Project Name : When North Gold Project, Zimbabwe
TECHNICAL REVIEW- INTERNAL
PROJECT NUMBER:Project Name: When North Gold Claims
Reviewed by: L. Mauled Date: 08/06/15
For Office Use
Important
Please tick what has been availed together with the other information that has been brought. CHECKED
1 Applicable prospecting / mining license; X
2 Locality/ Location data (including maps, co-odinates etc) X
3 Supporting geological, exploration or mining/production data X
4 Deal Terms X
5 Name and contact details of promoter X
**Request for missing required information.
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
2/20
Project Name : When North Gold Project, Zimbabwe
CATEGORY FACTOR COMMENTS
Location Country Zimbabwe, Africa
Investment
Sought/ CostUS$ 4 000 000 (Four million United States Dollar)
Location Province: Matebeleland North
Project is located in Motapa, Sijauke village which is 120km North west of Bulawayo.
Access is gained by taking Bulawayo Nkayi road(strip tarred road) which goes to Isabella mine .
About 10km from Nkayi turn off turn left at T- junction(Motapa turn off) to Sijauke village for 6km on gravel road.
Total Project Size: 40 Hectares
Number of gold claims: 4 Gold Claims.
Infrastructure
National road (strip tarred) Bulawayo Nkayi road passing via near the Joshua Nkomo airport
Gravel road from Motapa turn-off to Mine
Temporary zinc shelter
- Tenure Name of claim Type size Year registered
When North 2 Mining 10 hecteres 11 January 2011
When North 3 Mining 10 hectares 11 January 2011
When North 4 Mining 10 hectares 11 January 2011
When North 5 Mining 10 hectares 11 January 2011
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
3/20
Project Name : When North Gold Project, Zimbabwe
Ownership Precious Mining Syndicate
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
4/20
Project Name : When North Gold Project, Zimbabwe
Promoter Lovemore Mauled
Cell: + 27 71 980 1399
Email:[email protected]
Skype: lovemore.mauled
Geology Regional setting
& metallogenesis
When North gold claims are situated on the western margin of Bubi greenstone belt.A number of archaen greenstone belts
host the majority of gold deposits in Zimbabwe.
Mineralization is within a broad shear zone cutting through felsic schists close to contact between rocks of the
mailto:[email protected]:[email protected]:[email protected]:[email protected]7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
5/20
Project Name : When North Gold Project, Zimbabwe
Bulawayan and Shamvaian group.
Orebody widths range from 5 metres to 20 metres
Strike length is 75 to 500 metres
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
6/20
Project Name : When North Gold Project, Zimbabwe
Lithologies Andesites
Pillow basalts
Feisic Schists
Structure Economic gold mineralization is structurally controlled.
Regional rock stratigraphy and zone lie roughly parallel to a North East South East trend,undulating on
dip between 50 degrees and 70 degrees South East
Exploration History Extensive soil geochemistry, trenching, pitting and drilling activities were done by Anglo American Zimbabwe Ltd. The
data is proprietary
and is not available to the current holders of the claims at the moment.
The huge open cast Motapa mine, Isabella mine, McCays mines and Bubi mine have been mined by Anglo American .
Artisanal miners have been active in the area since the closing down of Motapa Mine.
Exploration activities near the When gold claims led to the discovery of Open pittable resources.
Other Historical
Records
Big mines around the area are:
Turk Mine,
Lonely,
Dawn,
Isabella Mine incorporating When ,McCays & Bubi mines. Anglo American has the historical production records. The
mines have excellent production records. Turk and Lonely mines are still operating but they are underground
operations.
Surface activities Sampling was done and the rock samples were taken to the following laboratories:-
Zimbabwe School of Mines (ZSM) and;
Duration gold mine laboratory
Drilling Extensive drilling was done by Anglo-America,who are the former owners of Isabella mine.
Records of the drilling are not available.
Mineralisati
on
Metal-
association and
style
Within shear zone there are a number of elongate pods of mineralization which occur as brecciated and Silicified stock-work
zones impregnated with pyrites and arsenopyrites.
Mineralogy Arsenopyrite
Pyrite
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
7/20
Project Name : When North Gold Project, Zimbabwe
Controls Economic gold mineralization is structurally controlled
Strike length Strike length ranges between 75 to 500 metres
Width and
orientation Width ranges from 5metres to 20 metres
Dip between 50 degrees to 70 degrees
Depth (open pit
potential)
Mineralization on oxidised material on top shows open cast can be done.
Resource Resource Size
and Grade
These need to determined through exploration activities such as trenching and drilling and laboratory analyses of samples
Methodology of
estimation
To be determined
Upside potential Potential to peg more gold claims around the property. This will increase the project size as well as life of mine.
Mining Study status None yet but the area presents open cast potential.
Mining method Open castable to about 60 metres
Life of mine plan To be determined.
Mining
infrastructure
None yet on the site. The project is early stage greenfield.
Historical mining Small scale gold mining has taken place in and around the claims.
Past Production No records are available at the moment.However, the mining that occurred in the surrounding areas by Anglo American Ltd
and other companies indicate that the area has potential for gold. This is also supported by the general location of the project
on the Bubi Greenstone Belt.
Reserve Needs to be determined once an interested investor/funder is found
Processing Study status &
test work
None yet
Processing
method
At the moment artisanal miners in the vicinity use custom milling at local stamp mill with a concerntrator
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
8/20
Project Name : When North Gold Project, Zimbabwe
Key risks Technical risks De risk the project by using a phased approach to any exploration program.
Litigation None known at the moment
Recommend
ation The project presents an excellent exploration and development opportunity.
It is located in a geologically good environment. Artisanal miners are found in the area and this is a good indication of
potential.
The area in which the project lies is a well known gold producing area in Zimbabwe. Successful open cast mining
operations
have been carried out by renowned companies such as Anglo American Zimbabwe (Pvt) Ltd.
Like any project, due diligence is required. A field visit is required.
Arrangements to purchase any available data relating to the When Gold claims (from Anglo American) must be made.
An preliminary budget is attached herewith.
Recommended exploration activities will include Geochemical and Geophysical methods.
Trenching, diamond drilling/or RC or Percussion drilling will need to be done so that a geological model of the
Project can be produced. This will aid the planning of any subsequent exploration programs or the development
of the project into a producing mine.
Data Source Source Project owners
Deal Terms The owners of the project are seeking for Joint Venturepartners in order to explore and develop the project into aproducing mine.
The project requires an investment in the region of R 3 707 815.00 (which can be rounded off to approximately US$4
million)
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
9/20
Project Name : When North Gold Project, Zimbabwe
Copy of Claims Licences/ Proof of Ownership
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
10/20
Project Name : When North Gold Project, Zimbabwe
Laboratory Analyses of Samples from When North Gold Claims
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
11/20
Project Name : When North Gold Project, Zimbabwe
AAS ANALYSIS RESULTS CERTIFICATE
Results of the analysis done using the AAS method are shown below. The results are shown in grams
per tonne.
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
12/20
Project Name : When North Gold Project, Zimbabwe
Nearby Mines
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
13/20
Project Name : When North Gold Project, Zimbabwe
Project BudgetExplorationEXPLORATION PLAN & RESOURCE EVALUATION
ACTIVITIES
Reconnaissance survey and Field mapping
Trenching Trenches will be dug at 100m intervals across strike, each trench 500m long and samples will be taken in each trench on bed rock
Diamond Drilling 16 holes will be drilled on the 4 claims, on a grid of 100m X 100m to investigate gold mineralization and behavior of mineralized sections
with depth, to get dip of ore body, depth and thickness of ore body. Diamond drill boreholes will be drilled to a depth of 60 metres @$150 per metre
Diamond drill cores will be logged and taken for analysis. The analysis envisaged will include Bottle roll and Fire assay.
Diamond Drilling is done to declare Resources and Reserves which assist in projecting the life span of the mine. Mining geological soft wares will be used for
ore Reserves calculations.
Compilation of a detailed Geological report with all maps, core log sheets, assay results and estimation of Life span of the mine.
Drawing up of operational plan and pit designs
Motapa (When North 2 -5 claims) EXPLORATION BUDGET
ITEM QUANTITY UNIT PRICE TOTAL (US $)
4 X 4 Bakkie(diesel) 2 $12 000 $24000
Reconnaissance Survey 1 $500 $500
Trench Samples Assaying 100 $18 $1800
Diamond DrillingBoreholes (60metres)
16 $9 000 $144 000
Core Samples Assaying 200 $18 $3 600
Stationery, internet,
phone1 $1000 $1000
Sample Bags, Twine String 1 $2000 $2000
Measuring Tape 4 $150 $600
Chisels & Hammers 4 $25 $100
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
14/20
Project Name : When North Gold Project, Zimbabwe
Picks 10 $15 $150
Shovels 10 $10 $100
Tents 5 $300 $1500
Diesel Fuel 10000 $1.50 $15 000
Food 12 $5000 $60000
TOTAL $254 350
NB: Costs to include
hiring of excavator
Labour
Project Manager@4800
per month12 4800 $57600
Geologist @ $4000 per
month12 4000 $48000
Geological Assistants
@$30/dayfor 26days2 assistants $1000 $24000
General labour @$250
per month10 general labour $250 $30000
Cook 1 300 $3600
Resource andMiningEngineering Consultants
$300 000
TOTAL $163200
LICENCES
Company Registration 1 $300 $300
Bank Account Opening 1 $500 $500
Zimbabwe Investment
Authority Licence1 $3 000 $3 000
Site of works plan 1 $500 $500
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
15/20
Project Name : When North Gold Project, Zimbabwe
Inspection Fees update 1 $400 $400
Legal fees 1 $1 000 $1 000
Environmental Impact
Assessment1 $5 000 $5 000
TOTAL $10 700
Totals For Exploration
Field Equipment 1 $242350 $254350
Labour 1 $163200 $163200
Licences 1 $10 700 $10700
Sub Total $428250
10% Contigency $42825
Grand Total $471075
_________________________________________________
PROCESSING PLANT
ITEM QUANTITY UNIT PRICE TOTAL
5 Tonne/hour ball mill 2 $70 000 $140 000Concentrators 2 $3 500 $7 000
Crusher 1 $10 000 $10 000
Ore bin 1 $8 000 $8 000
Conveyors $12 000Scrapper Winch 1 $5 000 $5 000Slurry pumps 2 $500 $1 000
Thickener 1 $30 000 $30 000100 cubic metre Leach tanks 2 $7 000 $14 000
Carbon Tanks 4 $5 000 $20 000
Elution Plant 1 $35 000 $35 0000
Total $282 000
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
16/20
Project Name : When North Gold Project, Zimbabwe
VEHICLES
ITEM QUANTITY UNIT PRICE TOTALExcavator 1 $400 000 $400 000
10 tonne tipper trucks 4 $80 000 $320 000Front End Loader 1 $250 000 $250 000
Compressors+jackhammer+hose
4 $10 000 $40 000
7 tonne truck 1 $30 000 $30 0004X4 Bakkies 4 $25 000 $100 000
Minibus 1 $20 000 $20 000
TOTAL $1 160 000
LICENCES
ITEM QUANTITY UNIT PRICE TOTAL
Rural council fee 1 $1 500 $1 500Milling permit 1 $3 000 $3 000
Borehole licence 1 $400 $400
TOTAL $4 900
TOOLS
ITEM QUANTITY UNIT PRICE TOTAL
200 kVa Generator 1 $30 000 $30 000Wheel barrows 10 $120 $1 200
Tool boxes 2 $500 $1 000
Office furniture 1 $10 000 $10 000TOTAL $42 200
____________________________________________________________________________
INFRASTRUCTURE DEVELOPMENT
ITEM QUANTITY UNIT PRICE TOTAL
Ball mill installation 2 $5 000 $10 000
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
17/20
Project Name : When North Gold Project, Zimbabwe
Office block 1 $15 000 $15 000Staff quarters 4 $5 000 $20 000
Borehole +piping 1 $15 000 $15 000Workshop 1 $5 000 $5 000
Electricity 1 $20 000 $20 000Electrical tubing 1 $10 000 $10 000
Plumbing 1 $5 000 $5 000
Fencing + signs 1 $5 000 $5 000Water Reservoirs 2 $1 000 $2 000
Magazine 1 $10 000 $10 000Guest house/ management house 1 $10 000 $10 000
Fuel storage 1 $5 000 $5 000
TOTAL $132 000
MONTHLY CONSUMABLES
ITEM QUANTITY UNIT PRICE TOTAL
Diesel 20 000 $1.50 $30 000
Electricity $10 000Explosives 30 boxes $350 $10 500
Drill bits 40 $20 $800
Drill sticks 20 $40 $800Fertilizer 20x20kg $24 $480
Cyanide 50X50kg 200 $10 000
Carbon 20X25kg $125 $2 500Solution Tests+Test Tubes $1 000
Stationery $500Telephone +Internet $2 000
Rock Drill oils $500
Maintenance spare parts $2 000
Canteen supplies $500Labour (salaries) $46 600
PPE $100 $61 $6 100
TOTAL for 12 months $1491360
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
18/20
Project Name : When North Gold Project, Zimbabwe
Figure 1 below shows artisanal miners on a Shafton the Claims.Rock samples from this shaft were taken and analysed at the laboratory and the fire
assay results obtained are as shown below.
.
Analysis Element Sample Au (ppm) Detection Limit
Fire Assay Gold 2 Top Right Reef 16.1 0.01
Fire Assay Gold Shaft 1 Bottom 0.24 0.01
Fire Assay Gold Shaft 1 Top Left 0.34 0.01
Fire Assay Gold Shaft 2 Bottom and Top 13.64 0.01
Fire Assay Gold Vimila Shaft 11.62 0.01
Fire Assay Gold Vimila South 2 10.08 0.01
Fire Assay Sample Analytical Results By Duration Gold Laboratory.
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
19/20
Project Name : When North Gold Project, Zimbabwe
Figure 1.
7/25/2019 When North Gold project seeking investors to develop in Zimbabwe
20/20
Project Name : When North Gold Project, Zimbabwe
Figure 2. Geologist standing on artisanal minersshaft