4
 1 2 3 4 5 6  LEVEL DIFFERENCE (Mtr) 7 8 9  LEVEL DIFFERENCE (Mtr) 10 11 12 13 14 15 16    S    H    I    F    T TILT ALONG X-AXIS= 1 IN WELL DIA/C6 ALONG Y-AXIS WITH DIRECTION (Mtr ) = GAUGE MARK/TILT@Y-AXIS RESULTANT SHIFT= COL.14²+ COL.15² (Mtr) RESULTANT TILT= COL.6²+ COL.9² ALONG X-AXIS WITH DIRECTION (Mtr ) = GAUGE MARK/TILT@X-AXIS RESULTANT TILT DIRECTION O=(1/TAN)C9/C6 PROFORMA FOR RECORDING TILTS AND SHIFTS OF WELLS DATE TOTAL STEINING HEIGHT (Mtr) TOTAL SINKING GAUGE MARK(Mtr) KHERRA END WELL No.    R    E    D    U    C    E    D    L    E    V    E    L    S    (    R  .    P  .    S  .    )    O    F    G    A    U  U/S SIDE D/S SIDE    A    L    O    N    G    X      A    X    I    S    A    L    O    N    G    Y      A    X    I    S NANOWAL END TILT ALONG Y-AXIS = 1 IN WELL DIA/C9    T    I    L    T

Well Sinking Proforma

Embed Size (px)

DESCRIPTION

For measuring and recording tilt and shift during sinking of well in bridge construction.History is also clarified by this pro forma.

Citation preview

  • 12

    3

    4

    5

    6 LEVEL DIFFERENCE (Mtr)

    7

    8

    9 LEVEL DIFFERENCE (Mtr)

    10

    11

    12

    13

    14

    15

    16

    SHIF

    T

    TILT ALONG X-AXIS= 1 IN WELL DIA/C6

    ALONG Y-AXIS WITH DIRECTION (Mtr ) = GAUGE MARK/TILT@Y-AXIS

    RESULTANT SHIFT= COL.14+ COL.15 (Mtr)

    RESULTANT TILT= COL.6+ COL.9

    ALONG X-AXIS WITH DIRECTION (Mtr ) = GAUGE MARK/TILT@X-AXIS

    RESULTANT TILT DIRECTION O=(1/TAN)C9/C6

    PROFORMA FOR RECORDING TILTS AND SHIFTS OF WELLS

    DATE

    TOTAL STEINING HEIGHT (Mtr)

    TOTAL SINKING GAUGE MARK(Mtr)

    KHERRA END

    WELL No.R

    EDU

    CED

    LE

    VEL

    S (R

    .P.

    S.) O

    F G

    AU

    GE

    MA

    RK

    U/S SIDE

    D/S SIDE

    ALO

    NG

    X

    -A

    XIS

    ALO

    NG

    Y

    -A

    XIS

    NANOWAL END

    TILT ALONG Y-AXIS = 1 IN WELL DIA/C9

    TILT

  • PROFORMA FOR RECORDING TILTS AND SHIFTS OF WELLS

  • INDEXS.NO. DISCRIPTION PAGES