WHITELEYS SHOPPING CENTRE COMMUNITY LIAISON GROUP
PRESENTATION 02
29 JANUARY 2019
PRESENTATION TOPICS
• Site access arrangements• Works – Complete and Upcoming • Overview and Look ahead programme• Façade retention scheme • Tower cranes • Hoarding, parking bay and bus lane
suspensions • Soft strip progress• Demolition • Contact information
SITE ENTRANCE ARRANGEMENTS
• Pedestrian entrance for all staff and visitors is via Porchester Gardens
• Secondary welfare access to open next week from Redan Place.
• Vehicle access onto the site is via Redan Place
• Deliveries to Queensway/Porchester Gardens
WORKS OVERVIEW
• Completed/Active works - Southern dome removal - Carriageway and footpath improvement works - Street light removal Queensway and Porchester Gardens - Soft strip works under rear car park - Service decommissioning. Gas, aircon, Comms, Water, Electric - Heritage window and stair removal - Asbestos survey throughout entire building- Demolition of rear car park to ground floor- UKPN substation bases – Porchester Gardens
WORKS OVERVIEW
• Upcoming works
- Hoarding/gates along Queensway - Window removal along Porchester Gardens- Concrete plinths for façade frame - Façade frame erection on Porchester- Concrete kentledge install around façade frame- Tower crane erection 23/24 Feb - Continue demolition of rear car park
PROGRAMME OVERVIEW
PROGRAMME LOOK AHEADHERITAGE
PROGRAMME LOOK AHEADDEMOLITION
FAÇADE RETENTION SCHEME
• Design in place • Steel fabrication has started • Footpath substrate improvement works• Steel frame erection due to start Mid February 19 • Frame erection planned completion June 19
TOWER CRANES
• Two tower cranes are to be erected
• TC1 (South) 23/24th February 19• TC2 (North) 9/10th March 19
• TC dismantles Sept/Oct 19
HOARDING AND ROAD WORKS
• Hoarding to Queensway has been installed with the centre section to be completed after the old pedestrian crossing “build out” is removed.
• Temporary substation base construction to start W.C 4th Feb
• Queensway bus stop is closed. Relocation of the advertising board is pending.
• Road improvement works (hump removal) are complete along Queensway and Redan Place footway
• Porchester Gardens bus stop is to be suspended from 4th Feb. A temporary footpath closure will shortly be in place to allow façade frame preparation and erection. Estimated closure 6-8 weeks
ASBESTOS AND SOFT STRIP WORKS
• Asbestos survey/investigations are complete. No asbestos due to 1980’s rebuild.
• Soft strip works are continuing within the shopping centre
• Erith welfare on GF of Queensway is active.
NOISE DUST AND VIBRATION
• Real time monitors installed and active.
• Monitoring plans and trigger levels agreed with WCC
• Alerts sent if any trigger levels are breached
• Onsite testing of dust suppression equipment completed before Christmas
• Concerns raised by residents when demolition started. WCC inspectors have been onsite to monitor our methods with no concerns raised.
DEMOLITION
• Demolition of the car park began 7th January
• Demolition of the car park to be complete mid April 19
• Demolition of the car park basement slab March to end May 19
• Demolition of the main shopping centre May – Nov 19
COMMUNITY LIAISON
Liaison Group Meetings will be held every Month
Newsletters will be sent out on a monthly basis and information notices on a ad-hoc basis
Complaints Procedure:
The contact telephone number of the Erith Site Manager and Erith Communications Team will be displayed around the site boundary and contained in newsletters and notices.
If you have any queries, problems or complaints during the works, please contact the Community Liaison Manager Cherrie O’Kane or Project Manager Paul Millar
Paul Millar (Erith Project Manager)Mobile – 07584 233922 Email - [email protected]
Cherrie O’Kane (Erith Community Liaison/Conduct Manager)Mobile - 07894 259321 Email - cherrie.o'[email protected]
24hr On Site Security (direct phone number) Mobile – 07769 243525
Erith Tel No: 0370 950 8800 Email - [email protected]
NEXT LIAISON MEETING
Next liaison meeting proposed on 28th February 2019