    Project Name : When North Gold Project, Zimbabwe

    TECHNICAL REVIEW- INTERNAL

    PROJECT NUMBER:Project Name: When North Gold Claims

    Reviewed by: L. Mauled Date: 08/06/15

    For Office Use

    Important

    Please tick what has been availed together with the other information that has been brought. CHECKED

    1 Applicable prospecting / mining license; X

    2 Locality/ Location data (including maps, co-odinates etc) X

    3 Supporting geological, exploration or mining/production data X

    4 Deal Terms X

    5 Name and contact details of promoter X

    **Request for missing required information.

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    2/20

    Project Name : When North Gold Project, Zimbabwe

    CATEGORY FACTOR COMMENTS

    Location Country Zimbabwe, Africa

    Investment

    Sought/ CostUS$ 4 000 000 (Four million United States Dollar)

    Location Province: Matebeleland North

    Project is located in Motapa, Sijauke village which is 120km North west of Bulawayo.

    Access is gained by taking Bulawayo Nkayi road(strip tarred road) which goes to Isabella mine .

    About 10km from Nkayi turn off turn left at T- junction(Motapa turn off) to Sijauke village for 6km on gravel road.

    Total Project Size: 40 Hectares

    Number of gold claims: 4 Gold Claims.

    Infrastructure

    National road (strip tarred) Bulawayo Nkayi road passing via near the Joshua Nkomo airport

    Gravel road from Motapa turn-off to Mine

    Temporary zinc shelter

    - Tenure Name of claim Type size Year registered

    When North 2 Mining 10 hecteres 11 January 2011

    When North 3 Mining 10 hectares 11 January 2011

    When North 4 Mining 10 hectares 11 January 2011

    When North 5 Mining 10 hectares 11 January 2011

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    3/20

    Project Name : When North Gold Project, Zimbabwe

    Ownership Precious Mining Syndicate

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    4/20

    Project Name : When North Gold Project, Zimbabwe

    Promoter Lovemore Mauled

    Cell: + 27 71 980 1399

    Email:[email protected]

    Skype: lovemore.mauled

    Geology Regional setting

    & metallogenesis

    When North gold claims are situated on the western margin of Bubi greenstone belt.A number of archaen greenstone belts

    host the majority of gold deposits in Zimbabwe.

    Mineralization is within a broad shear zone cutting through felsic schists close to contact between rocks of the

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    5/20

    Project Name : When North Gold Project, Zimbabwe

    Bulawayan and Shamvaian group.

    Orebody widths range from 5 metres to 20 metres

    Strike length is 75 to 500 metres

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    6/20

    Project Name : When North Gold Project, Zimbabwe

    Lithologies Andesites

    Pillow basalts

    Feisic Schists

    Structure Economic gold mineralization is structurally controlled.

    Regional rock stratigraphy and zone lie roughly parallel to a North East South East trend,undulating on

    dip between 50 degrees and 70 degrees South East

    Exploration History Extensive soil geochemistry, trenching, pitting and drilling activities were done by Anglo American Zimbabwe Ltd. The

    data is proprietary

    and is not available to the current holders of the claims at the moment.

    The huge open cast Motapa mine, Isabella mine, McCays mines and Bubi mine have been mined by Anglo American .

    Artisanal miners have been active in the area since the closing down of Motapa Mine.

    Exploration activities near the When gold claims led to the discovery of Open pittable resources.

    Other Historical

    Records

    Big mines around the area are:

    Turk Mine,

    Lonely,

    Dawn,

    Isabella Mine incorporating When ,McCays & Bubi mines. Anglo American has the historical production records. The

    mines have excellent production records. Turk and Lonely mines are still operating but they are underground

    operations.

    Surface activities Sampling was done and the rock samples were taken to the following laboratories:-

    Zimbabwe School of Mines (ZSM) and;

    Duration gold mine laboratory

    Drilling Extensive drilling was done by Anglo-America,who are the former owners of Isabella mine.

    Records of the drilling are not available.

    Mineralisati

    on

    Metal-

    association and

    style

    Within shear zone there are a number of elongate pods of mineralization which occur as brecciated and Silicified stock-work

    zones impregnated with pyrites and arsenopyrites.

    Mineralogy Arsenopyrite

    Pyrite

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    7/20

    Project Name : When North Gold Project, Zimbabwe

    Controls Economic gold mineralization is structurally controlled

    Strike length Strike length ranges between 75 to 500 metres

    Width and

    orientation Width ranges from 5metres to 20 metres

    Dip between 50 degrees to 70 degrees

    Depth (open pit

    potential)

    Mineralization on oxidised material on top shows open cast can be done.

    Resource Resource Size

    and Grade

    These need to determined through exploration activities such as trenching and drilling and laboratory analyses of samples

    Methodology of

    estimation

    To be determined

    Upside potential Potential to peg more gold claims around the property. This will increase the project size as well as life of mine.

    Mining Study status None yet but the area presents open cast potential.

    Mining method Open castable to about 60 metres

    Life of mine plan To be determined.

    Mining

    infrastructure

    None yet on the site. The project is early stage greenfield.

    Historical mining Small scale gold mining has taken place in and around the claims.

    Past Production No records are available at the moment.However, the mining that occurred in the surrounding areas by Anglo American Ltd

    and other companies indicate that the area has potential for gold. This is also supported by the general location of the project

    on the Bubi Greenstone Belt.

    Reserve Needs to be determined once an interested investor/funder is found

    Processing Study status &

    test work

    None yet

    Processing

    method

    At the moment artisanal miners in the vicinity use custom milling at local stamp mill with a concerntrator

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    8/20

    Project Name : When North Gold Project, Zimbabwe

    Key risks Technical risks De risk the project by using a phased approach to any exploration program.

    Litigation None known at the moment

    Recommend

    ation The project presents an excellent exploration and development opportunity.

    It is located in a geologically good environment. Artisanal miners are found in the area and this is a good indication of

    potential.

    The area in which the project lies is a well known gold producing area in Zimbabwe. Successful open cast mining

    operations

    have been carried out by renowned companies such as Anglo American Zimbabwe (Pvt) Ltd.

    Like any project, due diligence is required. A field visit is required.

    Arrangements to purchase any available data relating to the When Gold claims (from Anglo American) must be made.

    An preliminary budget is attached herewith.

    Recommended exploration activities will include Geochemical and Geophysical methods.

    Trenching, diamond drilling/or RC or Percussion drilling will need to be done so that a geological model of the

    Project can be produced. This will aid the planning of any subsequent exploration programs or the development

    of the project into a producing mine.

    Data Source Source Project owners

    Deal Terms The owners of the project are seeking for Joint Venturepartners in order to explore and develop the project into aproducing mine.

    The project requires an investment in the region of R 3 707 815.00 (which can be rounded off to approximately US$4

    million)

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    9/20

    Project Name : When North Gold Project, Zimbabwe

    Copy of Claims Licences/ Proof of Ownership

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    10/20

    Project Name : When North Gold Project, Zimbabwe

    Laboratory Analyses of Samples from When North Gold Claims

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    11/20

    Project Name : When North Gold Project, Zimbabwe

    AAS ANALYSIS RESULTS CERTIFICATE

    Results of the analysis done using the AAS method are shown below. The results are shown in grams

    per tonne.

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    12/20

    Project Name : When North Gold Project, Zimbabwe

    Nearby Mines

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    13/20

    Project Name : When North Gold Project, Zimbabwe

    Project BudgetExplorationEXPLORATION PLAN & RESOURCE EVALUATION

    ACTIVITIES

    Reconnaissance survey and Field mapping

    Trenching Trenches will be dug at 100m intervals across strike, each trench 500m long and samples will be taken in each trench on bed rock

    Diamond Drilling 16 holes will be drilled on the 4 claims, on a grid of 100m X 100m to investigate gold mineralization and behavior of mineralized sections

    with depth, to get dip of ore body, depth and thickness of ore body. Diamond drill boreholes will be drilled to a depth of 60 metres @$150 per metre

    Diamond drill cores will be logged and taken for analysis. The analysis envisaged will include Bottle roll and Fire assay.

    Diamond Drilling is done to declare Resources and Reserves which assist in projecting the life span of the mine. Mining geological soft wares will be used for

    ore Reserves calculations.

    Compilation of a detailed Geological report with all maps, core log sheets, assay results and estimation of Life span of the mine.

    Drawing up of operational plan and pit designs

    Motapa (When North 2 -5 claims) EXPLORATION BUDGET

    ITEM QUANTITY UNIT PRICE TOTAL (US $)

    4 X 4 Bakkie(diesel) 2 $12 000 $24000

    Reconnaissance Survey 1 $500 $500

    Trench Samples Assaying 100 $18 $1800

    Diamond DrillingBoreholes (60metres)

    16 $9 000 $144 000

    Core Samples Assaying 200 $18 $3 600

    Stationery, internet,

    phone1 $1000 $1000

    Sample Bags, Twine String 1 $2000 $2000

    Measuring Tape 4 $150 $600

    Chisels & Hammers 4 $25 $100

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    14/20

    Project Name : When North Gold Project, Zimbabwe

    Picks 10 $15 $150

    Shovels 10 $10 $100

    Tents 5 $300 $1500

    Diesel Fuel 10000 $1.50 $15 000

    Food 12 $5000 $60000

    TOTAL $254 350

    NB: Costs to include

    hiring of excavator

    Labour

    Project Manager@4800

    per month12 4800 $57600

    Geologist @ $4000 per

    month12 4000 $48000

    Geological Assistants

    @$30/dayfor 26days2 assistants $1000 $24000

    General labour @$250

    per month10 general labour $250 $30000

    Cook 1 300 $3600

    Resource andMiningEngineering Consultants

    $300 000

    TOTAL $163200

    LICENCES

    Company Registration 1 $300 $300

    Bank Account Opening 1 $500 $500

    Zimbabwe Investment

    Authority Licence1 $3 000 $3 000

    Site of works plan 1 $500 $500

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    15/20

    Project Name : When North Gold Project, Zimbabwe

    Inspection Fees update 1 $400 $400

    Legal fees 1 $1 000 $1 000

    Environmental Impact

    Assessment1 $5 000 $5 000

    TOTAL $10 700

    Totals For Exploration

    Field Equipment 1 $242350 $254350

    Labour 1 $163200 $163200

    Licences 1 $10 700 $10700

    Sub Total $428250

    10% Contigency $42825

    Grand Total $471075

    _________________________________________________

    PROCESSING PLANT

    ITEM QUANTITY UNIT PRICE TOTAL

    5 Tonne/hour ball mill 2 $70 000 $140 000Concentrators 2 $3 500 $7 000

    Crusher 1 $10 000 $10 000

    Ore bin 1 $8 000 $8 000

    Conveyors $12 000Scrapper Winch 1 $5 000 $5 000Slurry pumps 2 $500 $1 000

    Thickener 1 $30 000 $30 000100 cubic metre Leach tanks 2 $7 000 $14 000

    Carbon Tanks 4 $5 000 $20 000

    Elution Plant 1 $35 000 $35 0000

    Total $282 000

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    16/20

    Project Name : When North Gold Project, Zimbabwe

    VEHICLES

    ITEM QUANTITY UNIT PRICE TOTALExcavator 1 $400 000 $400 000

    10 tonne tipper trucks 4 $80 000 $320 000Front End Loader 1 $250 000 $250 000

    Compressors+jackhammer+hose

    4 $10 000 $40 000

    7 tonne truck 1 $30 000 $30 0004X4 Bakkies 4 $25 000 $100 000

    Minibus 1 $20 000 $20 000

    TOTAL $1 160 000

    LICENCES

    ITEM QUANTITY UNIT PRICE TOTAL

    Rural council fee 1 $1 500 $1 500Milling permit 1 $3 000 $3 000

    Borehole licence 1 $400 $400

    TOTAL $4 900

    TOOLS

    ITEM QUANTITY UNIT PRICE TOTAL

    200 kVa Generator 1 $30 000 $30 000Wheel barrows 10 $120 $1 200

    Tool boxes 2 $500 $1 000

    Office furniture 1 $10 000 $10 000TOTAL $42 200

    ____________________________________________________________________________

    INFRASTRUCTURE DEVELOPMENT

    ITEM QUANTITY UNIT PRICE TOTAL

    Ball mill installation 2 $5 000 $10 000

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    17/20

    Project Name : When North Gold Project, Zimbabwe

    Office block 1 $15 000 $15 000Staff quarters 4 $5 000 $20 000

    Borehole +piping 1 $15 000 $15 000Workshop 1 $5 000 $5 000

    Electricity 1 $20 000 $20 000Electrical tubing 1 $10 000 $10 000

    Plumbing 1 $5 000 $5 000

    Fencing + signs 1 $5 000 $5 000Water Reservoirs 2 $1 000 $2 000

    Magazine 1 $10 000 $10 000Guest house/ management house 1 $10 000 $10 000

    Fuel storage 1 $5 000 $5 000

    TOTAL $132 000

    MONTHLY CONSUMABLES

    ITEM QUANTITY UNIT PRICE TOTAL

    Diesel 20 000 $1.50 $30 000

    Electricity $10 000Explosives 30 boxes $350 $10 500

    Drill bits 40 $20 $800

    Drill sticks 20 $40 $800Fertilizer 20x20kg $24 $480

    Cyanide 50X50kg 200 $10 000

    Carbon 20X25kg $125 $2 500Solution Tests+Test Tubes $1 000

    Stationery $500Telephone +Internet $2 000

    Rock Drill oils $500

    Maintenance spare parts $2 000

    Canteen supplies $500Labour (salaries) $46 600

    PPE $100 $61 $6 100

    TOTAL for 12 months $1491360

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    18/20

    Project Name : When North Gold Project, Zimbabwe

    Figure 1 below shows artisanal miners on a Shafton the Claims.Rock samples from this shaft were taken and analysed at the laboratory and the fire

    assay results obtained are as shown below.

    .

    Analysis Element Sample Au (ppm) Detection Limit

    Fire Assay Gold 2 Top Right Reef 16.1 0.01

    Fire Assay Gold Shaft 1 Bottom 0.24 0.01

    Fire Assay Gold Shaft 1 Top Left 0.34 0.01

    Fire Assay Gold Shaft 2 Bottom and Top 13.64 0.01

    Fire Assay Gold Vimila Shaft 11.62 0.01

    Fire Assay Gold Vimila South 2 10.08 0.01

    Fire Assay Sample Analytical Results By Duration Gold Laboratory.

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    19/20

    Project Name : When North Gold Project, Zimbabwe

    Figure 1.

  • 7/25/2019 When North Gold project seeking investors to develop in Zimbabwe

    20/20

    Project Name : When North Gold Project, Zimbabwe

    Figure 2. Geologist standing on artisanal minersshaft