Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Embed Size (px)

Citation preview

Page 1: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Welcometo the

USA Parkway ProjectPublic Information Meeting

ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION.

January 17, 2012

Page 2: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Meeting Format and Public Comments

Questions to be addressed during the open comment period are to be written on a card available at the welcome table and given to a project representative prior to the start of the presentation

A court reporter is available to take comments today

Comments can also be submitted on the comment form

Submit comment forms today or by mail, fax , or e-mail

([email protected])

Reference the project in your correspondence (USA Parkway

Project)

Comments must be received by 5:00 p.m. Friday, February 3,

2012

Page 3: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

What is the Project

A proposed transportation link between Interstate 80 in Storey County and US 50 in Lyon County

5.5 miles of USA Parkway in Storey County already exists

4.5 miles to County line has been graded but not paved

From the County line to US 50 is an additional 8.6 miles

Page 4: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Project History and Status

Tahoe Reno Industrial Center (TRIC) built improvements from I-80 to the Storey/Lyon County line

TRIC previously analyzed alignment options to US 50 and held public and stakeholder meetings

NDOT is initiating a preliminary design and environmental process to consider transportation solutions to improve connectivity between I-80 and US 50

2000

2011

HISTORY:HISTORY:

STATUS:STATUS: The previous work and public input will be considered, but

NDOT is still considering reasonable and feasible alternatives

The project is currently not funded for construction

Page 5: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

What is the Purpose of this Environmental Assessment

To satisfy the requirements of the National Environmental Policy Act (NEPA)

To identify the transportation problems and needs in the study area

To evaluate alternative transportation solutions to improve connectivity between I-80 and US 50

To evaluate and document impacts of implementing a transportation link between I-80 and US 50

Required if federal funding becomes available

Page 6: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

What is the Purpose of this Meeting?

Provide information about the study process

Seek your input regarding:

• The purpose and need for the project• Potential alternatives• Community issues and concerns

Your input will help NDOT refine the study and alternatives

Page 7: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Agency Participants

The Federal Highway Administration (FHWA) is the lead federal agency

The Nevada Department of Transportation (NDOT) is the lead state agency

The Bureau of Land Management (BLM) is a cooperating agency

Various local and state agencies will play an active role

Page 8: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Project Process

Page 9: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Preliminary Purpose and Need

Provide a new north-south transportation link between I-80 and US 50 that will enhance local and regional access and mobility

Provide an alternative/redundant vehicle route in case of an emergency or construction on I-80, US 50, or US 95A

Support planned land uses and economic development

Improve efficiency of freight movement from areas east of Reno to points south

Page 10: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

Alternatives Evaluation

Several preliminary alignments have been developed. NDOT will consider reasonable and feasible alternatives including a no build alternative. Alternatives will be evaluated based on:

Design standards Terrain and topography Existing roadway network Land status Environmental and human impacts Cultural resources Public input and comment

Page 11: Welcome to the USA Parkway Project Public Information Meeting ALL INFORMATION PRESENTED IS PRELIMINARY AND SUBJECT TO REVISION. January 17, 2012

We Are Seeking Your Input

You know your community best. We need your input on:

The purpose and need for the project

Alternative solutions and alignments

Potential issues in the study area

Comments should be submitted by February 3, 2012 to:

Steve M. Cooke, P.E., ChiefEnvironmental Services DivisionNevada Department of Transportation1263 South Stewart StreetCarson City, NV 89712