ZĞǀŝĞǁ ĐŽŶƐƚƌƵĐƟŽŶ ƐƚĂŐŝŶŐ ƉůĂŶ ZĞǀŝĞǁ ĚƌĂŌ streetscape ĐŽŶĐĞƉƚƐ dĂůŬ ƚŽ ƉƌŽũĞĐƚ ƐƚĂī 2019 Construction 2018 Construction Learn about these projects... ZĞǀŝĞǁ ŝŶƚĞƌƐĞĐƟŽŶ ŝŵƉƌŽǀĞŵĞŶƚƐ ĂŶĚ ĐŽŶƐƚƌƵĐƟŽŶ ŝŶĨŽƌŵĂƟŽŶ www.movingforward13-21.com dŽŐĞƚŚĞƌ ǁŝƚŚ d ŽŐĞƚŚĞƌ ǁŝƚŚ CH 21 Downtown Prior Lake Reconstruction TH 13 Reconstruction Duluth Ave Intersection Improvements May 16, 2018 - 5:00-7:00 pm Welcome to the Open House!

Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

• streetscape

2019 Construction2018 Construction

Learn about these projects...

www.movingforward13-21.com

CH 21 Downtown Prior Lake Reconstruction

TH 13 ReconstructionDuluth Ave Intersection Improvements

May 16, 2018 - 5:00-7:00 pm

Welcome to the Open House!

Page 2: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

!(

!(

!(

!(

#:Qh

O

O

@

@

@

@@

@

@

@ @

@

@

@

@

@

@

@

@

@

@ @

@

@

@

@

Duluth AveIntersection/Village

Dr Roundabout(City)

CH 21 PavementImprovements

(County)

CH 42Reconstruction

(County)

Minnesota TrunkHighway 13

(State)

IntersectionControl Evaluation

(State)

CH 21/TH 13(County)

Minnesota TrunkHighway 13

(State)

CH 21 PavementRepair

(County)

CH 42(County)

Franklin Trl(City)

FishPoint Rd

(City)

Texas Ave(County)

?±A@

?±A@

GuWX

GuWX

G±WX

G|WX

G|WX

G³WX

GwWX

GkWX

GuWX

GÝWX

GÜWX

GqWX

Legend

Traffic Control Project

O Roundabout

#:Qh Signal

Project Year

20182019

20202021

0 ¼Miles

Source: Scott County, MnDOT, MnGeo

!I

Legend

Traffic Control Project

O Roundabout

#:Qh Signal

Project Year

20182019

20202021

0 ¼Miles

Source: Scott County, MnDOT, MnGeo

!I

#:Qh

Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13 Reconstruction Project (MnDOT).

@@@@@@@@@@@

@@@@@@@@@

MMMiiinnnnnnnnneeesssoootttttaaaaa TTTTTTrruuuuuunnnnnkkkkkHHHHHHiggggggghhhhhhhwwwwwaaaaayyyyyy 111133333

(((((SSStttttaaaaaaattttteeeee)))))

0 ¼Miles

Sourcrr e: Scott Countyt ,yy MnDOT,TT MnGeo

DRAFT 5/16/2018Subject to change

Upcoming Construction Projects

@@@@@@@@@@@

CCCHHH 444222ttioonn

Page 3: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

• corrid

or

• • •

Project GOALS

Project PURPOSE

• enviro

nm

ent

• • Pre

serve

and

en

rich th

e ch

aracter o

f D

ow

nto

wn

Prio

r Lake

Pre

limin

ary De

sign

Define WHAT to Build

Final D

esign

Define HOW to Build

Build

You

are h

ere.

JUN

E 29

, 20

17

OP

EN H

OU

SE 1P

roject P

urp

ose &

U

nd

erstand

ing

DEC

5, 2

01

7O

PEN

HO

USE 3

-

OC

T 10

, 20

17

OP

EN H

OU

SE 2 -

Project CONTACTS

Ch

ris Ch

rom

y, Bo

lton

& M

en

k

Project Timeline

Follow Project Process - m

ovin

gforw

ard1

3-2

1.co

m

Project IntroductionC

H 2

1 D

ow

nto

wn

Prio

r Lake Im

pro

vemen

t

Page 4: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Main Ave. SE

Duluth Ave. SE

Arcadia Ave.

Dakota St. SE

Pleasant St. SE

Evanston Ave. SE

Colorado St. SE

Roundabout at Arcadia supports a permeable downtown with vehicular access to both the north and south side of downtown as well as two-stage pedestrian crossings.

Northbound left-turn onto Pleasant St. - access to downtown from the south

Opportunities• Roundabout and median plantings• Streetscape Elements• Wayfinding

Roundabouts frame downtown

Traffic Flow:Slower and more consistent speeds expected leading up to and in between roundabouts

Two-stage enhanced pedestrian crossing at Main Ave

~10-20 seconds, average pedestrian wait time to cross

~80 seconds - estimated travel time from north side of Main Ave to south side via Arcadia roundabout

Facilitate northbound left-turn onto CH 21 from Duluth through a right turn and "u-turn" at Arcadia roundabout

Two-stage pedestrian crossing at roundabouts

Roundabouts frame downtown

Improvements to 13-21 intersection anticipated to reduce "cut-through" traffic on residential side streets

~95 seconds - estimated vehicular travel time from south side of Main Ave to north side via TH13 roundabout

Resurface Scott West Regional Trail to Franklin Trail Intersection

Roundabout at Arcadia supports a permeable downtown with vehicular access to both the north and south side of downtown aswell as two-stage pedestrian crossings.

Northbound left-turn onto Pleasant St. - access to downtown from the south

Opportunities• Roundabout and median plantings• Streetscape Elements• Wayfinding

Roundabouts frame downtown

Traffic Flow:Slower and more consistent speeds expected leading up to and in between roundabouts

Two-stage enhanced pedestriancrossing at Main Ave

~10-20 seconds, averagepedestrian wait time to cross

~80 seconds - estimated travel time from north side of Main Ave to south side via Arcadia roundabout

Facilitate northbound left-turn onto CH 21 from Duluth through a right turn and "u-turn" at Arcadia roundabout

Two-stage pedestrian crossing at roundabouts

Roundabouts frame downtown

Improvements to 13-21 intersection anticipated to reduce "cut-through" traffic on residential side streets

~95 seconds - estimated vehicular travel time from south side of Main Ave to north side via TH13 roundabout

Resurface Scott West RegionalTrail to Franklin Trail Intersection

Improvements OverviewCH 21 Downtown Prior Lake Improvement

Page 5: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

• • •

Inset A

Inset B

Inset C

Project Begins

Project Ends

con

crete

28

0th

St. (TH1

9)

County Trail E (282)

Inset A

Co

nstru

ct righ

t turn

lan

es

Co

nstru

ct

lanes

treatmen

t site #1

treatmen

t site #3

treatmen

t site #2

13

Langfo

rd B

lvd18

0th

St NE

Vergus Ave

Vergus Ave

Sprin

g Lake Ave

Inset B

turn

lanes

treatmen

t site #5

treatmen

t site #4

Sho

uld

er

Langford Blvd

176th St

13

81

Inset C

- Trail Map

Prop

osed

trail

Langford Blvd

Duluth Ave

An

na Tr

13

23nama Ave

Improvem

ents Overview

Page 6: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

AREA UNDER CONSTRUCTION

AREA UNDER CONSTRUCTION

AREA UNDER CONSTRUCTION

STAGE 1

STAGE 2

12

Spring Lake

17

Spring Lake Regional

Park

Staging Considerations:

Schedule:•

What is Construction Staging?

• services

STAGE 1

DULUTH AVE*

Fair

law

n A

ve

180th St E

Franklin Trail SE

Pleasant St SE

AREA UNDER CONSTRUCTION

AREA UNDER CONSTRUCTION

AREA UNDER CONSTRUCTION

Spring Lake

Spring Lake Regional

Park

Staging Considerations:

Schedule:•

•services

DULUTH AVE

CTI

Fair

law

n A

ve

180th St E

Franklin Trail SE

Pleasant St SE

Construction Staging Overview

Page 7: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

STA

GE

2

STA

GE

1

12

Upper Prior Lake

Spring Lake

MARSCHALL RD.

17

Spring Lake Regional

Park

14

0T

H S

T. NE

TEXAS AVE.

15

4T

H S

T. NW

16

0T

H S

T. SE

42

Cleary Lake Regional

Park

Cynthia Lake

LANGFORD AVE.

23

8

19

0T

H S

T. E

PANAMA AVE.

22

0T

H S

T. E

Detour Routes Rules of Thumb

1/3

1/3

1/3

TH 1

3 D

etou

r

deto

ur ro

ute

CH

21

Deto

ur

deto

ur ro

ute

STA

GE

1

Regional Detour RoutesC

H 2

1 D

ow

nto

wn

Prio

r Lake Im

pro

vemen

t

Page 8: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Collective Business Messaging

12

Franklin Trail SE

Du

luth

Ave

SE

Five

Haw

ks A

ve S

E

Village Lake Dr SE

Pleasant St SE

Colorado St SE

We

st A

ve S

E

12

Franklin Trail SE

Du

luth

Ave

SE

Five

Haw

ks A

ve S

E

Village Lake Dr SE

Pleasant St SE

Colorado St SE

We

st A

ve S

E

Local Access Routes

Page 9: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Spring Lake

17

Fair

law

n A

ve

180th St E

Ve

rgu

s A

ve

Sun

ray

Blv

d S

W

Pan

ama

Ave

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

Stage 2A (TH 13)

Stage 2A (CH 21)

Integra Utility Relocation

Stage 2B (TH 13/CH 21)

2019

May June July Aug.April Sept. Oct.

STAGE 1A West project termini to Vergus Ave

STAGE 1B Vergus Ave to CH-81 (Fairlawn Ave)

STAGE 1C CH 81 to CH 12/S. Half of TH 13 from

CH 12 to CH 23 (Panama Ave)

STAGE 1A

East project termini to Duluth Ave

We

st A

ve S

E

Du

luth

Ave

SE

Colorado St SE

See Stage 2 Board

12

Spring Lake

17

Fair

law

n A

ve

180th St E

Ve

rgu

s A

ve

Sun

ray

Blv

d S

W

Pan

ama

Ave

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

2019

May June July Aug.April Sept. Oct.

Stage 2A (TH 13)

Stage 2A (CH 21)

Integra Utility Relocation

Stage 2B (TH 13/CH 21)

West project termini to Vergus Ave

Vergus Ave to CH-81 (Fairlawn Ave)

CH 81 to CH 12/S. Half of TH 13 from CH 12 to CH 23 (Panama Ave)

East project termini to Duluth Ave

We

st A

ve S

E

Du

luth

Avee

SSE

Colorado St SEC l d S SE

See Stage 2 Board

12

Construction Stage 1

Page 10: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Upper Prior Lake

Du

luth

Ave

SE

Village Lake Dr SE

Franklin Trail SE

Pleasant St SE

Five

Haw

ks A

ve S

E

Willowwood St SW

Will

ow

wo

od

Ln

SW

Mai

n A

ve S

E

Lyons Ave SE

Blind Lake Trail SE

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

Stage 2A (TH 13)

Stage 2A (CH 21)

Integra Utility Relocation

Stage 2B (TH 13/CH 21)

2019

May June July Aug.April Sept. Oct.

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

Stage 2A (TH 13), Stage 2A

(CH 21), Stage 2B (CH 21) *Expected 3 week schedule reduction with all downtown work completed at the same time

2019

April May June July Aug. Sept. Oct.

STAGE 2A CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout

STAGE 2B

STAGE 2A N. Half of TH 13 from CH 12 to CH 23 /

See Stage 1 Board

See Stage 1 Board

Du

luth

Ave

SE

Village Lake Dr SE

Franklin Trail SE

Pleasant St SE

Five

Haw

ks A

ve S

E

Willowwood St SW

Will

ow

wo

od

Ln

SW

Mai

n A

ve S

E

Lyons Ave SE

Blind Lake Trail SE

Stage 2A (TH 13)

Stage 2A (CH 21)

Integra Utility Relocation

Stage 2B (TH 13/CH 21)

2019

May June July Aug.April Sept. Oct.

Stage 2A (TH 13), Stage 2A

(CH 21), Stage 2B (CH 21)*Expected 3 week schedule reduction with all downtown work completed at the same time

2019

April May June July Aug. Sept. Oct.

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

Stage 1A (TH 13)

Stage 1B (TH 13)

Stage 1A (CH 21)

Stage 1C (TH 13)

CH 21/Arcadia Ave roundabout & South leg of TH 13/CH 21 roundabout

N. Half of TH 13 from CH 12 to CH 23 /

See Stage 1 Board

See Stage 1 Board

Construction Stage 2

12

Page 11: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

SCENE

Scott County will be responsible for regional detour signage during the project. Updates regarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.

Sign up here!

The WavelengthPrior Lake:

A Wonderful Place To Live, Work and Play for a Lifetime.

June/July ‘18

In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthly publication, The Wavelength, will

contain project updates throughout construction. Sign up to receive these updates on the City website.

Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.

movingforward13-21.com SOUTHVIEW BLVDRECONSTRUCTION

HOTLINE612-619-6284

[email protected]

EMERGENCY651-322-2323

Community Liaison (CL)The CL will act as the central point of contact for the community and will relay any concerns to the project team and agencies.

Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.

A short video will be released as construction staging details are finalized in order to share construction details and timeline with the community. This graphic timeline will be used with written project updates (shared electronically) to track progress.

Keep watching the project

Facebook page and website

for updates!

Example contact cards

Scott County will be responsible for regionaldetour signage during the project. Updatesregarding closures, and detours will be shared through their email notification system, Notify Me. Their bi-monthly publication SCENE will provide project updates throughout construction.

Sign nup here!

Newsletter of the City of Prior Lake www.cityofpriorlake.comwww cityofpriorlake com

Prior Lake:AA f y f fA Wonderful Place To Live, Work and Play for a Lifetime.A Wonderful Place To Live, Work and Play for a Lifet

June/July ‘18

In addition to active social media pages, the weekly e-mail, City Newswire, and the bi-monthlypublication, The Wavelength, will

contain project updates throughout construction. Sign up to receive these updates on the City website.

Several communication outlets will be utilized during construction to share current activities, impacts, and milestones with the public. The project team will provide content to all agencies so that messaging is clear, consistent, and timely.

SOUTHVIEW BLVDRECONSTRUCTION

HOTLINE612-619-6284

[email protected]

EMERGENCY651-322-2323

Community Liaison (CL)The CL will act as the centralpoint of contact for thecommunity and will relay any concerns to the project team andagencies.

Contact CardsThese will be distributed to residents, businesses, and stakeholders as construction nears and will include pertinent contact information.

A short video will be released as construction staging details are finalized in order to share construction details and timelinewith the community. This graphic timeline will be used withwritten project updates (sharedelectronically) to track progress.

Keep watching the project

Facebook page and website

for updates!

Example contact cardsExample contact cards

Construction Communications - What to Expect

Page 12: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Roundabout RodeoSt. James, MN

Brought to you by the

...By Engineer/Contractor

...By Communities!

Construction Communications!

Business Wayfinding Signage

Community Events

Guiding Documents

The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.

The Main EventRedwing, Minnesota

On the Road AgainSouth St. Paul, Minnesota

Branded communication tools can rally the community during construction and clearly

communicate what is part of the project. Two examples from Buffalo and Hopkins are shown here.

Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.

Roundabout RodeoSt. James, MN

Brought to you by the

The events below are Community organized events from other Minnesota cities that brought visitors downtown during construction.

he Main EventThedwing, MinnesotaR

On the Road AgainSouth St. Paul, Minnesota

ed communication tools can rally the Brandemmunity during construction and clearly comccommunicate what is part of the project. Two cc

examples from Buffalo and Hopkins areeshown here.shown here.s

Preparing for construction is key. St. James developed a "Business Survival Guide” with their Chamber of Commerce to prepare downtown businesses and unify the downtown as one big destination rather than individual business owners.

Construction Communications - What can the community do?

Page 13: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

What is a RRFB?

• • • • •

Typical Street Sections

"Typical" Streetscape Treatment

Section across CH 21 at Prior Lake Library

Section across CH 21 at Main Ave

Du

luth

Ave

SE

Colorado St SE

Mai

n A

ve S

E

•••••

~15’(VARIES)

11’LANE

13’ BUS BAY 5’

LOA

DING

ZON

E

10’TRAIL

11’LANE

11’LANE

10’ BOULEVARD

BBBBBBBBBBBUIUIUIUIUIUIUIUIIILLLLLD

IDIIDIDINGNGNGNGNGN

FFFFACACACCCACAA

EEEE

BBBBBBBBUIUIUIUIULLLLLLLLD

IDIDIDIDIIIDDNGNGNGNGNGNN

FFFFFFFFFFFFFFFFFFFFACACAA

E

11’LANE

29’ MEDIAN

11’LANE

5’ B

OULE

VARD

10’ TRAIL

12.5’ LANE

12.5’LANE

12’AMENITYTT ZY ONE

11’LANE

5’ B

OULE

VARD

6’WALK

Section across CH 21 at Prior Lake Library

Section across CH 21 at Main Ave

Du

luth

Ave

SE

Colorado St SE

Mai

n A

ve S

E

Streetscape ElementsCH 21 Downtown Prior Lake Improvement

Page 14: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

Dakota St. SE

Pleasant St. SE

Colorado St. SE

Main Ave. SE

Arcadia Ave.

Duluth Ave. SE

Planter Curb Planter Wall Landscape Boulder Details

Planters & Plant Material

Decorative Pavement

Downtown Wayfinding Kiosk

Roundabout Lighting Decorative Lighting

Lighting

Plant Materials

Common Considerations•

DRAFT

D kkkDDakoDakDakot SSSta SSta Sta Sa SSt. St. S. St. Stt. St. S.ttt EEE

PleaPleasantsansantsant St.tSt.SSttt.. SESESESE SE

CoColColllColCCCC oraararaoradoddododdo St.St.SSt.St.S SESESESESE

Main

Main

Main

Main

Main

AveAveAveAveAve. SE

. SE. SE. SE. SESSSSS

ArcaArcaArcaArcaArcaArcaArcaArcaadia

dddia dia diadia diadiadiad

Ave.Ave.Ave.AAveAveAve.

DuluDulu

uluDuluDulu

uluululuuluuuth A

th Ath Ath Ath Ath

Ath Ath

Ath AAAAAve.

ve.vve.vve.vv

.e.. SESESESESESESESESESESSESESE

Planter Curb Planter Wall Landscape Boulder Details

Roundabout LightingRoRo Decorative LightingDeDe

Plant Materials

Common Considerations•

DRAFT

Streetscape ElementsCH 21 Downtown Prior Lake Improvement

Page 15: Welcome to the Open House! - Bolton & Menk...2018/05/14  · Construction staging for the CH 21 Downtown Improvements Project will be planned and scheduled together with the TH 13

• •

Bollards

Decorative Rail

Nautical Details Concept (Recommended Approach)

Wave Concept

Intermittent Plaques

Median Feature - Sail Boat Mast Lighting Feature

Banner Across CH 21

• •

DRAFT

••

Nautical Details Concept (Recommended Approach)

Wave Concept

Intermittent Plaques

••

DRAFT

Streetscape ElementsCH 21 Downtown Prior Lake Improvement