Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Upper Mekong
Lower Mekong
7 Dams in China- Completed (6) 15,600 MW.
(2 Storage dam + 4 Run of River)
- Under construction (1) 155 MW.- Total 15,755 MW.
Completed
Lao PDR
MyanmarVietnam
Thailand
China
Development in MekongLower Mainstream
1. Pak beng 1,230 MW
2. Luang Prabang 1,410 MW
3. Xayaburi 1,285 MW
4. Pak Lay 1,320 MW
5. Sanakham 570 MW
6. Pak Chom 1,079 MW
7. Ban Khoum 2,000 MW
8. Lat Sua 800 MW
9. Don Sahong 360 MW
10. Stung Treng 980 MW
11. Sambor 460 MW
Total 10,394 MW
1 2
3
4
5 6
7
8
910
11
Mekong natural river flow 15,000 - 4,000 - 1,200 cms.Design 47,000 - 5,000 - 2,000 cms.Water Level U/S = 275 masl , Rated Head = 28.5 m
Xayaburi Project feature
1. Navigation Lock = 144 + 154 length 12 m. width for 500 tons ship2. Spillway = 7 Surface gates (19 m x 21 m) +
4 Low Level Outlets for Sediment (12 m x 16 m) 3. Intermediate Block = Fish pumps and passage + Powerhouse Erection Bay4. Powerhouse = 7 x 175 MW (EGAT) + 1 x 60 MW (EdL)5. Fish Migration = Multi – system , U/S + D/S migration
Xayaburi Project feature
Powerhouse
8 Kaplan Turbine 175 MW (7 units) +
60 MW (1 unit) with full capacity at discharge 5,000 cms
1234567EdL
Fish Lock
D/S Fish Passage
Pump 2 for D/S Fish Migration
Pump 1 and Gravity pond for U/S Fish Passage
U/S Fish Passage
U/S Fish Passage
Upper channel
Fish Ladder
D/S Exit
Switchyard Area
Upstream Reservoir
Fish passing system
Transmission Line
115 kV to Xayaburi substationLine Route 17 km Number of Tower 51
500 kV to Thai-Lao borderLine Route 196 km (3 sections)
section 1 : 76 kmsection 2 : 58 kmsection 3 : 62 km
Number of Tower 426Tower design 12 type
15 Villages are affected
6 villages in XYB(1RS/5RL)
9 villages in LPQ(6RS/3RL)
Resettlement activities
2,986
RS 1
RS 2
RS 3
RS 4
RS 5
RS 6
RS-7RS-8
RSH-3
RSH-4
RSH-1
RSH-2
Project
CITY
Relocation Site
HouaySouy
93
98
170
55
68
24
3
3 3
12
Paknoen
KhokYai
HouayDeua
Talan
76
62
Completed
Thadeua
PakkhonPakphai
Houaykheua
Pakhao
Khoktom
Hatxaykham
Pakmon
Paklan
Phonsavanh
Ongoing
Resettlement Site
Completed workSite Affected Village Description Host Village Date
RS1 Housysouy Resettlement 76 HH
Neunsavang
11/1/2012
RS2 Paknoen Resettlement 93HH 1/3/2013
RS3 Khok-Yai, Houaydeua
Resettlement 98 HH7/8/2013
RS4 Talan Relocation 62 HH Talan 3/11/2013
RS5
Phonsavanh
Resettlement 170 HH Thungjalern
1/10/2014
Paklan 20/10/2014
Pakmon 10/10/2014
RS6 Thadua Relocation 68 HH Thadua 1/11/2014
Site Affected Village Description Host Village Target Date
RS7 Pakkhon Relocation 55 HH Pakkhon 17/8/2015
Relocation Plan of 2015
Resettlement activities
Site Affected Village Description Host Village Target Date
RS8 Pakphai Relocation 24 HH Pakphai 5/4/2016
RSH-1 Khoktom Relocation 12 HH Khoktom 5/7/2016
RSH-2 Hatxaykham Relocation 3 HH Hatxaykham 12/7/2016
RSH-3 Houaykheua Relocation 3 HH Houaykheua 19/7/2016
RSH-4 Pakkhao Relocation 3 HH Pakkhao 25/7/2016
Relocation Plan of 2016 Neunsavang
Neunsavang
Thungjalern