

Cl.4

.4.6

AS

4801

)

PS

Y

es

No

NA

- Fi

rst A

id re

quire

men

ts h

ave

been

ass

esse

d fo

r the

pro

ject

, and

the

first

ai

d pr

oces

s is

pla

ce is

app

ropr

iate

to th

e pr

ojec

t site

. Si

gnifi

cant

Com

plia

nce

Firs

t aid

ers

are

disp

laye

d, ti

cket

s ar

e av

aila

ble,

lo

cal d

octo

rs, h

ospi

tals

hav

e be

en id

entif

ied

and

loca

tions

are

not

ed.

(Crit

eria

- C

l.4.4

.6A

S 48

01)

PS

Y

es

No

NA

CH

CH

ECK

Page 56: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

56 O

F 90

PLAN

WH

SE M

anag

emen

t Sys

tem

Crit

eria

R

espo

nsib

ility

By

Whe

n St

atus

(Com

plet

ed)

Com

men

ts (L

ist

actio

ns if

sta

tus

is in

com

plet

e)

By

Dat

e

13.

Mon

itorin

g &

Mea

sure

men

t Th

ere

is a

pro

cess

in p

lace

to re

gula

rly m

onito

r per

form

ance

aga

inst

WH

SE

obje

ctiv

es &

targ

ets.

PM

Yes

N

o N

A

Wor

kpla

ce in

spec

tion

prog

ram

is in

pla

ce.

Sign

ifica

nt C

ompl

ianc

e W

orkp

lace

Insp

ectio

ns a

re c

ondu

cted

regu

larly

. R

egis

ters

(Ele

ctric

al, H

azch

em, L

iftin

g re

gist

er, e

tc.)

are

in p

lace

. (C

riter

ia

Cl.4

.5.1

AS

4801

)

PS

Y

es

No

NA

14.

Inci

dent

Inve

stig

atio

n, C

orre

ctiv

e &

Pre

vent

ive

Act

ion

Inci

dent

s/In

jurie

s ar

e in

vest

igat

ed a

s pe

r Com

pany

Ris

k m

atrix

& le

aar

e sh

ared

with

the

wor

kfor

ce.

Sign

ifica

nt C

ompl

ianc

e C

ompe

tent

per

sonn

el h

ave

com

plet

ed

cont

rols

are

impl

emen

ted.

(C

riter

ia

Cl.4

.5.2

AS

4801

& IS

O14

001)

PM

Y

es

No

NA

Ther

e is

a p

roce

ss fo

r rec

ordi

ng &

mon

itorin

g co

rrec

tive

actio

ns re

sulti

ng fr

om

insp

ectio

ns, i

ncid

ent i

nves

tigat

ions

, and

inte

rnal

aud

its.

Sign

ifica

nt C

ompl

ianc

e In

cide

nts,

Act

ions

are

ent

ered

in J

DE

and

are

re

view

ed a

nd c

lose

d ou

t. (C

riter

ia

Cl.8

.5 IS

O90

01, C

l.4.5

.3 IS

O14

001)

PM

Y

es

No

NA

AC

T

ACT

15.

Man

agem

ent R

evie

w

WH

SE

man

agem

ent s

yste

m a

t pla

nned

in

terv

als

to e

nsur

e its

con

tinui

ng s

uita

bilit

y, a

dequ

acy

and

effe

ctiv

enes

s.

Sign

ifica

nt C

ompl

ianc

e S

ite m

anag

emen

t rev

iew

mee

tings

are

con

duct

ed

regu

larly

and

are

doc

umen

ted.

(C

riter

ia

Cl.4

.6 A

S48

01, I

SO

140

01 &

Cl.5

.6 IS

O90

01)

PM

Y

es

No

NA

Page 57: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

57 O

F 90

C AP

PEN

DIX

- RO

LES

AND

RESP

ON

SIBI

LITI

ES

Tabl

e 9:

Rol

es a

nd R

espo

nsib

ilitie

s

Rol

e Ti

tle

Res

pons

ibili

ties

Wor

kpla

ce

Man

ager

D

emon

stra

ting

a ge

nuin

e in

tere

st a

nd c

omm

itmen

t to

heal

th/s

afet

y an

d en

viro

nmen

t man

agem

ent a

nd s

uppo

rting

sup

ervi

sory

sta

ff in

the

wor

kpla

ce

C

omm

unic

atin

g an

d pr

omot

ing

safe

ty a

nd e

nviro

nmen

t lea

ders

hip.

Impl

emen

ting,

mai

ntai

ning

and

com

plyi

ng w

ith th

e Er

tech

Hol

ding

s H

ealth

/Saf

ety

and

Env

ironm

ent M

anag

emen

t Sys

tem

.

Ensu

ring

the

Pro

ject

com

plie

s w

ith a

ll re

leva

nt le

gisl

atio

n, s

tand

ards

and

cod

es o

f pra

ctic

e re

latin

g to

hea

lth/s

afet

y an

d en

viro

nmen

t.

WH

SEM

P.

Ac

tivel

y an

d op

enly

com

mun

icat

ing

with

wor

kpla

ce p

erso

nnel

dur

ing

tool

box

talk

s, s

afet

y m

eetin

gs, e

tc.

D

evel

opin

g, w

here

nec

essa

ry, d

etai

led

safe

wor

k sy

stem

s fo

r hig

h-ris

k w

ork

activ

ities

and

revi

ewin

g th

ese

syst

ems

for a

dequ

acy.

Esta

blis

hing

the

heal

th a

nd s

afet

y re

quire

men

ts o

f all

subc

ontra

ctor

s be

fore

wor

k be

gins

and

ens

urin

g co

mpl

ianc

e to

thes

e re

quire

men

ts.

En

surin

g ris

k m

anag

emen

t sys

tem

s an

d pr

oced

ures

are

impl

emen

ted,

mon

itore

d an

d re

view

ed.

En

surin

g ris

ks a

ssoc

iate

d w

ith c

hang

e ar

e id

entif

ied,

ass

esse

d, c

ontro

lled

and

com

mun

icat

ed.

C

omm

unic

atin

g al

loca

ted

heal

th a

nd s

afet

y re

spon

sibi

litie

s to

all

pers

onne

l em

ploy

ed a

t the

wor

kpla

ce.

Pr

ovid

ing

and

mai

ntai

ning

com

pete

nt s

uper

visi

on, a

dequ

ate

safe

equ

ipm

ent,

info

rmat

ion,

inst

ruct

ion,

com

mun

icat

ion,

trai

ning

and

reso

urce

s.

En

surin

g al

l nec

essa

ry p

lant

and

equ

ipm

ent i

s pr

ovid

ed to

allo

w w

ork

to b

e ca

rrie

d ou

t saf

ely

and

ensu

ring

all p

lant

is m

aint

aine

d to

the

Setti

ng u

p fa

cilit

ies

for f

irst a

id, f

irefig

htin

g an

d em

erge

ncy.

pre

pare

dnes

s an

d en

surin

g co

mpl

ianc

e w

ith th

e re

leva

nt a

utho

ritie

s

Iden

tifyi

ng a

nd re

gula

rly re

view

ing

the

train

ing

need

s of

em

ploy

ees

and,

whe

re n

eces

sary

, pro

vidi

ng tr

aini

ng.

C

onsu

lting

with

HR

reso

urce

s an

d us

ing

com

pany

pro

cedu

res

to re

crui

t com

pete

nt p

erso

nnel

.

Ensu

ring

all s

taff

and

empl

oyee

s un

derg

o a

pre-

plac

emen

t exa

min

atio

n an

d ar

e pl

aced

in p

ositi

ons

suita

ble

to th

eir c

ondi

tions

.

Ensu

ring

all p

erso

nnel

, inc

ludi

ng s

ubco

ntra

ctor

s an

d th

eir e

mpl

oyee

s, p

rovi

de e

vide

nce

of th

eir e

xper

ienc

e, c

ompe

tenc

e, tr

aini

ng a

nd p

rofic

ienc

y be

fore

they

beg

in w

ork

on-s

ite.

Ta

king

app

ropr

iate

dis

cipl

inar

y ac

tion

agai

nst p

erso

nnel

who

fail

to fu

lfil t

heir

allo

cate

d re

spon

sibi

litie

s.

En

surin

g th

e w

orkp

lace

has

effe

ctiv

e an

d ac

tive

heal

th a

nd s

afet

y co

nsul

tativ

e m

echa

nism

s th

at m

eet l

egis

lativ

e re

quire

men

ts.

En

surin

g al

l inc

iden

ts a

re a

ppro

pria

tely

repo

rted

and

inve

stig

ated

and

that

iden

tifie

d co

rrec

tive

actio

ns h

ave

been

impl

emen

ted.

Activ

ely

parti

cipa

ting

in th

e re

habi

litat

ion

of in

jure

d w

orkp

lace

per

sonn

el to

ens

ure

the

nece

ssar

y su

ppor

t is

give

n to

the

inju

red

wor

ker a

nd th

eir

fam

ily.

C

omm

unic

atin

g an

d m

onito

ring

heal

th a

nd s

afet

y pe

rform

ance

to e

nsur

e es

tabl

ishe

d pe

rform

ance

targ

ets

are

achi

eved

.

Con

tinuo

usly

impr

ovin

g th

e he

alth

and

saf

ety

man

agem

ent s

yste

m b

y re

view

ing

site

aud

its a

nd im

plem

entin

g co

rrec

tive

actio

ns.

Hea

lth a

nd

Safe

ty M

anag

er

or A

dvis

or

an

d sa

fety

man

agem

ent p

olic

y, s

tand

ards

, sys

tem

s, m

anag

emen

t pla

ns a

nd p

roce

dure

s.

Ad

visi

ng th

e W

orkp

lace

Man

ager

and

sup

ervi

sory

sta

ff on

ove

rall

heal

th a

nd s

afet

y in

the

wor

kpla

ce a

nd th

e pr

ovis

ion

and

adeq

uacy

of c

ompe

tent

su

perv

isio

n, a

dequ

ate

safe

equ

ipm

ent,

info

rmat

ion,

inst

ruct

ion,

com

mun

icat

ion,

trai

ning

and

reso

urce

s.

H

elpi

ng th

e W

orkp

lace

Man

ager

and

sup

ervi

sory

sta

ff m

anag

e he

alth

and

saf

ety

risks

on

the

proj

ect.

Page 58: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

58 O

F 90

Rol

e Ti

tle

Res

pons

ibili

ties

M

anag

ing

the

wor

kpla

ce re

habi

litat

ion

prog

ram

for a

ll in

jure

d or

ill s

taff

to a

ssis

t and

sup

port

inju

red

empl

oyee

s.

C

ondu

ctin

g re

gula

r ins

pect

ions

of t

he w

orkp

lace

, inc

ludi

ng s

ubco

ntra

ctor

act

iviti

es, t

o en

sure

the

heal

th a

nd s

afet

y st

anda

rds

are

obse

rved

, and

ta

king

cor

rect

ive

mea

sure

s as

requ

ired.

Ensu

ring

all i

njur

ies,

wor

k-re

late

d ill

ness

es a

nd d

ange

rous

occ

urre

nces

are

inve

stig

ated

and

reco

rded

, and

mak

e re

com

men

datio

ns a

s re

quire

d.

En

surin

g al

l Pro

ject

per

sonn

el a

re c

orre

ctly

usi

ng p

erso

nal p

rote

ctiv

e eq

uipm

ent.

En

surin

g sa

fety

indu

ctio

ns o

ccur

at t

he w

orkp

lace

for a

ll ne

w p

erso

nnel

, inc

ludi

ng s

ubco

ntra

ctor

s.

O

rgan

isin

g an

d co

nduc

ting

heal

th a

nd s

afet

y co

mm

ittee

mee

tings

and

ens

urin

g re

cord

s of

mee

tings

, inc

ludi

ng re

com

men

datio

ns, a

re m

aint

aine

d.

M

aint

aini

ng u

p-to

-dat

e re

cord

s fo

r ver

ifyin

g im

plem

enta

tion

and

man

agem

ent o

f the

Hea

lth a

nd S

afet

y M

anag

emen

t Sys

tem

.

Des

ign

Man

ager

U

sing

the

desi

gn s

tage

to a

ctiv

ely

rem

ove

as m

any

heal

th a

nd s

afet

y ha

zard

s as

pos

sibl

e.

Im

plem

entin

g a

form

al s

afet

y-in

-des

ign

proc

ess

for c

onsi

derin

g he

alth

and

saf

ety

haza

rds

durin

g al

l for

mal

Pro

ject

des

ign

eval

uatio

n or

revi

ew

proc

esse

s.

M

onito

ring

the

desi

gn p

roce

ss to

ens

ure

heal

th a

nd s

afet

y ha

zard

s ar

e sy

stem

atic

ally

eva

luat

ed a

nd o

utco

mes

are

doc

umen

ted.

Ensu

ring

that

H&

S is

sues

not

fully

elim

inat

ed a

t the

des

ign

stag

e ar

e ad

equa

tely

iden

tifie

d, d

ocum

ente

d an

d pa

ssed

to th

e co

nstru

ctio

n te

am a

t a

form

al h

ando

ver m

eetin

g so

they

can

be

man

aged

dur

ing

cons

truct

ion.

Ensu

ring

resi

dual

risk

s th

at re

mai

n po

st-c

onst

ruct

ion

are

docu

men

ted

and

prov

ided

to th

e as

set o

wne

r.

Pr

ovid

ing

verif

icat

ion

the

desi

gn c

ompl

ies

with

legi

slat

ive

and

spec

ifica

tion

requ

irem

ents

.

Line

Man

ager

th a

nd s

afet

y.

en

viro

nmen

t ini

tiativ

es a

nd p

rom

otin

g en

viro

nmen

tal a

war

enes

s.

C

omm

unic

atin

g an

d pr

omot

ing

heal

th a

nd s

afet

y po

licie

s an

d st

anda

rds.

Supe

rvis

ing

com

plia

nce

to th

e H

ealth

/Saf

ety

and

Env

ironm

ent M

anag

emen

t Sys

tem

, inc

ludi

ng p

olic

y, s

tand

ards

, sys

tem

s, m

anag

emen

t pla

ns a

nd

proc

edur

es.

En

surin

g co

rrec

t and

saf

e w

ork

proc

edur

es a

re im

plem

ente

d, c

omm

unic

ated

, tra

ined

and

adh

ered

to b

y al

l per

sonn

el u

nder

thei

r co

ntro

l.

Ensu

ring

all p

erso

nnel

, inc

ludi

ng s

ubco

ntra

ctor

s an

d th

eir e

mpl

oyee

s, p

rovi

de e

vide

nce

of th

eir e

xper

ienc

e, c

ompe

tenc

e, tr

aini

ng a

nd p

rofic

ienc

y be

fore

they

sta

rt w

ork

on-s

ite.

Ta

king

app

ropr

iate

dis

cipl

inar

y ac

tion

agai

nst p

eopl

e w

ho fa

il to

fulfi

l the

ir al

loca

ted

resp

onsi

bilit

ies

for h

ealth

and

saf

ety

man

agem

ent.

Pr

ovid

ing

safe

pla

nt a

nd e

quip

men

t, in

form

atio

n, in

stru

ctio

n, c

omm

unic

atio

n, tr

aini

ng a

nd re

sour

ces.

Che

ckin

g on

all

plan

t and

equ

ipm

ent t

o en

sure

that

app

ropr

iate

doc

umen

tatio

n, in

acc

orda

nce

with

com

pany

pro

cedu

res,

is s

ight

ed b

efor

e it

is

used

.

Activ

ely

parti

cipa

ting

in s

ite W

H,S

&E c

onsu

ltativ

e fo

rum

s.

Id

entif

ying

and

taki

ng c

orre

ctiv

e ac

tion

to e

limin

ate

or c

ontro

l haz

ardo

us w

ork

cond

ition

s, e

quip

men

t or p

ract

ices

to re

duce

the

risk

to p

erso

nnel

, pl

ant,

prop

erty

dam

age

and

finan

cial

loss

.

Ensu

ring

acce

ptab

le s

tand

ards

of h

ouse

keep

ing

are

met

and

mai

ntai

ned

as w

ell a

s en

surin

g th

e ne

cess

ary

faci

litie

s ar

e av

aila

ble

to e

nsur

e go

od

hous

ekee

ping

.

Ensu

ring

empl

oyee

s ar

e pr

ovid

ed w

ith a

nd u

se a

ppro

pria

te p

erso

nal p

rote

ctiv

e cl

othi

ng a

nd e

quip

men

t, an

d ar

e pr

ovid

ed w

ith th

e ne

cess

ary

train

ing

in it

s co

rrec

t use

.

Page 59: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

59 O

F 90

Rol

e Ti

tle

Res

pons

ibili

ties

R

epor

ting

and

inve

stig

atin

g al

l inc

iden

ts in

acc

orda

nce

with

com

pany

pro

cedu

res

and

ensu

ring

appr

opria

te c

orre

ctiv

e ac

tion

is ta

ken

and

com

mun

icat

ed to

all

empl

oyee

s.

As

sist

ing

and

coop

erat

ing

in th

e w

orkp

lace

reha

bilit

atio

n pr

ogra

m to

sup

port

inju

red

empl

oyee

s an

d th

eir f

amilie

s.

En

surin

g su

bcon

tract

ors

com

ply

with

thei

r hea

lth a

nd s

afet

y sy

stem

s, p

ract

ices

and

obl

igat

ions

.

Mon

itorin

g he

alth

/saf

ety

and

envi

ronm

enta

l per

form

ance

to e

nsur

e es

tabl

ishe

d pe

rform

ance

targ

ets

are

achi

eved

.

Empl

oyee

s

Com

plyi

ng w

ith th

e Er

tech

Hol

ding

s H

ealth

/Saf

ety

and

Env

ironm

ent M

anag

emen

t Sys

tem

, inc

ludi

ng it

s po

licy,

sta

ndar

ds, s

yste

ms,

man

agem

ent

plan

s an

d pr

oced

ures

.

Imm

edia

tely

repo

rting

to li

ne m

anag

emen

t any

uns

afe

cond

ition

or a

ctiv

ity, d

ange

rous

occ

urre

nce,

haz

ard,

inci

dent

or i

njur

y in

the

wor

kpla

ce.

Pa

rtici

patin

g in

and

con

tribu

ting

to th

e ef

fect

iven

ess

of h

ealth

and

saf

ety

mee

tings

, too

lbox

talk

s w

ork

activ

ity b

riefin

gs a

nd ri

sk a

sses

smen

ts w

here

ap

plic

able

.

Hel

ping

info

rm n

ew e

mpl

oyee

s of

pro

per w

ork

proc

edur

es a

nd p

ract

ices

.

Wor

king

in a

man

ner t

hat w

ill no

t end

ange

r the

mse

lves

or a

ny o

ther

per

son.

Cor

rect

ly u

sing

all

prov

ided

per

sona

l pro

tect

ive

clot

hing

or e

quip

men

t

Rep

ortin

g an

y de

fect

ive

or d

amag

ed p

erso

nal p

rote

ctiv

e cl

othi

ng, e

quip

men

t, pl

ant,

or g

ear,

and

retu

rnin

g th

e ite

m to

the

Sup

ervi

sor f

or

repl

acem

ent o

r rep

air.

C

ompl

ying

with

the

inst

ruct

ions

giv

en b

y a

Sup

ervi

sor o

r Hea

lth a

nd S

afet

y M

anag

er/A

dvis

or re

gard

ing

the

use

of p

erso

nal p

rote

ctiv

e cl

othi

ng,

equi

pmen

t or g

ear o

r any

oth

er m

atte

r in

rela

tion

to h

ealth

and

saf

ety.

Not

inte

rferin

g w

ith a

nyth

ing

that

has

bee

n pr

ovid

ed in

the

inte

rest

of h

ealth

and

saf

ety

in th

e w

orkp

lace

.

Not

eng

agin

g in

any

act

ivity

or o

pera

ting

any

plan

t or e

quip

men

t tha

t req

uire

s ce

rtific

atio

n, u

nles

s th

e re

leva

nt c

ertif

icat

e or

per

mit

is h

eld

and

perm

issi

on h

as b

een

give

n.

N

ot a

ttem

ptin

g an

y ta

sk u

nles

s th

ey a

re c

apab

le, c

ompe

tent

and

aut

horis

ed to

saf

ely

carr

y ou

t the

task

.

Und

erst

andi

ng th

e im

porta

nce

of w

orki

ng s

afel

y to

ach

ieve

hea

lth a

nd s

afet

y pe

rform

ance

targ

ets.

Com

ing

to w

ork

fit fo

r dut

y (F

FD) a

nd n

otify

ing

the

supe

rvis

or o

f any

pot

entia

l FFD

issu

es o

f the

mse

lves

or t

heir

peer

s.

Subc

ontr

acto

rs

/S

afet

y an

d E

nviro

nmen

t and

the

HS

EM

P.

C

ompl

ying

with

all

subc

ontra

ct c

ondi

tions

rega

rdin

g he

alth

/saf

ety

and

envi

ronm

ent a

nd fo

llow

ing

inst

ruct

ions

issu

ed b

y th

e W

orkp

lace

Man

ager

.

Impl

emen

ting,

mon

itorin

g an

d re

view

ing

risk

man

agem

ent s

yste

ms

and

proc

edur

es fo

r the

pur

pose

of r

educ

ing

the

risk

to p

erso

nnel

, pla

nt, p

rope

rty

and

finan

ce.

H

elpi

ng a

chie

ve p

erfo

rman

ce ta

rget

s fo

r hea

lth a

nd s

afet

y m

anag

emen

t as

spec

ified

.

Forw

ardi

ng to

the

Proj

ect,

befo

re w

ork

begi

ns a

hea

lth a

nd s

afet

y pl

an o

r a m

etho

d st

atem

ent f

or th

e w

ork

to b

e pe

rfor

med

.

Coo

pera

ting

fully

with

the

supe

rvis

ory

staf

f, H

ealth

and

Saf

ety

Man

ager

/Adv

isor

and

hea

lth a

nd s

afet

y co

mm

ittee

repr

esen

tativ

e (w

here

app

licab

le).

Pa

rtici

patin

g in

and

con

tribu

ting

to th

e ef

fect

iven

ess

of h

ealth

and

saf

ety

mee

tings

, too

lbox

talk

s w

ork

activ

ity b

riefin

gs a

nd ri

sk a

sses

smen

ts, w

here

ap

plic

able

.

Imm

edia

tely

repo

rting

to th

e W

orkp

lace

Man

ager

, sup

ervi

sory

sta

ff or

Hea

lth a

nd S

afet

y M

anag

er/A

dvis

or a

ny u

nsaf

e co

nditi

on o

r act

ivity

, da

nger

ous

occu

rren

ce, h

azar

d, in

cide

nt o

r inj

ury

in th

e w

orkp

lace

.

Prov

idin

g ad

equa

te tr

aini

ng a

nd d

ocum

ente

d ev

iden

ce to

dem

onst

rate

all

empl

oyee

s ca

n pe

rform

the

task

s ex

pect

ed o

f the

m s

afel

y an

d pr

ofic

ient

ly.

Page 60: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

60 O

F 90

Rol

e Ti

tle

Res

pons

ibili

ties

Pr

ovid

ing

com

pete

nt s

uper

visi

on, a

dequ

ate

safe

equ

ipm

ent,

info

rmat

ion,

inst

ruct

ion,

com

mun

icat

ion,

trai

ning

and

reso

urce

s to

em

ploy

ees

unde

r th

eir c

ontro

l at a

ll tim

es.

Pa

rtici

patin

g in

the

wor

kpla

ce re

habi

litat

ion

prog

ram

to s

uppo

rt in

jure

d em

ploy

ees.

Prov

idin

g an

d m

aint

aini

ng p

erso

nal p

rote

ctiv

e eq

uipm

ent a

nd in

stru

ctin

g em

ploy

ees

in th

e sa

fe u

se o

f suc

h eq

uipm

ent.

C

ompl

ying

with

all

stat

utor

y he

alth

and

saf

ety

regu

latio

ns, A

cts,

cod

es o

f pra

ctic

e an

d lic

ence

s, e

tc.

N

ot e

ngag

ing

in a

ny a

ctiv

ity o

r ope

ratin

g an

y pl

ant o

r equ

ipm

ent t

hat r

equi

res

certi

ficat

ion,

unl

ess

the

rele

vant

cer

tific

ate

or p

erm

it is

hel

d an

d pe

rmis

sion

has

bee

n gi

ven.

Not

atte

mpt

ing

any

task

unl

ess

they

are

cap

able

, com

pete

nt a

nd a

utho

rised

to s

afel

y ca

rry

out t

he ta

sk.

R

evie

win

g he

alth

and

saf

ety

man

agem

ent s

yste

m a

udit

repo

rts a

nd im

plem

entin

g co

rrec

tive

actio

ns, e

nsur

ing

com

plia

nce

with

con

tract

ual a

nd

Com

pany

pro

cedu

re in

ord

er to

brin

g ab

out c

ontin

uous

impr

ovem

ent.

Page 61: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

61 O

F 90

D AP

PEN

DIX

- GLO

SSAR

Y O

F TE

RMS

The

follo

win

g ta

ble

outli

nes

key

term

s us

ed in

this

doc

umen

t:

Term

D

efin

ition

Cha

nge

An a

dditi

on, r

evis

ion,

del

etio

n, m

odifi

catio

n or

ha

s th

e re

ason

able

pot

entia

l to

impa

ct h

ealth

and

saf

ety

outc

omes

or e

xpec

tatio

ns.

Cha

nge

does

not

incl

ude

varia

tions

to p

roce

sses

, pla

nt,

equi

pmen

t and

peo

ple

that

are

with

in ro

utin

e de

cisi

on m

akin

g pr

otoc

ols

or a

utho

ritie

s, in

clud

ing

desi

gned

or a

gree

d co

ntro

ls, b

ound

arie

s or

to

lera

nces

.

Cha

nge

Ow

ner

The

pers

on w

ho fo

rmal

ly p

repa

res

and

subm

its th

e ch

ange

doc

umen

tatio

n.

Com

pete

ncy

Com

pete

ncy

is h

avin

g an

d ap

plyi

ng s

peci

fic k

now

ledg

e an

d sk

ill to

a r

equi

red

perfo

rman

ce s

tand

ard.

It

invo

lves

all

aspe

cts

of w

ork

perfo

rman

ce, i

nclu

ding

:

Perfo

rmin

g at

acc

epta

ble

skill

leve

l

Org

anis

ing

own

task

s

Res

pond

ing

and

reac

ting

appr

opria

tely

whe

n th

ings

go

wro

ng

Fu

lfillin

g a

spec

ific

role

Tran

sfer

ring

skill

and

know

ledg

e to

new

situ

atio

ns.

Com

pete

nt P

erso

n A

com

pete

nt p

erso

n is

one

who

has

the

qual

ifica

tions

and

/or e

xper

ienc

e re

quire

d to

ski

lfully

per

form

the

stat

ed d

utie

s.

Cor

e Sy

stem

s of

Wor

k (C

SW)

Cor

pora

tely

man

date

d pr

oced

ures

to m

anag

e se

lect

hig

h ris

k pr

oced

ures

. Cur

rent

CSW

s in

clud

e lif

ting

oper

atio

ns a

nd w

ork

at h

eigh

t.

Dan

gero

us g

oods

D

ange

rous

goo

ds a

re th

ose

subs

tanc

es, u

sual

ly w

ith h

azar

dous

pro

perti

es, t

hat a

re li

sted

in th

e Au

stra

lian

Dan

gero

us G

oods

Cod

e.

Due

Dili

genc

e D

ue d

ilige

nce

esse

ntia

lly m

eans

per

sons

mus

t not

onl

y ha

ve a

cle

ar u

nder

stan

ding

of t

he o

rgan

isat

ion,

its

safe

ty ri

sks

and

how

to m

inim

ise

com

plia

nce

for e

xam

ple,

hav

e do

cum

enta

tion

rela

ting

to s

yste

ms,

trai

ning

, rep

ortin

g of

inci

dent

s an

d ha

zard

s, fo

llow

up

proc

edur

es a

nd c

onsu

ltatio

n w

ith e

mpl

oyee

s.

Foun

datio

n Ke

y ar

eas

that

mak

e up

the

core

stru

ctur

e of

eac

h of

the

man

agem

ent p

lans

.

Emer

genc

y

An e

mer

genc

y is

any

abn

orm

al a

nd d

ange

rous

and

/or

envi

ronm

enta

lly th

reat

enin

g si

tuat

ion

need

ing

prom

pt a

ctio

n to

con

trol,

corr

ect a

nd

retu

rn to

a s

afe

cond

ition

. Typ

es o

f em

erge

ncie

s in

clud

e:

Fi

re

Ex

plos

ion

C

hem

ical

spi

lls

Page 62: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

62 O

F 90

Term

D

efin

ition

Gas

leak

(tox

ic o

r fla

mm

able

)

Nat

ural

eve

nts

Im

pact

eve

nts

C

ivil

dist

urba

nces

Exte

rnal

eve

nts,

e.g

. los

s of

ser

vice

s or

em

erge

ncy

in n

eigh

bour

ing

faci

lity

Si

gnifi

cant

dis

char

ge/s

pilla

ge

Emer

genc

y re

spon

se p

lan

An e

mer

genc

y re

spon

se p

lan

that

add

ress

es a

ll id

entif

ied

emer

genc

ies

with

spe

cific

em

erge

ncy

proc

edur

es f

or e

ach

diffe

rent

pot

entia

l em

erge

ncy.

The

em

erge

ncy

resp

onse

pla

n (E

RP)

sho

uld

cove

r:

Rol

es a

nd re

spon

sibi

litie

s fo

r all

pers

onne

l

Safe

eva

cuat

ion

proc

edur

es a

nd ro

utes

Appr

opria

te tr

eatm

ent o

f inj

ured

per

sons

Dan

gero

us g

oods

/haz

ardo

us s

ubst

ance

s re

spon

se

Emer

genc

y re

spon

se

proc

edur

es

Spec

ific

emer

genc

y pr

oced

ures

mus

t be

prep

ared

and

impl

emen

ted

for

each

pot

entia

l em

erge

ncy

iden

tifie

d in

the

Emer

genc

y R

espo

nse

Plan

and

mus

t be

read

ily a

cces

sibl

e.

Emer

genc

y Se

rvic

es

An o

rgan

isat

ion/

grou

p th

at p

rovi

des

assi

stan

ce d

urin

g an

em

erge

ncy.

Thi

s m

ay in

clud

e in

clud

ing

polic

e, a

mbu

lanc

e se

rvic

es, d

octo

r/clin

ic,

Pois

ons

info

rmat

ion

cent

re a

nd fi

re b

rigad

e.

Empl

oyee

Ass

ista

nce

Prog

ram

(E

AP)

Th

e E

AP

is a

con

fiden

tial a

nd v

olun

tary

cou

nsel

ling

serv

ice.

The

aim

is to

ass

ist w

ith th

e re

solu

tion

of p

erso

nal a

nd w

ork

rela

ted

prob

lem

s w

hich

may

affe

ct w

ork

perfo

rman

ce.

Expe

ctat

ion

The

high

-leve

l out

com

es a

chie

ved

as p

art o

f eac

h Fo

unda

tion.

Exte

rnal

Sta

keho

lder

s En

titie

s su

ch a

s cu

stom

ers,

sup

plie

rs, l

ende

rs, o

r th

e w

ider

soc

iety

whi

ch in

fluen

ce a

nd a

re in

fluen

ced

by a

n or

gani

zatio

n bu

t are

not

its

'inte

rnal

par

t'.

Firs

t Aid

Th

e in

itial

trea

tmen

t of p

erso

ns s

uffe

ring

inju

ry o

r illn

ess

at a

wor

kpla

ce.

Firs

t Aid

Atte

ndan

t - Q

ualif

ied

A pe

rson

app

oint

ed b

y th

e W

orkp

lace

Man

ager

who

has

the

cur

rent

qua

lific

atio

ns i

n fir

st a

id p

lus

any

wor

kpla

ce s

peci

fic i

nfor

mat

ion

requ

ired

to d

o th

e jo

b (A

qua

lifie

d fir

st a

id a

ttend

ant n

orm

ally

als

o pe

rform

s ot

her t

asks

).

Fit f

or p

urpo

se

Appr

opria

te a

nd o

f a n

eces

sary

sta

ndar

d fo

r its

inte

nded

use

.

Form

al In

spec

tions

Fo

rmal

insp

ectio

ns a

re re

cord

ed o

n a

chec

klis

t and

clo

sed

out b

y th

e S

uper

inte

nden

t/Site

Man

ager

.

Form

al O

bser

vatio

ns

Form

al o

bser

vatio

ns a

re s

ched

uled

and

reco

rded

on

an a

ppro

ved

form

.

Page 63: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

63 O

F 90

Term

D

efin

ition

H&

S R

epre

sent

ativ

e El

ecte

d m

embe

rs o

f th

e w

orkp

lace

that

hav

e ac

quire

d th

e sk

ills a

nd k

now

ledg

e to

ena

ble

them

to

fulfi

l the

rol

e of

wor

kpla

ce h

ealth

and

sa

fety

repr

esen

tativ

e as

requ

ired

unde

r leg

isla

tion.

Hig

h R

isk

Act

ivity

Th

e ca

tego

ry a

ssig

ned

to a

n ac

tivity

afte

r a ri

sk a

sses

smen

t has

con

side

red

the

likel

ihoo

d an

d co

nseq

uenc

e or

as

defin

ed b

y le

gisl

atio

n.

H&

S A

lert

A

stan

dard

com

pany

com

mun

icat

ion

tool

use

d to

tran

sfer

lear

ning

s fro

m a

haz

ardo

us c

ondi

tion/

inci

dent

. The

H&S

Ale

rt m

ust b

e ap

prov

ed

by th

e w

orkp

lace

man

ager

and

BU

H&S

Man

ager

.

H&

S C

omm

ittee

A

foru

m i

nvol

ving

mem

bers

of

Com

pany

man

agem

ent

and

the

wor

kfor

ce w

ith t

he p

rimar

y fu

nctio

n to

ass

ist

coop

erat

ion

betw

een

the

empl

oyer

and

wor

kers

in d

evel

opin

g an

d ca

rryi

ng o

ut m

easu

res

to im

prov

e w

orkp

lace

hea

lth a

nd s

afet

y.

H&

S R

epor

ting

Syst

em

The

H&S

Rep

ortin

g S

yste

m is

an

intra

net d

atab

ase

used

to c

olle

ct s

tatis

tical

and

inci

dent

dat

a fro

m p

roje

cts

and

busi

ness

uni

ts. A

ll Er

tech

H

oldi

ngs

inci

dent

cla

ssifi

catio

ns a

re c

onta

ined

in

the

H&

S R

epor

ting

Sys

tem

. Vi

sit

http

://H

&S

stat

s.Er

tech

.com

.au/

and

sel

ect

Gui

danc

e D

ocum

ents

/For

ms

loca

ted

on th

e fro

nt p

age

of th

e da

taba

se.

H&

S R

epor

ting

Syst

em-

Cor

rect

ive

Act

ions

dat

abas

e Th

e co

rrec

tive

actio

n da

taba

se f

orm

s pa

rt of

the

H&S

Rep

ortin

g S

yste

m a

nd e

nabl

es a

ctio

ns t

o be

ele

ctro

nica

lly a

ssig

ned,

tra

cked

and

re

porte

d on

.

HSE

H

ealth

Saf

ety

and

Env

ironm

ent

Inci

dent

An

occ

urre

nce

caus

ing

inju

ry, d

isea

se, p

lant

, pro

perty

, or e

nviro

nmen

tal d

amag

e, in

clud

ing

a ne

ar-m

iss.

Indi

vidu

al tr

aini

ng p

lan

Also

kno

wn

as a

dev

elop

men

t pla

n as

det

aile

d in

Erte

ch H

oldi

ngs

Per

form

ance

and

Dev

elop

men

t Man

agem

ent S

tand

ards

and

Gui

delin

es.

Indu

ctio

n R

efer

s to

pro

gram

s de

sign

ed to

impa

rt sp

ecifi

c kn

owle

dge

to n

ew e

mpl

oyee

s, s

o th

ey u

nder

stan

d th

e bu

sine

ss a

nd c

an b

egin

to s

afel

y an

d i

n th

e or

gani

satio

n.

Info

rmal

Insp

ectio

ns

Info

rmal

insp

ectio

ns a

re n

ot re

cord

ed o

n a

chec

klis

t and

rely

on

the

expe

rienc

e of

the

obse

rver

.

Info

rmal

Obs

erva

tions

In

form

al o

bser

vatio

ns a

re n

ot re

cord

ed o

n a

form

and

rely

on

the

expe

rienc

e of

the

obse

rver

.

Inju

ry M

anag

emen

t File

rk

pro

gres

s.

Irreg

ular

vis

itor/d

eliv

ery

Req

uire

s ac

cess

to th

e w

orkp

lace

(ope

ratio

nal a

reas

) at a

freq

uenc

y ex

ceed

ing

mon

thly

.

Join

t Ven

ture

A

Join

t Ven

ture

(JV

) is

an

unin

corp

orat

ed a

ssoc

iatio

n be

twee

n tw

o or

mor

e pa

rties

, for

a s

peci

fic b

usin

ess

proj

ect w

here

the

parti

es m

eet

proj

ect c

ost a

nd re

ceiv

e a

shar

e of

any

resu

lting

out

put r

athe

r tha

n re

venu

e or

pro

fit. D

ispo

sal o

f eac

h pa

rty's

sha

re o

f out

put i

s de

term

ined

Page 64: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

64 O

F 90

Term

D

efin

ition

by

that

par

ty.

Key

Per

form

ance

Indi

cato

r A

Key

Per

form

ance

Indi

cato

r is

the

colle

ctio

n of

info

rmat

ion

used

to m

easu

re p

erfo

rman

ce o

f a p

artic

ular

func

tion

or o

pera

tion.

Lag

indi

cato

r A

lag

indi

cato

r is

esse

ntia

lly a

sta

tistic

or o

ther

mea

sure

that

sim

ply

indi

cate

s th

e re

sult

of a

pla

nned

act

ivity

but

do

not

mea

sure

the

effe

ctiv

e im

plem

enta

tion

of s

afet

y pr

ogra

ms,

pro

activ

e ac

tion

plan

s an

d pr

even

tativ

e ac

tiviti

es in

pla

ce.

An

exam

ple

of a

lag

indi

cato

r is

Los

t Tim

e In

jury

Fre

quen

cy R

ate

(LTI

FR).

Lead

indi

cato

r Th

ese

mea

sure

s ha

ve b

een

dete

rmin

ed a

s th

e cr

itica

l con

trol p

oint

s ne

cess

ary

to p

reve

nt w

orkp

lace

inj

urie

s fro

m o

ccur

ring

Exam

ples

in

clud

e w

orkp

lace

insp

ectio

ns c

ondu

cted

, tra

inin

g co

mpl

eted

etc

.

Lega

l Com

plia

nce

Lega

l Com

plia

nce

is th

e ef

fect

ive

cont

rol o

f leg

al ri

sks

at a

wor

kpla

ce to

ens

ure

com

plia

nce

with

all

appl

icab

le la

ws.

Legi

slat

ion

Legi

slat

ion

is a

cts

or la

ws

pass

ed b

y go

vern

men

t bod

ies,

incl

udin

g Fe

dera

l, S

tate

and

Loc

al G

over

nmen

t.

Line

Man

ager

Th

e lin

e m

anag

er is

you

r dire

ct re

port

or n

ext p

erso

n of

aut

horit

y.

Lost

Tim

e In

jury

(LTI

) Lo

st ti

me

inju

ry is

an

occu

rren

ce re

sulti

ng in

a fa

talit

y, p

erm

anen

t dis

abili

ty o

r los

t tim

e fro

m w

ork

of o

ne d

ay/s

hift

or m

ore.

Safe

ty

Dat

a Sh

eet

(SD

S)

(form

erly

Mat

eria

l Sa

fety

Dat

a Sh

eet (

MSD

S)

Key

sour

ce o

f do

cum

enta

tion

for

heal

th a

nd s

afet

y in

form

atio

n fo

r a

subs

tanc

e. In

clud

es p

reca

utio

ns o

f use

, haz

ard

info

rmat

ion,

firs

t aid

re

quire

men

ts.

Nat

iona

l C

ompe

tenc

y St

anda

rds

Nat

iona

l Com

pete

ncy

Sta

ndar

ds s

peci

fy th

e kn

owle

dge

and

skill

requ

ired

in e

mpl

oym

ent,

as w

ell a

s th

e ap

plic

atio

n of

that

kno

wle

dge

and

skill

to th

e st

anda

rd o

f per

form

ance

requ

ired.

Sta

ndar

ds a

re e

xpre

ssed

in te

rms

of w

orkp

lace

out

com

es a

nd a

re d

evel

oped

by

the

indu

stry

pa

rties

, bas

ed o

n th

e st

ruct

ure

of w

ork

with

in th

e pa

rticu

lar i

ndus

try.

OH

S O

ccup

atio

nal H

ealth

and

Saf

ety

Ope

ratio

nal A

rea

As d

efin

ed b

y th

e w

orkp

lace

man

ager

- us

ually

whe

re p

erso

ns w

ould

acc

ess

the

live

cons

truct

ion/

min

ing

zone

s, d

oes

not i

nclu

de th

e m

ain

offic

e co

mpo

und.

Pre-

Star

t Mee

ting

Pre-

star

t mee

tings

are

a fo

rum

to d

iscu

ss th

e re

quire

d w

ork

for t

he d

ay a

nd a

ssoc

iate

d H

&S

aspe

cts.

Proj

ect C

hart

er

A co

mm

itmen

t or v

alue

s st

atem

ent d

evel

oped

in c

onsu

ltatio

n w

ith o

ther

s th

at o

utlin

e th

e de

sire

d sa

fety

cul

ture

/per

form

ance

of t

he p

roje

ct.

Reg

ular

vis

itor/d

eliv

ery

Req

uire

s ac

cess

to th

e w

orkp

lace

(ope

ratio

nal a

reas

) at a

freq

uenc

y no

t exc

eedi

ng m

onth

ly.

Res

ourc

e Pl

an

A st

affin

g pl

an th

at s

how

s th

e nu

mbe

r of p

erso

nnel

, by

type

, tha

t will

be re

quire

d on

the

proj

ect.

Page 65: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

65 O

F 90

Term

D

efin

ition

Ret

urn

to w

ork

coor

dina

tor

Res

pons

ible

for t

he c

ontin

ued

man

agem

ent o

f an

empl

oyee

who

has

sus

tain

ed a

n in

jury

. Thi

s in

clud

es;

En

surin

g no

tific

atio

n of

an

inju

ry is

repo

rted

to th

e TI

MS

team

with

in 2

4 ho

urs

of o

ccur

renc

e

Acco

mpa

nyin

g an

inju

red

empl

oyee

to m

edic

al tr

eatm

ent (

whe

re p

ossi

ble)

Assi

stin

g th

e in

jure

d em

ploy

ee to

com

plet

e re

leva

nt p

aper

wor

k an

d fo

rwar

d to

the

Stat

e C

oord

inat

or o

n th

e sa

me

day

Id

entif

ying

sui

tabl

e an

d m

eani

ngfu

l dut

ies

to e

nabl

e th

e de

velo

pmen

t of t

he S

uita

ble

Dut

ies/

Ret

urn

to W

ork

Plan

Reg

ular

ly c

omm

unic

atin

g w

ith th

e in

jure

d em

ploy

ee a

nd S

tate

Coo

rdin

ator

rega

rdin

g th

e re

turn

to w

ork

prog

ress

Ensu

ring

any

docu

men

tatio

n pr

ovid

ed b

y th

e in

jure

d em

ploy

ee, s

uch

as m

edic

al c

ertif

icat

es a

re p

rom

ptly

forw

arde

d to

the

TIM

S te

am

for p

roce

ssin

g

Gen

eral

ly o

fferin

g su

ppor

t and

enc

oura

gem

ent t

o an

y in

jure

d em

ploy

ee

Ret

urn

to w

ork

plan

A

retu

rn to

wor

k pl

an is

bas

ed o

n th

e pr

inci

ple

that

the

empl

oyer

can

ena

ble

a co

ordi

nate

d re

turn

to w

ork.

The

pla

n m

ust m

atch

the

inju

red

al c

ertif

icat

e. T

he p

lan

sets

out

how

tre

atm

ent,

reha

bilit

atio

n, c

laim

s m

anag

emen

t and

em

ploy

men

t pra

ctic

es a

re to

be

coor

dina

ted

to a

chie

ve a

saf

ety

and

dura

ble

retu

rn-to

-wor

k fo

r an

inju

red

empl

oyee

.

Ris

k Th

e ch

ance

of s

omet

hing

hap

peni

ng th

at w

ill ha

ve a

n im

pact

upo

n ob

ject

ives

. It

is m

easu

red

in te

rms

of c

onse

quen

ce a

nd li

kelih

ood.

For

th

is p

lan,

als

o en

com

pass

es o

ppor

tuni

ty.

Ris

k A

sses

smen

t A

risk

asse

ssm

ent i

s th

e lo

gica

l and

sys

tem

atic

app

roac

h to

iden

tifyi

ng h

azar

ds, a

sses

sing

risk

s, a

nd im

plem

entin

g an

d m

aint

aini

ng c

ontro

ls

in o

rder

to re

duce

risk

to a

n ac

cept

able

leve

l.

Ris

k R

egis

ter

A re

gist

er o

f the

iden

tifie

d is

sues

, ris

ks/o

ppor

tuni

ties,

ana

lysi

s, e

valu

atio

n an

d tre

atm

ents

for t

he p

roje

ct.

Safe

Wor

k M

etho

d St

atem

ent

A ta

sk le

vel r

isk

asse

ssm

ent t

ool a

ddre

ssin

g H

igh

Ris

k Ta

sks,

and

con

cent

ratin

g on

cur

rent

con

ditio

ns, i

nter

actio

ns a

nd re

sour

ces.

Skill

s m

atrix

A

tabl

e th

at m

atch

es p

erso

nnel

, or j

ob ro

les,

or o

ther

reso

urce

s, w

ith d

esire

d sk

ills

to p

rovi

de v

iew

s of

the

need

for a

dditi

onal

dev

elop

men

t, tra

inin

g or

the

acqu

isiti

on o

f new

reso

urce

s.

Subc

ontr

acto

r A

subc

ontra

ctor

is

a co

mpa

ny,

partn

ersh

ip,

trust

or

indi

vidu

al b

usin

ess

unde

r a

sign

ed c

ontra

ct t

o ca

rry

out

wor

ks f

or t

he p

rinci

pal

cont

ract

or.

Tool

box

Talk

A

tool

box

mee

ting

is a

n in

tera

ctiv

e in

form

al m

eetin

g of

wor

kgro

up m

embe

rs.

Fore

seea

ble

wor

k ha

zard

s ar

e di

scus

sed

and

cont

rols

pl

anne

d.

Visi

tor

Any

pers

on e

nter

ing

a si

te fo

r the

pur

pose

of o

ne o

ff an

d/or

irre

gula

r vis

it an

d w

ho w

ill n

ot b

e un

derta

king

any

wor

k at

the

wor

kpla

ce.

WH

S W

orkp

lace

Hea

lth a

nd S

afet

y

Page 66: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

66 O

F 90

Term

D

efin

ition

WH

SE

Wor

kpla

ce H

ealth

, Saf

ety

and

Env

ironm

ent

Wor

k A

rea

A se

para

ble

porti

on o

f wor

k th

at is

iden

tifie

d ea

rly in

con

stru

ctio

n pl

anni

ng t

o he

lp d

rive

early

def

initi

on o

f co

nstru

ctio

n m

etho

dolo

gy a

nd

alig

nmen

t of d

esig

n ac

tiviti

es.

Wor

k Ar

eas

shou

ld b

e lis

ted

in th

e ov

eral

l con

stru

ctio

n m

etho

dolo

gy.

The

plan

ning

doc

umen

t for

a w

ork

area

is

cal

led

a W

ork

Area

Pla

n.

Wor

k ar

ea p

lan

The

mai

n do

cum

ent

prep

ared

dur

ing

the

cons

truct

ion

plan

ning

for

tha

t w

ork

area

. I

nclu

des

cons

truct

ion

met

hodo

logy

, ris

k as

sess

men

t, co

nstru

ctab

ility

revi

ews

and

Wor

k Pa

ck li

stin

g.

Wor

k pa

ck

A pa

ck o

f rel

evan

t con

stru

ctio

n do

cum

ents

that

con

tain

s re

leva

nt in

form

atio

n fo

r S

ite E

ngin

eers

and

fore

men

to m

anag

e th

e w

orks

. Th

ere

will

be m

ultip

le W

ork

Pack

s co

ntai

ned

in a

WA

P.

A W

ork

Pack

con

tain

s w

ork

met

hod

stat

emen

ts,

risk

asse

ssm

ents

, SW

MS,

ITP

s,

draw

ings

, site

inst

ruct

ions

, env

ironm

enta

l con

trols

, etc

.

Wor

kpla

ce H

azar

d In

spec

tion

A pl

anne

d, s

yste

mat

ic a

ppra

isal

of t

he w

orkp

lace

to id

entif

y ha

zard

s an

d as

sess

and

con

trol r

isks

.

Wor

kpla

ce H

&S

Obs

erva

tion

A pl

anne

d, s

yste

mat

ic a

ppra

isal

of t

he w

orkp

lace

to id

entif

y sa

fe a

nd a

t ris

k w

orkf

orce

beh

avio

urs.

Wor

kpla

ce M

anag

er

Also

refe

rred

to a

s th

e P

roje

ct M

anag

er o

r sim

ilar-

the

pers

on w

ho h

as o

vera

ll re

spon

sibi

lity

for t

he o

pera

tion

of th

e w

orkp

lace

.

Page 67: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

67 O

F 90

E AP

PEN

DIX

- FLO

RA A

ND

FAU

NA

SUB-

PLAN

E.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent o

f flo

ra a

nd fa

una

in re

latio

n to

pro

ject

act

iviti

es.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t has

the

pote

ntia

l to

impa

ct fl

ora

and

faun

a ar

e pr

ovid

ed b

elow

. Th

ese

have

bee

n ex

tract

ed fr

om p

roje

ct ri

sk a

sses

smen

ts:

Tabl

e 10

: Flo

ra &

Fau

na H

azar

ds a

nd R

isks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Blas

ting

Gen

erat

ion

of n

oise

N

uisa

nce

to c

omm

unity

Ope

ratio

n of

ear

thm

ovin

g eq

uipm

ent

Gen

erat

ion

of n

oise

N

uisa

nce

to c

omm

unity

and

or d

amag

e to

flor

a

Rev

ersi

ng s

irens

G

ener

atio

n of

noi

se

Nui

sanc

e to

com

mun

ity

E.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

E.2.

1 PR

OJE

CT T

ARG

ETS

Base

d on

the

req

uire

men

ts d

efin

ed a

t Se

ctio

n 4

(Pro

ject

Com

plia

nce

Req

uire

men

ts),

the

findi

ngs

of p

roje

ct r

isk

man

agem

ent

proc

esse

s an

d th

e po

tent

ial

impa

cts

to t

he

com

mun

ity,

the

follo

win

g ta

rget

s ha

ve b

een

set

for

man

agin

g flo

ra a

nd f

auna

on

the

proj

ect.

Any

dev

ianc

e fro

m t

he t

arge

ts w

ill re

sult

in P

roje

ct M

anag

emen

t im

med

iate

ly

impl

emen

ting

corr

ectiv

e ac

tions

: Ta

ble

11: F

lora

& F

auna

Pro

ject

Tar

gets

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Num

ber o

f nat

ive

faun

a in

jure

d Ze

ro

At a

ll tim

es

Wor

kpla

ce M

anag

er

Area

of v

eget

atio

n cl

eare

d As

requ

ired

(CEM

P 3.

11.3

) As

requ

ired

Wor

kpla

ce M

anag

er

Page 68: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

68 O

F 90

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Area

of l

and

clea

red

or d

istu

rbed

with

out a

utho

risat

ion

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f act

ions

take

n by

regu

lato

rs a

nd/o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

E.2.

2 CO

NTR

OLS

USE

D T

O M

ANAG

E FL

ORA

AN

D FA

UN

A

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (

as d

efin

ed b

y th

e R

isk

Cla

ssifi

catio

n M

atrix

H-M

GT-

PRT-

004)

are

impl

emen

ted

befo

re a

ny r

elev

ant

wor

ks c

omm

ence

. E

limin

atio

n of

the

haz

ard

is t

he f

irst

pref

eren

ce o

f co

ntro

l, fo

llow

ed b

y en

gine

erin

g, t

hen

adm

inis

trativ

e co

ntro

ls.

Con

trols

use

d on

this

pro

ject

incl

ude:

Ta

ble

12: F

lora

& F

auna

Ris

ks

Con

trol

A

ccou

ntab

ility

Min

imiz

e th

e cl

eara

nce

requ

ired

Proj

ect E

ngin

eer

No

new

dis

turb

ance

, cle

arin

g or

gru

bbin

g ac

tiviti

es w

ill o

ccur

in a

ny lo

catio

n un

til a

per

mit

to c

lear

is in

pla

ce

Site

Eng

inee

r

Prio

r to

clea

ring

area

s, a

wild

life

catc

her/s

potte

r or t

he E

nviro

nmen

tal R

epre

sent

ativ

e w

ill a

ssis

t with

and

ens

ure

any

faun

a pr

esen

t are

re

loca

ted

Proj

ect E

ngin

eer

Spee

d lim

its o

f 20

km/h

r. ar

e in

pla

ce in

all

area

s kn

own

to b

e hi

gh ri

sk fo

r veh

icle

/faun

a co

llisio

ns, t

his

incl

udes

: (D

etai

led

in T

MP)

Pr

ojec

t Eng

inee

r

Boun

darie

s of

allo

wab

le d

istu

rban

ce a

reas

on

the

proj

ect a

re c

lear

ly m

arke

d an

d de

linea

ted

Proj

ect E

ngin

eer

Spec

ific

trees

and

oth

er fo

rms

of fl

ora

that

are

not

to b

e di

stur

bed

are

clea

rly d

elin

eate

d an

d si

gned

to e

nsur

e th

ey a

re n

ot d

istu

rbed

Pr

ojec

t Eng

inee

r

Cle

ared

/rem

oved

veg

etat

ion

will

be b

enef

icia

lly u

sed

eith

er o

n or

off

the

proj

ect w

here

pos

sibl

e (e

.g. f

or h

abita

t, ch

ippe

d fo

r mul

ch a

nd re

used

) Pr

ojec

t Eng

inee

r

Ensu

re m

achi

nery

par

king

, mat

eria

l sto

rage

and

sto

ckpi

ling

are

wel

l out

side

sen

sitiv

e na

tura

l fea

ture

s, in

clud

ing

nativ

e ve

geta

tion,

wet

land

s an

d dr

aina

ge li

nes

Proj

ect E

ngin

eer

Mai

ntai

n su

itabl

e bu

ffer d

ista

nces

to w

ater

way

s Pr

ojec

t Eng

inee

r

Whe

re p

ossi

ble

reve

geta

tion

activ

ities

will

pre

fere

ntia

lly u

se o

f onl

y sp

ecie

s th

at a

re in

dige

nous

to th

e ar

ea

Proj

ect E

ngin

eer

Page 69: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

69 O

F 90

If a

Gre

en a

nd G

old

Bel

l fro

g is

foun

d w

ork

shou

ld c

ease

and

the

Envi

ronm

enta

l Man

ager

con

tact

ed

Site

Eng

inee

r

E.2.

3 M

ON

ITO

RIN

G

Mon

itorin

g is

per

form

ed th

at c

ompl

ies

with

lega

l and

con

tract

requ

irem

ents

.

The

plan

ning

and

con

duct

of m

onito

ring

and

anal

ysis

of d

ata

will

be

carr

ied

out b

y co

mpe

tent

per

sonn

el.

Trai

ning

reco

rds

will

be

mai

ntai

ned.

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k, c

orre

ctiv

e ac

tions

are

impl

emen

ted

imm

edia

tely

.

All f

lora

and

faun

a m

onito

ring

will

cond

ucte

d by

per

sonn

el th

at a

re d

eem

ed tr

aine

d an

d co

mpe

tent

by

regu

lato

rs.

It is

the

acco

unta

bilit

y of

the

Envi

ronm

enta

l Rep

rese

ntat

ive

to e

nsur

e al

l mon

itorin

g is

per

form

ed a

ccor

ding

to th

ese

requ

irem

ents

.

The

Site

Eng

inee

r will

con

duct

a w

eekl

y vi

sual

insp

ectio

n of

pro

tect

ed fl

ora

to e

nsur

e th

e co

ntro

ls a

re s

till i

n pl

ace

and

ther

e is

no

dam

age

to th

e tre

es.

E.2.

4 FL

ORA

AN

D F

AUN

A M

ON

ITO

RIN

G

The

follo

win

g flo

ra a

nd fa

una

mon

itorin

g w

ill be

und

erta

ken

on th

e pr

ojec

t: Ta

ble

13: F

lora

& F

auna

Mon

itorin

g

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

As p

er w

ork

site

N

o da

mag

e to

pre

serv

ed tr

ees

visu

al

Mon

thly

E.2.

5 PL

AN O

F M

ON

ITO

RIN

G L

OCA

TIO

NS

Visu

al m

onito

ring

as p

er p

lan

from

Sta

ge 1

CEM

P 3

.11

The

Site

Eng

inee

r will

con

duct

a w

eekl

y vi

sual

insp

ectio

n of

pro

tect

ed fl

ora

to e

nsur

e th

e co

ntro

ls a

re s

till i

n pl

ace

and

ther

e is

no

dam

age

to th

e tre

es.

Page 70: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOU

RCE

RECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN

-WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17 (R

ECO

VERE

D)

70

OF

90

Vege

tatio

n M

anag

emen

t Pla

n - C

EMP

Pag

e 30

New

Lea

chat

e Po

nd;

No

tree

rem

oval

re

quire

d

Page 71: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17 (R

ECO

VERE

D)

71

OF

90

F AP

PEN

DIX

- AIR

QU

ALIT

Y SU

B-PL

AN

F.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent

of e

mis

sion

s to

the

atm

osph

ere

that

may

be

caus

ed b

y P

roje

ct a

ctiv

ities

and

tha

t ha

ve t

he p

oten

tial

to a

dver

sely

affe

ct t

he

envi

ronm

ent o

r com

mun

ity b

y af

fect

ing

air q

ualit

y.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t hav

e th

e po

tent

ial t

o im

pact

air

qual

ity a

re p

rovi

ded

belo

w.

Thes

e ha

ve b

een

extra

cted

from

pro

ject

risk

ass

essm

ents

: Ta

ble

14: A

ir Q

ualit

y H

azar

ds a

nd R

isks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Vehi

cle

mov

emen

t G

ener

atio

n of

dus

t N

uisa

nce

to c

omm

unity

Stoc

k pi

ling

Gen

erat

ion

of d

ust

Nui

sanc

e to

com

mun

ity

F.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

F.2.

1 PR

OJE

CT T

ARG

ETS

nt p

roce

sses

and

the

pote

ntia

l im

pact

s to

the

com

mun

ity, t

he fo

llow

ing

air

qual

ity ta

rget

s ha

ve b

een

set f

or th

e Pr

ojec

t. A

ny d

evia

nce

from

the

targ

ets

will

resu

lt in

Pro

ject

man

agem

ent i

mm

edia

tely

impl

emen

ting

corr

ectiv

e ac

tions

. Ta

ble

15: A

ir Q

ualit

y Pr

ojec

t Tar

gets

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Num

ber o

f non

-com

plia

nt m

onito

ring

resu

lts

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f act

ions

take

n by

regu

lato

rs a

nd/o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

Page 72: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

72 O

F 90

F.2.

2 CO

NTR

OLS

USE

D T

O M

ANAG

E AI

R Q

UAL

ITY

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (

as d

efin

ed b

y th

e R

isk

Cla

ssifi

catio

n M

atrix

H-M

GT-

PRT-

004)

are

impl

emen

ted

befo

re a

ny r

elev

ant

wor

ks c

omm

ence

. E

limin

atio

n of

the

haz

ard

is t

he f

irst

pref

eren

ce o

f co

ntro

l, fo

llow

ed b

y en

gine

erin

g, t

hen

adm

inis

trativ

e co

ntro

ls.

Con

trols

use

d on

this

pro

ject

incl

ude:

Ta

ble

16: A

ir Q

ualit

y R

isks

Con

trol

A

ccou

ntab

ility

Min

imis

ing

the

area

s in

whi

ch v

eget

atio

n ha

s be

en re

mov

ed o

r dis

turb

ed

Site

Eng

inee

r

Con

side

r wea

ther

con

ditio

ns p

rior t

o co

mm

enci

ng e

arth

wor

ks

Proj

ect E

ngin

eer

Prog

ress

ivel

y re

habi

litat

ing

or g

rass

ing

area

s as

soo

n as

they

bec

ome

avai

labl

e Pr

ojec

t Eng

inee

r

Appl

ying

dus

t sup

pres

sant

(wat

er/b

iode

grad

able

pol

ymer

-bas

ed a

pplic

atio

n) to

are

as th

at p

rese

nt a

hig

h ris

k fo

r dus

t gen

erat

ion

at a

freq

uenc

y su

ffici

ent t

o en

sure

con

tract

ual a

nd c

ompl

ianc

e re

quire

men

ts a

re a

chie

ved

and

the

com

mun

ity is

not

adv

erse

ly a

ffect

ed

Site

Eng

inee

r

Esta

blis

hing

pro

perly

con

stru

cted

rum

ble

pads

at a

ll P

roje

ct s

ites,

for t

he in

gres

s an

d eg

ress

of a

ll ve

hicl

es

Proj

ect E

ngin

eer

Esta

blis

hing

traf

fic s

peed

s of

20

km/h

in o

rder

to m

inim

ise

dust

gen

erat

ion

Wor

kpla

ce M

anag

er

Asse

ssin

g ex

haus

t em

issi

ons

as p

art o

f pla

nt in

spec

tions

, with

exc

essi

ve e

mis

sion

s re

sulti

ng in

the

plan

t bei

ng re

mov

ed fr

om u

se

Plan

t Man

ager

Ensu

ring

that

bur

ning

-off

does

not

occ

ur o

n th

e P

roje

ct

Site

Eng

inee

r

If du

st e

mis

sion

s ar

e be

ing

gene

rate

d fro

m o

ther

are

as n

ot re

late

d to

ER

TEC

H w

orks

the

wor

kpla

ce w

ill no

te th

e so

urce

of t

he d

ust a

nd th

e w

ind

dire

ctio

n W

orkp

lace

Man

ager

F.2.

3 M

ON

ITO

RIN

G

Air q

ualit

y m

onito

ring

is p

erfo

rmed

that

com

plie

s w

ith le

gal a

nd c

ontra

ctua

l req

uire

men

ts a

nd w

hich

is s

uffic

ient

to id

entif

y po

tent

ial n

on-c

ompl

ianc

es b

efor

e th

ey o

ccur

.

Qua

litat

ive

(vis

ual)

asse

ssm

ents

will

be

cond

ucte

d at

the

star

t of e

ach

new

con

stru

ctio

n ac

tivity

.

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k, w

ork

prac

tices

are

alte

red

and/

or a

dditi

onal

con

trols

are

impl

emen

ted

imm

edia

tely

. A

ir qu

ality

mon

itorin

g is

con

duct

ed

acco

rdin

g to

the

requ

irem

ents

of t

he E

MS

Gui

delin

es.

Mon

itorin

g an

d an

alys

is o

f dat

a w

ill be

car

ried

out b

y co

mpe

tent

per

sonn

el.

Trai

ning

reco

rds

will

be

mai

ntai

ned.

Page 73: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

73 O

F 90

Inde

pend

ent a

ir qu

ality

mon

itorin

g w

ill oc

cur a

t lea

st e

ach

quar

ter t

o su

ppor

t and

ver

ify P

roje

ct m

onito

ring.

Thi

s m

onito

ring

will

onl

y be

con

duct

ed b

y in

divi

dual

s w

ho a

re tr

aine

d an

d co

mpe

tent

.

F.2.

4 AI

R Q

UAL

ITY

MO

NIT

ORI

NG

The

follo

win

g Ai

r Qua

lity

mon

itorin

g w

ill b

e un

derta

ken

on th

e pr

ojec

t: Ta

ble

17: A

ir Q

ualit

y M

onito

ring

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

Vario

us w

ork

site

s Q

ualit

ativ

e (v

isua

l) as

sess

men

t Pl

ant

Mon

thly

and

at e

ach

new

con

stru

ctio

n ac

tivity

F.2.

5 PL

AN O

F M

ON

ITO

RIN

G L

OCA

TIO

NS

N/A

at e

ach

new

con

stru

ctio

n ac

tivity

site

Page 74: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

74 O

F 90

G AP

PEN

DIX

- NO

ISE

AND

VIBR

ATIO

N S

UB-

PLAN

G.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent o

f noi

se a

nd v

ibra

tion

gene

rate

d by

pro

ject

act

iviti

es th

at h

ave

the

pote

ntia

l to

adve

rsel

y af

fect

the

envi

ronm

ent a

nd/o

r com

mun

ity.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t has

the

pote

ntia

l to

gene

rate

und

esira

bles

leve

ls o

f noi

se a

re p

rovi

ded

belo

w.

Thes

e ha

ve b

een

extra

cted

from

pro

ject

risk

ass

essm

ents

: Ta

ble

18: N

oise

and

Vib

ratio

n H

azar

ds a

nd R

isks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Blas

ting

Gen

erat

ion

of n

oise

N

uisa

nce

to c

omm

unity

Ope

ratio

n of

ear

thm

ovin

g eq

uipm

ent

Gen

erat

ion

of n

oise

N

uisa

nce

to c

omm

unity

Rev

ersi

ng s

irens

G

ener

atio

n of

noi

se

Nui

sanc

e to

com

mun

ity

G.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

G.2

.1 P

ROJE

CT T

ARG

ETS

nt p

roce

sses

and

the

pote

ntia

l im

pact

s to

the

com

mun

ity, t

he fo

llow

ing

nois

e an

d vi

brat

ion

targ

ets

have

bee

n se

t for

the

Pro

ject

. A

ny d

evia

nce

from

the

targ

ets

will

resu

lt in

Pro

ject

man

agem

ent i

mm

edia

tely

impl

emen

ting

corr

ectiv

e ac

tions

.

The

follo

win

g se

nsiti

ve re

ceiv

ers

are

iden

tifie

d in

the

CEM

P (W

hyte

s G

ully

New

Lan

dfill

Cel

l CE

MP

8/6

/201

6 N

umbe

r 117

6250

03_1

55_R

_Rev

2 P

age

9)

N

1 R

esid

ence

NW

of W

hyte

s G

ully

RR

P (1

30 m

eter

s fro

m b

ound

ary)

N

2 - R

esid

ence

NE

of W

hyte

s G

ully

RR

P (9

60 m

eter

s fro

m b

ound

ary)

N

3 - R

esid

ence

SW

of W

hyte

s G

ully

RR

P (2

30 m

eter

s fro

m b

ound

ary)

N

4 - R

esid

ence

NE

of W

hyte

s G

ully

RR

P (1

,100

met

ers

from

bou

ndar

y)

N

5 C

lose

st re

side

nce

at F

arm

boro

ugh

Hei

ghts

(700

met

ers

from

bou

ndar

y)

Page 75: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

75 O

F 90

The

stan

dard

wor

king

hou

rs a

re;

7.

30 a

m to

4.3

0 pm

Mon

day

to F

riday

8.

00 a

m to

4.0

0 pm

Sat

urda

ys

N

o w

orks

Sun

days

or p

ublic

hol

iday

s

Tabl

e 19

: Noi

se a

nd V

ibra

tion

Proj

ect T

arge

ts

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Num

ber o

f non

-com

plia

nt m

onito

ring

resu

lts

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f act

ions

take

n by

regu

lato

rs o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f nui

sanc

e co

mpl

aint

s Ze

ro

At a

ll tim

es

Wor

kpla

ce M

anag

er

G.2

.2 C

ON

TRO

LS U

SED

TO

MAN

AGE

NO

ISE

AND

VIBR

ATIO

N

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (

as d

efin

ed b

y th

e R

isk

Cla

ssifi

catio

n M

atrix

H-M

GT-

PRT-

004)

are

impl

emen

ted

befo

re a

ny r

elev

ant

wor

ks c

omm

ence

. E

limin

atio

n of

the

haz

ard

is t

he f

irst

pref

eren

ce o

f co

ntro

l, fo

llow

ed b

y en

gine

erin

g, t

hen

adm

inis

trativ

e co

ntro

ls.

Con

trols

use

d on

this

pro

ject

incl

ude:

Ta

ble

20: N

oise

and

Vib

ratio

n R

isks

Con

trol

A

ccou

ntab

ility

Lim

iting

the

hour

s of

wor

k to

com

ply

with

all

cond

ition

s st

ated

at 5

.2.2

(abo

ve)

Wor

kpla

ce M

anag

er

Lim

iting

the

hour

s of

wor

k in

resp

onse

to c

omm

unity

con

cern

s W

orkp

lace

Man

ager

All e

quip

men

t is

serv

iced

and

mai

ntai

ned

acco

rdin

g to

, as

a m

inim

um, t

he o

rigin

al e

quip

men

t man

ufac

ture

rs re

com

men

datio

ns, o

r m

ore

frequ

ently

if re

quire

d to

min

imis

e no

ise

gene

rate

d Pl

ant M

anag

er

Subc

ontra

ctor

s

Noi

se a

ttenu

atio

n of

fixe

d an

d m

obile

pla

nt a

s re

quire

d in

ord

er to

ach

ieve

com

plia

nce

W

orkp

lace

Man

ager

Con

stru

ct a

nd m

aint

ain

nois

e ba

rrie

rs a

s re

quire

d in

ord

er to

com

ply

W

orkp

lace

Man

ager

Page 76: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

76 O

F 90

Adju

st th

e Pr

ojec

t Tra

ffic

Man

agem

ent P

lan/

Pla

ns to

min

imis

e no

ise

impa

cts

Proj

ect E

ngin

eer

Pend

ing

safe

ty re

quire

men

ts, t

he le

ast n

oise

-intru

sive

reve

rsin

g al

arm

s ar

e us

ed

Plan

t Man

ager

Ther

e w

ill be

ear

ly c

onsu

ltatio

n w

ith o

wne

rs a

nd o

ccup

ants

of p

oten

tially

affe

cted

com

mun

ity m

embe

rs w

here

pre

dict

ive

mod

ellin

g in

dica

tes

pote

ntia

l im

pact

s th

at e

xcee

d co

mpl

ianc

e lim

its

Com

mun

ity M

anag

er

In th

e ev

ent t

hat i

mpl

emen

tatio

n of

all

abov

e-st

ated

con

trols

are

insu

ffici

ent t

o ac

hiev

e co

mpl

ianc

e th

en m

itiga

tion

mea

sure

s (e

.g. f

ittin

g ai

r co

nditi

oner

s an

d do

uble

-gla

zing

win

dow

s) a

re im

plem

ente

d at

sen

sitiv

e re

cept

ors

Wor

kpla

ce M

anag

er

G.2

.3 M

ON

ITO

RIN

G

Noi

se a

nd V

ibra

tion

mon

itorin

g is

per

form

ed th

at c

ompl

ies

with

lega

l and

con

tract

requ

irem

ents

and

whi

ch is

suf

ficie

nt to

iden

tify

pote

ntia

l non

-com

plia

nces

bef

ore

they

occ

ur.

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k or

to h

ave

occu

rred

, and

inci

dent

repo

rt an

d co

rrec

tive

actio

ns a

re ra

ised

in J

DE

and

wor

k pr

actic

es a

re a

ltere

d an

d/or

ad

ditio

nal c

ontro

ls a

re im

plem

ente

d im

med

iate

ly.

Noi

se a

nd V

ibra

tion

mon

itorin

g is

con

duct

ed a

ccor

ding

to th

e re

quire

men

ts o

f the

EM

S G

uide

lines

. Mon

itorin

g an

d an

alys

is o

f dat

a w

ill be

car

ried

out b

y a

com

pete

nt p

erso

n.

Evid

ence

of c

ompe

tenc

e re

tain

ed.

Inde

pend

ent N

oise

and

Vib

ratio

n m

onito

ring

will

occu

r at

leas

t eac

h qu

arte

r to

sup

port

and

verif

y th

e pr

ojec

t mon

itorin

g.

This

mon

itorin

g w

ill o

nly

be c

ondu

cted

by

indi

vidu

als

who

are

trai

ned

and

com

pete

nt.

It is

the

acco

unta

bilit

y of

the

Envi

ronm

enta

l Rep

rese

ntat

ive

to e

nsur

e al

l mon

itorin

g is

per

form

ed a

ccor

ding

to th

ese

requ

irem

ents

.

G.2

.4 N

OIS

E AN

D V

IBRA

TIO

N M

ON

ITO

RIN

G

The

follo

win

g N

oise

and

Vib

ratio

n m

onito

ring

will

be

unde

rtake

n on

the

proj

ect:

Tabl

e 21

: Noi

se a

nd V

ibra

tion

Mon

itorin

g

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

Clo

sest

rece

iver

to th

e cu

rren

t wor

ks

Qua

litat

ive

(i.e.

aud

ibili

ty o

f con

stru

ctio

n w

orks

aga

inst

oth

er n

oise

sou

rces

) Pl

ant

Perio

dic

(i.e.

mon

thly

or d

urin

g hi

gh n

oise

ac

tiviti

es)

Page 77: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

77 O

F 90

G.2

.5 P

LAN

OF

MO

NIT

ORI

NG

LO

CATI

ON

S

Inse

rt pl

an/d

raw

ing/

sche

mat

ic s

how

ing

the

loca

tion

of e

ach

mon

itorin

g st

atio

n/po

int

Page 78: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

78 O

F 90

H AP

PEN

DIX

- WAT

ER S

OIL

AN

D ER

OSI

ON

MAN

AGEM

ENT

SUB-

PLAN

H.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent o

f im

pact

s to

wat

er, s

oils

and

ero

sion

and

/or q

uant

ity th

at m

ay b

e ca

used

by

Pro

ject

act

iviti

es a

nd th

at h

ave

the

pote

ntia

l to

adve

rsel

y af

fect

the

envi

ronm

ent a

nd/o

r com

mun

ity.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t has

the

pote

ntia

l to

impa

ct w

ater

qua

lity

and/

or q

ualit

y is

pro

vide

d be

low

. Th

ese

have

bee

n ex

tract

ed fr

om p

roje

ct ri

sk a

sses

smen

ts:

Tabl

e 22

: Wat

er S

oil a

nd E

rosi

on M

anag

emen

t Haz

ards

and

Ris

ks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Cle

arin

g an

d gr

ubbi

ng

Incr

ease

d se

dim

ent l

oad

in ru

n-of

f wat

ers

Impa

cts

to a

quat

ic fa

una

and

flora

Exca

vatio

n D

amag

e to

wat

erco

urse

or w

ater

way

Im

pact

s to

aqu

atic

faun

a an

d flo

ra

Con

cret

ing

Dis

char

ge o

f con

tam

inat

ed w

ater

W

ater

qua

lity

nega

tivel

y im

pact

ed

Stor

age

and

use

of fl

amm

able

and

com

bust

ible

liqu

ids

and

solid

s Sp

ills

Wat

er q

ualit

y ne

gativ

ely

impa

cted

Ope

ratio

n of

a c

oncr

ete

batc

hing

pla

nt

Use

of w

ater

U

nnec

essa

ry lo

ad o

n w

ater

reso

urce

s co

ntrib

utin

g to

re

sour

ce a

vaila

bilit

y

H.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

H.2.

1 PR

OJE

CT T

ARG

ETS

Base

d on

the

req

uire

men

ts d

efin

ed a

t Se

ctio

n 4

(Pro

ject

Com

plia

nce

Req

uire

men

ts),

the

findi

ngs

of p

roje

ct r

isk

man

agem

ent

proc

esse

s an

d th

e po

tent

ial

impa

cts

to t

he

com

mun

ity,

the

follo

win

g ta

rget

s ha

ve b

een

set

for

man

agin

g w

ater

, so

ils a

nd e

rosi

on o

n th

e pr

ojec

t. A

ny d

evia

nce

from

the

tar

gets

will

resu

lt in

Pro

ject

Man

agem

ent

imm

edia

tely

impl

emen

ting

corr

ectiv

e ac

tions

:

Page 79: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

79 O

F 90

Tabl

e 23

: Wat

er S

oil a

nd E

rosi

on M

anag

emen

t Pro

ject

Tar

gets

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Num

ber o

f non

-com

plia

nt m

onito

ring

resu

lts

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f act

ions

take

n by

regu

lato

rs a

nd/o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f inc

iden

ts o

f non

-com

plia

nt w

ater

leav

ing

site

Ze

ro

At a

ll tim

es

Wor

kpla

ce M

anag

er

H.2.

2 CO

NTR

OLS

USE

D T

O M

ANAG

E W

ATER

SO

IL A

ND

ERO

SIO

N

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (a

s de

fined

by

the

Ris

k C

lass

ifica

tion

Mat

rix H

-MG

T-PR

T-00

4) a

re im

plem

ente

d be

fore

any

rel

evan

t w

orks

com

men

ce.

E

limin

atio

n of

the

haz

ard

is t

he f

irst

pref

eren

ce o

f co

ntro

l, fo

llow

ed b

y en

gine

erin

g, t

hen

adm

inis

trativ

e co

ntro

ls.

Con

trols

use

d on

this

pro

ject

incl

ude:

Ta

ble

24: W

ater

Soi

l and

Ero

sion

Ris

ks

Con

trol

A

ccou

ntab

ility

The

proj

ect h

as b

een

desi

gned

and

is b

eing

con

stru

cted

to d

iver

t as

muc

h w

ater

as

poss

ible

aw

ay fr

om th

e si

te (i

.e. t

o pr

even

t the

wat

er fr

om

ente

ring

the

site

) Pr

ojec

t Eng

inee

r

Min

imis

ing

the

area

s fro

m w

hich

veg

etat

ion

is re

mov

ed/d

istu

rbed

Si

te E

ngin

eer

Prog

ress

ivel

y re

habi

litat

ing/

reve

geta

ting

area

s as

soo

n as

they

bec

ome

avai

labl

e Si

te E

ngin

eer

All m

ater

ial t

o be

sto

ckpi

led

for a

per

iod

of g

reat

er th

an o

ne m

onth

will

be

prot

ecte

d fro

m e

rosi

on a

s so

on a

s pr

actic

able

(e.g

. see

ded,

mul

ched

, hy

dro-

mul

ched

) Si

te E

ngin

eer

Eros

ion

and

sedi

men

t con

trols

are

inst

alle

d pr

ior t

o or

imm

edia

tely

upo

n an

y di

stur

banc

e to

veg

etat

ion

or s

oil

Site

Eng

inee

r

All e

rosi

on a

nd s

edim

ent c

ontro

ls a

re p

rope

rly d

esig

ned

by a

com

pete

nt p

erso

n to

ens

ure

they

are

:

The

corr

ect t

ype

of c

ontro

l

Adeq

uate

ly s

ized

acc

ordi

ng to

the

soil

and

clim

atic

con

ditio

ns a

nd c

atch

men

t are

as s

uch

that

dis

char

ged

wat

er w

ill m

eet c

ompl

ianc

e lim

its

Proj

ect E

ngin

eer

Page 80: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

80 O

F 90

Con

trol

A

ccou

ntab

ility

Con

stru

cted

to a

n en

gine

erin

g st

anda

rd th

at c

ompl

ies

with

the

requ

irem

ents

of t

he re

leva

nt re

gula

tory

bod

y/bo

dies

Sedi

men

t lad

en w

ater

(dirt

y w

ater

) cap

ture

d on

site

will

be

pref

eren

tially

use

d fo

r dus

t con

trols

. Si

te E

ngin

eer

No

wat

er is

dis

char

ged

from

site

unt

il a

wat

er a

dis

char

ge p

erm

it is

app

rove

d by

the

Envi

ronm

enta

l Rep

rese

ntat

ive

Proj

ect E

ngin

eer

Whe

re n

eces

sary

to m

eet w

ater

qua

lity

disc

harg

e co

mpl

ianc

e lim

its, w

ater

will

be

chem

ical

ly tr

eate

d pr

ior t

o di

scha

rge

from

site

Pr

ojec

t Eng

inee

r

Wat

er tr

eatm

ent p

lant

s us

ed a

re d

esig

ned

and

cons

truct

ed b

y a

com

pete

nt p

erso

n an

d co

nsid

erin

g th

e qu

antit

y an

d qu

ality

of w

ater

pre

dict

ed to

re

quire

trea

tmen

t. T

he q

uant

ity a

nd q

ualit

y pr

edic

tion

is b

ased

on

the

outc

omes

of a

mod

el th

at is

pro

vide

d by

a s

uita

bly

qual

ified

per

son

Proj

ect E

ngin

eer

Wat

er tr

eatm

ent p

lant

s ar

e su

bjec

t to

sche

dule

d ro

utin

e m

aint

enan

ce th

at a

s a

min

imum

com

plie

s w

ith th

e re

quire

men

ts o

f the

sup

plie

r Si

te E

ngin

eer

All h

azar

dous

sub

stan

ces

(liqu

ids

and

solid

s) a

re s

tore

d an

d m

anag

ed a

ccor

ding

to A

S19

40.

All

refu

ellin

g po

ints

, inc

ludi

ng re

fuel

ling/

lube

tru

cks,

will

carr

y hy

droc

arbo

n sp

ill k

its

Proj

ect E

ngin

eer

An a

dequ

ate

num

ber o

f con

cret

e w

asho

ut p

its w

ill b

e m

aint

aine

d at

all

times

. Th

e w

asho

ut p

its w

ill be

isol

ated

from

sur

face

wat

er fl

ows

at w

ith

bund

s to

pre

vent

con

tam

inat

ion

of c

lean

sur

face

wat

ers

and

will

be

lined

to p

reve

nt c

onta

min

atio

n of

soi

l and

gro

und

wat

er.

Proj

ect E

ngin

eer

H.2.

3 M

ON

ITO

RIN

G

Wat

er S

oil a

nd E

rosi

on m

onito

ring

is p

erfo

rmed

that

com

plie

s w

ith le

gal a

nd c

ontra

ct re

quire

men

ts a

nd w

hich

is s

uffic

ient

to id

entif

y po

tent

ial n

on-c

ompl

ianc

es b

efor

e th

ey o

ccur

.

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k or

to h

ave

occu

rred

, an

inci

dent

repo

rt an

d co

rrec

tive

actio

ns a

re ra

ised

in J

DE

Wat

er S

oil a

nd E

rosi

on m

onito

ring

is

cond

ucte

d ac

cord

ing

to th

e re

quire

men

ts o

f the

EM

S G

uide

lines

. Mon

itorin

g an

d an

alys

is o

f dat

a w

ill b

e ca

rrie

d ou

t by

a co

mpe

tent

per

son.

Evi

denc

e of

com

pete

nce

reta

ined

.

It is

the

acco

unta

bilit

y of

the

Envi

ronm

enta

l Rep

rese

ntat

ive

to e

nsur

e al

l mon

itorin

g is

per

form

ed a

ccor

ding

to th

ese

requ

irem

ents

.

H.2.

4 W

ATER

SO

IL A

ND

ERO

SIO

N M

ON

ITO

RIN

G

The

follo

win

g W

ater

Soi

l and

Ero

sion

mon

itorin

g w

ill be

und

erta

ken

on th

e pr

ojec

t: Ta

ble

25: W

ater

Soi

l and

Ero

sion

Mon

itorin

g

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

Cur

rent

wor

k si

te

CEM

P M

anag

emen

t stra

tegy

3.2

.2

Qua

litat

ive

(i.e.

No

turb

id w

ater

leav

ing

Dur

ing

rain

eve

nts

that

resu

lt in

ove

rland

Page 81: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

81 O

F 90

Req

uire

men

ts

site

)

Cle

an w

ater

div

ersi

on fr

om w

orks

flow

s

O

verla

nd ru

n-of

f

Inst

all p

erm

anen

t dra

ins

as e

arly

as

prac

ticab

le

Mul

ch b

unds

to b

e us

ed fo

r ove

rland

flow

m

anag

emen

t

Early

wor

ks

Page 82: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

82 O

F 90

H.2.

5 PL

AN O

F M

ON

ITO

RIN

G L

OCA

TIO

NS

Pack

age

2 an

d 3

Page 83: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

83 O

F 90

H.2.

6 Co

ntro

ls fo

r New

Lea

chat

e Po

nd C

onst

ruct

ion

Page 84: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

84 O

F 90

I AP

PEN

DIX

- WAS

TE M

ANAG

EMEN

T SU

B-PL

AN

I.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent o

f was

te g

ener

ated

on/

caus

ed b

y th

e pr

ojec

t tha

t hav

e th

e po

tent

ial t

o ad

vers

ely

affe

ct th

e en

viro

nmen

t and

/or o

r com

mun

ity.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t hav

e th

e po

tent

ial t

o ge

nera

te w

aste

are

pro

vide

d be

low

. Th

ese

have

bee

n ex

tract

ed fr

om p

roje

ct ri

sk a

sses

smen

ts:

Tabl

e 26

: Was

te M

anag

emen

t Haz

ards

and

Ris

ks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Bene

ficia

tion/

refin

emen

t pro

cess

es

Gen

erat

ion

of w

aste

pro

duct

So

il an

d w

ater

con

tam

inat

ion

Plan

t mai

nten

ance

G

ener

atio

n of

was

te o

il So

il an

d w

ater

con

tam

inat

ion

Ope

ratio

n an

d m

aint

enan

ce o

f offi

ces,

crib

hut

s an

d ca

mp

faci

litie

s G

ener

atio

n of

gen

eral

was

te

Unn

eces

sary

load

on

land

fill a

vaila

bilit

y

I.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

I.2.1

PR

OJE

CT T

ARG

ETS

Base

d on

the

req

uire

men

ts d

efin

ed a

t Se

ctio

n 4

(Pro

ject

Com

plia

nce

Req

uire

men

ts),

the

findi

ngs

of p

roje

ct r

isk

man

agem

ent

proc

esse

s an

d th

e po

tent

ial

impa

cts

to t

he

com

mun

ity,

the

follo

win

g ta

rget

s ha

ve b

een

set

for

man

agin

g w

ater

, so

ils a

nd e

rosi

on o

n th

e pr

ojec

t. A

ny d

evia

nce

from

the

tar

gets

will

resu

lt in

Pro

ject

Man

agem

ent

imm

edia

tely

impl

emen

ting

corr

ectiv

e ac

tions

: Ta

ble

27: W

aste

Man

agem

ent P

roje

ct T

arge

ts

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

% o

f was

te g

ener

ated

sen

t to

land

fill

85%

of t

otal

was

te

gene

rate

d At

all

times

W

orkp

lace

Man

ager

% o

f was

te re

used

or r

ecyc

led

15%

of t

otal

was

te

gene

rate

d At

all

times

W

orkp

lace

Man

ager

Page 85: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

85 O

F 90

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

% re

duct

ion

in to

tal w

aste

gen

erat

ed

5% re

duct

ion

in to

tal w

aste

ge

nera

ted

Ever

y 12

mon

ths

Wor

kpla

ce M

anag

er

% o

f reg

ulat

ed/h

azar

dous

was

tes

for w

hich

tran

sfer

cer

tific

ates

are

reta

ined

10

0%

At a

ll tim

es

Wor

kpla

ce M

anag

er

Num

ber o

f act

ions

take

n by

regu

lato

rs a

nd/o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

I.2.2

CO

NTR

OLS

USE

D T

O M

ANAG

E W

ASTE

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (

as d

efin

ed b

y th

e R

isk

Cla

ssifi

catio

n M

atrix

H-M

GT-

PRT-

004)

are

impl

emen

ted

befo

re a

ny r

elev

ant

wor

ks c

omm

ence

.

Elim

inat

ion

of t

he h

azar

d is

the

firs

t pr

efer

ence

of

cont

rol,

follo

wed

by

engi

neer

ing,

the

n ad

min

istra

tive

cont

rols

. C

ontro

ls u

sed

on th

is p

roje

ct in

clud

e:

Tabl

e 28

: Was

te M

anag

emen

t Ris

ks

Con

trol

A

ccou

ntab

ility

The

proc

urem

ent o

f goo

ds in

clud

es a

sses

smen

t of p

acka

ging

min

imis

atio

n, b

ulk

good

s ar

e pu

rcha

sed

pref

eren

tially

Pr

ocur

emen

t C

omm

erci

al M

anag

er

Bins

are

pro

vide

d at

eac

h w

ork

area

in s

uffic

ient

num

bers

in o

rder

to fa

cilit

ate

segr

egat

ion

at th

e so

urce

of g

ener

atio

n. A

s a

min

imum

, the

fo

llow

ing

type

s of

bin

are

pro

vide

d w

here

rele

vant

: Gen

eral

was

te, R

ecyc

labl

es, R

e-us

e (e

.g. w

aste

tim

ber f

or c

hipp

ing)

, Haz

ardo

us/re

gula

ted

was

tes.

Pr

ojec

t Eng

inee

r

Bins

are

cle

arly

sig

ned

to a

dequ

atel

y in

form

all

proj

ect p

erso

nnel

of t

he c

orre

ct m

ater

ial t

o be

pla

ced

with

in e

ach

bin

type

. B

ins

are

empt

ied

at a

fre

quen

cy th

at is

suf

ficie

nt to

ens

ure

thei

r cor

rect

use

.

Proj

ect E

ngin

eer

All w

aste

s ar

e pl

aced

in th

e co

rrec

t bin

. Al

l Per

sonn

el

No

was

te w

ill be

bur

ied

or b

urne

d on

the

proj

ect

Wor

kpla

ce M

anag

er

All h

azar

dous

/regu

late

d w

aste

s ar

e tre

ated

and

dis

pose

d of

in a

ccor

danc

e w

ith re

gula

tory

requ

irem

ents

. Pr

ojec

t Eng

inee

r

All h

azar

dous

/regu

late

d w

aste

s re

mov

ed fr

om s

ite fo

r tre

atm

ent a

re c

olle

cted

from

the

proj

ect,

trans

porte

d an

d tre

ated

by

com

pani

es a

utho

rised

to

do

so.

Proj

ect E

ngin

eer

Page 86: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

86 O

F 90

Con

trol

A

ccou

ntab

ility

Was

te tr

ansf

er c

ertif

icat

es a

re re

tain

ed fo

r all

was

te re

mov

ed fr

om s

ite fo

r tre

atm

ent a

s re

quire

d by

regu

lato

ry re

quire

men

ts.

Site

Eng

inee

r

All s

ubco

ntra

ctor

s en

gage

d to

man

age

was

te a

re a

udite

d to

ens

ure

Subc

ontra

ctor

s

A fu

lly m

aint

aine

d co

ncre

te w

asho

ut p

it w

ill b

e m

aint

aine

d on

the

site

at a

ll tim

es.

Pr

ojec

t Eng

inee

r

CEM

P 3.

7.3

Man

agem

ent s

trate

gy a

nd c

ontro

l Pr

ojec

t Eng

inee

r

I.2.3

M

ON

ITO

RIN

G

Was

te m

onito

ring

is p

erfo

rmed

that

com

plie

s w

ith le

gal a

nd c

ontra

ct re

quire

men

ts a

nd w

hich

is s

uffic

ient

to id

entif

y po

tent

ial n

on-c

ompl

ianc

es b

efor

e th

ey o

ccur

.

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k or

to

have

occ

urre

d, a

n in

cide

nt r

epor

t an

d co

rrec

tive

actio

ns a

re r

aise

d in

JD

E w

aste

mon

itorin

g is

con

duct

ed

acco

rdin

g to

the

requ

irem

ents

of t

he E

MS

Gui

delin

es. M

onito

ring

and

anal

ysis

of d

ata

will

be c

arrie

d ou

t by

a co

mpe

tent

per

son.

Evi

denc

e of

com

pete

nce

reta

ined

.

It is

the

acco

unta

bilit

y of

the

Env

ironm

enta

l Rep

rese

ntat

ive

to e

nsur

e al

l mon

itorin

g is

per

form

ed a

ccor

ding

to th

ese

requ

irem

ents

.

I.2.4

W

ASTE

MO

NIT

ORI

NG

The

follo

win

g W

aste

mon

itorin

g w

ill be

und

erta

ken

on th

e pr

ojec

t: Ta

ble

29: W

aste

Mon

itorin

g

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

I.2.5

PL

AN O

F M

ON

ITO

RIN

G L

OCA

TIO

NS

N/A

Page 87: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

87 O

F 90

J AP

PEN

DIX

- CU

LTU

RAL,

ARC

HAEO

LOGI

CAL

HERI

TAGE

SIT

ES S

UB

PLAN

J.1

SCO

PE

This

sub

-pla

n ad

dres

ses

the

man

agem

ent o

f cul

tura

l, ar

chae

olog

ical

her

itage

site

s in

rela

tion

to p

roje

ct a

ctiv

ities

.

Activ

ities

con

duct

ed o

n th

e pr

ojec

t tha

t has

the

pote

ntia

l to

impa

ct c

ultu

ral,

arch

aeol

ogic

al a

nd h

erita

ge s

ites

are

prov

ided

bel

ow.

Thes

e ha

ve b

een

extra

cted

from

pro

ject

ris

k as

sess

men

ts:

Tabl

e 30

: Cul

tura

l, A

rcha

eolo

gica

l Her

itage

Haz

ards

and

Ris

ks

Proj

ect A

ctiv

ity

Envi

ronm

enta

l Haz

ard

Envi

ronm

enta

l Ris

k

Dre

dgin

g

Impa

cts

to h

erita

ge s

ites

durin

g co

nstru

ctio

n ac

tiviti

es.

Dam

age

or d

istu

rban

ce o

f he

ritag

e si

tes

Exca

vatio

n Im

pact

s to

her

itage

site

s du

ring

cons

truct

ion

activ

ities

. D

amag

e or

dis

turb

ance

of

herit

age

site

s

Cle

arin

g

Impa

cts

to h

erita

ge s

ites

durin

g co

nstru

ctio

n ac

tiviti

es.

Dam

age

or d

istu

rban

ce o

f he

ritag

e si

tes

J.2

PRO

JECT

CO

MPL

IAN

CE R

EQU

IREM

ENTS

J.2.1

PR

OJE

CT T

ARG

ETS

Base

d on

the

req

uire

men

ts d

efin

ed a

t S

ectio

n 4

(Pro

ject

Com

plia

nce

Req

uire

men

ts),

the

findi

ngs

of p

roje

ct r

isk

man

agem

ent

proc

esse

s an

d th

e po

tent

ial

impa

cts

to t

he

com

mun

ity,

the

follo

win

g ta

rget

s ha

ve b

een

set

for

man

agin

g cu

ltura

l, ar

chae

olog

ical

and

her

itage

site

s on

the

pro

ject

. A

ny d

evia

nce

from

the

tar

gets

will

res

ult

in P

roje

ct

Man

agem

ent i

mm

edia

tely

impl

emen

ting

corr

ectiv

e ac

tions

: Ta

ble

31: C

ultu

ral,

Arc

haeo

logi

cal H

erita

ge P

roje

ct T

arge

ts

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

Num

ber o

f non

-com

plia

nt m

onito

ring

resu

lts

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f act

ions

take

n by

regu

lato

rs o

r clie

nt

Zero

At

all

times

W

orkp

lace

Man

ager

Num

ber o

f inc

iden

ts o

f dam

age

caus

ed to

her

itage

site

s Ze

ro

At a

ll tim

es

Wor

kpla

ce M

anag

er

Page 88: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

88 O

F 90

Met

ric/M

easu

re

Targ

et

Tim

e fr

ame

Acc

ount

abili

ty

J.2.2

CO

NTR

OLS

USE

D T

O M

ANAG

E AB

ORI

GIN

AL H

ERIT

AGE

SITE

S

Con

trols

that

are

ade

quat

e to

ens

ure

com

plia

nce

and

to re

duce

risk

to a

ratin

g of

to a

s lo

w a

s re

ason

ably

pra

ctic

al (A

LAR

P) (

as d

efin

ed b

y th

e R

isk

Cla

ssifi

catio

n M

atrix

H-M

GT-

PRT-

004)

are

impl

emen

ted

befo

re a

ny r

elev

ant

wor

ks c

omm

ence

.

Elim

inat

ion

of t

he h

azar

d is

the

firs

t pr

efer

ence

of

cont

rol,

follo

wed

by

engi

neer

ing,

the

n ad

min

istra

tive

cont

rols

. C

ontro

ls u

sed

on th

is p

roje

ct in

clud

e:

The

CEM

P se

ctio

n 3.

10 is

rela

ted

to a

borig

inal

and

her

itage

pro

tect

ion,

it id

entif

ies

2 he

ritag

e si

tes;

PAD

1 o

ne b

asal

t fla

ke a

rtefa

ct id

entif

ied

PAD

2 n

o cu

ltura

l ide

ntifi

catio

n

PAD

3 O

ne b

asal

t cor

e, o

ne b

asal

t ang

ular

frag

men

t and

one

che

rt an

gula

r fra

gmen

t ide

ntifi

ed

Ta

ble

32: C

ontr

ols

Use

d to

Man

age

Cul

tura

l, A

rcha

eolo

gica

l Her

itage

Ris

ks

Con

trol

A

ccou

ntab

ility

Lim

iting

the

wor

k ar

eas

and

com

ply

with

all

cond

ition

s st

ated

at 5

.7.2

(abo

ve)

Wor

kpla

ce M

anag

er

Lim

iting

the

wor

k in

resp

onse

to c

omm

unity

con

cern

s W

orkp

lace

Man

ager

Ther

e w

ill be

ear

ly c

onsu

ltatio

n w

ith o

wne

rs a

nd o

ccup

ants

of p

oten

tially

affe

cted

sen

sitiv

e pl

aces

or s

truct

ures

whe

re p

redi

ctiv

e m

odel

ling

indi

cate

s po

tent

ial h

erita

ge im

pact

s.

Com

mun

ity M

anag

er

Wor

k pr

actic

es p

redi

cted

to g

ener

ate

unac

cept

able

dam

age

will

be

asse

ssed

prio

r to

com

men

cing

wor

ks to

the

exte

nt re

quire

d to

com

ply

with

ap

plic

able

per

mits

and

aut

horit

y.

Wor

kpla

ce M

anag

er

CEM

P 3.

10.3

Stra

tegy

and

con

trol m

easu

res

Proj

ect E

ngin

eer

J.2.3

M

ON

ITO

RIN

G

Cul

tura

l, ar

chae

olog

ical

and

her

itage

mon

itorin

g is

per

form

ed t

hat c

ompl

ies

with

lega

l and

con

tract

req

uire

men

ts a

nd w

hich

is s

uffic

ient

to

iden

tify

pote

ntia

l non

-com

plia

nces

be

fore

they

occ

ur.

Page 89: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

89 O

F 90

Whe

re m

onito

ring

dete

rmin

es n

on-c

ompl

ianc

e to

be

a ris

k or

to h

ave

occu

rred

, an

d in

cide

nt r

epor

t and

cor

rect

ive

actio

ns a

re r

aise

d in

the

HS

E R

epor

ting

Sys

tem

and

wor

k pr

actic

es a

re a

ltere

d an

d/or

add

ition

al c

ontro

ls a

re im

plem

ente

d im

med

iate

ly.

Cul

tura

l, ar

chae

olog

ical

and

her

itage

mon

itorin

g is

con

duct

ed a

ccor

ding

to

the

requ

irem

ents

of t

he E

MS

Gui

delin

es.

Mon

itorin

g an

d an

alys

is o

f da

ta w

ill b

e ca

rrie

d ou

t by

a

com

pete

nt p

erso

n. E

vide

nce

of c

ompe

tenc

e re

tain

ed.

Inde

pend

ent

cultu

ral,

arch

aeol

ogic

al a

nd h

erita

ge s

ites

mon

itorin

g w

ill oc

cur

at le

ast

each

qua

rter

to s

uppo

rt an

d ve

rify

the

proj

ect

mon

itorin

g.

This

mon

itorin

g w

ill o

nly

be

cond

ucte

d by

indi

vidu

als

who

are

trai

ned

and

com

pete

nt.

It is

the

acco

unta

bilit

y of

the

Envi

ronm

enta

l Rep

rese

ntat

ive

to e

nsur

e al

l mon

itorin

g is

per

form

ed a

ccor

ding

to th

ese

requ

irem

ents

.

J.2.4

CU

LTU

RAL,

ARC

HAE

OLO

GIC

AL A

ND

HERI

TAG

E M

ON

ITO

RIN

G

The

follo

win

g cu

ltura

l, ar

chae

olog

ical

and

her

itage

mon

itorin

g w

ill be

und

erta

ken

on th

e pr

ojec

t: Ta

ble

33: C

ultu

ral,

Arc

haeo

logi

cal H

erita

ge M

onito

ring

Loca

tion

Para

met

er

Equi

pmen

t Typ

e Fr

eque

ncy

J.2.5

PL

AN O

F M

ON

ITO

RIN

G L

OCA

TIO

NS

Page 90: €¦ · WHSE MANAGEMENT PLAN 13853-20170406-PLAN-WHSE MGMT WHYTES GULLY STG 2 REV-8 24052017 (RECOVERED) 2 OF 90 DOCUMENT REVISION SUMMARY Rev. No. …

WHS

E M

ANAG

EMEN

T PL

AN

STAG

E 2

CON

STRU

CTIO

N O

F A

NEW

LAN

DFIL

L CE

LL A

T W

OLL

ON

GON

G W

ASTE

AN

D RE

SOUR

CE R

ECO

VERY

PAR

K

1385

3-20

1704

06-P

LAN-

WHS

E M

GMT

WHY

TES

GULL

Y ST

G 2

REV-

8 24

0520

17

(REC

OVE

RED)

90 O

F 90

K AP

PEN

DIX

SIT

E LA

YOU

T AN

D BO

UN

DARI

ES