WHAT PEOPLE ARE SAYING JANUARY 2010 "To visually illustrate the concrete wall pour schedule to the sub-contractors, I imported a shop drawing PDF into Google SketchUp, created a model off of it, and then imported the 3D SketchUp model and the Oracle Primavera P6 schedule into Synchro where the model and schedule were merged to create the 4D schedule. Stepping through the 4D schedule live in Synchro made for a very effective discussion for the wall pour sequencing. We were all able to visually walk through it and thoroughly understand the sequencing. The 4D Synchro schedule was also shown to the owner and they were very impressed with the clarity and understanding it brought to the schedule." --Steve Szoke, Regional Scheduling Executive Western Regional Office, Gilbane Building Company (See Case Study.) "We used Synchro's 4D BIM schedule simulation to communicate among the project stakeholders the complex construction sequences and site logistics. The ability to see clearly the schedule sequences creates a team dialogue and encourages creative problem solving." --Michael Piotrkowski, Director of Technical Development, Rudolph and Sletten (See Case Study.) "Synchro has been useful at UCSF to schedule site logistics. It is so helpful to identify and address potential scheduling problems early with 4D BIM software." --Mitch Boryslawski, Principal at View By View (See Case Study.) "This year we've seen the highest standard of award entries yet and competition has been incredibly tough. The ongoing judging process has been rigorous and the panel faces a major challenge deciding the final winners. It's fantastic to see the quality and diversity of technology companies the West Midlands region has to offer." -- Mike Musson, ICT Cluster Manager, West Midlands ICT Cluster on Synchro's Shortlisting in the ICT Excellence Awards for "2009 Best Innovative Product" (See Full News Story.) "The multiple viewsthe bird's eye and plan viewsare key to showing the overall picture. In some high impact decisions it really helps to bring everyone onto the same page. Everything we have asked Synchro to do, it has done. It was very easy for me to pick up. We've got some pretty big plans for interfacing 3D drawings with Synchro." -- John Cassano, Schedule and Cost Control Engineer, New Generation Construction, Manitoba Hydroelectric (See Case Study.) "We attended this year's CMAA Conference, cameras ready, to get footage of what's new and interesting in construction software. The most cutting edge demo we saw was Synchro's collaboration with Google SketchUp. Synchro enables project managers to integrate 3D drawings with Google SketchUp with project scheduling (time being the 4 th dimension). It's pretty cool stuff." -- Source: Houston Neal, SoftwareAdvice.com "I hear a lot that there are things you just can't see. Synchro allows us to take the model, assemble it, put it to a schedule and analyze it. Synchro helps visualize potential problems and allows you to better assess the situation at any given time. Synchro is extremely user-friendly. It's the best 4-D scheduling asset around." -- Jim Schrader, BIM Manager, Power Construction Company, LLC (See Case Study.) "The real appeal of Synchro in South America is to help large-scale, construction project management come alive vividly through project simulation modelling in 4D. Widely accepted Primavera scheduling solutions, like P6, add significant value by delivering to our customers leading-edge technology to save them valuable time and money by identifying, avoiding and addressing early those construction problems that could, otherwise, go unseen until much later when they can cause project delays and cost much more money to fix." --Jorge Rossini, Director, Verano Engenharia de Sistemas "Synchro helped us demonstrate our knowledge of the project and our ability to solve key issues through the use of 4D simulation. It gave us the means as a communications tool and helped us show that the Turner Team would be a collaborative partner in one of the largest public works projects in the history of Sacramento County. This was a tool for collaborating with and communicating to owners." -- Ken Harms, VPBusiness Development at Turner Construction on Sacramento Airport (See Case Study.) "We are excited about Synchro combined with Primavera solutions helping our customers to better understand the interdependencies of their projects through visual simulation." -- Jim Fairchild, Managing Director, Primavera Australia Pty Ltd "If a picture is worth a thousand words, then what do 10,000 animated pictures, acting together, say? To us, they say that this is how it was built." -- Shawn Pressley, Director of Project Management Systems and Development, Hill International Inc. (See Case Study.)

What People Are Saying about Synchro

Embed Size (px)

DESCRIPTION

Testimonials from client usersand the press.

Citation preview

Page 1: What People Are Saying about Synchro

WHAT PEOPLE ARE SAYING

JANUARY 2010

"To visually illustrate the concrete wall pour schedule to the sub-contractors, I imported a shop drawing PDF

into Google SketchUp, created a model off of it, and then imported the 3D SketchUp model and the Oracle Primavera P6 schedule into Synchro where the model and schedule were merged to create the 4D schedule. Stepping through the 4D schedule live in Synchro made for a very effective discussion for the wall pour sequencing. We were all able to visually walk through it and thoroughly understand the sequencing. The 4D Synchro schedule was also shown to the owner and they were very impressed with the clarity and understanding it brought to the schedule." --Steve Szoke, Regional Scheduling Executive – Western Regional Office, Gilbane Building Company (See Case Study.)

"We used Synchro's 4D BIM schedule simulation to communicate among the project stakeholders the complex construction sequences and site logistics. The ability to see clearly the schedule sequences creates a team dialogue and encourages creative problem solving." --Michael Piotrkowski, Director of Technical Development, Rudolph and Sletten (See Case Study.)

"Synchro has been useful at UCSF to schedule site logistics. It is so helpful to identify and address potential scheduling problems early with 4D BIM software."

--Mitch Boryslawski, Principal at View By View (See Case Study.) "This year we've seen the highest standard of award entries yet and competition has been incredibly tough. The ongoing judging process has been rigorous and the panel faces a major challenge deciding the final winners. It's fantastic to see the quality and diversity of technology companies the West Midlands region has to offer." -- Mike Musson, ICT Cluster Manager, West Midlands ICT Cluster on Synchro's Shortlisting in the ICT Excellence Awards for "2009 Best Innovative Product" (See Full News Story.) "The multiple views– the bird's eye and plan views– are key to showing the overall picture. In some high impact decisions it really helps to bring everyone onto the same page. Everything we have asked Synchro to do, it has done. It was very easy for me to pick up. We've got some pretty big plans for interfacing 3D drawings with Synchro." -- John Cassano, Schedule and Cost Control Engineer, New Generation Construction, Manitoba Hydroelectric (See Case Study.)

"We attended this year's CMAA Conference, cameras ready, to get footage of what's new and interesting in

construction software. The most cutting edge demo we saw was Synchro's collaboration with Google SketchUp. Synchro enables project managers to integrate 3D drawings with Google SketchUp with project scheduling (time being the 4th dimension). It's pretty cool stuff." -- Source: Houston Neal, SoftwareAdvice.com "I hear a lot that there are things you just can't see. Synchro allows us to take the model, assemble it, put it to a schedule and analyze it. Synchro helps visualize potential problems and allows you to better assess the situation at any given time. Synchro is extremely user-friendly. It's the best 4-D scheduling asset around." -- Jim Schrader, BIM Manager, Power Construction Company, LLC (See Case Study.)

"The real appeal of Synchro in South America is to help large-scale, construction project management come

alive vividly through project simulation modelling in 4D. Widely accepted Primavera scheduling solutions, like P6, add significant value by delivering to our customers leading-edge technology to save them valuable time and money by identifying, avoiding and addressing early those construction problems that could, otherwise, go unseen until much later when they can cause project delays and cost much more money to fix." --Jorge Rossini, Director, Verano Engenharia de Sistemas

"Synchro helped us demonstrate our knowledge of the project and our ability to solve key issues through the

use of 4D simulation. It gave us the means as a communications tool and helped us show that the Turner Team would be a collaborative partner in one of the largest public works projects in the history of Sacramento County. This was a tool for collaborating with and communicating to owners." -- Ken Harms, VP–Business Development at Turner Construction on Sacramento Airport (See Case Study.)

"We are excited about Synchro combined with Primavera solutions helping our customers to better understand

the interdependencies of their projects through visual simulation." -- Jim Fairchild, Managing Director, Primavera Australia Pty Ltd

"If a picture is worth a thousand words, then what do 10,000 animated pictures, acting together, say? To us, they say that this is how it was built." -- Shawn Pressley, Director of Project Management Systems and Development, Hill International Inc. (See Case Study.)

Page 2: What People Are Saying about Synchro

2

"Synchro allows us to maintain control of an ever changing worksite. It is the finest management

system ever built for the construction industry." -- Adrian Greenhalghe, Commercial Director, Kier Build (See Case Study.)

"Synchro has had a definite, positive impact on the project team. While it's possible to create an image of a building in your mind, to see it take shape on screen, in sequence, creates a much more effective shared understanding with the entire delivery team. Synchro also provides a unique 'usability' factor." -- Christopher Seliga, First Vice President of Tishman Construction (See Case Study.)

"I still don't know how you managed it all. The only trouble is that nobody will believe that this was

done in two days!" -- Paul Goodman-Simpson, Managing Director of CAD Visual UK Ltd., Manager of Best Design Award Team using Synchro in global, 48-hour, BuildLondonLive Competition. Source: MSNBC, July 17, 2008

"Synchro provides the graphic simulation needed to deliver and improve construction solutions for our clients, along with a real time based 4D model for idea generation and problem solving within the project team." -- Rob Owen, Director at Mace Group Ltd., using Synchro for Tate Modern and the Glass Shard at London Bridge. (See Case Study.)

"We are moving toward all our new work to be based in 3D onto which a 4D and 5D planning

capability is superimposed.After reviewing available options in the market place, we opted to trial Synchro for its unique and dynamic synchronization of the ASTA schedule of activities and CAD drawing revisions needed to simulate and optimize results." -- Gary Taylor at Expanded of Laing O'Rourke Group on One Hyde Park. (See Case Study.)

"It is notable that the world's most advanced 4D system is produced by Synchro." -- Source: 2008 BIM revolution: Centre for Process Innovation "We will work closely with Synchro to build awareness in construction project management software among regional companies, encouraging these companies to make this an essential part of their business process." -- Bassam Al Samman, CEO and Founder of CMCS

Synchro Ltd Online: Design Hub 2.3 www.synchroltd.com Coventry University Technology Park t: +44 (0) 2476 792209 Swift Road, Coventry CV1 2TT