Copyright © 2017 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com innacle created the 3D Model of Wheaton P Library & Community Centre - an educational project, for new building construction. The educational building included basic Architectural Model creation for the 4 Floors (Ground, 1st, 2nd and Roof) comprising of Digital Access Area, World Language Room, Large Multipurpose Staff Conference Room, Gymnasium, Book Sale Area, Store, Staff Office, Rest Room, Study Room, Kitchen, Library, Children Program Room, Service Corridor and more. Challenges & Solutions Solution: We have raised RFIs to client for the dimension mismatch and other discrepancies in the input document. We have organized Go to Meeting with the client every week to take their suggestion and resolved the concern based on our expertise and research. Architectural BIM Model Scope of Work Trades Covered: Architecture, Structure, Plumbing, Electrical/Fire Alarm Software Used: Autodesk Fabrication CAD MEP 2015 & Revit 2015 LOD: 300 Our scope of work for the project included creation of Architectural 3D model of exterior wall, interior wall, curtain wall, ceiling, door, window, roof, We have also created Structural 3D model of Foundation & Footing, Grade Beams, Piles & Pile Caps, Slab on grade, Concrete Wall, Column, Ramps, Floor, Deck, Beams, Tie Column, Bracing and Curb Wall. Input Challenge: Input Document Mismatch pertaining to mismatch in Room Dimension, Alignment and Fascade Dimension. BIM Start Date January, 2016 Project Area 166,888 Sq ft Architect 5 Engineers Grimm & Parker Team Size Developer/Owner Montgomerry Country, Maryland BIM End Date February, 2016 Pinnacle’s Value Addition We have provided clash free coordinated model to client through our in-house coordination, by closely monitoring all processes even after completion of coordination and have successfully completed the project within stipulated deadline. Architectural BIM Model

WHEATON LIBRARY AND COMMUNITY CENTRE … · Library & Community Centre - an educational project, for new building construction. The educational building included basic Architectural

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WHEATON LIBRARY AND COMMUNITY CENTRE … · Library & Community Centre - an educational project, for new building construction. The educational building included basic Architectural

Copyright © 2017 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

innacle created the 3D Model of Wheaton PLibrary & Community Centre - an educational project, for new building construction. The

educational building included basic Architectural Model creation for the 4 Floors (Ground, 1st, 2nd and Roof) comprising of Digital Access Area, World Language Room, Large Multipurpose Staff Conference Room, Gymnasium, Book Sale Area, Store, Staff Office, Rest Room, Study Room, Kitchen, Library, Children Program Room, Service Corridor and more.

Challenges & Solutions

Solution: We have raised RFIs to client for the dimension mismatch and other discrepancies in the input document. We have organized Go to Meeting with the client every week to take their suggestion and resolved the concern based on our expertise and research.

Architectural BIM Model

Scope of Work

Trades Covered: Architecture, Structure,

Plumbing, Electrical/Fire Alarm

Software Used: Autodesk Fabrication CAD

MEP 2015 & Revit 2015

LOD: 300

Our scope of work for the project included creation of Architectural 3D model of exterior wall, interior wall, curtain wall, ceiling, door, window, roof, We have also created Structural 3D model of Foundation & Footing, Grade Beams, Piles & Pile Caps, Slab on grade, Concrete Wall, Column, Ramps, Floor, Deck, Beams, Tie Column, Bracing and Curb Wall.

Input Challenge: Input Document Mismatch pertaining to mismatch in Room Dimension, Alignment and Fascade Dimension.

BIM Start Date January, 2016

Project Area 166,888 Sq ft

Architect

5 Engineers

Grimm & Parker

Team Size

Developer/Owner Montgomerry Country, Maryland

BIM End Date February, 2016

Pinnacle’s Value Addition

We have provided clash free coordinated model to client through our in-house coordination, by closely monitoring all processes even after completion of coordination and have successfully completed the project within stipulated deadline.

3D BIM Model

WHEATON LIBRARY AND COMMUNITY CENTRE

Wharton, New Jersey, USA

[Educational]

Architectural BIM Model