Wentlooge Farmer’s Solar Scheme
Limited
Proposed Solar & Wind Farm, Broadway, Wentlooge
Construction Traffic Management Plan
March 2020
REPORT CONTROL
Document: Construction Traffic Management Plan (CTMP)
Project: Proposed Solar & Wind Farm, Wentlooge
Client: Savills
Job Number: 194740
File Origin: P:\Projects\190000\194740 - Wentlooge\2. Documents\1.
Reports\202003.03.EP.CTMP.RO1
Document Checking:
Primary Author Emily Poultney Initialled: EP
Contributor Tim Bright Initialled: TB
Review By Tim Bright Initialled: TB
Issue Date Status Checked for Issue
1 Nov’ 2019 Draft TB
2 Mar’2020 Issue TB
3
4
i
Contents
1 INTRODUCTION .......................................................................................................... 1
Overview of the Development .................................................................................... 1
2 CONSTRUCTION TRAFFIC ROUTING ............................................................................. 3
3 DELIVERY SCHEDULE................................................................................................... 7
4 CONSTRUCTION TRAFFIC MANAGEMENT MEASURES .................................................. 8
Site Access Arrangements........................................................................................... 8
Construction Site Signage ........................................................................................... 8
Construction Site Operating Hours .............................................................................. 8
Staff Safety ................................................................................................................ 8
Wheel Washing Facilities ............................................................................................ 9
Dust Management ..................................................................................................... 9
Road Condition Survey ............................................................................................... 9
Management & Monitoring ...................................................................................... 10
5 HIGHWAY WORKS AND STRUCTURES........................................................................ 11
6 ENVIRONMENTAL IMPACT ....................................................................................... 12
7 CONSULTEES FOR TRAFFIC MANAGEMENT PLAN ....................................................... 13
8 SUMMARY AND CONCLUSION .................................................................................. 14
Summary ................................................................................................................. 14
Conclusion ............................................................................................................... 14
Appendices
Appendix A - Proposed Site Plan
Appendix B - Proposed Site Access Arrangement
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 1
March 2020
1 INTRODUCTION
1.1 Vectos have been commissioned by the Wentlooge Farmers Solar Scheme to prepare a
Construction Traffic Management Plan (CTMP) in support of an outline planning application
for a solar farm of 129.9 hectares of panelled area This is to be built over a period of 12
weeks. The plans for this site are provided in Appendix A.
1.2 This CTMP has been produced to detail the measures that will be implemented during the
construction phase of the site, the overarching aim of these measures is to minimise
disruption on the highway network and to maintain safety for all users. The facility has been
designed to have an operational life of 40 years, past this point the solar panels will be
decommissioned and removed from the site.
1.3 Following this introduction, this report follows the subsequent sections:
• Section 2 – Overview of the Development;
• Section 3 – Construction Traffic Routing;
• Section 4 – Delivery Schedule;
• Section 5 – Highway works and Structures;
• Section 6 – Construction Traffic Management Measures;
• Section 7 – Trial Runs;
• Section 8 – Environment Impact; and
• Section 9 – Consultees for TMP.
Overview of the Development
1.4 The application if for a solar farm of 129.9 hectares. The site currently consists of open
farmland, located to the south of Marshfield, west of Newport and east of Cardiff. Within the
site the fields are segregated by hedgerows with farm gate accesses between fields. Where
possible, the existing access points will be utilised for movement throughout the site,
however it is acknowledged that a small number of new access points may be required.
1.5 A preliminary site access drawing is provided at Appendix B identifying the existing site
access arrangement on Broadway from which point access to the site will be achieved.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 2
March 2020
1.6 A vehicular swept path assessment has been undertaken identifying that recent
improvements undertaken to this access provide sufficient width to allow a 16.5m
articulated vehicle to access the site to and from Broadway to both the north and south.
1.7 Visibility splays have been illustrated commensurate with recorded 85th%ile speeds on
Broadway recorded from the 2019 Automatic Traffic Count, measured as 51.6mph
northbound and 52.5mph southbound. Visibility splays have been plotted in line with the
requirements of Design Manual for Roads and Bridges, equivalent to 2.4m x 160m to the
north and 155m to the south.
1.8 Before construction the haulage company appointed for the site, shall complete a review of
the routes into the site, to ensure appropriate vehicles are able to access the site and deliver
required materials.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 3
March 2020
2 CONSTRUCTION TRAFFIC ROUTING
2.1 The routes considered for abnormal construction traffic to and from the proposed
development site are the M4 (J28), the A48 and Broadway/Marshfield Road, this is
presented in Figure 8.1. Prior to construction contractors will undertake a thorough
assessment of the route considering both horizontal and vertical alignment to ascertain the
maximum size of vehicle to be used for delivery of solar parts to the site. As part of that
process, trial runs may be undertaken. It is anticipated that the number of such movements
will be minimal if any.
Figure 8.1: Construction Traffic Routing – Abnormal Loads
Source: Consultant and Google Maps
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 4
March 2020
2.2 The route to the Construction Site entrance for abnormal loads is as follows:
• Leave the M4 at Junction 28;
• Travel west along the A48 taking the second exit at the first two roundabouts
reached;
• At Castleton, turn left and head south along Marshfield Road;
• Remain on Marshfield Road, travelling through Marshfield and over the railway
line; and
• In approximately 360 meters turn left into the site access.
2.3 The A48 is a major road with two lanes in either direction along with sections of duelling. The
road is subject to a 50mph speed limit connecting with Junction 28 of the M4.
2.4 Marshfield Road is a single carriageway road catering for two-way traffic and is subject
predominantly to a 30mph speed limit, with a 20mph provided through the centre of
Marshfield village. The route runs through a number of residential areas with pinch points
along the route resulting from traffic calming measures and on-street parking. There are
footways running alongside the length of Marshfield Road between the A48 and Broadway.
2.5 Broadway forms a continuation of Marshfield Road, from a point approximately 225m north
of the site, following a north/south alignment connecting with the B4239 to the south, it is
subject to a 30mph speed limit. There are no footways present.
2.6 In order to accommodate the proposed vehicular movements expected at the access point,
minor improvements will be required. Swept path analysis will be undertaken in order to
demonstrate that access will be achievable by all construction vehicles.
2.7 It is anticipated that traffic management measures will be put in place to ensure abnormal
deliveries are undertaken outside of network peak hours such as the start and end of the
school day, and if required temporary on-street parking restrictions are put in place. These
will be discussed directly between the contractors and local authorities prior to construction
commencing.
2.8 To minimise any impact on the neighbouring village of Marshfield, the routes considered for
the remaining construction traffic (i.e. all non-abnormal loads), comprise a route to and from
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 5
March 2020
the proposed development site via Broadway/Marshfield Road, Wentloog Ave, A48 and M4,
this is presented in Figure 8.2.
Figure 8.2: Construction Traffic Routing – HGV
Source: Consultant and Google Maps
2.9 The route to the construction site entrance is as follows:
• Leave M4 at Junction 29;
• Follow A48(M) to the A4232 junction to Cardiff;
• At Roundabout take 1st exit onto Lamby Way;
• Follow Lamby Way onto Wentloog Ave; and
• Follow Wentloog Ave.B4239 onto Broadway, in approximately 600 m turn right into
site entrance.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 6
March 2020
2.10 Wentloog Avenue is approximately 5.5m in width with no footways provided along the
majority of its length. It is subject to a range of speed limits ranging from 30mph-50mph.
Predominantly the route bypasses any residential development however, through the
minimal residential settlement areas pavements are generally provided.
2.11 Lamby Way accommodates pedestrian movement via a footway on the northern edge of the
carriageway and is subject to a 40mph speed limit.
2.12 The A4232 is a 40mph single carriageway road to the south and a 50mph dual carriageway to
the north. There are no footways provided along this route.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 7
March 2020
3 DELIVERY SCHEDULE
3.1 The likely construction plan for the solar farm is demonstrated in Table 1.1 and accords with
that set out alongside neighbouring proposals in Llanwern (App No. App/G6935/A/16/3150137).
The proposals at Wentlooge comprise 129.9 hectares compared to the 139 hectares at the
Llanwern site.
Table 1.1: Construction Plan - Solar Farm
Week
1 2 3 4 5 6 7 8 9 10 11 12
Ground works
Mounting System
Panel Fitting
Test Commissioning
3.2 On this basis the following HGVs are expected to be generated over a 12-week construction
period as demonstrated in Table 1.3.
Table 1.3: Predicted HGV Movements – Solar Farm
Week
1 2 3 4 5 6 7 8 9 10 11 12
Total per week 10 10 10 10 28 28 28 112 112 103 103 0
3.2.1 Assuming a worst-case 5 day working week, during weeks 8-9 the solar farm will generate a
total of 23 HGV movements daily to and from the south west.
3.2.2 The exact range and quantity of equipment expected will be derived pre-delivery. The police
and local authority will be advised of any abnormal loads to ensure suitable traffic
management measures are in place.
3.2.3 Should analysis be required a swept path assessment shall be conducted using the industry
standard AutoTrack, to assess the potential impact of the delivery of loads to the site.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 8
March 2020
4 CONSTRUCTION TRAFFIC MANAGEMENT MEASURES
4.1 A number of mitigation measures can be put in place to mitigate any construction impacts
resulting from the proposals. This potential mitigation is detailed as follows:
Site Access Arrangements
4.2 As demonstrated from the site access drawing at Appendix B, the proposed access has been
designed to accommodate a 16.5m max legal articulated vehicle, being the largest vehicle
expected to visit the site during the solar construction phase. Should any abnormal loads be
required to visit the site, these will need to be considered on an individual basis to establish
an appropriate means of access.
Construction Site Signage
4.3 Construction site signage will be installed in the vicinity of the proposed access junction to
advise drivers of increased HGV traffic during the construction period. The location of this
signage and the requirements will be agreed by the Principal Contractor and the Local
Highway Authority.
Construction Site Operating Hours
4.3.1 It is envisioned that construction will only occur Monday to Saturday between 07:00 and
19:00 (this is to be confirmed at a later stage). Outside these hours only emergency works,
and dust suppression works will be carried out, unless otherwise agreed beforehand. No
works shall be carried out on Sundays or public holidays unless received written consent
stating otherwise.
4.3.2 The local council shall be informed in writing should any planned emergency works be
required; this shall occur three days before the works are scheduled.
Staff Safety
4.3.3 All staff that will be working on-site shall be made aware of construction work, construction
traffic movements on site and off site and the need for attentiveness to safety.
4.4 All staff that will be working on-site shall be made aware of construction work, construction
traffic movements on site and off site and the need for attentiveness to safety.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 9
March 2020
4.5 It is envisioned that information on construction traffic movements will be provided to the
residents in direct conflict with construction traffic and that local media will be made aware
in order to help inform the public on progress and any disruption that may occur in
association of the vehicle movements, should there be any adverse impacts identified.
Furthermore, a local newsletter will be prepared should the local authority require one, for
affected residents advising them on the construction traffic movements and safety measures
put in place along the routes.
Wheel Washing Facilities
4.5.1 During the construction period it is not considered appropriate to apply wet wheel washing
facilities, this is due to the fact that this results in the highway being wet for a considerable
distance. As a consequence, this could create unnecessary highway hazards, and therefore it
is considered appropriate to use a dry wash to remove debris before entering the highway
network.
Dust Management
4.5.2 It is envisioned that dust associated with the development site will be compressed by water
bowers where and when required. Additional measures are to be considered in relation to
management of dust on and off site.
Road Condition Survey
4.5.3 A Road Condition Survey (RCS) of the proposed construction route (identified in Appendix
8.5) will be undertaken, should the highway authority require. This will be used to identify
areas of carriageway that are sub-standard and require protection from further degrading
from construction traffic.
4.5.4 Surveys shall be conducted before and after construction in order to note any damage made
from construction traffic. The extent of this survey will be agreed upon with the highway
authority and secured as a planning condition.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 10
March 2020
Management & Monitoring
4.5.5 It is envisioned that management and monitoring during the construction phase shall be
undertaken by the principal contractor who will be responsible for addressing any issues that
arise during this period.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 11
March 2020
5 HIGHWAY WORKS AND STRUCTURES
5.1 It is anticipated that there will be no adverse impact on the highway network and there will
be no requirement for any highway or structural improvements.
5.2 Routing of abnormal loads to the site shall be assessed by the contractor, with consideration
for both horizontal and vertical alignment of the carriageway. This is to ascertain the most
appropriate size vehicle to transport oversized construction material to the site.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 12
March 2020
6 ENVIRONMENTAL IMPACT
6.1 It is not envisioned at this time that there will be any significant adverse impacts on the
environment in association with this development proposal.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 13
March 2020
7 CONSULTEES FOR TRAFFIC MANAGEMENT PLAN
7.1 There are no adverse impacts on the highway network and as such there should be no
requirement for consultation. However, the applicant will notify the following of dates and
times of the delivery of any abnormal loads:
• Newport City Council; and
• Gwent Police.
Wentlooge, Construction Traffic Management Plan (CTMP)
P:\Projects\190000\194740 - Wentlooge\2. Documents\1. Reports\2020.03.03.EP.CTMP.RO1.docx 14
March 2020
8 SUMMARY AND CONCLUSION
Summary
8.1 Vectos has been commissioned by the Wentlooge Farmers Solar Scheme Ltd to prepare a
CTMP in support of an outline planning application for a 129.9-hectare solar farm on land at
Wentlooge, Newport, South Wales.
8.2 The solar farm will comprise a single site with a principal means of access from Broadway at
the location of an existing field gate access.
8.3 This CTMP sets out the development proposals, means of access, traffic generation, routing
and potential mitigation measures. The key points set out in this document include:
• The principal means of access will be provided from Broadway which can accommodate
a 16.5m design vehicles across all movements;
• A maximum of 23 HGV movements will be generated by the solar farm daily that will
arrive and depart the site from the south west, this is based on a 5-day week and will
therefore reduce across 6 days as currently proposed;
• In the unlikely event an abnormal load is required to access the site, it is anticipated
that they will be subject to a dedicated traffic management arrangement which will be
agreed with the local authority (NCC). It is anticipated that this will take place outside of
the network peak hours to reduce the impact on the village; and
• A number of measures are proposed which will mitigate any impact on the neighbouring
highway network.
Conclusion
8.4 This CTMP sets out how the proposals of Wentlooge Farmers Solar Scheme Limited can be
accommodated within the local highway network without undue impact on existing highway
users and local residents.
IMPORTANT SECTION BREAK NEXT – DO NOT DELETE PAST THIS CHEVRON >
APPENDIX A
Drain
Tygwyn
Drain
Path (um)
Drain
Mile Post
Arnold House
Drain
1 to 5
SPs
Oakfield
Birc
h Co
ttage
Pont Stone-Birch
CR
Drain
Sluice
Drain
Drain
16
Box
Drain
The
TY M
AWR
LANE
47
11
Drain
7.3m
48
19
Pennin
g Ree
n
1
Pond
Drain
71
56
Farm
79
5.5m
4
Drain
Track
2
Drain
Lodg
e
4.3mClevedon House
Pond
66
Shelter
Drain
Drain
9
Court
1
Glandwr
Pont
Sto
ne-
61
Drain
Hollyberry
Drain
PENT
WYN
TER
RACE
Wellfield
Port o' Call
Hollies
20
WOODFIELD
164
33
BLAC
KTOW
N GAR
DENS
1
6 to 9
39
Signal
31
Drain
Sandfield
5.2m
Drain
Station House
Drain
133
14
Pentwyn House
Blacktown
Glenfield
11.0m
Drain
April
Fairfield
Nursing Home
41
4.6m
23
Drain
Greenford
134
ETL
Pumping Station
1
130132
(PH)
89
93
Rosefield
23
ETL
Mast (Telecommunication)
Blackwater Reen
Signal
40
Drain
House
Posts
Broadway Reen
CLO
SE
Beechfield House
17
87
7
Elmfield
25
Drain
2
15
El Sub Sta
54
166
Bakers
53
46
Wentlooge Level
133a
49
81
59
12
Dunvagon Cottage
Drain
Wood D
itch Ree
n
Ppg Sta
3
55
73
10 to
13
MARSHFIELD ROAD
Drain
1
PO
Tymawr Farm
Drain
Play Area
Little Ty Mawr
Drain
Greenfields Cottage
167a
Ty Mawr
24
8
1
1
CAM
BRIA
N G
RO
VE
11
4
Wentlooge Level
Penn
ing
Reen
38
4.6m
Track
18
17
7
Drain
22
Path (um)
Track
1
7
2
28
Pen-y-wain Farm
12
6
Summerway Reen
Drain
Station
23
2
Drain
1
Dra
in
Drain
167c
FB
WAY
15
1
4.3m
19
FB
Gas
Works
126
FB
Path (um)
12
29
Tretio
2
Glandwr House
12
39
8
4.3m
11
167b
Drain
Drain
12
Drain
Path (um)
Dren
ewyd
d Re
en
Dra
in
Ty Mawr
ETL
Pond
4.3m
11
Drain
Dra
in
TY M
AWR
LAN
E
Ty Newydd Barn
43
Track
Drain
Stables
Marshfield
1
Lane
4
Pwllbargod Reen
1
CAM
BRIA
N15
The
Bung
alow
Path (um)
3
Lodge
Distribution
5
CAM
BRIA
N DR
IVE CAMBRIAN GARDENS
Depot
CAM
BRIA
N C
LOSE
Drain
Ordnance Survey, (c) Crown Copyright 2018. All rights reserved. Licence number 100022432
Drain
Club
Pond
Sluice
Summerway Reen
Rhosog Fawr Reen
7.9m
House
Drain
B 4239
New
FB
Sluice
Broadway Reen
Track
Gout Fawr
Cattle Grid
Peterstone House
Sluice
Drain
Drain
Drai
n
Drain
Drain
Track
Track
ETL
Summ
erway Reen
FB
Drain
FB
Drain
Broadway Reen
Drain
Drain
Sluice
Drain
B 4239
Drain
Drain
Track
Horsecro
ft Reen
Pond
4.9m
Drain
Drain
Greenacre Farm
Pond
Track
Horsecroft Reen
Pond
Drain
4.3m
Sluice
Drain
Drain
Sluice
Drain
Drain
Caravan Site
Ty-coch Farm
Pond
FB
Drain
FB
5.2m
Drain
Path
Sluice
Drain
Sluice
Summerway Reen
Drain
Path (um)ETL
Drain
Exist
ing
Trac
k
Track
Trac
k
Wentlooge Level
Drain
Drain
Track
Drain
Sluice
Drain
Drai
n
Drain
Drain
Drain
Penn
ing
Reen
Drain
5.2m
Path
(um
)
Hors
ecro
ft Re
en
Drain
Drain
CR
Drai
n
MP 163.25DrainDrain
MP 163.5
Path (um)
11.6m
Drain
Path (um)
Ford
Drain
MP 163.0
Drain
Drain
Drain
Pond
LevelPath
Shingle
Summerway Reen
Pond
FB
Wentlooge
Drain
Shingle
Golf Course
Path
(um
)
Pond
Fishing Lake
Drain
Drain
Drain
Bryn Glas Farm
Kismet
Drain
Walnut Tree Farm
FBs
Cottage
Hawse Reen
Drain
Drain
ETL
Drain
Drain
Oak Medow House
Drain
Drain
Drain
Farm
5.5m
FB
Farm
OUTFALL LANE
Little Ty-Coch
Springfield
FB
Drain
LB
Fishing Lake
Drain
Drain
5.5m
Drain
Drain
Drain
Drain
Tree
Wentlooge Level
Drain
Tree
Holly House
Wharf R
een
B 4239
Walnut Tree
Bluebell Cottage
White Gates
5.5m
HAW
SE LANE
Walnut
5.8m
Drain
White Lodge
6.1m
FB
Sealand Reen
Greenfields
FB
5.2m
Drain
FB
Track
Walnut
Drain
Greenhill Depot
Willowbrook
Greenmoor Farm
Twm Barlwm
Haw
se Reen
Drain
Haw
se Reen
FB
Orchard Farm
Path (um)
Drain
Drain
Drain
Drain
Drain
Path (um)
Drain
Drain
Tank
Drain
Drain
Drain
Red House
Hawse Farm
Drain
HAWSE LANE
Drain
Drain
Track
Drain
5.5m
Seagulls
WHEEL LANE (TRACK)
Track
Drain
Drain
5.8m
Drain
FB
5.8m
6.1m
DrainETL
Path (u
m)
Drain
Drain
Drain
Hawse Reen
Drain
Drain
Drain
Drain
Drain
MP 162.75
Drain
Wentlooge Level
Drain
Drain
Drain
FB
Trac
k
GridYard
Batte
ry sto
rage
Drain
Drain
Track
Drain
Drain
Drain
Drain
Drain
Drain
FB
Wellhouse
Drai
n
FB
Drain
Red
Drain
Drain
Blackwater Reen
Mile Post
Drain
Drain
Drain
Drain
Drain
Track
Dra
in
Path (um)
Drain
Track
Drain
Drain
HEOL LAS
Drain
Drain
Cross Reen
5.2m
CR
The
Drain
Drain
Drain
Drain
Cross Reen
FB
Drain
Drain
Drain
Drain
Drain
Drain
3
Drain
Bayview House
Drain
Barn
164.25
Greenlane Reen
Subway
Drain
5.2m
Drain
Drain
Dra
in
Arnold House
Oakfield
16
The
11
48
56
4
Clevedon House
1
Hollyberry
Wellfield
Hollies
BLAC
KTOW
N GAR
DENS
1
39
Sandfield
Pentwyn House
Blacktown
Glenfield
Fairfield
Nursing Home
Greenford
1
Rosefield
40
House
Beechfield HouseElmfield
2
El Sub Sta
54
46
Dunvagon Cottage
Wood D
itch Ree
n
3
PO
167a
1
Drain
167c
126
167b
11
Marshfield
1
15
5
Ordnance Survey, (c) Crown Copyright 2018. All rights reserved. Licence number 100022432
Track
Drain
FB
Wellhouse
Drai
n
Red
Drain
Mile Post
Drain
Drain
Dra
in
Path (um)
Drain
Drain
Drain
The
Drain
Drain
FB
Drain
Drain
Drain
3
Bayview House
Barn
164.25
Subway
Drain
5.2m
Drain
Dra
in
Arnold House
Oakfield
16
The
11
48
56
4
Clevedon House
1
Hollyberry
Wellfield
Hollies
1
Pentwyn House
Blacktown
Glenfield
Nursing Home
Greenford
1
Rosefield
40
House
Beechfield HouseElmfield
2
El Sub Sta
46
Dunvagon Cottage
Wood D
itch Ree
n
3
PO
167a
1
Drain
167c
126
167b
11
Marshfield
1
5
Ordnance Survey, (c) Crown Copyright 2018. All rights reserved. Licence number 100022432
Wood D
itch Ree
n
Track
Drain
Wellhouse
Drai
n
Red
Drain
Mile Post
Drain
Drain
Dra
in
Path (um)
Drain
Drain
Drain
Solar Panels
The
Drain
Drain
FB
Drain
Drain
Drain
3
Bayview House
Wood Ditch Reen
Barn
Subway
Drain
5.2m
Drain
Dra
in
Llech
THE SH
IRES
3
Trac
k
7
El
45
Path (um)
Ty Clyd
House
Marshfield
THE
SHIR
ES
Blacktown
Ty-
Red
28
Chauen
24
4
Court
Crossways
185
18
The Cherrys
120
Hall
1
Cottage
12
Drain
Mawr
Gwynne
15
2O
52
Karelia
Court
9
23
2
5
15
Ty
Field View
145
48
1
WELLFIELD CT
1 Walnut House
Issues
7.3m
ORCHARD
3
CHURCH LANE
1
20
1
Bungalows
Farm
Path (um)
Ty
Gwydr
50
50a
House
Ty Coed
9
182
El Sub Sta
Rimah
o
Old Green Court
31
186
El Sub Sta
Blacktown
Area
Ty
Church Reen
REAC
H
Cilgwyn
Geneva
197
8
44
176
7
Tanglewood
27
GAR
DEN
S
Oakdene
MARYSFIELD
CLO
SE
The Old Vicarage
Brandi
4
5
THE
SHIR
ES
Oakdale
Holmelea
Marysfield Cottage
Wellfield House
6a
102
WHITETHO
RN WAY
Wellhouse
Church Farm
32
116
10
Groes
20
20
The Orchards
Farm
10
3a
Perllan
16
6
Willowmead
14
33
Church Reen
MALLARDS
Sub Sta
Play
201
Clandeboye
1
1
167
Gold Roses
60
Blacktown
126
Holmleigh
Pond
Gas Gov
1
10.4m
26
PW
27
177
Drain
2
El Sub Sta
6
9
177
Full Moon
Court Farm
2
HERBERT CLOSE
3
Tewin
ST MELLONS ROAD
Westfield House
157
11
3
147
6
5
Drai
n
Play Area
THE GRANGE
The Green
(PH)
Dra
in
Recreation Ground
44
3
St Alban's C
ottage
Ppg Sta
Marysfield House
15
Greenacres
St Dav
id's
The Bungalow
14
133
2
South View
Mason
s Arm
St David's
Fairoaks
Nursing Home
House
The
11
5
House
Allotment
5
10
187
Marshfield
Pond
38
29
1
2
ST MELL
ONS ROAD
88
1
2
Fach
167c
6.7m
Drain
Drain
135
8
4
17
1
Drain
35
Cross
Lych Gate
The
41
118
9
36
209a
181
1
31
Cae Bran
di
Path
Cae
The
1
38
Rose
52
WELLFIELD ROAD
10
9
1
122
OAKFIELD
S
1
Wellfield
Sub
The Old Barn
Sunflower
Azelea
CL
13
Dunvagon Cottage
17
209b
CATHERINE DRIVE
GROES FAWR CLOSE
6
FB
MARSHFIELD ROAD
Cottage
12
3
101
1
Tythe
Ron-y-Mar
LB
Blacktown
175
WELLFIELD ROAD
16
5
House
Pond
11
Newcroft
TCB
18
Hall
30
5
209
Thistledown
1
The
Clevedon House
Garth
13
8
Pinewood
40
St Mary's Church
Croft
25
34
The Elms
19
Station
4
Hollyberry
Hollies
Gwn
Trevene
5
5
169
7
24
26
1419
Colinda
Post
The Forge
9
Blacktown
Oak
VICAR
AGE
211
8.5m
Sewage
Vicarage
Pond
ElectricityOAKFIELD
S
House
40
Church Lodge
46
Cottage
(remains of)
17
Gardens
Pear Tree
Path (um)
1
19
Path (um)
Drain
LB
5
Oakley
Tyn y Cornel
7.0m
Exist
ing
Trac
k
Exist
ing T
rack
Exist
ing T
rack
Existing Track
Existing Track
Existing Track
Existing Track
Existing Track
Existing Track
Exis
ting
Trac
k
Existing Track
Sterling Court,17 Dix's Field,Exeter,Devon,
savills
Notes:
DRAWING TITLE
Controlled by
Date
Drawn by
Scale
CLIENT
Dwg. No.
Office
Designed by
Checked by
File No.
PROJECT
C
DateNo. Revision
DRAWING TITLE
Controlled by
Date
Drawn by
Scale
CLIENT
Dwg. No.
Office
Designed by
Checked by
File No.
PROJECT
EXETER
Do not scale from this drawing unless for Planning purposes. Figured dimensions onlyto be used. All dimensions must be checked on site by the Contractor prior to thecommencement of any fabrication or building works. Where applicable, dimensionsand details are to be read in conjunction with specialist consultants' drawings; anydisparity between drawings is to be brought to the attention of Savills prior to thecommencement of any fabrication or building works. This drawing is the property ofSavills and may not be reproduced without their expressed permission.
C
based upon the Ordnance Survey Map with the sanction of the Controller Crown Copyright Reserved O.S. LICENCE No. 100024244. This plan is
of Her Majesty's Stationery Office.
This drawing is the copyright of Savills.C
WENTLOOGE
SITE LAYOUT PLAN
429574/02E
1:5000 @ A1 1:10000 @ A3
NB
TC NB
NOV 18
429574
NB
A Mar 19 Grid yard added. B May 19 Wind turbine position amended. C May 19 Land removed.
D Sep 19 Extent of panels amended, grid yard & battery storage moved.
E Feb 20 Extent of panels amended, wind turbines removed, tracks, cable runs, legend added.
- Transformer Housing
LEGEND KEY
- Solar panel
- Stock Proof Fencing
General Scheme Notes:
All cables are to be laid underground
All existing public right of way footpaths and bridal ways to be retainedand also enhanced where possible
Where a cable run is shown alongside a new ditch crossing, this is forindicative purposes as the cable run would be routed beneath the newcrossing as shown on the technical drawings.
- Cabinet Inverter Housing
- CCTV Point
- Cable Run
- Cable Bored under Existing Hedgerow / Rheen
- Cable Laid through Existing Gateway
- Rheens and Ditches
- New Bridge / Ditch Crossing
- New Stone Access Track
- Gate in stock proof fence providing access to Rheens
- Tele Communications Tower within grid yard
- Access points to the site
WENTLOOGE FARMERS SOLAR SCHEME LIMITED
- Ecological Mitigation
APPENDIX B