WEST PALM BEACH AREAELEMENTARY SCHOOL 06-D

Project No.: 400000006

GMP Proposa lApr i l 1 , 2008

Page 2: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DGMP Proposal

April 1, 2008

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY

2. GUARANTEED MAXIMUM PRICEa. Exhibit B - GMP Summaryb. Itemization of Exhibit Bc. Value Engineeringd. Allowances

3. EXHIBITS

a. Exhibit D - Personnel Assigned & Summary of Construction Phase Feeb. Exhibit E - CM Staff Per Diemc. Exhibit Sd. Exhibit I - Builder's Risk Questionnairee. Beneficial Interest Affidavit

4. QUALIFICATIONS AND CLARIFICATIONS

5. SCHEDULEa. Schedule Narrativeb. CPM Schedule

6. M/WBEa. Letter of Intentb. M/WBE Certificationc. Appendix D- Statement of Good Faith Effortsd. Appendix E - Good Faith Efforts MWBE Sub Participation

7. DOCUMENT LIST

Page 3: WEST PALM BEACH AREA

1. Executive Summary

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

Page 4: WEST PALM BEACH AREA

WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-D WEST PALM BEACH, FLORIDA

MONTHLY REPORT

April 1, 2008

Suffolk Construction Company, Inc. Page 1 of 2 Monthly Report

EXECUTIVE SUMMARY The West Palm Beach Area Elementary School 06-D Project is a Construction Management at Risk Project designed by Zyscovich, Inc. The project consist of two buildings; a Covered PE Shelter Building and a U-shaped building consisting of a three-story Classroom section, a two-story Administration/ Reading Room section and a one-story Kitchen/ Dinning/ Lab/ Mechanical section totaling approximately 130,441 square feet. The total student station capacity is 996. The project includes a full site work package including; Multipurpose Fields, Playcourts, Bus Loop, Parking Lots, Offsite Utility Improvements, Lift Station Upgrades and Road Widening. The design consists of tilt-up construction with a concrete slab, precast concrete joists and a modified bitumen roofing system accented with towers, metal trusses and cement roof tile. Interior finishes include drywall, veneer plaster, VCT, quarry tile and full elementary school amenities as outlined in the documents. DELIVERABLES Multiple GMP’s are not required. While the land swap issue affected interim delivery dates in the schedule, the entire team worked to overcome this challenge and it is still anticipated that approval will occur at the April 2008 Board meeting. MARKET ANALYSIS There was excellent subcontractor coverage in all areas on the 06-D project with very intense competition among the bidders. Capacity is readily available with many trades in almost all CSI divisions. This has resulted in numbers coming in significantly below the previous DD estimate. It should be noted, however, that several large increases in scope were added to this GMP proposal that were not included in our March 12, 2008 GMP proposal such as going LEED certified and added precast site walls. This has caused us to currently exceed the Owner budget as indicated below. So far in 2008, we continue to receive notice of material price increases primarily due to strong overseas demand particularly in the price of steel. We have also received notice of further price increases in steel in the next few months which will have an affect on the cost of pipe and structural steel components, as well as, glass products. Continued volatility can be expected in commodities prices due to this strong overseas demand for all types of building materials. However, due to the local slow down, it is expected that any material price increases may be offset during buy-out if the project moves forward quickly and sub prices can be locked in.

Page 5: WEST PALM BEACH AREA

WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-D WEST PALM BEACH, FLORIDA

MONTHLY REPORT

April 1, 2008

Suffolk Construction Company, Inc. Page 2 of 2 Monthly Report

ISSUES PENDING There are no significant issues pending that could affect the anticipated May 2008 start of this project. There has been a recent decision to proceed with a LEED certified project. The architect and the CM are working together to develop a preliminary order of magnitude on the anticipated costs. SCHEDULE NARRATIVE

The revised project time line is as follows:

100% Construction Documents/ GMP:

• 3/25/08 = Final GMP submittal to Owner • 4/23/08 = Board Meeting to approve GMP

Construction:

• Anticipated Notice to Proceed: 5/15/08 • Substantial Completion of Buildings: 6/15/09 • Final Completion of Buildings: 9/14/09

FINAL GMP Final GMP $24,944,679.00 ACCOUNTING NARRATIVE One billing for the schematic design development estimate has been issued to the SDPBC for Preconstruction Services.

Page 6: WEST PALM BEACH AREA

2. Guaranteed Maximum Price

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

Page 7: WEST PALM BEACH AREA
Page 8: WEST PALM BEACH AREA

1st Floor 66,1992nd Floor 36,990

04/01/08 GMP PROPOSAL ESTIMATE 3rd Floor 27,252PROJECT: WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-DLOCATION: WEST PALM BEACH, FLORIDA TOTAL AREA (SF) 130,441BID DATE: March 18, 2008

STUDENT STATIONS 996SPEC DIVISION

SECTION TRADE ITEM GMP COST/GSF TOTAL

DIV 01 GENERAL REQUIREMENTS $66,000Temporary Construction Fencing $66,000 $0.51

DIV 02 SITEWORK $2,427,90002110 Site Clearing In Earthwork02200 Earthwork $1,535,600 $11.77

Stacy Street Road Improvements $162,300 $1.2402280 Soil Treatment for Termite Control In Tilt Up Conc02400 Asphalt Paving In Earthwork02520 Concrete Paving In Earthwork02540 Athletic Surfacing $44,200 $0.3402565 Underground LP Storage and Distribution Excluded02580 Pavement Marking In Earthwork02685 Gas Piping Excluded02660 Water Distribution System In Earthwork02670 Irrigation Water Well In Trees, Plants 02700 Site Drainage Utilities In Earthwork02730 Sanitary Sewerage Utilities In Earthwork02733 Waste Water Pump Station In Earthwork02800 Site Improvements and Amenities $6,600 $0.0502810 Underground Irrigation System In Trees, Plants 02825 Decorative Metal Fencing & Gates Not Applicable02831 Chain Link Fencing $245,500 $1.8802853 Parking Bumpers In Earthwork02931 Tree & Plant Protection In Trees, Plants 02932 Sodding In Trees, Plants 02950 Trees, Plants, and Ground Cover $318,700 $2.44

Precast Concrete Wall $115,000 $0.88

DIV 03 CONCRETE $4,217,00003100 Concrete Formwork In Tilt Up Conc03200 Concrete Reinforcement In Tilt Up Conc03300 Cast-in-Place Concrete In Tilt Up Conc03341 Fibrous Concrete Reinforced In Tilt Up Conc03346 Concrete Floor Finishing In Tilt Up Conc03410 Precast Prestressed Concrete Joists & Beams $928,100 $7.1203411 Structural Precast Concrete In Precast Joists03470 Tilt-Up Precast Concrete $3,288,900 $25.2103521 Insulating Concrete Fill In Mod Bit Roofing

DIV 04 MASONRY $148,30004100 Mortar & Grout In Unit Masonry04270 Glass Unit Masonry Not Applicable04300 Unit Masonry System $148,300 $1.1404340 Reinforced Unit Masonry System In Unit Masonry

DIV 05 STRUCTURAL STEEL $371,30005120 Structural Steel $325,500 $2.5005210 Steel Joists & Joist Girders In Structural Stl05310 Steel Deck In Structural Stl05400 Cold Formed Metal Framing In Gyp Brd Sys05500 Metal Fabrications In Structural Stl05510 Metal Stairs In Structural Stl05520 Handrails & Railings In Structural Stl05531 Gratings & Floor Plates In Structural Stl05805 Expansion Joint Assemblies $10,600 $0.08

Metal Trusses $35,200 $0.27

Page 9: WEST PALM BEACH AREA

1st Floor 66,1992nd Floor 36,990

04/01/08 GMP PROPOSAL ESTIMATE 3rd Floor 27,252PROJECT: WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-DLOCATION: WEST PALM BEACH, FLORIDA TOTAL AREA (SF) 130,441BID DATE: March 18, 2008

STUDENT STATIONS 996SPEC DIVISION

SECTION TRADE ITEM GMP COST/GSF TOTAL

DIV 06 WOOD & PLASTICS $808,92206100 Rough Carpentry $65,222 $0.5006410 Custom Casework $743,700 $5.70

DIV 07 THERMAL & MOISTURE PROT. $566,70007120 Fluid Applied Waterproofing $43,000 $0.3307135 Sheet Membrane Waterproofing In Fluid Waterproof.07160 Bituminous Damproofing In Fluid Waterproof.07181 Water Repellent Penetrant In Fluid Waterproof.07191 Vapor Retarders In Tilt Up Conc07212 Extruded Polystrene Board Insulation In Trades07213 Building Insulation In Drywall07214 Foamed-In-Place Insulation In Masonry07255 Cementitious Fireproofing Not Applicable07311 Asphalt Shingles Not Applicable07320 Cement Roofing Tiles In Mod Bit Roofing07465 Metal Wall Panels Not Applicable07536 Modified Bitumen Roofing System $523,700 $4.0107565 Preparation for Re-Roofing Not Applicable07610 Metal Roof Panels In Mod Bit Roofing07620 Sheet-Metal Flashing & Trim In Mod Bit Roofing07724 Roof Hatches In Mod Bit Roofing07840 Firestop Systems In Trades07900 Joint Sealants In Fluid Waterproof.

DIV 08 DOORS & WINDOWS $999,50008110 Hollow Metal Frames $421,400 $3.23

Door/Hardware Installation $63,000 $0.4808210 Solid Core Wood Doors In HMF08305 Access Doors/Hatches $10,000 $0.0808520 Aluminum Windows $502,900 $3.8608710 Door Hardware In HMF08800 Glass & Glazing In Alum Windows

Overhead Coiling Doors $2,200 $0.02

DIV 09 FINISHES $2,188,80009111 Metal Stud Framing System In Gyp Brd Sys09206 Metal Furring & Lathing In Gyp Brd Sys09210 Gypsum Veneer Plaster In Gyp Brd Sys09215 Veneer Plaster In Gyp Brd Sys09220 Portland Cement Plaster In Gyp Brd Sys09250 Gypsum Board Systems $1,276,300 $9.7809311 Ceramic Tile $256,700 $1.9709330 Quarry Tile In Ceramic Tile09511 Suspended Acoustical Ceiling System $170,900 $1.3109520 Acoustical Wall Panels In Acoustical Ceilings09546 Linear Metal Ceiling Not Applicable09640 Wood Flooring Not Applicable09650 Resilient Flooring $272,700 $2.0909682 Tile Carpet In Resilient Flooring09688 Carpet - Non-Modular Not Applicable09900 Painting $212,200 $1.63

DIV 10 MISC. SPECIALTIES $567,90010100 Marker Boards & Tack Boards $58,100 $0.4510171 Toilet Compartments, Urinal Screens, Shower Cubicles $5,400 $0.0410196 Cubicle Curtains $800 $0.01

Page 10: WEST PALM BEACH AREA

1st Floor 66,1992nd Floor 36,990

04/01/08 GMP PROPOSAL ESTIMATE 3rd Floor 27,252PROJECT: WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-DLOCATION: WEST PALM BEACH, FLORIDA TOTAL AREA (SF) 130,441BID DATE: March 18, 2008

STUDENT STATIONS 996SPEC DIVISION

SECTION TRADE ITEM GMP COST/GSF TOTAL10211 Fixed Metal Wall Louvers In HVAC10260 Wall Protection Systems $12,800 $0.1010350 Flagpoles $6,800 $0.0510415 Display Cases $16,300 $0.1210420 Plaque In Signage10441 Identifying Devices $64,900 $0.5010443 Exterior Marquee Sign In Identifying Dev.10508 Metal Wardrobe Lockers $7,000 $0.0510522 Fire Extinguishers, Cabinets & Accessories $9,900 $0.0810532 Aluminum Walkway Covers $241,500 $1.8510605 Wire Mesh Partitions $4,300 $0.0310675 Metal Shelving $52,400 $0.4010800 Toilet & Bath Accessories $87,700 $0.67

DIV 11 EQUIPMENT $455,000Library Theft Detection System Not Applicable

11026 Safe $10,000 $0.0811062 Stage Curtains Cotton Not Applicable11063 Stage Curtains Polyester $21,500 $0.1611131 Projection Screens $14,700 $0.1111165 Loading Dock Bumpers Not Applicable11400 Food Service Equipment $375,700 $2.8811450 Residential Appliances $15,200 $0.1211480 Athletic Equipment In Athletic Surfacing11484 Gym Dividers Not Applicable11515 Kilns $4,400 $0.03

Miscellaneous Items $13,500 $0.10

DIV 12 FURNISHINGS $12,00012345 Laboratory Casework Not Applicable12500 Window Vertical Blinds $12,000 $0.0912610 Fixed Auditorium Seating Not Applicable12692 Entrance Floor Mats Exclude12760 Telescoping Bleachers Not Applicable

DIV 13 SPECIAL CONSTRUCTION $013100 Spray Painting Booth Exclude13120 Fabricated Engineered Structures In Div. 513125 Home Side Grandstand Seating Not Applicable13126 Visitor Side Aluminum Seating Not Applicable13127 Modular Press Box Not Applicable13128 Portable Exterior Bleachers Not Applicable

DIV 014 CONVEYING SYSTEMS $85,80014210 Inclined Wheelchair Lift Not Applicable14245 Hydraulic Elevators - Passenger $85,800 $0.6614450 Automobile Lift System Not Applicable

DIV 15 MECHANICAL $3,580,084Fire Protection $327,084 $2.51Plumbing $738,000 $5.66HVAC $2,515,000 $19.28

DIV 16 ELECTRICAL $2,749,500Electrical $2,749,500 $21.08

SUBTOTAL $19,244,706 $147.54

Page 11: WEST PALM BEACH AREA

1st Floor 66,1992nd Floor 36,990

04/01/08 GMP PROPOSAL ESTIMATE 3rd Floor 27,252PROJECT: WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-DLOCATION: WEST PALM BEACH, FLORIDA TOTAL AREA (SF) 130,441BID DATE: March 18, 2008

STUDENT STATIONS 996SPEC DIVISION

SECTION TRADE ITEM GMP COST/GSF TOTAL

GENERAL CONDITIONS $539,719 $4.14CONSTRUCTION PHASE FEE $1,570,104 $12.04Playground Equipment (Allowance) $240,000 $1.84PE Storage Shelter (Allowance) $165,000 $1.26 Allowance TotalLEED Certification (Allowance) $950,000 $7.28 $1,355,000BUILDERS RISK INSURANCE By Owner, Excluding DeductiblesINSURANCES $241,000 $1.85SECURITY ExcludedP & P BOND $186,400 $1.43OWNER'S CONSTRUCTION CONTINGENCY (3%) $577,341 $4.43THRESHOLD INSPECTION By OwnerTESTING AND INSPECTION By OwnerBUILDING PERMIT By OwnerFEE $1,422,856 $10.91SALES TAX SAVING (1%) ($192,447) ($1.48)

TOTAL $24,944,679 $191.23

ALTERNATE BREAKOUTS INCLUDED IN ABOVE:8' high precast concrete wall at the east, south and west property line ecompassing the playcourts and playfield area at the south end of the campus totaling approximately 900 lf (Div. 3). Include 3 gallon coco plums at 2' o.c. and mulch along the outside of the wall (Div. 2). To delete this work from the GMP deduct the following amount: ($112,880)Approximately 670 lf of chain link fence from the west property line from Stacy Street south to the point where the fence jogs to the west and ending at the point where the jog turns back to the south (Div. 2). To delete this work from the GMP deduct the following amount: ($13,400)

Page 12: WEST PALM BEACH AREA

DATE:

WEEKS: 61PROJECT: 06D ELEMENTARY MONTHS: 14

OWNER: SCHOOL DISTRICT OF PBC UNITS:LOCATION: WEST PALM BEACH, FL AREA: 130,441

LABOR MATERIAL/SUB COST REMARKSCODE ITEM QTY. UNIT unit total unit total total

General Expense Items01105 Building Permit ls 0 0 0 By Owner01110 Prints & Records 14 mo 0 600 8,400 8,400 Reimbursable for Print01120 Postage & Courier 14 mo 0 500 7,000 7,00001150 Final Survey 1 ls 0 0 0 0 Included w/ Sitework01730 Testing & Inspection ls 0 0 0 0 By Owner01140 Photos/Web Page 14 mo 0 250 3,500 3,500 01297 Fuel 61 wks 0 400 24,248 24,24801640 Close-out 6 wks 0 1800 10,800 10,800

Subtotal General Expense 53,948

Job Office01527 Office Trailer 14 mo 0 1500 21,000 21,000 (2) - (12' x 60') Trailers

01527.1 Owner Trailer 14 mo 0 550 7,700 7,70001527 Trailer Deliver & Setup 1 ls 0 12000 12,000 12,00001604 Cleaning Service for Trailer 14 mo 0 400 5,600 5,60001522 Office Equipment/Fax/Copier 14 mo 0 1600 22,400 22,40001524 Computer Equipment 4 ea 0 1700 6,800 6,80001525 Office Supplies 14 mo 0 350 4,900 4,90001530 Ice, Water, Cups 14 mo 200 2,800 2,80001525 Sanitary Supplies 14 mo 75 1,050 1,050

01522.1 Owner Equipment 14 mo 0 100 1,400 1,400 Allowance Subtotal Job Office 85,650

Temporary Utilities01517 Temporary Water 14 mo 0 300 4,200 4,20001511 Temp. Electric 10 mo 0 800 8,000 8,000

01511.1 Permanant Power 4 mo 0 25000 100,000 100,000 01296 Temp. Telephone 14 mo 0 2000 28,000 28,00001516 Temp. Toilets 14 mo 0 600 8,400 8,400

Subtotal Utiities 148,600

Cleaning01605 Interim Cleaning 130441 sf 0 0.25 32,610 32,61001607 Final Cleaning 130441 sf 0 0.3 39,132 39,132

71,742

Division 1 - General Conditions (direct cost items related to field staff)01581 Construction Sign 2 ea 0 1000 2,000 2,00001300 Protection/safety 130441 sf 0.2 26,088 0.2 26,088 52,17601603 Dumpsters 200dmpstr 0 375 75,000 75,00001410 Tools & Equipment 14 mo 0 800 11,200 11,20001900 Misc. Labor 61 wks 0 650 39,403 39,403

179,779 Subtotal Cleaning

SUBTOTAL GENERAL CONDITIONS 539,719

Project Staffing Part Time On-Site

Project Executive 61 wks 500 30,310 65 3,940 34,25001212 General Supertndt 61 wks 500 30,310 65 3,940 34,250 01213 Safety Director 61 wks 250 15,155 0 0 15,15501214 Scheduling 61 wks 460 27,885 0 0 27,885

Full Time On-Site01242 Project Manager 61 wks 2900 175,798 150 9,093 184,89101243 Asst. Proj. Mgr. 61 wks 1700 103,054 0 103,05401245 Accountant 61 wks 1425 86,383 0 86,383

01245.1 MIS 61 wks 1425 86,383 0 86,38301226 Secretary 61 wks 700 42,434 0 42,43401272 Superintendent 61 wks 2800 169,736 150 9,093 178,82901273 Asst. Superintendent (MWBE CM) 61 wks 0 235,51601200 Project Engineer 61 wks 769 46,616 75 4,546 51,162

SUBTOTAL CONSTRUCTION PHASE FEE 1,080,192Labor Insurance and taxes on GCs $ 0 0.58 844,676 489,912

SUBTOTAL CONSTRUCTION PHASE FEE INCLUDING MWBE CM AND LIT 1,570,104

TOTAL INDIRECT COSTS 2,109,823

1 Construction Phase Fee $1,570,103.682 General Conditions (direct cost related to field staff $539,719.00

$2,109,822.68

Construction Manager Fee $1,422,856.1915% MWBE CM Fees= $213,428.43

April 01, 2008

Page 13: WEST PALM BEACH AREA

03/2

5/08

VA

LU

E E

NG

INE

ER

ING

PRO

JEC

T:W

EST

PA

LM

BE

AC

H A

RE

A E

LE

ME

NT

AR

Y S

CH

OO

L 0

6-D

LOC

ATI

ON

:W

EST

PA

LM

BE

AC

H, F

LO

RID

AB

ID D

ATE

:04

/01/

08

The

follo

win

g va

lues

are

app

roxi

mat

e in

nat

ure

to p

rovi

de a

n or

der

of m

agni

tude

to a

ssis

t the

ow

ner

in d

eter

min

ing

if ea

ch sh

ould

be

acce

pted

. O

nce

acce

pted

item

s are

det

erm

ined

the

CM

w

ill p

ursu

e ac

tual

val

ues f

rom

the

prob

able

subc

ontr

acto

rs th

at w

ill b

e aw

arde

d a

subc

ontr

act.

NO

TD

IVT

RA

DE

DE

SCR

IPT

ION

VA

LU

EST

AT

US

AC

CE

PTE

DA

CC

EPT

ED

PEN

DIN

G02

831

Del

ete

botto

m ra

il at

cha

in li

nk fe

ncin

g &

add

tens

ion

wire

($20

,000

)Pr

opos

ed($

20,0

00)

0283

1C

hang

e vi

nyl c

oate

d fe

nce

at m

ain

parc

el to

gal

vani

zed

exce

pt a

long

Sta

cy S

treet

($10

,000

)A

ccep

ted/

Incl

uded

in G

MP

($10

,000

)08

400

Use

a .6

4 sh

adin

g co

effic

ient

in li

eu o

f .44

for t

inte

d la

min

ated

impa

ct g

lass

($15

,000

)Pr

opos

ed($

15,0

00)

0910

0D

elet

e ar

chite

ctur

al fo

am c

orni

ce a

t bui

ldin

g ex

terio

r($

40,0

00)

Prop

osed

($40

,000

)

0925

0Pr

ovid

e m

old

& m

ildew

resi

stan

t boa

rd w

/hig

h im

pact

acr

ylic

kno

ckdo

wn

text

erur

e in

lieu

of

vene

er p

last

er($

6,00

0)Pr

opos

ed($

6,00

0)09

250

Del

ete

fram

ing

& d

ryw

all f

rom

6"

abov

e ce

iling

to d

eck

abov

e at

all

exte

rior w

alls

($6,

000)

Prop

osed

($6,

000)

0925

0D

elet

e gr

outin

g of

inte

rior h

ollo

w m

etal

fram

es($

4,00

0)A

ccep

ted/

Incl

uded

in G

MP

($4,

000)

1530

0G

eom

etric

ally

cen

ter s

prin

kler

hea

ds in

cei

lings

in li

eu o

f sym

etric

ally

cen

terin

g in

cei

ling

tile

($25

,000

)Pr

opos

ed($

25,0

00)

1600

0U

se p

vc in

lieu

of r

igid

con

duit

for f

ire a

larm

duc

t ban

kTB

DPr

opos

edTB

D16

000

Free

wire

all

low

vol

tage

wiri

ng($

60,0

00)

Prop

osed

($60

,000

)

SUB

TO

TA

L($

186,

000)

($14

,000

)($

60,0

00)

($11

2,00

0)

Page 14: WEST PALM BEACH AREA

:

Summary of ALLOWANCES

WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-D4/1/2008

TRADE VALUE COMMENTSDivision 1

LEED Certification $950,000 Refer to Q&A

Division 11 Play Ground Equipment $240,000 Refer to Q&A

Division 13

PE Storage Shelter $165,000 Refer to Q&A

$1,355,000

Page 15: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

3. Exhibits

Page 16: WEST PALM BEACH AREA

EXHIBIT D 4/1/2008PERSONNEL ASSIGNED DURING CONSTRUCTION

SUMMARY OF CONSTRUCTION PHASE FEES

PROJECT NAME: WEST PALM BEACH AREA ES 06-DPROJECT NO.: 400000006

NAME/ TITLE RATE/ WEEK TOTAL

Bill Fisher 61 12% 887.13$ 54,115(General Superintendent)

John Murphy 61 8% 392.55$ 23,945(Safety Director)

Peter Supple 61 12% 887.13$ 54,115(Project Executive)

Roby DeReuil 61 100% 4,788.98$ 292,128(Senior Project Manager)

Victor McLachlan 61 100% 4,631.96$ 282,550(Lead Superintendent)

Ben Austin 61 100% 2,669.27$ 162,825(Assistant Project Manager)

Shanin Johnson 61 100% 1,325.18$ 80,836(Project Engineer)

Janice Dzuris 61 100% 1,099.11$ 67,046(Secretary)

Ewell Dexter 61 100% 3,860.92$ 235,516(MWBE Assistant Superintendent)

Steven Muscarella 61 12% 722.27 44,058(Scheduler)

Jessica Otto 61 50% 2,237.46 136,485(Accounting)

Jon Gantner 61 50% 2,237.46 136,485(MIS)

TOTAL 25,739.41 1,570,103.71

DURATION (WEEKS)

PRECENTAGE OF TIME

Page 17: WEST PALM BEACH AREA

EXHIBIT E 4/1/2008CONSTRUCTION MANAGER'S STAFF PER DIEM FOR TIME EXTENSIONS

PROJECT NAME: WEST PALM BEACH AREA ES 06-DPROJECT NO.: 400000006

NAME/ TITLE HRS/ DAY RATE/ HR PER DIEM RATE

Bill Fisher 8 180.12 177.4254(General Superintendent)

John Murphy 8 121.53 78.5097(Safety Director)

Peter Supple 8 180.12 177.4254(Project Executive)

Roby DeReuil 8 119.72 957.7960(Senior Project Manager)

Victor McLachlan 8 115.80 926.3928(Lead Superintendent)

Ben Austin 8 66.73 533.8534(Assistant Project Manager)

Shanin Johnson 8 33.13 265.0359(Project Engineer)

Janice Dzuris 8 27.48 219.8220(Secretary)

Ewell Dexter 8 96.52 772.1840(MWBE Assistant Superintendent)

Steven Muscarella 8 144.5068 144.4536(Scheduler)

Jessica Otto 8 112.18695 447.4913(Accounting)

Jon Gantner 8 112.18695 447.4913(MIS)

TOTAL STAFF PER DIEM 5,147.88$

Page 18: WEST PALM BEACH AREA

4/1/2008

Mechanical/HVAC Farmer & Irwin Steve Irwin CMC0106403300 Avenue KWest Palm Beach, FL 33401

Electrical DEC Electric James Mears EC-00004013200 W. Copans RoadPompano Beach, FL 33069

Plumbing Healey Plumbing Peter Healy CFC0S76431238 SW 6th StreetPompano Beach, FL 33069

Roofing Crowther Roofing Lee Crowther CCC 0398222543 Rockfill RoadFort Myers, FL 33916

Concrete Southwest Const. Services oJulie Sabiston CBC125SS846970 Buckingham RoadFort Myers, FL 33905

Structural Included in Concrete

Sitework Rio-Bak Corporation Robert Broxton CGC 01075512773 Forest Hill Blvd, Suite 210Wellington, FL 33414

Corporate Name and Address

Principal or Officer's NameDivision of Work License Number

EXHIBIT SLIST OF MAJOR SUBCONTRACTORS

PROJECT NAME: WEST PALM BEACH AREA ES 06-DPROJECT NO.: 400000006

Page 19: WEST PALM BEACH AREA
Page 20: WEST PALM BEACH AREA
Page 21: WEST PALM BEACH AREA
Page 22: WEST PALM BEACH AREA
Page 23: WEST PALM BEACH AREA
Page 24: WEST PALM BEACH AREA
Page 25: WEST PALM BEACH AREA

WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-D PROJECT NO.: 400000006

Beneficial Interest and Disclosure of Ownership Affidavit, Continuation

Suffolk Construction Company, Inc. Page 1 of 1

April 1, 2008 Explanation of Suffolk Trust: 100% of the shares of Suffolk Construction Company, Inc. is owned by the Suffolk Trust which is a Massachusetts business Trust established under the laws of the Commonwealth of Massachusetts. John Fish, the Chief Executive Officer of Suffolk Construction Company is the sole trustee of the Suffolk Construction Trust and is the owner of 100% of the shares of the beneficial interest of the Suffolk Construction Trust.

Page 26: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

4. Qualifications and Clarifications

Page 27: WEST PALM BEACH AREA

WEST PALM BEACH AREA ELEMENTARY SCHOOL 06-D WEST PALM BEACH, FLORIDA

GMP QUALIFICATIONS & ASSUMPTIONS

APRIL 01, 2008 GENERAL 1. We have not included impact or permanent utility fees or charges, offsite connections, sewer connection

fees, water tap fees, water meters or water meter fees that may be required by local, state or federal authorities having jurisdiction. Relocation of any existing utilities (if required) not identified in the bid documents is not included nor have we included costs to repair/replace any damage to utilities that are not identified in the bid documents.

2. All allowances are inclusive of purchase, delivery and installation (labor and materials) to create a

complete system. We have included allowances in our Guaranteed Maximum Price Proposal for the following items: a. Playground Equipment $240,000 b. PE Storage Shelter $165,000 c. LEED Certification $950,000

3. The following items are excluded from this proposal:

Offsite road improvements, pavement markings and/or signalization with the exception of work indicated on the drawings at Stacy Street between the east and west property lines

Demolition of existing on-site structures Fencing for softball field Grouting of interior hollow metal frames Library shelving Entrance floor mats (spec section 12692) Spray painting booth and/or mixing room (spec section 13100) Furnishing of the Security system CCTV cameras, monitors, card readers, etc. Furniture, fixtures & equipment unless otherwise noted on bid drawings and specifications

4. We have included an 8' high manufacturer’s standard precast concrete wall at the east, south and west

property line encompassing the play courts and playfield area at the south end of the campus totaling approximately 900 lf and 3 gallon coco plums at 2' o.c. and mulch along the outside of the wall

SITEWORK/FENCING/LANDSCAPING1. All gates are included as manually operated. 2. The canopy adjacent to the K-2 Play Area where it abuts to the rubberized play surface will be tied in to

the yard drain per typical detail on Civil drawings. All other canopies will drain to adjacent grass areas. FLOORING 1. We have included ceramic wall tile to 6'-0" AFF at the two walls abutting the mop sink in each Janitor's

Closet. FURNISHINGS, EQUIPMENT & MEP1. Aluminum walkway covers are included with a baked enamel in manufacturer’s standard color or clear

anodized finish.

Page 28: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

5. SCHEDULE

Page 29: WEST PALM BEACH AREA

Suffolk Construction Company, Inc.

West Palm Beach Elementary School – Final GMP- Construction SDPBC Project: 400000006 Construction Schedule Narrative April 1, 2008 Building Construction will commence upon receipt of Notice to Proceed which is anticipated May 2008. Construction will begin with the clearing of a wooded site and demolition of several minor structures. Early completion of utility work in the Stacy Street right of way is required by the end September 2008 to ensure that the Palm Beach County street widening work is not affected. Substantial Completion and receipt of Certificate of Occupancy for the new school will be in June 2009 with Final Completion to follow in September 2009.

Page 30: WEST PALM BEACH AREA

Activity

ID

Activity

Description

Sched

Dur

Sched

Start

Sched

Finish

Total

Float

05

BOARD APPROVAL

123APR08

23APR08

0

10

NOTICE TO PROCEED

015MAY08

0

20

CONSTRUCTION TIMELINE (Cal. Days)

397*

15MAY08

15JUN09

0

30

SUBSTANTIAL COMPLETION

115JUN09

15JUN09

0

40

PUNCHLIST / F.F.E.

22

16JUN09

15JUL09

42

50

CO - FINAL COMPETE

114SEP09

14SEP09

0

60

CLEAR & GRUB & FENCING

415MAY08

20MAY08

0

70

LAYOUT & FOUNDATION

20

21MAY08

17JUN08

0

80

UNDER SLAB UTILITIES & SOG

20

18JUN08

15JUL08

0

90

STRUCTURE

50

16JUL08

23SEP08

0

100

CMU

10

24SEP08

07OCT08

0

110

ROOFING

25

01OCT08

04NOV08

0

115

TEXCOTE

25

05NOV08

09DEC08

38

120

STAIRS/RAILINGS

10

08OCT08

21OCT08

0

130

WINDOWS / EXT. DOORS

15

08OCT08

28OCT08

0

140

FRAMING

20

22OCT08

18NOV08

0

150

FIRE SPRINKLER ROUGH / INSPECTIONS

10

12NOV08

25NOV08

0

160

ELEVATOR INSTALLATION

60

19NOV08

10FEB09

68

170

MECHANICAL ROUGH / INSPECTIONS

15

19NOV08

09DEC08

0

180

PLUMBING ROUGH / INSPECTIONS

10

03DEC08

16DEC08

0

190

ELECTRICAL ROUGH / INSPECTIONS

15

03DEC08

23DEC08

0

200

INSULATION / MEP INSPECTIONS

324DEC08

26DEC08

0

210

HANG & FINISH DRYWALL

30

24DEC08

03FEB09

0

220

PRIME / 1ST COAT PAINT

10

28JAN09

10FEB09

0

230

CERAMIC TILE

15

04FEB09

24FEB09

5

240

CEILING GRID

15

11FEB09

03MAR09

0

250

MEP FINISHES

15

04MAR09

24MAR09

3

260

COMPLETE OH ROUGH / INSPECTIONS

15

25FEB09

17MAR09

0

270

FIXTURES / ACCESSORIES / TOILET PARTS

15

04MAR09

24MAR09

0

280

INSTALL CEILING TILE

825MAR09

03APR09

0

290

DOORS / HARDWARE

10

30MAR09

10APR09

0

300

LANDSCAPE/HARDSCAPE/IRRIGATION

45

21JAN09

24MAR09

38

310

RESILIENT FLOORING / CARPET

15

13APR09

01MAY09

0

320

FINAL PAINT

10

04MAY09

15MAY09

0

330

FINAL INSPECTIONS / TCO

20

18MAY09

12JUN09

0

2008

2009

2010

AM

JJ

AS

ON

DJ

FM

AM

JJ

AS

ON

DJ

FM

AM

J1

23

45

67

89

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

BOARD APPROVAL

NOTICE TO PROCEED

CONSTRUCTION TIMELINE (Cal. Days)

SUBSTANTIAL COMPLETION

PUNCHLIST / F.F.E.

CO - FINAL COMPETE

CLEAR & GRUB & FENCING

LAYOUT & FOUNDATION

UNDER SLAB UTILITIES & SOG

STRUCTURE

CMU ROOFING

TEXCOTE

STAIRS/RAILINGS

WINDOWS / EXT. DOORS

FRAMING

FIRE SPRINKLER ROUGH / INSPECTIONS

ELEVATOR INSTALLATION

MECHANICAL ROUGH / INSPECTIONS

PLUMBING ROUGH / INSPECTIONS

ELECTRICAL ROUGH / INSPECTIONS

INSULATION / MEP INSPECTIONS

HANG & FINISH DRYWALL

PRIME / 1ST COAT PAINT

CERAMIC TILE

CEILING GRID

MEP FINISHES

COMPLETE OH ROUGH / INSPECTIONS

FIXTURES / ACCESSORIES / TOILET PARTS

INSTALL CEILING TILE

DOORS / HARDWARE

LANDSCAPE/HARDSCAPE/IRRIGATION

RESILIENT FLOORING / CARPET

FINAL PAINT

FINAL INSPECTIONS / TCO

© Primavera Systems, Inc.

Start Date

01APR08

Finish Date

14SEP09

Data Date

23APR08

Run Date

27MAR08 11:30

Early Bar

Progress Bar

Critical Activity

WPBG

SUFFOLK CONSTRUCTION CO., INC.

WPB AREA O6D ELEMENTARY SCHOOL

GMP SCHEDULE

Sheet 1 of 1

Page 31: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

6. M/WBE

Page 32: WEST PALM BEACH AREA
Page 33: WEST PALM BEACH AREA
Page 34: WEST PALM BEACH AREA
Page 35: WEST PALM BEACH AREA
Page 36: WEST PALM BEACH AREA
Page 37: WEST PALM BEACH AREA
Page 38: WEST PALM BEACH AREA
Page 39: WEST PALM BEACH AREA
Page 40: WEST PALM BEACH AREA
Page 41: WEST PALM BEACH AREA
Page 42: WEST PALM BEACH AREA
Page 43: WEST PALM BEACH AREA
Page 44: WEST PALM BEACH AREA
Page 45: WEST PALM BEACH AREA
Page 46: WEST PALM BEACH AREA
Page 47: WEST PALM BEACH AREA
Page 48: WEST PALM BEACH AREA
Page 49: WEST PALM BEACH AREA
Page 50: WEST PALM BEACH AREA
Page 51: WEST PALM BEACH AREA
Page 52: WEST PALM BEACH AREA
Page 53: WEST PALM BEACH AREA
Page 54: WEST PALM BEACH AREA
Page 55: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

APPENDIX DStatement of Good Faith Efforts

NOT REQUIRED, WE MET THE GOAL

Page 56: WEST PALM BEACH AREA

THE SCHOOL DISTRICT OF PALM BEACH COUNTY

CONSTRUCTION-PURCHASING DEPARTMENT 3326 FOREST HILL BOULEVARD, C-216

WEST PALM BEACH, FLORIDA 33406-5813 (561) 434-8506

GOOD FAITH EFFORT - MINORITY/WOMEN BUSINESS ENTERPRISE (M/WBE) SUBCONTRACTOR PARTICIPATION

PROJECT NAME: West Palm Beach Area School – 06D PROJECT NO: 400000006 TO THE SCHOOL DISTRICT OF PALM BEACH COUNTY:

The following Certified M/WBE Subcontractors were invited to submit a proposal and declined to participate in the above project for the following work.

Item No. M/WBE Contractor (Trade) Items

Date Contacted Who Contacted *Reason No.

1

Landscape & Irrigation

Rolling Oaks Landscape

1

2

Division 9

B&B Interior Systems, Inc.

6

3

Fire Protection

All Fire Services

1

4

Fire Protection

Arfran II, Inc.

1

5

Fire Protection

Falcon Fire Protection, Inc.

6

6

HVAC

Coltec Engineering

1

7

HVAC

RP Technologies

1

8

Windows

NR Windows

6

9

Windows

Custom Glass

6

10

Flooring/Tile

Franklin’s Flooring

6

11

Flooring & Wood Flooring

Atlantic Flooring, Inc.

6

12

Painting

Inclan Painting

6

13

Painting

J. Mori Painting

6

14

Fire Extinguishers / Cabinets

Gold Coast Fire Equipment

6

15

HVAC

Jorda Mechanical Contractors

6

16

Traffic Markings

Roberts Traffic Marking

6

17

Landscape & Irrigation

Landscape Svc Professionals

3

18

Landscape & Irrigation

Mitchell Landscaping

3

19

Landscape & Irrigation

Superior Landscaping

3

20

Drywall

D & D Quality Constructors

3

21

Drywall

D. Stephenson

3

22

Painting

Divine Painting

3

23

Electrical

Stratton Electric, Inc.

3

24

25

26

27

28

Page 57: WEST PALM BEACH AREA
Page 58: WEST PALM BEACH AREA

WEST PALM BEACH AREA ES 06-DWest Palm Beach, FL

GMP Proposal

7. Document List

Page 59: WEST PALM BEACH AREA

WPB Area Elementary School 06-DWest Palm Beach, FLGMP Document List

April 1, 2008

Received Date:Original Set

DRAWING # DRAWING TITLE PREPARED BY DRAWING DATE

Landscape DrawingsCurtis Rogers Design

StudioL1.0 Landscape Plan 12/18/2007L1.1 Shrub Plans and Details 12/18/2007L1.2 Plant List and Planting Details 12/18/2007

TD1.0 Tree Disposition Plan 12/18/2007TD1.1 Tree Disposition Notes 12/18/2007IR1.0 Irrigation Plan 12/18/2007IR1.1 Irrigation Notes & Details 12/18/2007IR1.2 Pump Detail 12/18/2007

Survey Drawings Keith & Schnars, PASU-100 Topographic Survey Cover 12/18/2007SU-101 Topographic Survey 12/18/2007SU-102 Topographic Survey 12/18/2007SU-103 Topographic Survey 12/18/2007

Civil Drawings Difonte Consulting Inc1 of 22 Cover Sheet with Location Map 12/19/20072 of 22 Geometric Site Plans & Bldg. Locations 12/19/20073 of 22 Geometric Site Plans & Bldg. Locations 12/19/20074 of 22 Geometric Site Plans & Bldg. Locations 12/19/20075 of 22 Paving Grading & Drainage Plans - Phases I & II 12/19/20076 of 22 Paving Grading & Drainage Plans - Phases I & II 12/19/20077 of 22 Paving Grading & Drainage Plans - Phases I & II 12/19/20078 of 22 Stacy Street Improvements 12/19/20079 of 22 Paving Grading & Drainage Details & Notes 12/19/200710 of 22 Paving Grading & Drainage Details & Notes 12/19/200711 of 22 Signing & Pavement Marking Details and Notes 12/19/200712 of 22 Offsite Roadway Details and Notes 12/19/200713 of 22 Water and Sanitary Sewer Plans 12/19/200714 of 22 Water and Sanitary Sewer Plans 12/19/200715 of 22 Potable Water #1 Standard Details 12/17/200716 of 22 Potable Water #2 Standard Details 12/17/200717 of 22 Water and Wastewater Standard Details 12/17/200718 of 22 Wastewater Standard Details 12/17/200719 of 22 Lift Station Electrical Standard Details 12/17/200720 of 22 Lift Station Remote Telemetry Unit (RTU) Standard Details 12/17/2007

Architectural Drawings Zyscovich Inc.Cover Volume 1 of 2 Cover Sheet with Location Map 12/20/2007

GN-101 Drawing Index Volume I 12/18/2007GN-103 General Notes, Abbreviations and Symbols 12/18/2007

Page 60: WEST PALM BEACH AREA

LS-100 Overall Life Safety Site Plan 12/18/2007LS-201 Overall Life Safety 1st Floor Plan 12/18/2007LS-202 Overall Life Safety 2nd Floor Plan 12/18/2007LS-203 Overall Life Safety 3rd Floor Plan 12/18/2007LS-211 Enlarged 1st Floor Life Safety Plan Section A 12/18/2007LS-212 Enlarged 1st Floor Life Safety Plan Section B 12/18/2007LS-213 Enlarged 1st Floor Life Safety Plan Section C 12/18/2007LS-214 Enlarged 1st Floor Life Safety Plan Section 1E & Bldg 2 12/18/2007LS-215 Enlarged 2nd Floor Life Safety Plan Section A 12/18/2007LS-216 Enlarged 2nd Floor Life Safety Plan Section B 12/18/2007LS-217 Enlarged 3rd Floor Life Safety Plan Section B 12/18/2007

MS-100 Overall Master Site Plan 12/18/2007

A-100 Overall Site Plan 12/18/2007A-100.1 Overall North Site Plan 12/18/2007A-101 Enlarged Partial Site Plan 12/18/2007

A-101-A Enlarged Plaza at Parent Drop Plan 12/18/2007A-101-B Enlarged Plaza at Parent Drop Plan 12/18/2007A-101-C Enlarged Plaza at Parent Drop Plan 12/18/2007A-102 Enlarged Partial Site Plan 12/18/2007A-105 Playcourts & Pavement Marking Plans 12/18/2007A-106 Enlarged Court Plans & Details 12/18/2007A-107 Softball Plans & Details 12/18/2007A-108 Miscellaneous Site Details 12/18/2007A-109 Fence and Gate Details 12/18/2007A-110 Covered Walkway Details 12/18/2007A-111 Covered Canopy Details 12/18/2007A-201 Overall First Floor Plan 12/18/2007A-202 Overall Second Floor Plan 12/18/2007A-203 Overall Third Floor Plan 12/18/2007A-211 Enlarged 1st Floor Plan Section A 12/18/2007A-212 Enlarged 1st Floor Plan Section B 12/18/2007A-213 Enlarged 1st Floor Plan Section C 12/18/2007A-214 Enlarged 1st Floor Plan Section D & PE Bldg 2 12/18/2007A-215 Enlarged 2nd Floor Plan Section A 12/18/2007A-216 Enlarged 2nd Floor Plan Section B 12/18/2007A-217 Enlarged 3rd Floor Plan Section B 12/18/2007A-220 Miscellaneous Concrete Panel Details 12/18/2007A-221 Miscellaneous Floor Plan & Column Details 12/18/2007A-222 Miscellaneous Floor Plan Column Details 12/18/2007A-223 Miscellaneous Floor Plan Details 12/18/2007A-224 Miscellaneous Floor Plan Details 12/18/2007A-311 Enlarged First Floor Reflected Ceiling Plan Section A 12/18/2007A-312 Enlarged First Floor Reflected Ceiling Plan Section B 12/18/2007A-313 Enlarged First Floor Reflected Ceiling Plan Section C 12/18/2007A-314 Enlarged First Floor Reflected Ceiling Plan Section D 12/18/2007A-315 Enlarged 2nd Floor Reflected Ceiling Plan Section A 12/18/2007A-316 Enlarged 2nd Floor Reflected Ceiling Plan Section 1B 12/18/2007A-317 Enlarged 3rd Floor Reflected Ceiling Plan Section B 12/18/2007A-320 Miscellaneous Soffit Details 12/18/2007A-321 Miscellaneous Soffit Details 12/18/2007A-401 Overall Roof Plan 12/18/2007A-420 Roof Details & Roof Drainage Calculations 12/18/2007A-421 Roof Details 12/18/2007A-422 Roof Details 12/18/2007A-423 Roof Details 12/18/2007A-501 Overall Building Elevations 12/18/2007A-502 North Building Elevations 12/18/2007

Page 61: WEST PALM BEACH AREA

A-503 Building Elevations 12/18/2007A-504 West Building Elevations 12/18/2007A-505 Building Elevations 12/18/2007A-506 Building Elevations 12/18/2007A-507 Building Elevations 12/18/2007A-508 Building Elevations 12/18/2007A-509 Building Elevations 12/18/2007A-510 PE Shelter Building Elevations 12/18/2007A-520 Panel Recess & Scoreline Details 12/18/2007A-601 Building & Wall Sections 12/18/2007A-602 Building Section 12/18/2007A-603 Building Section 12/18/2007A-604 Building Section 12/18/2007A-605 Building Section 12/18/2007A-606 Building Section 12/18/2007A-607 Building Section 12/18/2007A-608 Building Section 12/18/2007A-609 Building Section 12/18/2007A-620 Wall Sections 12/18/2007A-621 Wall Sections 12/18/2007A-622 Wall Sections 12/18/2007A-623 Wall Sections 12/18/2007A-624 Wall Sections 12/18/2007A-625 Wall Sections 12/18/2007A-626 Wall Sections 12/18/2007A-627 Wall Sections 12/18/2007A-628 Wall Sections 12/18/2007A-650 Wall and Partition Types 12/18/2007A-670 Enlarged Stair 1 Plans and Section 12/18/2007A-671 Enlarged Stair 2 Plans and Section 12/18/2007A-672 Enlarged Stair 3 Plans and Section 12/18/2007A-673 Enlarged Stair 4 Plans and Section 12/18/2007A-674 Enlarged Stair 5 Plans and Section 12/18/2007A-675 Enlarged Stair 6 Plans and Section 12/18/2007A-677 Stair and Handrail Details 12/18/2007A-678 Stair and Handrail Details 12/18/2007A-679 Enlarged Stage Ramp/Stair Plan & Sections 12/18/2007A-680 Elevator Plan, Section and Details 12/18/2007A-690 Fire Stopping Penetration Chart 12/18/2007A-691 Fire Stopping Details 12/18/2007A-692 Fire Stopping Details 12/18/2007A-693 Fire Stopping Details 12/18/2007A-700 Mounting Heights & Elevations 12/18/2007A-701 Enlarged Administration 12/18/2007

A-701.1 Enlarged Administration 12/18/2007A-702 Enlarged ESE Resource & Classroom 12/18/2007

A-702.1 Enlarged ESE Resource & Classroom 12/18/2007A-703 Enlarged Comp. & Sci. Skill Labs 12/18/2007A-704 Enlarged Art Lab 12/18/2007A-705 Enlarged Music Classroom 12/18/2007A-706 Enlarged Dining / Multipurpose 12/18/2007

A-706.1 Enlarged Dining / Multipurpose 12/18/2007A-707 Enlarged Kitchen & Teacher Dining 12/18/2007A-708 Enlarged Custodial 12/18/2007A-709 Enlarged Resource Room 12/18/2007A-710 Enlarged Pre-Kinder & Kindergarten 12/18/2007

A-710.1 Enlarged Pre-Kinder & Kindergarten 12/18/2007A-711 Enlarged Primary & ESE Classroom 12/18/2007A-712 Enlarged Intermediate Classroom 12/18/2007

Page 62: WEST PALM BEACH AREA

A-713 Enlarged Media Center 12/18/2007A-713.1 Enlarged Media Center 12/18/2007A-714 Enlarged Corridors 12/18/2007A-715 Enlarged Corridors 12/18/2007A-716 Enlarged Corridors 12/18/2007A-717 Enlarged Outside Storage & PE 12/18/2007A-720 Overall First Floor Furniture Plan 12/18/2007A-721 Overall Second Floor Furniture Plan 12/18/2007A-722 Overall Third Floor Furniture Plan 12/18/2007A-740 Typ. Cabinet & Millwork Elevations 12/18/2007A-741 Typ. Cabinet & Millwork Elevations 12/18/2007A-750 Enlarged 1st Floor Toilet Plans 12/18/2007A-751 Enlarged 1st Floor Toilet Plans 12/18/2007A-752 Enlarged 2nd & 3rd Floor Toilet Plans 12/18/2007A-800 Door Window and Louver Types 12/18/2007A-801 Door Schedule First Floor Building 1 12/18/2007A-802 Door Schedule First Floor Building 1 12/18/2007A-803 Door Schedule First Floor Building 1 12/18/2007A-804 Door Schedule First Floor Building 1 12/18/2007A-805 Door Schedule 2nd & 3rd Floor Building 1 12/18/2007A-806 Door Schedule 3rd Floor Building 1, 1st Floor Building 2 12/18/2007A-810 Door Jamb Details 12/18/2007A-811 Door Threshold Details 12/18/2007A-850 Window Details 12/18/2007A-851 Window Details 12/18/2007A-900 Signage Details 12/18/2007A-901 Enlarged First Floor Signage Plan Section A 12/18/2007A-902 Enlarged First Floor Signage Plan Section B 12/18/2007A-903 Enlarged First Floor Signage Plan Section C 12/18/2007A-904 Enlarged First Floor Signage Plan Section D 12/18/2007A-905 Enlarged Second Floor Signage Plan Section A 12/18/2007A-906 Enlarged Second Floor Signage Plan Section B 12/18/2007A-907 Enlarged Third Floor Signage Plan Section B 12/18/2007

Interior Design Drawings Zyscovich Inc.ID-211 Enlarged First Floor Finish Plan Section A 12/18/2007ID-212 Enlarged First Floor Finish Plan Section B 12/18/2007ID-213 Enlarged First Floor Finish Plan Section C 12/18/2007ID-214 Enlarged First Floor Finish Plan Section D 12/18/2007ID-215 Enlarged Second Floor Finish Plan Section A 12/18/2007ID-216 Enlarged Second Floor Finish Plan Section B 12/18/2007ID-217 Enlarged Third Floor Finish Plan Section B 12/18/2007

Structural DrawingsDeRose Design Consultants Inc

S100 Notes and Schedules 12/18/2007S13N1 North Panels Details 12/18/2007S13N2 North Panels Details 12/18/2007S13N3 North Panels Details 12/18/2007S14E1 East Panels Details 12/18/2007S14E2 East Panels Details 12/18/2007S14E3 East Panels Details 12/18/2007S14W1 West Panels Details 12/18/2007S14W2 West Panels Details 12/18/2007S14W3 West Panels Details 12/18/2007S14S1 South Panels Details 12/18/2007S14S2 South Panels Details 12/18/2007S14S3 South Panels Details 12/18/2007S211 Enlarged 1st Floor Plan Section A 12/18/2007

Page 63: WEST PALM BEACH AREA

S212 Enlarged 1st Floor Plan Section B 12/18/2007S213 Enlarged 1st Floor Plan Section C 12/18/2007S214 Enlarged 1st Floor Plan Section D 12/18/2007S215 Enlarged 2nd Floor Plan Section A 12/18/2007S216 Enlarged 2nd Floor Plan Section B 12/18/2007S217 Enlarged Roof Plan Section C 12/18/2007S218 Enlarged Roof Plan Section D 12/18/2007S219 Enlarged Roof Plan Section A 12/18/2007S220 Enlarged 3rd Floor Plan Section B 12/18/2007S221 Enlarged Roof Plan Section B 12/18/2007S222 Wind Pressure Plan 12/18/2007S315 Sections 12/18/2007S316 Sections 12/18/2007S317 Sections 12/18/2007S318 Sections 12/18/2007S510 Soffit Beam Details 12/18/2007S511 Panels Details 12/18/2007S512 Soffit Beam Details 12/18/2007S513 Soffit Beam Details 12/18/2007

VOLUME 2 OF 2 MEPCover Cover Sheet with Location Map Zyscovich, Inc. 12/20/2007

GN-102 Drawing Index Volume II Zyscovich, Inc. 12/18/2007

Fire ProtectionJohnson Levinson Ragan & Davila Inc

FP-001 Legend, Schedules & General Notes 12/18/2007FP-002 Fire Protection Site Plan 12/18/2007FP-101 Partial First Floor F.P. Plan Section 1A 12/18/2007FP-102 Partial First Floor F.P. Plan Section 1B 12/18/2007FP-103 Partial First Floor F.P. Plan Section 1C 12/18/2007FP-104 Partial First Floor F.P. Plan Section 1D 12/18/2007FP-105 Partial Second Floor F.P. Plan Section 2A 12/18/2007FP-106 Partial Second Floor F.P. Plan Section 2B 12/18/2007FP-107 Third Floor Fire Protection Plan 12/18/2007FP-201 Fire Protection Details 12/18/2007FP-202 Fire Protection Details 12/18/2007

PlumbingJohnson Levinson Ragan & Davila Inc

P-001 Schedules Legend and Notes 12/18/2007P-002 Schedules Legend and Notes 12/18/2007P-101 Plumbing Floor Plan Underground Section 1A 12/18/2007P-102 Plumbing Floor Plan Underground Section 1D 12/18/2007P-103 Plumbing Floor Plan Underground Section 1D, 1E 12/18/2007P-104 Plumbing Floor Plan Underground Section 1B, 1C 12/18/2007P-105 Plumbing Floor Plan Above Ground Section 1A 12/18/2007P-106 Plumbing Floor Plan Above Ground Section 1D 12/18/2007P-107 Plumbing Floor Plan Above Ground Section 1D, 1E 12/18/2007P-108 Plumbing Floor Plan Above Ground Section 1B, 1C 12/18/2007P-109 Plumbing Floor Plan Building 1 2nd Floor Section 1A 12/18/2007P-110 Plumbing Floor Plan Building 1 2nd Floor Section 1B, 1C 12/18/2007P-111 Plumbing Floor Plan Building 1 3rd Floor Section 1B, 1C 12/18/2007P-201 Enlarged Kitchen Floor Plan 12/18/2007P-301 Riser Diagrams 12/18/2007P-302 Riser Diagrams 12/18/2007P-303 Riser Diagrams 12/18/2007P-304 Riser Diagrams 12/18/2007P-305 Riser Diagrams 12/18/2007

Page 64: WEST PALM BEACH AREA

P-306 Riser Diagrams 12/18/2007P-307 Kitchen Riser Diagrams 12/18/2007

Mechanical DrawingsJohnson Levinson Ragan & Davila Inc

M-001 Legend, Schedules, and General Notes 12/18/2007M-002 Mechanical Schedules 12/18/2007M-003 Mechanical Schedules 12/18/2007M-004 Mechanical Schedules 12/18/2007M-005 Mechanical Schedules 12/18/2007M-006 Mechanical Schedules 12/18/2007M-007 Mechanical Site Plan 12/18/2007M-101 Partial 1st Floor HVAC Plan Section 1A 12/18/2007M-102 Partial 1st Floor HVAC Plan Section 1B 12/18/2007M-103 Partial 1st Floor HVAC Plan Section 1C 12/18/2007M-104 Partial 1st Floor HVAC Plan Section 1D 12/18/2007M-105 Partial 2nd Floor HVAC Plan Section 2A 12/18/2007M-106 Partial 2nd Floor HVAC Plan Section 2B 12/18/2007M-107 3rd Floor HVAC Plan 12/18/2007M-201 1st Floor Mech. Room Plan & Section 12/18/2007M-202 1st Floor Mech. Room Plan & Section 12/18/2007M-203 1st Floor Mech. Room Plan & Section 12/18/2007M-204 1st Floor Mech. Room Plan & Section 12/18/2007M-205 2nd Floor Mech. Room Plan & Section 12/18/2007M-206 2nd Floor Mech. Room Plan & Section 12/18/2007M-207 3rd Floor Mech. Room Plan & Section 12/18/2007M-208 Chiller Plant Piping Plan 12/18/2007M-209 Chilled Water Piping Schematic 12/18/2007M-301 Mechanical Details 12/18/2007M-302 Mechanical Details 12/18/2007M-303 Mechanical Details 12/18/2007M-304 Mechanical Details 12/18/2007M-305 Mechanical Details 12/18/2007M-306 Mechanical Details 12/18/2007M-307 Mechanical Details 12/18/2007M-401 Mechanical Controls 12/18/2007M-402 Mechanical Controls 12/18/2007M-403 Mechanical Controls 12/18/2007M-404 Mechanical Controls 12/18/2007M-405 Mechanical Controls 12/18/2007M-406 Mechanical Controls 12/18/2007

Electrical DrawingsJohnson Levinson Ragan & Davila Inc

E-001 Electrical Sheet Index 12/18/2007E-002 Site Electrical Plan 12/18/2007E-003 Canopy Lighting and Details 12/18/2007E-101 Partial 1st Floor Lighting Plan 12/18/2007E-102 Partial 1st Floor Power Plan 12/18/2007E-103 Partial 1st Floor System Plan 12/18/2007E-104 Partial 1st Floor Lighting Plan 12/18/2007E-105 Partial 1st Floor Power Plan 12/18/2007E-106 Partial 1st Floor System Plan 12/18/2007E-107 Partial 1st Floor Lighting Plan 12/18/2007E-108 Partial 1st Floor Power Plan 12/18/2007E-109 Partial 1st Floor System Plan 12/18/2007E-110 Partial 1st Floor Lighting Plan 12/18/2007E-111 Partial 1st Floor Power Plan 12/18/2007E-112 Partial 1st Floor System Plan 12/18/2007

Page 65: WEST PALM BEACH AREA

E-113 Partial 2nd Floor Lighting Plan 12/18/2007E-114 Partial 2nd Floor Power Plan 12/18/2007E-115 Partial 2nd Floor System Plan 12/18/2007E-116 Partial 2nd Floor Lighting Plan 12/18/2007E-117 Partial 2nd Floor Power Plan 12/18/2007E-118 Partial 2nd Floor System Plan 12/18/2007E-119 Partial 3rd Floor Lighting Plan 12/18/2007E-120 Partial 3rd Floor Power Plan 12/18/2007E-121 Partial 3rd Floor System Plan 12/18/2007E-201 Enlarged Elect./Data Rms and Elev 12/18/2007E-202 Enlarged Elect./Data Rms and Elev 12/18/2007E-203 Enlarged Elect./Data Rms and Elev 12/18/2007E-204 Enlarged Kitchen Plan & Equip Schedule 12/18/2007E-301 Electrical Power One-Line Diagram 12/18/2007E-302 Power Riser Diagram 12/18/2007E-303 Video Surv. & Card Access Term. Cab. Riser Diagram 12/18/2007E-304 Security and ITV Terminal Cabinet Roser Diagram 12/18/2007E-305 Intercom Terminal Cabinet Riser Diagram 12/18/2007E-306 Fire Alarm Terminal Cabinet Riser Diagram 12/18/2007E-307 EMS Terminal CAB and Comm. Sys. Riser Diagram 12/18/2007E-401 Miscellaneous Details 12/18/2007E-402 Miscellaneous Details 12/18/2007E-403 Panelboard Schedule 12/18/2007E-404 Panelboard Schedule 12/18/2007E-405 Panelboard Schedule 12/18/2007E-406 Panelboard Schedule 12/18/2007E-407 Panelboard Schedule 12/18/2007E-408 Panelboard Schedule 12/18/2007E-501 Miscellaneous Details 12/18/2007E-502 Miscellaneous Details 12/18/2007E-503 Miscellaneous Details 12/18/2007E-504 Miscellaneous Details 12/18/2007E-505 Miscellaneous Details 12/18/2007E-506 Miscellaneous Details 12/18/2007E-507 Miscellaneous Details 12/18/2007E-508 Miscellaneous Details 12/18/2007E-509 Miscellaneous Details 12/18/2007E-510 Miscellaneous Details 12/18/2007

Food Service Drawings Merlino AssociatesFS-100 Food Service Equipment Plan & Schedule 12/18/2007FS-101 Food Service Electrical Plan 12/18/2007FS-102 Food Service Plumbing Plan 12/18/2007FS-103 Food Service Miscellaneous Notes & Details 12/18/2007

END OF SECTION

Page 66: WEST PALM BEACH AREA

WPB Area Elementary School 06-DWest Palm Beach, FL

GMP Specifications ListApril 1, 2008

DOCUMENT TITLE DATED

RFI01 Response to RFI01 1/24/2008RFI02 Response to RFI02 1/24/2008RFI03 Response to RFI03 1/24/2008RFI04 Response to RFI04 1/30/2008RFI09 Response to RFI09 2/7/2008

DIVISION 0 BIDDING AND CONTRACT DOCUMENTS December 200700001 Table of Contents00003 Professional Signatures and Seals00007 List of Professionals00015 List of Drawings00050 Geotechnical Report - Under separate Cover00460 Trench Act Compliance Statement MISSING

DIVISION 1 GENERAL REQUIREMENTS01010 Summary of Work MISSING01027 Applications for Payment01028 Contract Modifications Procedures01039 Coordination and Meetings01045 Cutting and Patching01060 Regulatory Requirements01120 Alteration Project Procedures01300 Submittals01311 Network Analysis Schedules01400 Quality Control01410 Testing Laboratory Services01500 Temporary Construction Facilities01540 Security Barriers & Enclosures01560 Temporary Controls01600 Material Equipment and Approved Equals01650 Starting & Adjusting of Systems01700 Contract Closeout01730 Operation and Maintenance Data01740 Warranties01810 Commissioning

DIVISION 2 SITEWORK02110 Site Clearing02200 Earth Moving

Page 67: WEST PALM BEACH AREA

02280 Termite Control02400 Asphalt Paving02520 Concrete Paving02540 Athletic Surfacing02565 Underground LP Storage & Distribution02580 Pavement Marking02685 Gas Piping02660 Water Distribution System02670 Irrigation Water Well02700 Site Drainage Utilities02730 Sanitary Sewerage Utilities02733 Waste Water Pump Station02800 Site Improvements02810 Underground Irrigation System02825 Decorative Metal Fencing & Gates02831 Chain Link Fencing & Gates02853 Parking Bumpers02931 Tree & Plant Protection02932 Sodding02950 Trees, Plants and Ground Cover

DIVISION 3 CONCRETE03100 Concrete Formwork03200 Concrete Reinforcement03300 Cast In Place Concrete03341 Fibrous Reinforcing03346 Concrete Floor Finishing03410 Precast Prestressed Concrete Joints & Beams03411 Structural Precast Concrete03470 Tilt-Up Concrete03521 Lightweight Insulating Concrete

DIVISION 4 MASONRY04100 Masonry Mortar & Grout04270 Glass Unit Masonry04300 Unit Masonry System MISSING04340 Reinforced Masonry Unit

DIVISION 5 METALS05120 Structural Steel05210 Steel Joists & Joist Girders05310 Steel Deck05400 Cold Formed Metal Framing05500 Miscellaneous Metal & Metal Fabrications05510 Metal Stairs05520 Metal Railings05531 Metal Grating and Floor Plates05805 Expansion Joint Cover Assemblies

DIVISION 6 WOOD AND PLASTICS06100 Rough Carpentry06410 Custom Casework

Page 68: WEST PALM BEACH AREA

DIVISION 7 THERMAL MOISTURE PROTECTION07120 Fluid Applied Waterproofing07135 Sheet Membrane Waterproofing07160 Bitiminous Damproofing07181 Water Repellant Penetrant07191 Vapor Retarders07212 Extruded Polystyrene Board Insulation07213 Batt Insulation07214 Foamed In Place Insulation07255 Cementitious Fireproofing07311 Asphalt Shingles07320 Cement Roofing Tiles07465 Metal Wall Panels07536 Modified Bitumen Roofing System07565 Preparation for Re-Roofing07610 Metal Roof Panels07620 Flashing, Gutters, Downspouts & Other Accessories07724 Roof Hatches07840 Firestop Systems07900 Joint Sealant

DIVISION 8 DOORS AND WINDOWS08110 Metal Doors and Frames08210 Solid Core Wood Doors08305 Access Doors & Frames08520 Aluminum Windows08710 Hardware Finish08800 Glazing

DIVISION 9 FINISHES09111 Non-Structural Metal Stud Framing 09206 Metal Furring and Lathing09210 Gypsum Veneer Plaster09215 Veneer Plaster09220 Portland Cement Plaster09250 Gypsum Board System09311 Ceramic Tile09330 Quarry Tile09511 Acoustical Ceiling09520 Acoustical Wall Panels09546 Linear Metal Ceiling09640 Wood Flooring09650 Resilient Flooring09682 Tile Carpet09900 Painting09910 Metal Stud Framing System MISSING

DIVISION 10 SPECIALTIES10100 Marker Boards and Tack Boards10171 Toilet Compartments & Cubicles10196 Cubicle Curtains

Page 69: WEST PALM BEACH AREA

10211 Fixed Louvers10260 Door & wall Protection10350 Flagpoles10415 Display Cases10420 Plaque10441 Signage10443 Illuminated Exterior Signage10508 Lockers - General / Corridor10522 Fire Protection Specialties10532 Walkway Coverings10605 Wire Mesh/Chainlink Partitions10675 Metal Shelving10800 Toilet Accessories

DIVISION 11 EQUIPMENT11026 Safes11062 Stage Curtains Cotton11063 Stage Curtains Polyester11131 Projection Screens 11165 Loading Dock Bumpers11450 Residential Appliances11480 Athletic & Recreational Equipment11484 Gym Dividers11515 Kilns

DIVISION 12 FURNISHINGS12345 Laboratory Casework & Equipment12500 Vertical Louver Blinds12610 Fixed Auditorium Seating12692 Entrance Floor Mats12760 Telescoping Bleachers

DIVISION 13 SPECIAL CONSTRUCTION 13100 Spray Painting Booth13120 Fabricated Engineered Structures13125 Home Side Grandstand Seating13126 Visitor Side Grandstand Seating13127 Modular Press Box13128 Portable Exterior Bleachers

DIVISION 14 CONVEYING SYSTEMS14210 Inclined Wheelchair14245 Hydraulic Elevators - Passenger14450 Automobile Lift System

DIVISION 15 MECHANICAL SYSTEMS15000 Basic Mechanical Requirements15073 Minor HVAC Demolition15135 Meters, Gages and Thermometers15140 Hangers and Supports for HVAC Piping15170 Motor Requirements for HVAC Piping 15190 ID for HVAC Piping and Equipment

Page 70: WEST PALM BEACH AREA

15242 HVAC Vibration Control15260 HVAC Pipe Insulation15280 HVAC Equipment Insulation15290 Ductwork Insulation15411 Facility Water Distribution15412 Facility Sanitary Distribution15420 Plumbing Piping15430 Plumbing Specialties15450 Plumbing Equipment15500 Fire Suppression15510 Hydronic Piping15515 Hydronic Specialties15535 Refrigeration Piping15540 Hydronic Pumps15671 Air Cooled Refrigerant Condensers15682 Air Cooled Water Chillers15684 Centrifugal Water Chillers15686 Rotary Screw Water Chillers15712 Cooling Tower15765 Variable Frequency Motor Controls15781 Decentralized HVAC Equipment15801 HVAC Water Treatment15817 Electric Resistance Duct Heaters15855 Air Handling Units15870 HVAC Power Ventilators15885 HVAC Air Filters15890 Ductwork15895 Air Duct Accessories15900 Energy Management and Control System15930 Variable Air Volume Units15936 Grilles, Registers Diffusers15990 Commissioning of HVAC Systems15991 HVAC Testing and Balancing15992 Tests - HVAC Piping Systems

DIVISION 16 ELECTRICAL16010 Electrical Requirements16020 Work Included16050 Electrical Materials and Methods16111 Electrical Raceway and Boxes16115 Indoor Services Poles16123 Electrical Wire and Cable MISSING16141 Wiring Devices16160 Electrical Cabinets and Enclosures16180 Equipment Wiring System16190 Hangers and Supports for Electrical Systems16195 Electrical Identification16420 Electrical Utility Services16425 Switchboards16440 Disconnect Switches16450 Grounding & Bonding of Electrical Systems16461 Dry Type Transformers

Page 71: WEST PALM BEACH AREA

16470 Panelboards16476 Enclosed Switches and Circuit Breakers16477 Fuses (600 Volts and Below)16480 Motor Control16485 Electrical Instrumentation Control16495 Transfer Switches16510 Interior Lighting16530 Exterior Lighting16535 Emergency Lighting16610 Transient Voltage Suppression16622 Gas Engine Drive Generator Assembly16650 Energy management and Control System16670 Lightning Protection for Structures16721 Fire Alarm and Smoke Detection System16722 Intrusion Detection16723 Video Surveillance System16724 Emergency Radio Communications Systems16725 Access Control16730 GPS Wireless Clock System 16765 Intercom Systems16770 Public Address Systems16781 Master Television Antenna System16902 Electrical Controls and Relays16905 Communications System16906 Ceiling Projector System

Educational Specification 1/24/2007Geotechnical Report 9/7/2007