129

Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item
Page 2: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item
Page 3: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item
Page 4: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 1 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

ADDENDUM NO. 3

to CONTRACT DOCUMENTS for: MULTI-DEPARTMENT RELOCATION PLAN – PHASE 1

859 MASSACHUSETTS AVENUE

CAMBRIDGE, MA HMFH ARCHITECTS, INC. 130 BISHOP ALLEN DRIVE CAMBRIDGE, MA 02139 (617) 492-2200 February 24, 2017 GENERAL: A. This Addendum shall supplement, amend and become part of the bid documents. All bids and

the construction contract shall be based on these modifications. B. All work called for shall comply with requirements specified for similar work unless otherwise de-

scribed. BIDDER’S QUESTIONS

Item 01: QUESTION: There is an issue with the bid bond form. The description of work has the sen-

ior center roof replacement. Do you want to change it or will you issue a new bid bond form?

RESPONSE: Bid Bond Form has been revised as part of this Addendum.

Item 02: QUESTION: Specs indicate mosaic floor tile but plans show a large format tile. Please con-firm to carry Mosaic Tile on all floors where ceramic tile is indicated.

RESPONSE: Specification Section 093000 has been revised as part of this Addendum.

Item 03: QUESTION: Specs indicate a 4"x 4" Semi gloss wall tile but elevations show a subway tile. Please confirm to carry 4"x 4" Ceramic Wall Tile on all walls where ceramic tile is indicated.

RESPONSE: Specification Section 093000 has been revised as part of this Addendum.

REVISIONS TO PROJECT MANUAL

Item 04: Section 00001-TABLE OF CONTENTS: Add the following sections: Section 019113-

GENERAL COMMISSIONING REQUIREMENTS, Section 040001-MASONRY WORK, Sec-

Page 5: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 2 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

tion 055001-MISCELANEOUS AND ORNAMENTAL IRON, Section 090005-RESILIENT FLOORS, Section 220800-COMMISSIONING OF PLUMBING, Section 230800-COMMISSIONING OF HVAC, and Section 260800-COMMISSIONING OF ELECTRICAL.

Item 05: Section 00300-FORM FOR GENERAL BID: Delete section in its entirety and replace with attached section.

Item 06: Section 00310-BID BOND: Delete section in its entirety and replace with attached section.

Item 07: Section 012201-UNIT PRICE PROPOSAL SHEET: Delete section in its entirety and re-place with attached section.

Item 08: Section 040001 – MASONRY FILED SUB-BID REQUIRED: 1.2 B. Add the following after Reference Drawings: “A0.1, A0.2, A1.1, A1.5, A2.1, A4.1, A4.2, A4.3, A6.1, A6.2.”

Item 09: Section 050001 – MISCELLANEOUS AND ORNAMENTAL IRON FILED SUB-BID REQUIRED: 1.2 B. Add the following after Reference Drawings: “A0.1, A0.2, A2.1, A2.2, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A6.6, A6.7, A10.1, A10.2, A13.1, A13.2.”

Item 010: Section 062010-EXTERIOR FINISH CARPENTRY: 1.4 B. Delete the words “Section 014330 – MOCKUPS” and replace with “Section 014000-QUALITY REQUIREMENTS”.

Item 011: Section 062010-EXTERIOR FINISH CARPENTRY: Delete 2.4 A. “Provide Red Cedar, Clear Grade, absolutely no knots, Plain Sawn:” and replace with “Decking: Accoya by Ac-csys Technologies or equal.”

Item 012: Section 070001-WATERPROOFING, DAMPPROOFING AND CAULKING FILED SUB-BID REQUIRED: 1.2 B. Add the following after Reference Drawings: “Civil C2.1, C3.2; Land-scape L1.0, L2.0, L4.0; Architecture A0.1, A0.2, A0.3 A2.1, A2.2, A2.3, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A6.1, A6.2, A6.3, A6.4, A6.5, A6.6, A6.7, A6.8, A7.1, A7.2, A8.1, A8.2, A8.3; Fire Protection FP001, FP100; Plumbing P001, P100, P101, HVAC M1.1, M1.2, M1.3, M1.4; Electrical E0.03, E1.10, E2.10, E2.12, and E5.10.”

Item 013: Section 070002 – ROOFING AND FLASHING FILED SUB-BID REQUIRED: 1.2 B. Add the following after Reference Drawings: “Architecture A2.1, A2.2, A2.3, A3.1, A3.2, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A6.1, A6.2, A6.3, A6.4, A6.5, A6.6, A6.7, A6.8, A71, A7.2, A10.1; Structural S2.0, S2.1, S2.2, S3.0, S3.1, S3.2; Plumbing P102, P103; Mechanical M1.4, M2.2; Electrical E2.12, E2.13, E3.01, E3.02.”

Item 014: Section 072700-AIR BARRIERS: Article 1.4 C. Delete in its entirety.

Item 015: Section 072700-AIR BARRIERS: Article 2.1: Delete the words “,FIRE-RATED TYPES”.

Item 016: Section 072700-AIR BARRIERS: Article 2.1 A. Delete the words “Self-Adhering,”.

Item 017: Section 072700-AIR BARRIERS: Article 2.1 A. 1. d.: At the end of the last sentence add “, and at the roof provide Siga Majcoat membrane.”

Item 018: Section 072700-AIR BARRIERS: Article 2.1 A. 1. Add: “e. Pro Clima; Solitex Mento 1000.”

Page 6: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 3 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Item 019: Section 072700-AIR BARRIERS: Article 2.2 L. Delete paragraph in its entirety.

Item 020: Section 072700-AIR BARRIERS: Add Article 3.5 INSTALLATION OF MECHANICALLY FASTENED SHEET MEMBRANE

A. Install air barrier over exterior face of exterior wall substrate in accordance with manufacturer recommendations.

B. Install air barrier prior to installation of windows and doors.

C. Begin by aligning the bottom edge of the roll approximately 3-6 inches below the base of the wall onto the foundation, approximately 12 inches from a corner, with the print side facing out. Maintain air barrier plumb and level.

D. Unroll the sheet membrane air barrier completely, wrapping the entire building, including door and window openings.

E. Air Barrier Attachment: Fasten securely to a stud, structural sheathing or through insulation board to an underlying framing member.

F. Attach air barrier to studs through exterior sheathing. Secure using air barrier manufacturer recommend fasteners, space 24 inches on center, maximum horizontally.

G. Overlap air barrier at all corners of building by a minimum of 12 inches.

H. Overlap air barrier at all seams by a minimum of 4 inches and tape all horizontal and vertical seams.

I. Secure to foundation as recommended by air barrier manufacturer.

Item 021: Section 073126-SLATE SHINGLES: Article 2.1 A. 1.: Add “h. Monson Maine Slate Com-pany (The).”

Item 022: Section 079200-JOINT SEALANTS: Article 1.2, add “D. Include caulking at all interior tran-sitions between masonry and drywall; caulking of all steel frames to adjacent surfaces; pe-rimeter exterior sealing where mechanical and electrical work penetrates exterior wall; finish sealant at joints between plumbing fixtures and adjacent construction; sealant at exterior paving and curbing; sealant at site improvements; sealant at control joints in concrete and in ceramic tile, and sealants at other locations as indicated.”

Item 023: Section 090002 – TILE FILED SUB-BID REQUIRED: 1.2 B. Add the following after Refer-ence Drawings: “Architecture A0.1, A0.2, A2.1, A2.2, A8.2, A8.3, A9.1, A12.3, A13.1, A13.2; Plumbing P001 P101, P102; Mechanical M1.2, M1.3, M1.4, M2.1, M2.3; Electrical E0.01, E1.10, E1.11, E2.10, E2.11.”

Item 024: Section 093000-TILING: ARTICLE 2.1 A. 1.: Unglazed Ceramic Mosaic Floor Tile, delete subparagraphs a. through g. and replace with the following:

Page 7: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 4 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

“a. Composition: Porcelain.

b. Surface: Slip-resistant, with abrasive admixture.

c. Module Size: 12 by 24 inches.

d. Nominal Thickness: 1/4 inch.

e. Face: Plain with cushion edges.

f. Basis-of-Design Product: Dal-Tile Corporation, Haut Monde, unpolished porcelain tile or equal by approved manufacturer.

g. Colors: Two, one for bathrooms, and one for vestibules.”

Item 025: Section 093000-TILING: ARTICLE 2.1 A. 2.: Delete the word “showers” and replace with the words “kitchens”. Delete subparagraphs a. through f. and replace with the following:

a. Module Size: 4 by 8 inches.

b. Nominal Thickness: 1/4 inch.

c. Face: Plain with cushion edges.

e. Finish: Semi-gloss opaque glaze.

d. Basis-of-Design Product: Dal-Tile Corporation, Modern Design, or equal by approved manufacturer.

e. Colors: Two, one for bathrooms, and one for kitchens.”

Item 026: Section 093000-TILING: ARTICLE 2.1 G.: Delete paragraph Metal Edge Strips, in its en-tirety and replace with the following: “Acoustic Underlayment: Provide 2mm thick sound control sheets, GenieMat RST as manufactured by Pliteq, Inc., or approved equal.”

Item 027: Section 090005 – RESILIENT FLOORS SUB-BID REQUIRED: 1.2 B. Add the following after Reference Drawings: “Architecture A0.1, A0.2, A2.1, A2.2, A6.1, A8.3, A8.4, A8.5, A9.1, A12.1, A12.2, A12.3,A13.1, A13.2; Structural S0.1, S0.2, S2.0,Plumbing P001 P101, P102; Mechanical M1.2, M1.3, M1.4, M2.1, M2.3; Electrical E0.01, E1.10, E1.11, E2.10, E2.11.”

Item 028: Section 090007 – PAINTING SUB-BID REQUIRED: 1.2 B. Add the following after Refer-ence Drawings: “Architecture A0.1, A0.2, A2.1, A2.2, A2.3, A3.1, A3.2, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A6.1, A6.2, A6.3, A6.4, A6.5, A6.6, A6.7, A6.8, A7.1, A7.2, A8.1, A8.2, A8.3, A8.4, A8.5, A9.1, A10.1, A10.2, A12.1, A12.2, A12.3, A12.4, A13.1, A13.2; Structural S0.1, S0.2, S2.0 S2.1, S2.2, S3.2; Fire Protection FP001, FP100; Plumbing P001 P101, P102; Mechanical M1.1; Electrical E0.01, E1.10, E2.10.”

Item 029: Section 102800-TOILET ACCESSORIES: Renumber Article 3.2 ADJUSTING AND CLEANING to be Article 3.3, and insert new Article 3.2 TOILET AND BATH ACCESSORY SCHEDULE:

A. Scheduled Accessories: Schedule is based upon accessories manufactured by Bobrick and/or others and is intended only to establish the general character,

Page 8: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 5 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

dimensions, gauges, materials and finishes required for toilet accessories for this project. Similar products by other acceptable manufacturers will not be approved, but considered. Provide scheduled accessories for each bathroom.

B. Heavy-Duty Towel Holders:

1. Products: Bobrick B-674.

2. Towel Bar: Stainless-Steel, 3/4 inch round. 3. Rectangular end brackets: Heavy brass with satin finish to match stainless steel. 4. Mounting: Surface-mounted with three exposed countersunk screws per post.

Blocking required.

C. Residential Toilet Tissue Dispensers: 1. Products: Doug Mockett & Co.; TPH1-SSS 2. Type: Single-roll dispenser.

3. Mounting: Surface mounted with concealed anchorage consisting of mounting brackets secured to concealed stainless steel wall pates with stainless steel lock-ing set-screws. Blocking required.

4. Material: 22 gauge stainless steel at flanges and support arms; 16 gauge stain-less steel at concealed mounting brackets.

5. Spindle: Chrome-plated plastic, equipped with heavy-duty internal spring. 6. Operation: Noncontrol delivery with mfr's standard spindle. 7. Capacity: Designed for 5-1/2-inch- (140-mm-) diameter-core tissue rolls.

D. Grab Bars:

1. Description: 1-1/4 inches o.d. grab bars fully thermoplasticly encapsulated, with concealed mounting.

2. Finish: As selected by the Architect. 3. Mounting: Attachment devices and reinforcing adequate to accept 300 pound

concentrated load at each attachment point without failure and 250 pounds total load for 5 minutes without displacement of bar. Screw holes shall be recessed and screws shall be of vandal-resistant design.

4. Configurations: At all locations, bar shall be 1-1/2 inches from wall. 5. Product: Comfort Designs, Comfort Care, or equal by approved manufacturer.

E. Robe Hooks:

1. Products: Bobrick, B-2116. 2. Stainless-Steel, nominal thickness minimum 11 gauge (3.2 mm); welded con-

struction. 3. Mounting: Surface-mounted, exposed anchorage with manufacturer's standard

flanges and anchors. Blocking required.

F. Mirror: Bobrick B-165. 1. Frame — Type-430 stainless steel, 1/2" x 1/2" x 3/8" (13 x 13 x 9.5mm) channel

with 1/4" (6mm) return at rear with bright polished Nish. One piece frame with 90 degree mitered corners. Galvanized steel back has integral horizontal hanging brackets near the top for hanging the mirror and near the bottom to prevent the bottom of the mirror from pulling away from the wall. Locking devices secure mir-ror to concealed wall hanger. In Screw Locking Design, concealed Philips-head locking screws securely fasten mirror to wall hanger.

Page 9: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 6 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

2. Mirror — No. 1 quality, 1/4" (6mm) select float glass: selected for silvering, elec-trolytically copper-plated by the galvanic process, and guaranteed for 15 years against silver spoilage. Corners are protected by friction-absorbing filler strips; back is protected by full-size, shock-absorbing, water-resistant, nonabrasive, 3/16" (5mm) thick polyethylene padding.

G. Shelf: Shelf: ¼” thick, frosted tempered glass shelf (4” deep x width of mirror) with

stand-offs for support, stainless finish

Item 030: Section 260000, Paragraph 1.2 Filed Sub-Bid Requirements, Sub-Paragraph A(4): Revise Class of Work “Security Intrusion/Access Control System” to read “Security Intru-sion/Access Control/CCTV System”

Item 031: Section 260000, Paragraph 2.11 Panelboards, Sub-paragraph D(1): Revise “22,000 AIC” to read “10,000 AIC”

Item 032: Section 260000, Paragraph 2.11 Panelboards, Sub-paragraph D(2): Revise “22,000 AIC” to read “100,000 AIC”

Item 033: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph A(5)(a): Revise “15.1 KW” to “15.12 KW” and “in the Contract Drawings” to read “shown on the Contract Drawings”.

Item 034: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph A(10): Revise “be IE” to read “by the Engineer”.

Item 035: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph A: Add the following sub-paragraphs:

“13. Provide all revised mounting systems to support and attach the PV system as specified herein and required for a complete and operational system.

14. Sensor connection to the SolarEdge gateway:

Page 10: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 7 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Item 036: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9): Revise “Three-Phase” to read “Single-Phase”

Item 037: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(a): Revise “three phase” to read “single phase”

Item 038: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(a): Revise “So-lectria Corporation” to read “Solar Edge Technologies Model SE100000A-US”

Item 039: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(b): Revise “two inverters” to read “two multiple”

Item 040: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(b): Revise Elec-trical Specifications table to read as follows:

Electrical Specifications: Nominal Power Rating Nominal AC Voltage Nominal AD Frequency Line Power Factor Maximum AC Line Current Max. Open Circuit Voltage Max. DC Input Current Peak Inverter Efficiency MMPT Input Voltage Range General Specifications: Temperature Range Ambient Storage Enclosure Environmental Rating Enclosure

9.98 kW 208 VAC Single-phase, +10%/-12% 60 Hz +0.5 Hz/-0.7 Hz >0.99 Above (+/-0.8) 48 amps AC 500 VDC 33 amps DC >98% 500 VDC -13°F to 140°F (-25°C to 60°C) -13°F to 140°F (-25°C to 60°C) NEMA3R Polyester Power Coated Aluminum

Page 11: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 8 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Weight Dimensions Relative Humidity Features & Options: Cooling Method Protective Functions

88.8 lb (40.1kg) 30.5” x 12.5” x 10.5” 0 to 95% non-condensing Fan cooling (user replicable) AC over/under voltage, AC over/under frequency, ground over current, over temperature, AC and DC over current, DC over voltage Standard – LCD, with User Display, NEMA3R wall mount enclosure in-tegrated arc fault protective for NEC2011 690.11 compliance. Rapid shutdown NEC 2014 690.12 Built in module level monitoring Outdoor/indoor installation

Item 041: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(d)(1): Delete “UL File No. E199356”

Item 042: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(e)(1): Replace “three-phase” with “single-phase”

Item 043: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I(9)(f): Add the fol-lowing sub-paragraphs:

“g. Provide communication gateway equal to Solar Edge control and communication gateway to allow multiple Solar Edge inverters to communicate data between them.

h. Provide power optimizer equal to solar edge model P400 or equal per solar panel.

i. Provide ambient temperature sensor, module temperature sensor and irradiance sen-sor for complete control and communication gateway for display on Solar Edge portal.”

Item 044: Section 260000, Paragraph 2.14 Photovoltaic System, Sub-paragraph I: Add the following sub-paragraph:

“10. Modbus Meter

a. Provide a Modbus meter equal to Solar Edge Modbus meter model SE-WNC-3Y400-MB-K1 or equal. Provide C.T.’s rated for building main electric service.

b. Modbus meter shall maintain building power production and communicate to in-verter for zero export.

c. Modbus Meter requirements:

Page 12: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 9 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

SE-WNC-3Y400-MB-K1 UNITS

ELECTRICAL SERVICE

Operating Voltage Range - Line to Neutral / Line to Line

184-264.5 / 320-460 Vac

AC Frequency 50/60 Hz

Grids Supported - Single Phase; Three Phase (PE (Protective Earth) connec-tion is not required for me-ter operation)

L / N / PE ; L1 / L 2 / L3 / N / PE

Power Consumption (typ.) 1.8 W

COMMUNICATION

Supported Communication Interfaces

RS485

Response time ≤1

(When meter is connected at grid connection point, and when RS485 is used for multiple inverters)

Sec

Default Device ID (Modbus) 2

ACCURACY (@25°C, PF:0.7- 1) (Using ACT-0750 CT models)

1% - 100% of Rated CT Current

±1.5 %

STANDARD

COMPLIANCE

Safety IEC 61010-1

Immunity EN 61326, EN 61000-4-2, EN 61000-4-3, EN 61000-4-4,

EN 61000-4-5, EN 61000-4-6, EN 61000-4-11

Emissions EN 55022 Class B

INSTALLATION

SPECIFICATIONS

Dimensions (HxWxD) mm

Weight 85 x 153 × 38 gm

Enclosure type 310

Operating Temperature Range

High impact, ABS and/or ABS/PC plastic UL 94V-0, IEC FV-0

°C

Relative Humidity (noncon- -30 to 55 %

Page 13: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 10 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

densing)

Protection Rating 5 - 90

Mounting Type Indoor (Outdoor when installed in an outdoor enclosure)

DIN Rail / Wall mount

Item 045: Section 260000, Paragraph 2.18 Security Intrusion/Access Control System: Add the follow-ing sub-paragraph:

“E. CCTV System

1. Video Recording and Storage Parameters

a. The project has a very specific storage requirement that shall not be deviated or

substituted. The video servers require 45days of storage. The Vendor shall sup-

ply a 10 Terabyte, RAID 5 storage server for this application with all licenses in-

cluded to support the number of cameras shown on the drawings.

b. The system specification for the network connected, integrated IP CCTV camera

solutions is based upon Genetec.

c. One video storage server per 25 cameras.

d. Video storage server shall have redundant power supply and at least dual network

ports for network connection redundancy.

e. Video storage servers shall be HP or approved equal.

2. Hardware and Software Requirements

3. The rack mount CCTV network video storage server shall include the following features:

a. 64-bit SUSE Linux Operating System

b. Dynamic bandwidth management

c. Embedded video analytics

d. Health monitoring for real time status of the system

e. Video Vault which shall save analytics data without time limits

f. 800Mbps of video throughput (400Mbps to disc/400Mbps to clients)

g. Multiple video streams for live, record, alarm bump and meta-data collection.

h. Shall utilize latest published hardware and software as supported by manufactur-

er’s most recent data sheet.

4. Core and Edge Network Switch

a. Provide Power over Ethernet (PoE) network switch(s) for all cameras, access con-

trol panels, encoders/decoders, security workstations, video servers, and access

control servers.

b. Each switch shall have 20 percent spare capacity per closet/IDF/MDF.

c. Each closet shall support 10/100mbs per port with a minimum of 1000GB on the

back bone/core switch. The fiber infrastructure shall be only utilized for connectivi-

ty from each IDF to the MDF/core switch. The use of any portion of the copper

back bone shall not be allowed.

Page 14: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 11 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

d. Provide a layer 3 core switch which shall support each IDF/remote security closet

with 1000gbs bandwidth over the fiber infrastructure. In addition to the support of

each closet, provide a dedicated 1000gbs for each server (access control and vid-

eo). Provide 20 percent 1000gbs copper ports and 20 percent spare 1000gbs fiber

ports at the core switch/head end.

e. Provide Uninterruptible Power Supply (UPS) for each closet/IDF/MDF to support

the network PoE Switches. Provide a 1500VA UPS in each rack that houses secu-

rity equipment. Each network switch shall be located in each IDF/MDF as required

by the integrator.

f. Provide HP 5400 series or approved equal for the core switch. Provide fiber GBIC cards

as required to support each IDF and/or security closet as shown on the drawings

and riser diagram.

g. Provide HP 2920 series or approved equal for each edge switch. Each switch shall

include a minimum of one fiber GBIC card.

h. Provide an interface to the owner’s LAN as required.

5. Interior/Exterior Fixed Megapixel Vandal Dome Camera

a. Provide cameras with the following specifications for all indoor/outdoor fixed cam-

eras as shown on the drawings. Provide exterior model for all exterior cameras.

Camera is based on Panasonic WV-SF346 (Indoor), Panasonic WV-SW3551 (Ex-

terior).

b. Provide cameras with the following specifications for all indoor fixed cameras as

shown on the drawings. Camera is based on Panasonic WV-SF346 Camera.

1) H.264, MJPEG video compression

2) Clear dome

3) Max frame rate of 30 images per second, 1280x960 (H.264)

4) Onvif compliant

5) 1.3 Megapixel

6) day/night

7) Auto Focus

8) Power Over Ethernet 802.3af

9) Digital Noise Reduction

10) Wide dynamic range

11) 2.8mm-10mm Vari-focal auto-iris lens

12) RJ-45 Ethernet Port

13) SD memory card slot

14) Analog monitor output

15) Video motion detection

c. Acceptable Manufacturers:

1) Panasonic

2) Axis

3) Bosch

4) Or equal

REVISIONS TO DRAWINGS

Page 15: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 12 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Item 046: Drawing C2.1–SITE UTILITIES PLAN: Add the following:

- ONE NEW DOWNSPOUT SHOE AND 6" DIA., 9'L PVC PIPE CONNECTION TO THE INFILTRATION SYSTEM.

- ONE NEW DOWNSPOUT SHOE AND 6" DIA., 5'L PVC PIPE CONNECTION TO 6" DIA. "RD" PIPE.

See attached SKC 001.

Item 047: Sheet A0.2-MASTER KEYNOTE LIST: Modify Keynote 073126.01 to say the following:

REINSTALL EXISTING SLATE SHINGLES, PROVIDE NEW SLATE TO MATCH EXISTING AS REQ. ASSUME 10% OF TOTAL.

Item 048: Sheet A0.2-MASTER KEYNOTE LIST: Modify Keynote #073113.02 to become the follow-ing number (Keynote text is to remain):

#061600.06

Item 049: Sheet A0.2-MASTER KEYNOTE LIST: Add Keynotes as follows:

062010.16 – ¾” COMPOSITE BEAD BOARD 062010.17 – STOCK SHAPE COMPOSITE MOLDING PROFILE 073113.09 – METAL FLASHING (ZINC COATED COPPER) 075400.08 – MEMBRANE BASE FLASHING 075400.11 – WATER CUT-OFF MASTIC 075400.26 – STAINLESS STEEL CLAMPING RING 076100.15 – METAL RAIN DIVERTER (ZINC COATED COPPER) 076200.10 – METAL COUNTERFLASHING

Item 050: Sheet A1.1-DEMOLITION BASEMENT PLAN & FIRST FLOOR PLANS: Add the following to Demolition- General Notes

23. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR DISCONNECTION OF EXG. ELECTRICAL SYSTEM

Item 051: Sheet A1.1-DEMOLITION BASEMENT PLAN & FIRST FLOOR PLANS: Add the following to Demolition – General Notes:

24. MASONRY SUBCONTRACTOR SHALL DEMOLISH MASONRY TO BE REMOVED ONLY AT THE FOUNDATION WALLS AND AT EXISTING FLUE IN BASEMENT. SALVAGE MASONRY AS NECESSARY FOR REUSE TO FILL EXISTING OPENINGS WHERE INDICATED AND TO REPLACE DAMAGED MASONRY TO REMAIN. ALL OTHER MASONRY TO BE DEMOLISHED BY THE DEMOLITION SUBCONTRACTOR.

Item 052: Sheet A1.1-DEMOLITION BASEMENT PLAN & FIRST FLOOR PLANS: Demolition – Gen-eral Notes: Modify Note 19 to read as follows:

Page 16: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 13 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

19. REMOVE EXISTING BASEMENT SLAB THROUGHOUT, REMOVE EARTH UNDER BASEMENT SLAB THROUGHOUT TO PROVIDE ADEQUATE SPACE FOR NEW SLAB, INSULATION, RADON MITIGATION PIPING, AND GRAVEL. ASSUME 4" FOR THICKNESS OF EXG. SLAB.

Item 053: Sheet A1.1, Drawing 2-DEMOLITION BASEMENT PLAN: Add information regarding scope of masonry demolition. See attached SKA 010.

Item 054: Sheet A1.1, DEMOLITION LEGEND: Modify as per SKA 014.

Item 055: Sheet A1.3–DEMOLITION ELEVATIONS: Add the following to General Notes:

6. SLATE SHINGLE PATTERN SHOWN ON DEMOLITION ELEVATIONS IS DIAGRAMMATIC AND DOES NOT REPRESENT ACTUAL SLATE PATTERN. FOR ACTUAL PATTERN SEE DRAWING 1/A6.8

Item 056: Sheet A2.1–BASEMENT AND FIRST FLOOR PLANS: Add the following to Floor Plan General Note:

14. RADON MITIGATION PIPING: INSTALL TWO LENGTHS OF 4" DIA. PVC PIPE. ONE, 56'-6" LENGTH TO RUN BELOW THE BASEMENT SLAB (NORTH TO SOUTH ALONG WEST WALL) AND ANOTHER LENGTH, 22'-0", TO RUN BELOW THE BASEMENT SLAB (EAST TO WEST) BELOW THE STORAGE AND LAUNDRY ROOMS. INSTALL ONE 4" TO 8” DIA. VERTICAL RISER TO BE LOCATED BY ARCHITECT. CAP, SEAL, AND LABEL RISER 36" ABOVE SLAB - LOCATION TBD. MATERIAL AND INSTALLATION PER SPECIFICATION SECTION 312000.

Item 057: Sheet A2.1–BASEMENT AND FIRST FLOOR PLANS: Add the following to FLOOR PLAN GENERAL NOTES:

15. PROVIDE REPLACEMENT OF 50SF OF DAMAGED BRICK AT EXG. PIERS AND FOUNDATION WITH SALVAGED BRICK

Item 058: Sheet A2.1-BASEMENT AND FIRST FLOOR PLANS: Floor Plan General Notes: Modify note 12 to read as follows:

12. PROVIDE NEW SLAB, INSULATION, AND UNDER-SLAB VAPOR RETARDER THROUGHOUT BASEMENT. REFER TO STRUCTURAL DRAWINGS AND ARCHITECTURAL WALL SECTIONS. LEVEL OF NEW SLAB TO MATCH LOWER LEVEL OF EXG. SLAB TO BE REMOVED

Item 059: Sheet A2.1-BASEMENT AND FIRST FLOOR PLANS: Floor Plan Legend: Remove “PORCELAIN FLOOR TILE” and “RUBBER FLOOR TILE” from legend.

Item 060: Sheet A2.2, Drawing 2-SECOND FLOOR PLAN: Add callout for Detail 2/A6.8. See at-tached SKA 006.

Item 061: Sheet A2.2, Drawing 2-SECOND FLOOR PLAN: Add callout for Detail 3/A6.8. See at-tached SKA 007.

Page 17: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 14 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Item 062: Sheet A2.2, Drawing 2-SECOND FLOOR PLAN: Add callout for Detail 4/A6.8 and 4A/A6.8, and revision of Entry Porch roof. See attached SKA 008.

Item 063: Sheet A4.1–EXTERIOR ELEVATIONS: Add the following to General Notes:

6. SLATE SHINGLE PATTERN SHOWN ON EXTERIOR ELEVATIONS IS DIAGRAMMATIC AND DOES NOT REPRESENT ACTUAL SLATE PATTERN. FOR ACTUAL PATTERN SEE DRAWING 1/A6.8

Item 064: Sheet A4.1, Drawing 1-EAST ELEVATION - CONSTRUCTION: Modify design of Entry Porch. See attached SKA 008.

Item 065: Sheet A4.2, Drawing 1-WEST ELEVATION - CONSTRUCTION: Add dimensions of exist-ing opening at basement to be infilled with brick. Dimensions of opening are 3’-0” x 2’-0”.

Item 066: Sheet A4.2, Drawing 2-NORTH ELEVATION - CONSTRUCTION: Modify design of Entry Porch. See attached SKA 008.

Item 067: Sheet A4.3, Drawing 1-RETURN @ ENTRY - NORTH: Modify design of Entry Porch. See attached SKA 008.

Item 068: Sheet A6.4-ROOF TYPES & DETAILS, Drawing 1-UPPER ROOF EDGE: Modify Detail. See attached SKA016.

Item 069: Sheet A6.4-ROOF TYPES & DETAILS: Add Roof Type R7-FLAT SEAM ROOFING SYSTEM. See attached SKA 001.

Item 070: Sheet A6.5, Drawing 5-FLAT ROOF @ EXG. BUILDING: Modify detail. See attached SKA 011.

Item 071: Sheet A6.5-ROOF DETAILS: Add Drawing 7 - TYP. PENETRATION @ THERMOPLASTIC ROOF. See attached SKA 002.

Item 072: Sheet A6.5-ROOF DETAILS: Add Drawing 8 – VALLEY @ DORMER ROOF. See attached SKA 003.

Item 073: Sheet A6.5-ROOF DETAILS: Add Drawing 9 – TYP. VALLEY @ ASPHALT SHINGLE ROOF. See attached SKA 012.

Item 074: Sheet A6.5-ROOF DETAILS: Add Drawing 10 – FLAT ROOF @ RISING WALL. See at-tached SKA 013.

Item 075: Sheet A6.8, Drawing 1 – DETAIL ELEVATION @CORNER & BAY: Modify detail. See at-tached SKA 015.

Item 076: Sheet A6.8, Drawing 2 – SECTION @ CANOPY: Modify detail. See attached SKA 004.

Item 077: Sheet A6.8: Add Drawing 3 – ROOF @ WEST BAY. See attached SKA 005

Page 18: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 15 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Item 078: Sheet A6.8: Add Detail 4-SECTION @ ENTRY PORCH and Detail 4A-SCUPPER @ ENTRY PORCH. See attached SKA 009.

Item 079: Sheet A12.3 – KITCHEN AND BATHROOM ELEVATIONS: Detail 21, Change tile wainscot dimension to “4’-6” (TYP.)”.

Item 080: Sheet A13.1 – FINISH FLOOR PLANS: Room Key A-1, change base key to “PNT-WD”.

Item 081: Sheet A13.2 – FINISH FLOOR PLANS: Room Key A-1, change base key to “PNT-WD”.

Item 082: Sheet FP100 BASEMENT AND FIRST FLOOR CEILING PLAN – FIRE PROTECTION: Add upright sprinklers per sketches SKFP002 and SKFP003.

Item 083: Sheet FP101 SECOND AND THIRD FLOOR CEILING PLAN – FIRE PROTECTION:

1. Add sprinkler head per sketch SKFP001.

2. Add upright sprinklers per sketch SKFP004.

Item 084: Sheet P001 PLUMBING, LEGEND, SCHEDULES AND DETAILS:

1. Modify schematic water service detail per sketch SKP001.

2. Modify Solar/Electric water heater piping details per sketch SKP006.

Item 085: Sheet P101 BASEMENT AND FIRST FLOOR PLAN – PLUMBING: Add indirect waste line for laundry drain pan per sketch SKP002.

Item 086: Sheet P100 BELOW SLAB BASEMENT FLOOR PLAN – PLUMBING: Add invert eleva-tions per sketches SKP003 and SKP004.

Item 087: Sheet P1.01 BASEMENT AND FIRST FLOOR PLAN – PLUMBING: Add branch water pip-ing to control valve at accessible showers per sketch SKP005.

Item 088: Sheet P103 ROOF PLAN – PLUMBING: Add domestic water riser diagram and sanitary, waste and vent riser diagram per sketches SKP007 and SKP008 respectively.

Item 089: Sheet M1.1 BASEMENT FLOOR PLANS – HVAC: Incorporate the following clarifications and/or revisions on the following sketch: SKM-001

Item 090: Sheet M1.4 THIRD FLOOR PLANS – HVAC: Incorporate the following clarifications and/or revisions on the following sketches: SKM-002 & SKM-003

Item 091: Sheet M1.5 – Attic Plans – HVAC: Revise the note above grid line 2 and between grid lines G and H of the Attic Floor Ductwork Plan to read ‘16”x8” O.A. DUCT DN.’

Item 092: Sheet M3.1 CONTROLS I – HVAC:

1. Incorporate the following clarifications and/or revisions on the following sketches: SKM-004 & SKM-005

Page 19: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 16 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

2. Revise Geothermal Side Operation to read “GEOTHERMAL LOOP SIDE SHALL BE CONTROLLED BY VRF SYSTEM MANUFACTURER'S CONTROLS NETWORK. UPON A CALL FOR COOLING OR HEATING, GROUND LOOP WATER ISOLATION VALVE SHALL OPEN AND GROUND LOOP WATER SHALL BE PROVIDED TO THE WATER-TO-REFRIGERANT HEAT PUMP UNITS BY VARIABLE SPEED PUMPS (P-3 & P-4). THE PRIMARY GEOTHERMAL WATER PUMP SHALL START. IF THE PRIMARY PUMP SHALL FAIL TO START, THE STANDBY PUMP SHALL START IN ITS PLACE. EACH PUMP SHALL ALSO BE CAPABLE OF DUTY CYCLING WHICH WILL BE AUTOMATICALLY CONTROLLED THROUGH THE DDC SYSTEM BASED UPON PUMP OPERATION TIME. THE DIFFERENTIAL PRESSURE SENSORS LOCATED IN THE SUPPLY AND RETURN PIPING SYSTEM SHALL MODULATE THE GEOTHERMAL WATER SYSTEM PUMPS FLOW VIA THE VARIABLE FREQUENCY DRIVE OR ECM TO MAINTAIN FLOW THROUGH THE VRF CONDENSING UNIT SYSTEM PER MANUFACTURER'S FLOW REQUIREMENTS.”

3. Revise Refrigerant-to-Water Heat Exchanger/Booster Heating Operation to read “_ THROUGH THE AUTOMATIC TEMPERATURE CONTROL SYSTEM, WHEN ANY ZONE CALLS FOR HEATING FROM THE HHW SYSTEM, THE PRIMARY HEATING HOT WATER PUMP SHALL START. _”

4. Revise the Geothermal VRF System Plant Control Points list as follows:

i. Revise the “Remarks” column for “PUMP S/S & STATUS (EACH)” to read “ALL HHW & GW PUMPS”

ii. Revise the “Remarks” column for “VFD OR ECM – EACH PUMP” to read “ALL HHW & GW PUMPS”

iii. Add “3 SENSORS REFER TO P001” to the Remarks column of the DHW Tem-perature row

iv. Add “SOLAR DHW PUMP RELAY” row followed by an “X” under the “DI”, “DO”, & “ALARM” columns. Under the “Remarks” column add “REFER TO P001”.

5. Add the following to the abbreviations list:

i. “GWR GEOTHERMAL GROUND WATER RETURN”

ii. “GWS GEOTHERMAL GROUND WATER SUPPLY”

Item 093: Sheet M3.2 CONTROLS II – HVAC

1. Revise “BUILDING ENERGY METERING SYSTEM” to read “BUILDING WATER METERING SYSTEM”

2. Revise the BMS Interface for Building Water Metering System to read “METERS SHALL BE PROVIDED BY PLUMBING CONTRACTOR. SENSORS & RELAYS SHALL BE PROVIDED BY THE ATC CONTRACTOR. ALL DEVICES SHALL BE UTILIZED TO PROVIDE WATER CONSUMPTION DATA TO THE (BMS) BUILDING MANAGEMENT SYSTEM FOR TRENDING. ATC CONTRACTOR TO PROVIDE PROGRAMMING REQUIRED FOR WATER CONSUMPTION DATA COLLECTION. ATC CONTRACTOR TO PROVIDE ALL NECESSARY WIRING, CONDUITS & PROGRAMMING FOR ALL DEVICES.”

3. Add the following to the abbreviations list:

i. “GWR GEOTHERMAL GROUND WATER RETURN”

Page 20: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 17 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

ii. “GWS GEOTHERMAL GROUND WATER SUPPLY”

Item 094: Sheet E0.02 LIGHTING FIXTURE SCHEDULE: Revision to site plan and fixture schedule per SKE006

Item 095: Sheet E0.03 ELECTRICAL SITE PLAN: Revision to site plan and fixture schedule per SKE006.

Item 096: Sheet E1.10 BASEMENT & FIRST FLOOR PLANS – LIGHTING: Revised Lighting Plan - First Floor per SKE007.

Item 097: Sheet E2.10 BASEMENT & FIRST FLOOR PLANS – POWER: Revision to Power Plans per SKE009.

Item 098: Sheet E2.11 SECOND & THIRD FLOOR PLANS – POWER: Revision to Power Plans per SKE009.

Item 099: Sheet E2.12 ROOF PLANS – POWER: Revision to Roof Plan - Power: SKE008

Item 0100: Sheet E3.01 ONE LINE RISER DIAGRAM:

1. Revised Security Riser Diagram per SKE004.

2. Revisions to One-Line Riser Diagram per SKE010 and SKE011.

Item 0101: Drawing E5.10 BASEMENT & FIRST FLOOR PLANS – SECURITY: Revised Door Intercom System Riser per SKE005.

Item 0102: Drawing E5.10 BASEMENT & FIRST FLOOR PLANS – SECURITY: Camera revisions per SKE001, SKE002 & SKE003

Item 0103: Drawing E5.10 BASEMENT & FIRST FLOOR PLANS – SECURITY: Camera revisions per SKE001, SKE002 & SKE003

Item 0104: Drawing E5.10 BASEMENT & FIRST FLOOR PLANS – SECURITY: Revision to equipment at exterior door as per SKE002.

Item 0105: Sheet T1.10 BASEMENT & FIRST FLOOR PLANS – TECHNOLOGY: Revised Floor Plans per SKT001.

Item 0106: Sheet T1.11 SECOND & THIRD FLOOR PLANS – TECHNOLOGY: Revised Floor Plans per SKT001.

Item 0107: Sheet T2.01 TECHNOLOGY DETAILS: Revisions to Technology Details per SKT002.

Attachments Issued with Addendum No. 3

Specifications

Section 00300 – FORM FOR GENERAL BID

Page 21: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ADDENDUM NO. 3 PAGE 18 OF 18

HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

Section 00310 – BID BOND Section 012201 – UNIT PRICE PROPOSAL SHEET Section 019113 – GENERAL COMMISSIONING REQUIREMENTS Section 040001 – MASONRY WORK Section 055001 - MISCELANEOUS AND ORNIMENTAL IRON Section 090005 - RESILIENT FLOORS Section 220800 – COMMISSIONING OF PLUMBING Section 230800 – COMMISSIONING OF HVAC Section 260800 – COMMISSIONING OF ELECTRICAL Sketches Civil SKC 001 thru 001 Architectural SKA 001 thru 016 Fire Protection SKFP 001 thru 001

Plumbing SKP 001 thru 008 Mechanical SKM 001 thru 005 Electrical SKE 001 thru 011

Technology SKT 001 thru 002

END OF ADDENDUM

Page 22: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Name of Bidder: ______________________________________________ 00300-1

File No. 7467

FORM FOR GENERAL BID

To the Awarding Authority: A. The Undersigned proposes to furnish all labor and materials required for Multi-

Department Relocation Plan Phase 1 859 Mass Ave in Cambridge, Massachusetts, in accordance with the accompanying plans and specifications prepared by HMFH for the contract price specified below, subject to additions and deductions according to the terms of the specifications.

B. This bid includes addenda numbered ______ C. The proposed contract price is _____________________________________ dollars ($________________). For alternate No. Add $_________________; Subtract $___________ (Repeat preceding line for each alternate) D. The subdivision of the proposed contract price is as follows: Item 1. The work of the general contractor, being all work other than that covered by Item 2. $_______________________ Item 2. Sub-bids as follows: – Sub-trade Name of Sub-bidder Amount Bonds required,

indicated by “Yes” or “No”

Masonry ______________________ $______________ ___________ Misc. Iron ______________________ $______________ ___________ Waterproofig ______________________ $______________ ___________ Roofing and Flashing ____________________ $______________ ___________ Tile ______________________ $______________ ___________ Painting ______________________ $______________ ___________ Resilient Floors ______________________ $______________ ___________ Fire Protection ______________________ $ ___________ Plumbing ______________________ $ ___________ HVAC ______________________ $ ___________ Electrical ______________________ $ ___________

Total of Item 2 $______________

The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for the performance and payment bonds furnished by sub-bidders as requested herein and that all of the cost of all such premiums is included in the amount set forth in Item 1 of this bid. The undersigned agrees that if he is selected as general contractor, he will promptly confer with the awarding authority on

Page 23: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Name of Bidder: ______________________________________________ 00300-2

the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in their respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid, the total contract price being adjusted to conform thereto.

FORM FOR GENERAL BID – PAGE 2

E. The undersigned agrees that, if he is selected as general contractor, he will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price.

The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A. The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder “I certify under the penalties of perjury that I have complied with all of the laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting child support”.

Page 24: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Name of Bidder: ______________________________________________ 00300-3

Date _______________

_________________________________ (Name of General Bidder)

By_________________________________ (Name of Person Signing Bid and Title)

___________________________________ (Business Address) ___________________________________

(City and State) __________________________________

(Contact Phone Number)

___________________________________ (Email)

Page 25: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

CITY OF CAMBRIDGE, MASSACHUSETTS

BID BOND

We, the undersigned,____________________________________________________________ as Principal, and ________________________________ as Surety, are hereby held and firmly bound unto the CITY OF CAMBRIDGE, a municipality in the County of Middlesex and Commonwealth of Massachusetts, in the penal sum of ___________________________ Dollars ($__________________ ), for the payment of which, well and truly to be made. We hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of the above obligation is such that the Principal has submitted to the City of Cambridge, Massachusetts, a certain Bid attached hereto and hereby made a part hereof for the Project described as Multi-Department Relocation Plan-Phase 1 – 859 Mass Ave If the Principal fails to perform his/her/its agreement to execute a contract and furnish a performance bond and a labor and materials or payment bond as stated in his/her/its bid in accordance with the applicable state statute or fails in all other respects to perform the agreement created by the acceptance of said bid, his/her/its bid deposit shall become and be the property of the City of Cambridge as liquidated damages. If said Bid shall be rejected because of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the Principal, his/her/its bid bond shall be returned to him/her/it. The Surety, for value received, hereby agrees that its obligations and its bond shall in no way be impaired or affected by an extension of the time in which the City of Cambridge may accept such bid and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and have caused this bond to be signed by their proper officers on this _____ day of _________. 20_. CONTRACTOR AS PRINCIPAL SURETY ____________________________ ___________________________ (Signature) (Signature) ____________________________ ___________________________ Name and Title: Name and Title: SEAL SEAL

00310-1

Page 26: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1

FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE

CAMBRIDGE, MA

UNIT PRICE PROPOSAL SHEET

012201 - 1

APPENDIX 012201

UNIT PRICE PROPOSAL SHEET

859 MASSACHUSETTS AVENUE

CAMBRIDGE, MA

1. The following unit prices as defined in the specifications are designated for items of work on the

basis of unknown quantities or quantities estimated by the Designer. These unit prices will be

used to add or to deduct from the dollar amounts shown, depending on whether the actual

amount is greater or less than the estimated amount. UNIT PRICES GIVEN HEREIN SHALL

BE FOR ADDITIONAL WORK ONLY. DECREASED WORK SHALL BE AT THE "ADD" PRICE

LESS FIFTEEN PERCENT (15%).

Unit

Price

Number

Specification Section and

Description

Unit Measure Unit Price Dollars/Cents

1 022820 – Remove and

dispose of joint

compound.

Square Foot

2 022820 – Remove and

dispose of flooring

materials.

Square Foot

3 022820 – Remove and

dispose of hidden pipe

and hard joint insulation.

Linear Foot

4 022820 – Remove and

dispose of demolition to

access ACM

Square Foot

5 022820 – Remove and

dispose of 1 foot x 1 foot

acoustical ceiling tile.

Square Foot

6 022820 – Remove and

dispose of exterior sewer

transite pipe.

Linear Foot

8 040120 – Repointing of

existing brick

Square Foot

9 061000 – Modifications

and repairs to existing

structural wood framing.

Linear Foot

10 061000 – Replacement of

existing damaged and

deteriorated wood

sheathing and decking.

Board Foot

11 061000 - New rough cut

solid wood sheathing,

Board Foot

FEBRUARY 24, 2017

Page 27: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1

FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE

CAMBRIDGE, MA

UNIT PRICE PROPOSAL SHEET

012201 - 2

roof, wall, and floor.

12 061000 – New rough cut

solid wood framing, 2

inch, nominal

Board Foot

13 061000 – New

replacement of damaged

4 inch by 6 inch sill plate.

Linear foot

14 310000 – Structural Fill Cubic Yard

15 310000 – Open Soil

Excavation

Cubic Yard

16 310000 – Trench Soil

Excavation

Cubic Yard

17 310000 – Crushed Stone Cubic Yard

18 310000 – Ordinary Fill

from Off-Site Source

Cubic Yard

19 310000 - Ordinary Fill

from On-Site Source

Cubic Yard

20 310000 – Lean Concrete Cubic Yard

2. The unit prices requested herein shall include their pro-rata share of all costs for the indicated

items of work, including such items as overhead, superintendence, general conditions, profit,

bond, labor, materials, payments to and coordination of subcontractors, equipment costs,

disposal fees, and all other work incidental thereto.

3. Any unit price proposal that contains a unit price which is unduly high or low may be rejected as

unbalanced.

***THIS FORM MUST BE SUBMITTED WITH THE GENERAL BID FORM ***

_______________________________________________

NAME OF CONTRACTOR (PLEASE PRINT)

END OF APPENDIX

FEBRUARY 24, 2017

Page 28: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 1

SECTION 019113

GENERAL COMMISSIONING REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. This section presents general commissioning requirements for the City of Cambridge 859 Massachusetts Avenue Renovation project to be met in addition to specific commissioning requirements for work on the commissioned systems in Divisions 22, 23 and 26.

B. The Owner requires participation in comprehensive commissioning of selected systems, assemblies, and components. This section includes general requirements that apply to all commissioned systems, assemblies, or components. Additional specific requirements are found in Divisions 22, 23 and 26. Systems and components to be commissioned on this project are listed in Paragraph 1.6 below.

C. This section includes the following Appendices:

“Appendix A” – Sample Training Agenda

“Appendix B” – Sample Commissioning Checklists

“Appendix C” – Sample Commissioning Test Procedures

“Appendix D” – Sample Component Commissioning Schedule

D. All requirements on drawings and in the general provisions of the Contract, including but not limited to the Agreement and General Conditions, apply to this Section.

1.2 RELATED COMMISSIONING SECTIONS

A. Section 220800 Commissioning of Plumbing

B. Section 230800 Commissioning of HVAC

C. Section 260800 Commissioning of Electrical

1.3 ABBREVIATIONS AND DEFINITIONS

A. BOD: Basis of Design. A document that records concepts, calculations, decisions, operational performance criteria and product selections used to meet the OPR and to satisfy applicable regulatory requirements, standards, and guidelines. The document includes both narrative descriptions and lists of specific items required to meet the Owner’s Project Requirements.

B. Commissioning Authority: The reviewing entity employed directly by the Owner to verify that the Owner’s Project Requirements are met, and to assist the Owner by providing quality improvement services.

Page 29: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 2

C. Commissioning Issues Log: The primary document for recording and communicating issues identified through the commissioning process.

D. Design Professional: The design professional or professionals of record responsible for sealing the construction documents, permit applications and for consultations with the authority having jurisdiction at various stages of plan review and construction. They are referred to separately when they perform distinct functions with respect to commissioning, such as considering commissioning comments during formal review of product data and other submittals.

E. FPT: Functional Performance Testing, including testing of individual components, entire systems, and intersystem performance.

F. O&M: Operations and Maintenance.

G. OPR: Owner's Project Requirements. A document that details the functional requirements of a project and the expectations of how it will be used and operated. These include Project goals, measurable performance criteria, cost considerations, benchmarks, success criteria, and supporting information. The commissioning process verifies and documents whether the final built commissioned systems in the project meet the OPR.

H. PFC: Pre-Functional Checklists developed by Stephen Turner Inc. for completion by Trade Contractors.

I. Submittals: Documents required by the contract documents including product data and other formal submittals.

J. Systems, Subsystems, Equipment, and Components: Where these terms are used together or separately, they shall mean "as-built" systems, subsystems, equipment, and components.

K. Systems Checklists: Checklists developed and completed by Stephen Turner Inc.

L. TAB: Test, Adjust and Balance.

1.4 COMMISSIONING PROCESS

A. For this project, Stephen Turner Inc. is the commissioning authority contracted directly by the Owner to lead the commissioning process. The design team, construction manager, and contractors, along with the Owner (Project Manager, Users, and Operations), form the commissioning team.

B. The commissioning process, including Functional Performance Tests, is separate from and does not reduce or replace the requirements of the formal acceptance process by the Owner and Design Professional or the requirements of the authorities having jurisdiction. Stephen Turner Inc. will accept documented testing performed as part of the formal acceptance process that is witnessed by the Owner, Design Professional or the authorities having jurisdiction in order to avoid duplicate testing where possible.

C. Sampling 1. Generally, representative samples of the work will be periodically verified by

Stephen Turner Inc. as an indicator of the quality of the work.

Page 30: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 3

2. This sampling method will be used as a quality check for equipment, piping, redline or record drawings, etc. The intent is that commissioning verification occurs when each aspect of commissioned work first begins, so that any resulting changes required are made after only a small portion of the work is put in place, not all of it.

D. Problem Solving 1. Stephen Turner Inc. will suggest solutions to issues but does not assume the

burden of responsibility to solve and correct issues that are found.

E. Communication During Construction Phase 1. Coordination of Trade Contractor participation in the commissioning team is

through the Construction Manager. Comments, observations, etc. resulting from commissioning activities will be recorded in the Commissioning Issues Log and relayed directly to the responsible party whenever possible, with copies to the Owner, Design Professional and Construction Manager, as applicable. This includes submittal comments, site observation reports, test reports, etc. This direct communication approach is intended to avoid delays from traditional remote paper exchanges, will encourage dialogue and discussion of options and alternatives, and generally maintain an atmosphere of cooperation and quality.

2. Stephen Turner Inc. is not responsible for design concept, design criteria, compliance with codes, design or general construction scheduling, cost estimating, or construction management.

3. Stephen Turner Inc. may assist with problem solving, non-conformance or deficiencies, but ultimately that responsibility resides with the construction manager.

4. The primary role of Stephen Turner Inc. is to develop and coordinate the execution of the commissioning plan including testing, to observe and document performance, and to document whether systems are functioning in accordance with the documented Owner’s Project Requirements.

5. Stephen Turner Inc. does not direct or redirect the Construction Manager or the Trade Contractors in their contracted work, and no communication shall be construed as such direction.

6. Stephen Turner Inc. is not authorized to: a. Release, revoke, alter or expand requirements of Contract Documents. b. Approve or accept any portion of the work. c. Perform any duties of the Construction Manager, its consultants, or its

contractors.

F. Response Times 1. Timeliness in delivering information or forming responses to Stephen Turner

Inc., and back, are essential to providing the built project to the Owner on time, as well as to implementing commissioning.

2. The following are guidelines established to meet this objective, and should be followed unless there are extenuating circumstances – in which case the delay shall be explained to each party in advance of the delay. Failure to avoid delays means that the delayed work product may not be incorporated into the commissioning reporting process, requiring a separate resolution process with the Owner without commissioning assistance.

Page 31: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 4

a. Construction schedule by the Construction Manager incorporating separate activities for commissioning activities, as a minimum including pre-functional checklists, equipment start-ups, controls completion, TAB, and functional performance testing. 1) Within 10 business days after award of Division 22, 23 and 26 work. 2) Appendix C shows a typical component-level commissioning

schedule by Stephen Turner Inc. with the dependencies between construction activities and commissioning activities.

b. Project-specific comments from Stephen Turner Inc. on how commissioning activities and dates are incorporated into the schedule: 1) Within 10 business days after receiving component schedule for

Division 22, 23 and 26 work and updates throughout project. c. Submittal comments by Stephen Turner Inc.:

1) 7 business days from date of receipt by Stephen Turner Inc. for typical product submittals; 15 business days for Controls, TAB, energy recovery equipment, and other selected complex submittal packages. Stephen Turner Inc. will identify other selected complex submittal packages in advance if provided with the submittal register.

2) For this paragraph’s purposes, “receive” means electronic or hard copy in the hands of Stephen Turner Inc.

d. Approved submittals to Stephen Turner Inc.: 1) Within 5 business days of receipt by construction manager.

e. Commissioning checklists by Stephen Turner Inc. to Construction Manager: 1) 10 business days before scheduled delivery of commissioned

equipment, provided that the schedule and the approved submittals have been provided to Stephen Turner Inc. 20 business days in advance.

f. Delivery of draft O&M manuals for Stephen Turner Inc. to review: 1) 30 business days after approved submittals.

g. Delivery of final O&M manuals and training materials to Stephen Turner Inc.: 1) 10 business days prior to each scheduled owner training session.

h. Delivery of record drawings marked to as-built conditions to Stephen Turner Inc.: 1) Prior to each scheduled training session.

i. Delivery of final as-built drawings to Stephen Turner Inc.: 1) Within 20 business days of start of warranty period(s).

j. Commissioning Issues Log entries by Stephen Turner Inc.: 1) Within 5 business days after observation.

k. Response by Construction Manager and Trade Contractor to commissioning Issues Log entries and field comments: 1) 5 business days after receipt of Issues Log where other parties are

not involved, or at the next commissioning meeting.

Page 32: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 5

l. Delivery of functional performance testing procedures by Stephen Turner Inc. to Construction Manager: 1) 20 business days before scheduled testing provided that schedule

and draft O&M manuals have been provided to Stephen Turner Inc. at least 40 business days in advance of scheduled testing.

1.5 CONSTRUCTION MANAGER AND TRADE CONTRACTOR REQUIREMENTS

A. Construction Manager 1. The Construction Manager’s responsibility for construction safety is unaffected

by this section. 2. The Construction Manager’s responsibility for the quality of the installed work

is unaffected by this section. 3. The Construction Manager shall establish at least one contact person, plus

alternates where appropriate, for each trade or system involved in the commissioning process. This requirement facilitates effective communication during commissioning.

4. The Construction Manager shall communicate to the commissioning team the construction schedules, milestones, completion schedules, planned testing, etc., including updates. The Construction Manager shall incorporate commissioning activities closely tied to the construction activities into the project schedule as agreed by the Construction Manager, the Owner, and Stephen Turner Inc.

5. Stephen Turner Inc. has no authority to change the contract or direct the Construction Manager in any of their work, only to provide comments and suggestions. Any issues that Stephen Turner Inc. cannot be resolved with the Construction Manager and the Trade Contractors will be jointly presented to the Owner for resolution.

6. As each commissioning issue is identified, the Construction Manager shall consider it with the Trade Contractors and respond to Stephen Turner Inc. The Construction Manager shall cooperate in resolving commissioning issues that are within the project scope.

7. The Construction Manager shall ensure that each required Trade Contractor and direct Supplier participates and cooperates in commissioning, and provides information, assistance, and responses within the time frames in this section.

8. The Construction Manager shall ensure that each required trade supports integrated testing and commissioning of inter-related work.

9. Warranty a. The Construction Manager shall provide a summary of warranty items as

specified, delineated by specification section number, title, and description. Stephen Turner Inc. will use this as part of the commissioning comparison and verification of warranty items. This step is intended to assure the Owner that the intended warranty protection will be provided.

b. For each warranty item, include the date when the warranty is to begin, the duration of the warranty, and Owner’s obligations to maintain to protect warranty.

Page 33: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 6

10. The Construction Manager shall schedule in advance and coordinate execution of seasonal or deferred commissioning testing by the Trade Contractors. The Construction Manager and the Trade Contractors shall correct deficiencies and make necessary adjustments to O&M manuals and as-built drawings for applicable issues .

B. Trade Contractors 1. The Trade Contractors’ responsibility for construction safety in their work is

unaffected by this section. 2. The Trade Contractors’ responsibility for the quality of their installed work is

unaffected by this section. 3. The Trade Contractors for commissioned systems and related work will be

required to perform certain tasks to assist in the commissioning process. These tasks are described in this section and the commissioning section of each Division that includes commissioned systems. Sample documents relating to these tasks are included in the appendix section of this specification to further clarify this work.

4. The responsibility for safe operation of components, equipment, and systems during commissioning testing rests with the Trade Contractors.

5. Stephen Turner Inc. has no authority to change the contract or direct the Trade Contractors in any of their work, only to provide comments and suggestions. Any issues that Stephen Turner Inc. cannot resolve with the Construction Manager and the Trade Contractors will be jointly presented to the Owner for resolution.

6. As each commissioning issue is identified, the Trade Contractors shall, with the Construction Manager, consider the issue and respond to Stephen Turner Inc. Trade Contractors shall cooperate in the resolution of commissioning issues that are within their contracted scope.

7. PFCs to verify components and work will be provided by Stephen Turner Inc. for completion on-site by Trade Contractors, preferably by the person performing the work. PFCs shall be completed as the work progresses.

8. FPT procedures will be developed and led by Stephen Turner Inc. and performed by the Trade Contractors on each commissioned system.

9. Inter-related work is subject to integrated inter-system functional performance testing and participation of each related trade is required. This includes seasonal performance testing.

1.6 INCLUDED SYSTEMS

A. For the following tables listing systems and their components by Division, Stephen Turner Inc. will develop Pre-Functional Checklists (PFC) that are completed by the Trade Contractors and Functional Performance Tests (FPT) that are executed by the Trade Contractors with Stephen Turner Inc. The installing contractors must complete Pre-Functional Checklists developed by Stephen Turner Inc. for components and systems listed; no sampling is allowed. Installing contractors are required to participate in all Functional Performance Testing.

Page 34: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 7

Building Systems to be Commissioned Pre-Functional Checklists

Functional Performance Testing

HVAC Systems and Associated Controls

Geothermal System Loop Pumps Yes 100%

HHW Loop Pumps Yes 100%

Water Cooled Condensing Unit Yes 100%

Heat Exchangers Yes 100%

Glycol Systems Yes 100%

BTU Meter Yes 100%

Branch Circuit Controllers Yes 100%

Energy Recovery Ventilation Units Yes 100%

Ductless Split Systems Yes 25%

Condensate Pumps Yes 25%

HW Radiation Wall Units Yes 25%

HW Unit Heaters Yes 25%

Metering and Monitoring Yes 100%

Electrical Systems

Lighting and Lighting Controls Yes 25%

Normal Power Distribution Yes 25%

Photovoltaic System Yes 100%

Metering and Monitoring Yes 100%

Plumbing Systems

Solar/Electric Domestic Hot Water Yes 100%

Instantaneous Water Heaters Yes 100%

Metering and Monitoring Yes 100%

PART 2 – PRODUCTS

2.1 TEST EQUIPMENT

A. Standard testing equipment required to perform startup, initial checkout, and required testing shall be provided by the Contractor, and shall remain the property of the Contractor.

B. System-specific test equipment, tools and instruments (e.g. test equipment specific to a piece of equipment) required shall be included in the base bid price by the Contractor.

Page 35: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 8

C. Equipment and software provided by Stephen Turner Inc. to test equipment shall not become the property of the Owner.

D. Testing equipment shall be of sufficient quality and accuracy to measure system performance with the tolerances listed in the system or product specifications.

E. Calibration tags shall be affixed or certificates readily available. Equipment shall be calibrated according to the manufacturer’s recommended intervals, recalibrated when dropped, and repaired and recalibrated when damaged.

PART 3 - EXECUTION

3.1 COMMISSIONING TEAM

A. The Construction Manager and each Trade Contractor performing work on commissioned systems or equipment shall designate personnel to the commissioning team. Such personnel, including knowledgeable sub-contractors or equipment suppliers, shall be responsible for coordinating commissioning activities with Stephen Turner Inc. and attending meetings.

3.2 COMMISSIONING TEAM RESPONSIBILITIES

A. The Commissioning Personnel for the Construction Manager and each Trade Contractor and equipment supplier for commissioned systems or equipment shall have expertise and authority to act on their firm’s behalf and shall be scheduled to participate in and perform commissioning activities including, but not limited to: 1. Cooperate with Stephen Turner Inc. for resolution of issues recorded in the

Issues Log. 2. Attend commissioning team meetings. Construction Manager and Trade

Contractors for commissioned systems to attend each commissioning meeting.

3. Integrate and coordinate commissioning process activities into the construction schedule.

4. Review and complete component pre-functional checklists provided by Stephen Turner Inc.

5. Consider and respond to commissioning issues in the Issues Log, which shall be the central communication and record for the commissioning team’s efforts and progress.

6. Review commissioning process test procedures provided by Stephen Turner Inc.

7. Prepare and pre-check components and systems to ensure successful functional performance testing.

8. Execute commissioning functional performance test procedures. 9. Evaluate performance issues identified in test reports and, in collaboration

with entity responsible for system and equipment installation, recommend corrective action.

10. In the event retesting is required, pre-check components and systems to ensure successful re-testing. Stephen Turner Inc. provides effort for initial and final testing. The Construction Manager and Trade Contractors shall provide the efforts required to ensure that subsequent additional re-testing is not required.

Page 36: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 9

3.3 COMMISSIONING MEETINGS

A. One hour commissioning meetings including one Construction Phase kick-off meeting will be held throughout the construction period and will be a separate meeting series, not as part of another meeting such as Owner’s, Design Professional, OAC Meetings, Coordination Meetings, etc.). Commissioning activities and issues will be handled during these regularly scheduled commissioning meetings.

B. At least one (1) representative from the Construction Manager and each Trade Contractor of the systems being commissioned shall participate in scheduled construction phase commissioning activities. These persons should be prepared and qualified to discuss system items relevant to commissioning.

C. Commissioning meetings will be held quarterly during demolition and rough-ins, monthly until system start-up, biweekly during system start-up, and weekly during functional performance testing, and as required by Owner to resolve issues after move-in.

3.4 SUBMITTALS

A. The Construction Manager and the Trade Contractors shall provide a submittal log from which Stephen Turner Inc. will determine what system/component submittals should be forwarded to Stephen Turner Inc. for review in addition to the copies sent to the Design Professional. Stephen Turner Inc. will review selected submittals with respect to the Owner’s Project Requirements. 1. The Construction Manager and the Trade Contractors will coordinate and

execute a submittal review process that results in formal submittal actions and records for each component of each commissioned system in advance of delivery of each component to the project site.

B. Submittals shall show evidence that they have been reviewed and approved for submittal by the Construction Manager and the Trade Contractors prior to circulation to Owner, Stephen Turner Inc., the Design Professionals, and others for review or action. The Construction Manager’s and the Trade Contractors’ pre-review shall include a technical review of the material compared to the drawings and specifications, by persons familiar with that field. Submittals that do not meet the specifications are to be corrected prior to sending to Stephen Turner Inc. for review.

C. Submittals for products that are a substitution shall be clearly indicated on the cover page.

D. Submittals shall be marked to show exact items, sizes, components, electrical characteristics, operating characteristics, details required for this project, service clearances, and shall be annotated to match drawing schedules. 1. Product data sheets not showing clearly marked the individual specific type,

model, and options intended for use on the project will be returned by Stephen Turner Inc. as not suitable for further review until revised.

E. Catalog information which makes reference to several options, variations, sizes, etc. shall be clearly marked (arrow, underline, circled, etc.) to indicate exactly the intended item. Generic cut sheets are not acceptable.

Page 37: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 10

F. Provide Manufacturers’ detailed installation, start-up, and operation requirements and instructions clearly marked (arrow, underline, circled, etc.) to exactly indicate the intended item.

G. Provide Manufacturers’ recommended maintenance and troubleshooting procedures clearly marked (arrow, underline, circled, etc.) to indicate only the intended item.

H. Provide Warranty and clear statement of Owner’s obligations to maintain equipment to preserve warranty.

I. Stephen Turner Inc. shall be provided commissioning-related submittals for review in parallel with the Design Professional review. The focus of this commissioning review will be to: 1. Verify that the equipment or system meets the Owner’s Project Requirements. 2. Verify that equipment or system includes provisions and accessories for

access, maintenance, start-up and functional performance testing.

J. Stephen Turner Inc. will forward review comments to the Owner with copies sent simultaneously to the Design Professional. The Design Professional will select which of these commissioning comments are appropriate to incorporate in their submittal actions.

K. Training Agendas, O&Ms, and As-Builts shall be provided as formal submittals.

3.5 PRE-FUNCTIONAL CHECKLISTS

A. The intent of the commissioning pre-functional checklists is to detect and reduce or eliminate problems in delivery and installation.

B. Stephen Turner Inc. will produce Pre-Functional Checklists for certain commissioned components. 1. Upon receipt of comments, to Stephen Turner Inc. will modify checklists to

address the Construction Manager and Trade Contractors comments, as applicable. Where inconsistencies occur between the PFCs and the contract documents, the contract documents take precedence.

2. Stephen Turner Inc. will develop component-based Pre-Functional Checklists and provide the Construction Manager with all PFCs (for individual Trade Contractors responsible) printed out and in a dedicated filing cabinet for use on the jobsite.

3. Each installing contractor’s personnel actually performing the installation work is responsible for completing that trade’s checklist for each component.

C. Timely completion of checklists is required within two business days of completing the related work.

D. Each Contractor is responsible for picking up checklists from the Construction Manager’s jobsite office, completing them, and returning them to the Construction Manager’s jobsite office.

E. The Construction Manager is responsible for managing and checking the checklists for timely, accurate completion.

Page 38: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 11

F. Stephen Turner Inc. will provide the Construction Manager and Trade Contractors with training on the checklist process. Stephen Turner Inc. will review the checklist for each type of equipment with the respective Trade Contractor(s) prior to installation of the equipment to ensure the Trade Contractors understand the checklist process and the specific items on the checklists.

G. The completion of the component checklist does not eliminate the Construction Manager and Trade Contractors responsibility for meeting other requirements in the specifications and drawings.

H. Stephen Turner Inc. will periodically verify the accuracy, completeness and tracking of the component checklists. If persistent errors are found, the responsible Trade Contractor shall re-validate 100% of the component checklists for the problem equipment or system type.

3.6 O&M MANUALS

A. General 1. O&M manuals in electronic format shall be submitted to Stephen Turner Inc.

for review in addition to the other parties. 2. Stephen Turner Inc. will provide their review comments to the Design

Professional, who will select which of these commissioning comments are appropriate to incorporate in their submittal actions.

3. The Construction Manager and Trade Contractors shall make changes to the O&M manual based on the comments of the Design Professional and Owner.

4. After delivering final copies of O&M manuals to the owner, confirm in writing the person who took delivery of the manuals and the date and time they were received.

B. Content 1. Include in the O&M Manuals all information required elsewhere, but not less

than the following: a. Manufacturer’s installation, operation, and maintenance manuals,

including:

1) Installation instructions

2) Operation instructions, including start-up, break-in, shutdown, seasonal, emergency, and special operation procedures

3) Maintenance instructions, including intervals, procedures and instructions for problem corrections, preventive maintenance, testing, alignment, adjustment, and repair

4) Removal and replacement instructions, including removal, replacement, disassembly, and assembly instructions, including any specific tools required, required tolerances, settings, or adjustments

5) Troubleshooting and diagnostic procedures, including troubleshooting and diagnostic procedures for common

Page 39: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 12

component malfunctions and the tools required for these procedures

b. Manufacturer’s recommended preventive maintenance tasks for the component in a timeline fashion. Includes:

1) Preventive maintenance task

2) Procedure for the task

3) Special tools and instruments required for the task

4) Frequency of the task c. A copy of the warranty, including the covered items, date of inception,

and date of expiration

C. Electronic O&M Manual Edits and Mark-Ups 1. O&M manual data should be edited and marked up to clearly indicate which

products, model numbers, accessories, and options were provided with the equipment for this project.

2. The O&M manual shall be organized by system, equipment type, and component name (tag number).

D. Electronic O&M Manual Format 1. If a paper O&M Manual is also submitted, the electronic O&M should be

labeled and organized so that all its sections appear in the same order in both versions.

2. All documents shall be submitted in standard formats acceptable to the Owner.

3. All documentation provided shall be clearly marked to indicate the installation for the present project. Unedited general cut sheets and manuals for multiple models, installations, etc. are not acceptable.

3.7 EQUIPMENT START-UP

A. The Construction Manager will coordinate start-up of commissioned systems and equipment by the Trade Contractors, and provide at least two working days notice to Stephen Turner Inc.

B. Stephen Turner Inc. will witness selected start-up of commissioned systems and equipment for compliance with the Owner’s Project Requirements.

C. For all commissioned systems and equipment, one copy of the start-up report shall be forwarded to Stephen Turner Inc. for review and to document that the equipment is installed, operational, and ready for commissioning testing.

3.8 COMMISSIONING FUNCTIONAL PERFORMANCE TESTING

A. All Pre-Functional Checklists, start-ups, adjustments, controls programming, and verification of proper operation shall be completed by the Contractors prior to Functional Performance Testing. 1. While components can be tested as work is completed, system functional

performance testing requires completion of all testing prerequisites:

Page 40: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 13

checklists, start-up, start-up forms, controls point-to-point checks, controls sequences programming and debugging, TAB, and other contractual requirements.

B. In general, Functional Performance Testing shall include testing each sequence in the sequence of operations, and other significant modes, sequences and control strategies not mentioned in the written sequences; including, but not limited to startup, shutdown, unoccupied and manual modes, modulation up and down the unit’s range of capacity, power failure, alarms, component staging and backup upon failure, interlocks with other equipment, and sensor and actuator calibrations. 1. All interlocks and interactions between systems shall be tested. 2. All larger equipment will be individually tested. 3. Like units or assemblies that are numerous (many smaller rooftop packaged

units, air terminal units, exhaust fans, windows, etc.) may have an appropriate sampling strategy applied per the list in the Table in Paragraph 1.6 above.

4. Heating equipment must be tested appropriately during winter and air conditioning equipment must be tested appropriately during summer to demonstrate performance under near-design conditions.

C. For systems and components in the Table in Paragraph 1.6 above, perform Functional Performance Tests as developed and led by Stephen Turner Inc. with the commissioning team. 1. Stephen Turner Inc. will provide draft Functional Performance Test

procedures for review by the commissioning team members. Stephen Turner Inc. will incorporate any comments received into revised procedures. No response within five business days indicates approval.

2. The contractors will provide all tools or the use of tools to start, access equipment, check-out and functionally test equipment and systems, except for specified testing with portable data-loggers, which shall be supplied and installed by Stephen Turner Inc.

D. If major problems are discovered during any test (i.e. problems that will delay the completion of the test), the Construction Manager, with the responsible Trade Contractors, will fix the problem after the conclusion of testing. Once the Construction Manager and Trade Contractors have resolved the problem, testing shall be rescheduled and redone. If the issue is still not resolved, Stephen Turner Inc. shall determine with the Owner how Stephen Turner Inc.’s cost for subsequent retesting will be borne.

E. For identical or near-identical components (e.g., terminal units, diffusers, traps, valves, etc.): if 10%, or three, whichever is greater, of identical pieces of equipment fails to perform (size alone does not constitute a difference), not allowing it to meet its designed performance specification, all identical units may be considered unacceptable by the Owner. In such cases, the Contractor shall provide the Owner with the following: 1. Within one week of notification from the PM, the Contractor or manufacturer’s

representative shall examine all other identical units, making a record of the findings. The findings shall be provided to the PM and Construction Manager within two weeks of the original notice.

2. Within two weeks of the original notification, the Contractor or manufacturer shall provide a signed and dated, written explanation of the problem, cause of

Page 41: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 14

failures, etc. and all proposed solutions which shall include full equipment submittals. The proposed solutions shall not significantly exceed the specification requirements of the original installation.

3. The Owner will determine whether a replacement of all identical units or a repair is acceptable. One example of the proposed solution will be installed for examination by the Owner and Stephen Turner Inc.

4. Stephen Turner Inc. will be allowed to test the installations for up to one week, after which the Owner will decide whether to accept the solution.

5. Upon acceptance, the Contractor and/or manufacturer shall replace or repair all identical items, at their expense and extend the warranty accordingly, if the original equipment warranty had begun. The replacement/repair work shall proceed with reasonable speed beginning within one week from when parts can be obtained.

6. For any functional performance testing issue identified that is not related to any issue identified on a pre-functional checklist or to a start-up fault, Stephen Turner Inc. will direct the retesting of the equipment once after the Construction Manager indicates the issue has been resolved. If the issue is still not resolved, Stephen Turner Inc. shall determine with the Owner how Stephen Turner Inc.’s cost for subsequent retesting will be borne.

F. Any required retesting shall not be considered a justified reason for a claim of delay or for a time extension by the Contractor.

G. Every effort will be made to expedite the testing process and minimize unnecessary delays, while not compromising the integrity of the testing procedures. As tests progress and an issue is identified, Stephen Turner Inc. will discuss the issue with the appropriate Trade Contractor who is performing the test to determine how to proceed. 1. Corrections of minor issues identified may be made during testing at the

discretion of Stephen Turner Inc. In such cases the issue and resolution will be documented on the test procedure form.

2. Major issues shall be corrected after the completion of testing. In such cases the issue and the Construction Manager and Trade Contractors proposed resolution will be documented on the test procedure form. Upon re-testing, the actual resolution will be documented.

H. Seasonal Commissioning Tests 1. Portions of the final commissioning test procedures including but not limited to

FPTs will be seasonally dependent (e.g., cooling system needs to be tested in late spring, summer, or early fall) and will need to be performed at a different time of year than the rest of the final commissioning testing.

3.9 SITE OBSERVATIONS AND VERIFICATION

A. The Commissioning Authority will periodically visit the site to observe the work in progress. Observations and recommended corrective measures will be tracked in the commissioning issues log and communicated to the Construction Manager and Owner.

B. Any commissioning observation that does not meet the Owner’s Project Requirements is a commissioning issue and will be included in the Commissioning

Page 42: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 15

Issues Log or other reports as appropriate. Each observation is intended to improve the project quality and achieve the Owner’s Project Requirements.

3.10 DOCUMENTATION OF COMMISSIONING ISSUES

A. The Commissioning Issues Log focuses on systemic issues and is not a complete “punch list” containing all occurrences of the issue, i.e., all pieces of the equipment type mentioned in the issue may not have been individually verified.

B. The Construction Manager shall respond to the Commissioning Authority and PM at least as often as commissioning meetings are being scheduled concerning the status of each outstanding issue identified during commissioning. Discussion shall cover explanations of any disagreements and proposals for their resolution. 1. If issues remain open for more than two commissioning meetings without

steps taken toward resolution or without a plan communicated for resolving the issue, Stephen Turner may request, and the Construction Manager shall provide, a response in writing including explanations of any disagreements and proposals for their resolution.

C. To aid in issue resolution, any commissioning issues identified during commissioning testing will be noted in the Issues Log.

D. If the commissioning team cannot reach a resolution to an issue or disagree on whether an item should be an issue, Stephen Turner Inc. and the Construction Manager will present the issue jointly to the Owner for direction.

3.11 TRAINING

A. General 1. The Construction Manager, with input from the Owner, shall be responsible for

training coordination and scheduling and ultimately to ensure that training is completed.

2. Stephen Turner Inc. will verify that the Construction Manager provides the training schedule in advance to the Owner.

3. The Trade Contractor for the respective system is responsible for the development and implementation of the training material for the system.

4. Training shall be completed and accepted by the Owner prior to occupancy.

B. Scope of Training 1. Training Manual

a. A Training Manual shall be developed in collaboration with the owner, commissioning agent, and contractor, and shall consist of two main sections, The Training Plan section composed of the training syllabus and agendas covering individual training sessions, and the Training Materials section containing training handouts, sign-in sheets and other documentation to be provided by the contractors. 1) The contractor shall propose for the owner’s approval how many

training sessions are needed for each Division for the 859 Massachusetts Avenue Renovation project. The first training session for all divisions shall be conducted at the time of start-up and checkout. The remaining sessions shall be scheduled and conducted prior to substantial completion and occupancy. The

Page 43: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 16

training sessions shall be conducted at the site and the agenda developed by the contractor shall specify the breakout and duration of each session.

2) The contractor shall provide the owner and commissioning agent a draft training schedule (syllabus) and agendas for review and comments. Contractors must provide training agendas as a formal submittal three weeks prior to the scheduled training session. Comments are due within 3 business days of receipt. Owner shall approve and sign off on the schedule (syllabus) and agendas before contractors proceed with the training sessions.

2. The Construction Manager shall provide designated Owner personnel with comprehensive orientation and training in the understanding of the systems and the operation and maintenance of each piece of equipment.

3. The training topics shall include all equipment and systems. The Construction Manager shall provide training on each piece of equipment. Training syllabus shall include a breakdown of the time allotted for each system.

4. Training shall include hands-on training on each piece of equipment, which shall illustrate all modes of operation, including startup, shutdown, emergency, power failure, seasonal changeovers, etc.

C. Preparation for Training 1. Training agenda forms shall be prepared by the relevant Trade Contractors.

The agenda shall be followed to assure efficient training and a knowledge level that meets or exceeds the owner’s intent.

2. Training manuals, O&M manuals, BAS programming files, and available as-builts must be provided as formal submittals 21 calendar days prior to each training session.

3. Stephen Turner Inc. will review the proposed training material from the Construction Manager and the Trade Contractors and will provide comments and suggestions to supplement the training material for operations and maintenance personnel, if and where appropriate.

4. The Construction Manager and Trade Contractors training material shall include: a. Detailed agenda b. Trade Contractor contact sheet, including address, phone number, fax

number and e-mail. c. Detailed training material, divided by sections. d. Maintenance checklists/ log sheets.

D. Implementation of Training 1. The trainer, prior to and during each training session, shall complete the

prepared training record form. The trainer is responsible for checking the subjects covered from the training agenda and for obtaining signatures from the trainees in attendance.

2. All trainers shall have an in-depth working knowledge of the specific installation or system to be covered.

3. All trainers shall be in place, set up, and ready to provide training as scheduled for each training session.

Page 44: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 17

E. Training Documentation 1. All training sessions shall be professional visually recorded using a standard

compact disk or other format specified by the owner. The sessions can be recorded however contractor deems suitable but must be transferred to owner’s requested method of distribution.

2. Format of final training deliverable must be organized and easy to use for maintenance purposes. Final training videos shall be labeled and provided in DVD format.

F. Prior to the end of the Construction Manager and Trade Contractors warranty period (typically the ninth or tenth month for a one year warranty), Stephen Turner Inc. will review operational issues reported by the owner’s operation and maintenance personnel and building users, to help determine if there are any operational problems which have construction or manufacturer’s deficiencies as their root cause. If any such problems are identified, Stephen Turner Inc. will work with the Contractor to identify a recommended course of action to correct the deficiencies. The contractual responsibility of the subcontractor or supplier to remedy the problem shall not be diminished by Stephen Turner Inc.’s cooperation.

G. Any resolutions to warranty issues shall be incorporated as changes to as-built, O&M and other required documentation.

3.12 AS-BUILT DRAWINGS

A. Redline or record drawings shall be kept up to date at all times.

B. The Construction Manager shall ensure that accurate red-line or record drawings of as-built conditions are maintained by each trade, at the job site, throughout the construction phase. The record drawings shall be available for review by Stephen Turner Inc.. If discrepancies are noted on the Trade Contractor’s record drawings, the Construction Manager will review the Trade Contractors’ recording procedures and adjustments to ensure that the record drawings are kept up to date and accurate. The record drawings shall be corrected promptly to ensure the accuracy of the as-built drawings throughout the project.

C. The redline or record drawings maintained by the Trade Contractors will be periodically reviewed and verified during construction by Stephen Turner Inc. Discrepancies in the drawings will be documented and the Trade Contractors shall verify the as-built drawings against the installed system for all similar problems for correction.

D. As-built drawings in compliance with the Owner’s requirements for electronic drawings shall be formally submitted, and provided to Stephen Turner Inc. for review, within 30 days of training.

Page 45: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 18

APPENDICES

Page 46: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 19

APPENDIX A - SAMPLE TRAINING AGENDA Date: Equipment / System:

SECTION 1. AUDIENCE AND GENERAL SCOPE

Intended audience type: ___facility engineer, operations, maintenance, technician __occupant, user, or other:________________ General scope of training: ___ Overview ___ Intermediate ___ Detailed

SECTION 2. INSTRUCTORS

Attach qualifications for each trainer ID Trainer Company Qualifications Attached (ü) 1) __________________________ _____________________________ 2) __________________________ _____________________________ etc. as needed

SECTION 3. AGENDA Subjects to be covered (see next page for Owner's requests; attach additional sheets if

needed) Session 1 Date:____________ Location:_____________________________ Duration Instructor(s) (hrs) ID(s)__ Session 2 Date:____________ Location:______________________________ Duration Instructor(s) (hrs) ID(s)__ etc. as needed Total duration of training (hrs) ----------------------------------------------------------------------------->

SECTION 4. APPROVALS This plan has been approved by the following individuals, subject to any additions and clarifications noted. (This is not an approval of training completion.) __________________________________________ _________________________ Owner’s Representative Date __________________________________________ _________________________ Commissioning Authority Date

Session Subject Date Duration

(hrs) Instructor

(ID#) Completed

(ü)

Page 47: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 20

1. Safety issues for the system and components

2. Overview and description of the purposes of the system

3. Troubleshooting: description of diagnostic step by step procedures for determining the source of problems on the system and component level; review technical service manual in detail

4. Maintenance: instruction of required procedures for weekly, monthly and annual preventative checks and timely repairs to preserve system and component integrity. Any special issues to maintain warranty.

5. Review of control drawings and schematics (have copies for attendees)

6. Startup, loading, normal operation, unloading, shutdown, unoccupied operation, seasonal changeover, etc, as applicable

7. On-board controls (for skid or packaged equipment): Programming, troubleshooting, alarms, manual operation

8. Building automation controls (BAS): Programming, troubleshooting, alarms, setpoints, manual operation, interface with integral controls

9. Critical BAS sensors and recommended recalibration intervals for each

10. Interactions with other systems, operation during power outage and fire

11. Utility metering

12. Energy conserving operation and strategies

13. Question and Answer Period

14. Additional Topic: ___________________________________

15. Additional Topic: ___________________________________

16. Additional Topic: ___________________________________

Total Duration of training (hrs) ------------------à

END OF APPENDIX A

Page 48: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 21

APPENDIX B – SAMPLE COMMISSIONING CHECKLISTS

1.2 PRE-FUNCTIONAL CHECKLIST: SAMPLE PROVIDED AS AN EXAMPLE OF THE LEVEL OF RIGOR REQUIRED

AHU-1 - DELIVERY AIR HANDLING UNIT AHU-1 Note: Complete upon arrival of unit Shipment Inspected: __________________________________________ Date checklist completed: ______________________________________

ITEM SPECIFIED SUBMITTED ACTUAL Manufacturer YORK TRANE

Model Number YSWU025 LPCAA21D

Total CFM / Minimum OA 8500 / 2300 8500 / No Spec

External Static (in) 2.0 2.0

Motor Manufacturer n/a n/a

Model Number n/a n/a

Serial Number n/a n/a

Nameplate HP 15 10

Volts/Phase/Amps 208V/3ph/42A 208V/3ph/32.2A

Preheat MBH 223.5 223.5

Cooling Coil 5 Row 12 Fins per Inch 6 Row 14 Fins per Inch

Cooling MBH (Total/Sensible) 333/248 333/257.45

VFD Manufacturer/Model No Spec No Spec Serial Number n/a n/a

VFD HP Rating No Spec No Spec

VFD Line Reactor % No Spec No Spec

Additional observations & notes___________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________

Page 49: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 22

1.3 PREFUNCTIONAL CHECKLIST: AIR HANDLING UNIT AHU-1 - CONNECT

Note: Complete after installation & connections Date checklist completed: _________________________________

Installation Check (Y/N) Notes 1. Equipment tag & nameplate permanently affixed 2. Unit on concrete pad with vibration isolators, isolators released

from shipping bolts.

3. Casing condition good - (no dents, no leaks, gaskets installed, access doors close)

4. Duct connections to unit tight, fully sealed without leaks, and in good condition

5. Duct flex connectors and sound attenuators provided and installed per drawings

6. Hydronic piping complete and in compliance with plans & specs, including gauges, sensor wells and PT test plugs

7. Preheat valve and actuator provided and properly installed (VG1241DN+936GGA)

8. Cooling valve and actuator provided and properly installed (VG1241ER+956GGA)

9. Condensate drain complete, trapped and pitched per, plans, specs & mfgr’s rec.

10. Adequate access for maintenance and removal/replacement of coils, shafts, etc.

11. Acoustic insulation properly installed according to specification 12. Clean up of equipment completed per contract documents 13. Fan bearings lubricated (checked by installer) 14. Belts properly aligned, tensioned and all guards in place 15. Filters installed per specifications 16. No unusual vibration or noise

Additional observations & notes___________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________

Page 50: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 23

1.4 PREFUNCTIONAL CHECKLIST: AHU-1 - POWER ELECTRICAL AIR HANDLING UNIT AHU-1

Note: Complete after wiring complete Date checklist completed: _________________________________

Installation Check (Y/N)? Note or # 1. Feeders and devices adequately sized per code to serve fan

and VFD

2. Feeders and devices supported per code 3. Power disconnect in place and labeled 4. Input and output VFD feeders in separate conduits 5. All electrical connections tight 6. Fan rotation correct (in both VFD and bypass mode if bypass

provided)

7. Electrical feeders, VFD and devices labeled per Brown requirements

Additional observations & notes___________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________

Page 51: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 24

1.5 PREFUNCTIONAL CHECKLIST: AHU-1 - CONTROLS CONTROLS AIR HANDLING UNIT AHU-1

Note: Complete after controls are installed, wired and fully tested Date checklist completed: _________________________________

Installation Check (Y/N)? Note or # 1. Damper actuators adequately sized; dampers operate smoothly

and close tightly

2. Damper actuators and EMS damper outputs adjusted to stroke simultaneously

3. Filter dP switch properly installed, wired, calibrated and tested 4. Mixed air averaging sensor located per specs and tested 5. Preheat discharge averaging sensor located per specs and

tested

6. Low temperature cutout located per specs, interlocked with VFD’s and EMS input, adjusted correctly, and tested

7. Air flow station properly located per specifications and calibrated to TAB results

8. High static cutout interlocked with VFD’s & EMS input, adjusted properly & tested

9. Discharge air temperature sensor properly located and tested 10. Duct static sensor properly located 2/3 down duct at location

appv’d by engineer, calibrated & tested

11. VFD interface points (S/S, Speed modulation, run status and smoke detector interlock) all installed completely and tested.

12. Fan status CT adjusted to indicate run status reliably at minimum fan speed

13. Controls fully tested, defect-free and ready for functional performance testing

Additional observations & notes___________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________

END OF APPENDIX B

Page 52: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 25

APPENDIX C – Sample Commissioning Test Procedures FUNCTIONAL PERFOMANCE TEST PROCEDURE: SAMPLE PROVIDED AS AN EXAMPLE OF THE LEVEL OF RIGOR REQUIRED

AHU CONTROL SEQUENCE TESTS Date / Time:

Test Observed By:

EQUIPMENT SAFETIES

PROCEDURE Test 1: High Static Pressure. Install a manometer in the ductwork to read static pressure. Fan off during this test. Determine the design shutdown setting. If not specified on the drawings, get this information from the design engineer. Using a manometer and a squeeze bulb, slowly apply pressure to the switch sensing input until the threshold pressure is achieved. Verify that the switch activates. Release the pressure and verify that the switch remains activated (manual reset). Verify that the fan will not start in automatic or manual modes, either through the BAS, motor starter, or VFD as applicable. Press the manual reset and verify that the equipment will re-start. This portion of the test will be considered successful if the high static switch shuts down the fan unconditionally, and cannot be bypassed by any manual controls. Test 2: Low Temperature (Freeze Stat). Lower the temperature of the freeze stat sensing element. Verify that the switch activates. Raise the element temperature and verify that the switch remains activated (manual reset). Verify that isolation and outdoor air dampers close, that preheat valve opens, coil heats up, and that the fan will not start in automatic or manual modes, either through the BAS, motor starter, or VFD as applicable. Press the manual reset and verify that the equipment will re-start. This portion of the test will be considered successful if the freeze stat shuts down the fan unconditionally, heating coil temperature rises, and the fan cannot be bypassed by any manual controls. Test 3: AHU Fire Alarm Shutdown. Disconnect one end of the wire at the duct detector or fire alarm relay that is intended to shutdown the AHU. Verify that the fan will not start in automatic or manual modes, either through the BAS, motor starter, or VFD as applicable. Replace the wire and verify that the equipment will re-start. This portion of the test will be considered successful if the control circuit as wired shuts down the fan unconditionally, and cannot be bypassed by any manual controls. NOTE: this is not a fire alarm test, this only tests that the interface method used will shut down the fan unconditionally. When finished, return all overridden points, modes and sequences to their original state.

RESULTS & NOTES:

Page 53: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 26

Test # Acceptance Criteria Tolerance

Accepted ? (Y / N) Remarks

1 High Static Shutdown: The high static switch shuts down the fan unconditionally, and cannot be bypassed by any manual controls.

Shutdown at +/- 0.2 in.w.c. from setting

2 Freeze Stat Shutdown: the freeze stat shuts down the fan unconditionally, and cannot be bypassed by any manual controls.

Shutdown at +/- 2°F from setting

3 Fire Alarm Shutdown: The control circuit as wired shuts down the fan unconditionally, and cannot be bypassed by any manual controls.

None

SUPPLY FAN VFD “RAMP-UP” AND “RAMP-DOWN”

PROCEDURE Begin the test with the VFD driven motor in the off position. With the fan in manual control, cause a step change from 0 to 50% commanded output. Verify that the VFD “ramp up” settings cause the motor to slowly increase in speed, and do not cause a abrupt change in speed. Cause a step change from 50 to 25% commanded output. Verify that the VFD “ramp down” settings cause the motor to slowly decrease in speed, and do not cause a abrupt change in speed. Once the test is completed, return all overridden points, modes and sequences to their original state. This portion of the test will be considered successful if the motor speed changes gradually after a step change output from the control system, indicating the “ramp-up” and “ramp-down” controls have been set in the VFD. 1.1

RESULTS

Acceptance Criteria Tolerance Accepted ? (Y / N) Remarks

The motor speed changes gradually after a step change output from the control system, indicating the “ramp-up” and “ramp-down” controls have been set in the VFD.

Abrupt changes not allowed

SUPPLY FAN STATIC PRESSURE CONTROL TEST

Page 54: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 27

PROCEDURE Complete the high static pressure safety and VFD “Ramp-Up” and “Ramp-Down” tests before beginning this test. Set up trends for the supply air static pressure, setpoint, and VFD percentage. Begin the test with the fan at 0% capacity. With the duct static setpoint at 1.0 in. w.c., start the fan. Observe the VFD and motor to see if the control action is smooth and does not hunt. Allow sufficient time for the control system to stabilize, approximately 2 or 3 minutes maximum. Read the static pressure and verify that the setpoint was achieved. Decrease the static pressure setpoint by 0.5 in. w.c. and observe the control system reaction to the step change. Return all overridden points, modes and sequences to their original state. This portion of the test will be considered successful if the controls are stable and the duct static pressure controls achieve their setpoint.

RESULTS

Acceptance Criteria Tolerance AHU Accepted ? (Y / N) Remarks

The controls are stable and the duct static pressure controls achieve their setpoint.

+/-0.1 in. w.c. B4

C2

AIR-SIDE ECONOMIZER CONTROL TEST

PROCEDURE High static pressure and freeze protection shutdown safety controls must be verified prior to this test, to avoid equipment damage during the test. For VAV system, open VAV boxes to permit unrestricted flow of the supply fan. The relationship between the outside air temperature, return air temperature, and mixed air temperature setpoint must be appropriate for utilizing the outdoor air for cooling purposes. In general, the OAT should be 55°F or less in order to conduct this test, and colder is better. In general, this test can be conducted if the OAT meets these requirements: OAT below RAT, OAT above freezing. If the OAT is not in the proper range, a complete test of the mixed air system will require a subsequent visit when the conditions are appropriate (seasonal test). Control the supply fan capacity for VAV air handlers manually during this test. Set up trends for OA, MA, and RA temperatures; OA cfm and setpoint; and OA and RA damper positions.

Page 55: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 28

Test 1: Override the outside air temperature value to a point just above the lower limit of the economizer enable threshold value (temperature or enthalpy as applicable). When the threshold value is crossed, the control should respond by entering and leaving the economizer mode. When entering the economizer mode, observe the dampers begin to modulate to maintain mixed air temperature setpoint. When leaving the economizer mode, observe the dampers revert to minimum outside air position. This portion of the test will be considered successful if the system enters and leaves the economizer mode according to outside air temperatures at the specified thresholds, and maintains the minimum ventilation rate when the economizer is disabled. Test 2: If there is an economizer “enable” or “lockout” temperature or enthalpy, temporarily manipulate this point as required to keep it from interfering with the test (e.g. enable the economizer without regard to OAT or enthalpy). Based on (OAT) and (RAT), determine a reasonable mixed air setpoint that will set the controls into motion. Observe the mixing dampers to see if the control action is smooth and does not hunt. Allow sufficient time for the control system to stabilize, approximately 2 or 3 minutes maximum. Read the mixed air temperature and verify that the setpoint was achieved. Select a different mixed air temperature setpoint, preferably at least 10 degrees different than the original setpoint, and observe the control system reaction to the step change. Return all overridden points, modes and sequences to their original state. This portion of the test will be considered successful if the controls are stable and the mixed air controls achieve their setpoint.

RESULTS

SUPPLY AIR TEMPERATURE CONTROL TEST

PROCEDURE High static pressure and freeze protection shutdown safety controls must be verified prior to this test, to avoid equipment damage during the test. For VAV system, open VAV boxes to permit unrestricted flow of the supply fan. Temporarily disable the Air-Side Economizer Control operation before beginning this test.

Test # Acceptance Criteria

Tolerance AHU

Accepted ? (Y / N) Remarks

1 The system enters and leaves the economizer mode according to outside air conditions at the specified thresholds, and maintains the minimum ventilation rate when the economizer is disabled.

Event occurs at specified temp.

B1

C2

2 The mixed air controls are stable and achieve their setpoint.

+/- 10 % of setpoint

B1

Page 56: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 29

Test 1: Temporarily disable the HW heating controls. Start the SA fan, and gradually increase the speed until 50 % capacity is reached. Adjust the SA heating temperature setpoint to 80°F and be sure it is higher than the SA temperature at this point. Release the HW controls. Observe the HW valve to see if the control action is smooth and does not hunt. Allow sufficient time for the control system to stabilize, approximately 2 or 3 minutes maximum. Read the SA temperature and verify that the setpoint was achieved. Gradually increase the SA fan capacity to 100 % and observe the control system reaction to the step change. This portion of the test will be considered successful if the controls are stable and the SAT controls achieve their setpoint. Test 2: Temporarily disable the CW cooling controls. Start the SA fan, and gradually increase the speed until 50 % capacity is reached. Adjust the SA cooling temperature setpoint to 55°F and be sure it is lower than the SA temperature at this point. Release the CW controls. Observe the CW valve to see if the control action is smooth and does not hunt. Allow sufficient time for the control system to stabilize, approximately 2 or 3 minutes maximum. Read the SA temperature and verify that the setpoint was achieved. Gradually increase the SA fan capacity to 100 % and observe the control system reaction to the step change. Return all overridden points, modes, and sequences to their original state. This portion of the test will be considered successful if the controls are stable and the SAT controls achieve their setpoint.

RESULTS

POWER FAILURE TEST Date / Time: Investigator(s): This test must follow the regulations and requirement of local Fire Department. Perform this test before the building is occupied. Notify the Fire Department before this test is started.

1.1 OBJECTIVES The purpose of this test is to verify that the generator starts within the designed time period after a power failure and supplies the power required by the systems. All systems and equipment must operate as intended after the power is restored and the power will maintain the specified quality as equipment start up. The circuit must be switched to supply generated power to all

Test # Acceptance Criteria Tolerance

Accepted ? (Y / N) Remarks

1 The HW controls are stable and the SAT controls achieve their setpoint.

+/- 2°F, no hunting

2 The CW controls are stable and the SAT controls achieve their setpoint.

+/- 2°F, no hunting

Page 57: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 30

system and equipment required to be on emergency power. When power goes back to the normal condition the equipment and systems shall operate as normal without interruptions and the generators shall shut off.

1.2 PROCEDURE Verify the generator start up time, voltage, and shut down. Verify that a random selection of equipment operates as intended. The power failure procedure is as follows: 1. Notify the local fire department 2. Disconnect the electrical power supply to the building 3. Verify that all emergency functions are operable until the generator supplies power 4. Verify that the generator and all equipment operate as required 5. Connect the building to the electrical supply 6. Verify that the equipment continues to operate as intended 7. Notify the local fire department that the testing is completed This test will require several observers (with 2-way radios) in different locations to verify when the equipment and systems are operational unless the building automation system is able to monitor all the equipment and systems.

1.3 MEASURING EQUIPMENT Prepare following measuring equipment, which shall have been calibrated less than 12 months before these tests:

• Stop watch • Voltmeter • Light meter

Page 58: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 31

1.4 RESULTS Emergency Lighting

Room number Emergency Lighting ? Room number Emergency Lighting ?

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Emergency Functions

Equipment Power available ? Equipment Power available ?

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Generator Start Up duration ( ) Sec. Maintains required voltage during start-up Yes / No

Maintains required voltage during power restoration Yes / No

Shut Down duration ( ) Sec.

Page 59: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 32

Equipment

Equipment type and #

Start up time after

power failure

(s)

Operates as intended during

external power outage

?

Operates as intended after

external power is

restored ?

Comments

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

Yes / No Yes / No

1.5 GENERAL COMMENTS:

END OF APPENDIX C

Page 60: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

GENERAL COMMISSIONING REQUIREMENTS 01 91 13 - 33

APPENDIX D: SAMPLE COMMISSIONING SCHEDULE

END OF APPENDIX D

END OF SECTION

ID Tasks1 Project Activities

2 CD

3 Owner's Project Requirements and Basis of Design Documentation

4 Construction

5 Submittal transmitted for processing

6 Approved submittal transmitted to CxA

7 Draft O&Ms transmitted to CxA

8 Contractor checklists completion

9 "Set"

10 "Connect"

11 Start-up/Controls/TAB

12 Complete checklists, start-up and controls on major components

13 Complete all controls, TAB, & programming

14 Complete O&Ms, submit Training Plan

15 Contractor Provided Training

16 Seasonal Performance Testing

17 Occupancy

18 First year warranty

19 Commissioning Tasks

20 Commissioning Specifications

21 Commissioning Plan

22 First Construction Documents Design Review

23 Backcheck Construction Documents Design Review

24 Contractor Submittal Review

25 Checklist(s) finalization

26 Contractor checklist performance monitoring

27 Functional Performance Test Development

28 Component Level Functional Performance Test Execution

29 System & Inter-System Functional Performance Test Execution

30 Task 2-4: Develop Systems Manual

31 Task 2-5: Systems Manual & Commissioning Training

32 Task 2-6: Post-Occupancy Review

33 Task 1-7: Commissioning Report

9/4

11/5

8/21

9/1

11/3

May July Septe Novem Januar March May July Septe Novem Januar March May July Septe Novem Januar

Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Yale Sample Commissioning Schedule

Page 1

Project: Sample Component Cx ScheduleDate: Wed 9/9/09

Page 61: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT NO. 223016.1 FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

MASONRY WORK 040001 - 1

SECTION 040001

MASONRY WORK

(Filed Sub-Bid Required)

PART 1 - GENERAL

1.1 GENERAL PROVISIONS

A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a part of this Section of the Specifications.

B. Examine all other Sections of the Specifications for requirements that affect work of this Section whether or not such work is specifically mentioned in this Section.

C. Coordinate work with that of all other trades affecting, or affected by work of this Section. Cooperate with such trades to assure the steady progress of all work under the Contract.

1.2 FILED SUB-BID REQUIREMENTS

A. Time, Manner and Requirements for Submitting Sub-Bids

1. Sub-bids shall be submitted in accordance with the provisions of Massachusetts General Laws (Ter. Ed.), Chapter 149, Sections 44A-44I, inclusive, as amended. The time, place and manner of submission of sub-bids shall be as set forth in the INSTRUCTIONS TO BIDDERS.

2. Each sub-bid submitted for work under this Section shall be on a form furnished by the Awarding Authority, as required by Section 44F of Chapter 149 of the General Laws, as amended.

3. Each sub-bid filed with the Awarding Authority shall be accompanied by a Bid Bond or Cash or Certified check or a Treasurer’s or Cashier’s Check issued by a responsible bank or trust company payable to the Awarding Authority in the amount of five percent of the bid. A sub-bid accompanied by any other form of bid deposit than those specified will be rejected.

B. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract Drawings: A0.1, A0.2, A1.1, A1.5, A2.1, A4.1, A4.2, A4.3, A6.1, and A6.2.

C. The listing of the Contract Drawings above shall not limit responsibility to determine full extent of work of this Section as required by: all Contract Drawings noted on the Contract Drawings-Title Sheet Drawing List, the Project Manual, and Addenda.

1.3 DESCRIPTION OF WORK

A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. All Work of Section 040120 – MASONRY RESTORATION AND CLEANING.

END OF SECTION

FEBRUARY 24, 2017

Page 62: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT NO. 223016.1 FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

MISCELLANEOUS AND ORNAMENTAL IRON 050001 - 1

SECTION 050001

MISCELLANEOUS AND ORNAMENTAL IRON

(Filed Sub-Bid Required)

PART 1 - GENERAL

1.1 GENERAL PROVISIONS

A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a part of this Section of the Specifications.

B. Examine all other Sections of the Specifications for requirements that affect work of this Section whether or not such work is specifically mentioned in this Section.

C. Coordinate work with that of all other trades affecting, or affected by work of this Section. Cooperate with such trades to assure the steady progress of all work under the Contract.

1.2 FILED SUB-BID REQUIREMENTS

A. Time, Manner and Requirements for Submitting Sub-Bids

1. Sub-bids shall be submitted in accordance with the provisions of Massachusetts General Laws (Ter. Ed.), Chapter 149, Sections 44A-44I, inclusive, as amended. The time, place and manner of submission of sub-bids shall be as set forth in the INSTRUCTIONS TO BIDDERS.

2. Each sub-bid submitted for work under this Section shall be on a form furnished by the Awarding Authority, as required by Section 44F of Chapter 149 of the General Laws, as amended.

3. Each sub-bid filed with the Awarding Authority shall be accompanied by a Bid Bond or Cash or Certified check or a Treasurer’s or Cashier’s Check issued by a responsible bank or trust company payable to the Awarding Authority in the amount of five percent of the bid. A sub-bid accompanied by any other form of bid deposit than those specified will be rejected.

B. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract Drawings: A0.1, A0.2, A2.1, A2.2, A4.1, A4.2, A4.3, A4.4, A4.5, A4.6, A6.6, A6.7, A10.1, A10.2, A13.1, A13.2

C. The listing of the Contract Drawings above shall not limit responsibility to determine full extent of work of this Section as required by: all Contract Drawings noted on the Contract Drawings-Title Sheet Drawing List, the Project Manual, and Addenda.

1.3 DESCRIPTION OF WORK

A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following:

1. All Work in Section 055000 - METAL FABRICATIONS.

FEBRUARY 24, 2017

Page 63: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT NO. 223016.1 FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

MISCELLANEOUS AND ORNAMENTAL IRON 050001 - 2

END OF SECTION

FEBRUARY 24, 2017

Page 64: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

RESILIENT FLOORS 090005 - 1

HMFH PROJECT NO. 223016.1 FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

SECTION 090005

RESILIENT FLOORS

(Filed Sub-Bid Required)

PART 1 - GENERAL

1.1 GENERAL PROVISIONS

A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made a part of this Section of the Specifications.

B. Examine all other Sections of the Specifications for requirements that affect work of this Section whether or not such work is specifically mentioned in this Section.

C. Coordinate work with that of all other trades affecting, or affected by work of this Section. Cooperate with such trades to assure the steady progress of all work under the Contract.

1.2 FILED SUB-BID REQUIREMENTS

A. Time, Manner and Requirements for Submitting Sub-Bids

1. Sub-bids shall be submitted in accordance with the provisions of Massachusetts General Laws (Ter. Ed.), Chapter 149, Sections 44A-44I, inclusive, as amended. The time, place and manner of submission of sub-bids shall be as set forth in the INSTRUCTIONS TO BIDDERS.

2. Each sub-bid submitted for work under this Section shall be on a form furnished by the Awarding Authority, as required by Section 44F of Chapter 149 of the General Laws, as amended.

3. Each sub-bid filed with the Awarding Authority shall be accompanied by a Bid Bond or Cash or Certified check or a Treasurer’s or Cashier’s Check issued by a responsible bank or trust company payable to the Awarding Authority in the amount of five percent of the bid. A sub-bid accompanied by any other form of bid deposit than those specified will be rejected.

B. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract Drawings: xxxxxxxxxx

C. The listing of the Contract Drawings above shall not limit responsibility to determine full extent of work of this Section as required by: all Contract Drawings noted on the Contract Drawings-Title Sheet Drawing List, the Project Manual, and Addenda.

1.3 DESCRIPTION OF WORK

A. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following:

1. All Work of Section 096500 - RESILIENT FLOORING

FEBRUARY 24, 2017

Page 65: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

RESILIENT FLOORS 090005 - 2

HMFH PROJECT NO. 223016.1 FEBRUARY 17, 2017

859 MASSACHUSETTS AVENUE CAMBRIDGE, MA

B. Sustainable Design Intent: Comply with project requirements intended to achieve sustainable design, measured and documented according to the LEED Green Building Rating System, of the US Green Building Council. Refer to Section 018110, SUSTAINABLE DESIGN REQUIREMENTS for certification level and certification requirements.

END OF SECTION

FEBRUARY 24, 2017

Page 66: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-1

SECTION 22 08 00 - COMMISSIONING OF PLUMBING

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. This section presents specific commissioning requirements for the City of Cambridge 859 Massachusetts Avenue Renovation project to be met in addition to other commissioning requirements, including but not limited to Section 01 91 13 “General Commissioning Requirements.”

1.2 RELATED COMMISSIONING SECTIONS

A. Section 01 91 13 General Commissioning Requirements

B. Section 23 08 00 Commissioning of HVAC

C. Section 26 08 00 Commissioning of Electrical

1.3 ABBREVIATIONS

A. See Section 01 91 13 for abbreviations and definitions.

1.4 CONTRACTOR REQUIREMENTS

A. Meet all the requirements of Section 01 91 13 “General Commissioning Requirements.”

B. Provide factory start-up and required technical personnel for participation in Owner’s Commissioning.

C. Construction and Acceptance Phase 1. Provide submittal data, commissioning documentation, O&M data and training

related to Commissioning, including information from equipment suppliers. 2. Attend meetings necessary to facilitate the Commissioning process (refer to

Section 01 91 13 and PART 3 of this specification for more information on meetings).

3. Review the commissioning Issues Log for items related to contracted work and assist the commissioning team in addressing and resolving these issues.

4. Complete commissioning checklists provided by Stephen Turner Inc. and return completed checklists to the Construction Manager. Startup checklists may require specific input from the Equipment Supplier such as a copy of the Manufacturer’s Startup Checklist.

5. Address any available Design Professional punch list items before final commissioning testing.

6. Complete Plumbing TAB with discrepancies and problems remedied before commissioning testing of the respective systems.

7. Execute commissioning tests, which will be developed and led by Stephen Turner Inc. Testing will start at the components level, will proceed to the system level, and will end with inter-system testing.

8. Correct deficiencies (differences between specified and observed performance) as interpreted by Stephen Turner Inc., the Owner, and Design Professional and retest the equipment.

Page 67: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-2

9. Provide training of the Owner’s operating staff, as required in PART 3 of this specification and elsewhere in the Contract Documents.

10. Assist and cooperate with Stephen Turner Inc. Provide skilled technicians familiar with this building to assist with commissioning testing.

D. Warranty Period 1. Execute seasonal or deferred commissioning testing, witnessed by Stephen

Turner Inc. Correct deficiencies and make necessary adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.

1.5 INCLUDED SYSTEMS

A. For the following systems and components, Stephen Turner Inc. will develop pre-functional checklists (PFCs) that are completed by the Trade Contractors (TC) and Functional Performance Tests (FPTs) that are executed by the Trades with Stephen Turner Inc., as indicated.

Building Systems to be Commissioned Pre-Functional Checklists

Functional Performance Testing

Plumbing Systems

Solar/Electric Domestic Hot Water Yes 100%

Instantaneous Water Heaters Yes 100%

Metering and Monitoring Yes 100%

B. The work provided under this Division that is listed above is included in the scope of the Commissioning activities to meet the Owner’s goals.

C. In addition to component and systems level commissioning of the work listed, participation in inter-system testing and integrated commissioning of inter-related work is required. For list of all commissioned work see Section 01 91 13 “General Commissioning Requirements.”

PART 2 – PRODUCTS – NOT USED

PART 3 - EXECUTION

3.1 COMMISSIONING TEAM PARTICIPATION

A. Each trade including all Sub-contractors, Tier Contractors, manufacturers’ start-up personnel, as well as direct Equipment Suppliers shall designate personnel to be responsible for coordinating commissioning activities with the Commissioning Authority as required in Section 01 91 13 “General Commissioning Requirements.”

3.2 CONTRACTOR RESPONSIBILITIES

A. Execution requirements for the following are in Section 01 91 13 “General Commissioning Requirements” with additional specific requirements for this Division stated below:

Page 68: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-3

3.3 COMMISSIONING MEETINGS

A. Additional requirements for this Division: 1. Attendance is required by at least one (1) representative from the

Contractor(s) for the systems being commissioned during delivery, installation, and start-up, and when checklists and tests are being performed.

2. As specific issues arise, a representative from each direct equipment supplier, and each supplier of other equipment not adequately represented by technical personnel from the responsible Contractor will be required to attend the meeting to assist in resolution.

3.4 SUBMITTALS

A. Additional requirements for this Division: 1. The Plumbing Contractor’s Submittals shall include Sequences of Operations

demonstrating that the control design and application incorporate the requirements provided by the Design Professional within the contract documents into a fully functional system. The controls submittals shall document Step-by-Step Control sequences for each controlled device, for each mode of operation, and for each possible transition from one mode to another.

2. Sequences documented in the submittals shall include all custom and standard sequence elements including but not limited to: a. Start-up sequences b. Shutdown sequences c. Emergency or stand-by power sequences where applicable, including

effects of power or equipment failure and all stand-by functions d. Sequences for all alarms and emergency shut-downs including

annunciation and notification sequences e. Initial and recommended values for all adjustable settings, setpoints, and

parameters that are typically set or adjusted by operating staff f. Schedules, if known g. All interlocks, interfaces, and interactions with other systems including

controls systems provided by others. h. Detailed delineation of control interface for any packaged equipment

controls, listing all controllable or adjustable points and all monitoring points.

i. Written sequences of control for packaged controlled equipment, including additional clarifying narrative for equipment manufacturers’ stock sequences.

j. The Plumbing TAB Contractor shall submit a project-specific TAB Plan four weeks prior to starting TAB work. The Plan shall address each system and component, and shall include but not be limited to: 1) Field reporting forms that list each piece of equipment and show the

data to be gathered for each. 2) Final test report forms. 3) Detailed procedures for TAB work for each system.

Page 69: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-4

4) Specific procedures to ensure Domestic Hot Water system operates at the lowest energy use and the methods to verify and document this.

5) Phasing plan for performing TAB work by floor or area. k. Submittals shall be marked to show exact items, sizes, components,

electrical characteristics, operating characteristics, details required for this project, service clearances, and shall be annotated to match drawing schedules.

l. Include ranges for all thermometers, pressure gages and other measuring devices.

m. Provide performance data including range, accuracy, data storage, local read-out, and data connections for each meter type submitted.

n. Provide performance curves (full and part-load as applicable) for each pump submitted.

o. Provide Manufacturers’ detailed installation requirements clearly marked (arrow, underline, circled, etc.) to indicate exactly the intended item.

p. Provide Manufacturers’ detailed start-up requirements and procedures clearly marked (arrow, underline, circled, etc.) to indicate exactly the intended item.

q. Provide Manufacturers’ operating instructions clearly marked (arrow, underline, circled, etc.) to exactly indicate the intended item.

r. Provide Manufacturers’ recommended maintenance and troubleshooting procedures clearly marked (arrow, underline, circled, etc.) to exactly indicate the intended item.

s. Provide Warranty and clear statement of Owner’s obligations to maintain equipment to preserve warranty.

3.5 PRE-FUNCTIONAL CHECKLISTS

A. No Additional requirements for this Division.

3.6 O&M MANUALS

A. No additional requirements for this Division.

3.7 EQUIPMENT START-UP

A. Additional requirements for this Division: 1. For all commissioned systems and equipment, one copy of the equipment

manufacturer’s or Contractor’s start-up report shall be provided to Stephen Turner Inc. for review and to document that the equipment is installed, operational, and ready for commissioning testing.

2. Copies of additional testing performed including but not limited to leak tests required elsewhere in the specifications shall be provided to Stephen Turner Inc.

3.8 COMMISSIONING TESTING

A. Additional requirements for this Division:

Page 70: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-5

1. Each direct equipment supplier, and each supplier of other equipment not adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in commissioning testing.

2. The Contractor shall assist and cooperate with the Stephen Turner Inc. Skilled technicians familiar with this project shall execute the functional performance testing of the controls system, and shall assist in the functional performance testing of systems and equipment, including systems with interlocks, interfaces, or other interaction with other systems.

B. Additional Requirements for Testing Specified Elsewhere: 1. This includes the following tests:

a. Piping Pressure Testing. 2. Additional requirements for each of these tests:

a. The Construction Manager (CM) shall provide a copy of the proposed test procedure to Stephen Turner Inc. for review.

b. The CM shall notify the Design Professional and Stephen Turner Inc. of the date and time the test is scheduled.

c. The CM shall provide copies of field and final test results to Stephen Turner Inc.

d. Stephen Turner Inc. will review the test results for consistency with the Owner’s Project Requirements.

3. Stephen Turner Inc. will provide all commissioning team members (contractors, Design Professional, Owner, etc.), and others as required, the commissioning test procedures prior to scheduled testing. If no comments are received from a particular commissioning team member, that shall constitute acceptance of the commissioning test procedures as is. a. Once all commissioning checklists have been completed by the

Contractor and accepted by Stephen Turner Inc., testing will be scheduled and performed.

4. Initial Testing a. The systems shall be sufficiently operational prior to the TAB of the

system. It is understood that a portion of the final system startup occurs in conjunction with the TAB work.

b. Commissioning verification of sensors will be made using the sampling method; an exhaustive re-test of all control system inputs and outputs will not be conducted by Stephen Turner Inc. Prior to Stephen Turner Inc. verification, the control contractor shall be responsible for complete input/output checkout quality assurance.

c. Sensor Tolerances. The following are the tolerances of the actual sensors in the system. Unless noted differently on the commissioning test procedure, use the following: 1) Temperature: +/- 2.0 deg. F 2) Pressure: +/- 5.0 % of reading 3) Flow rates for water: +/- 5.0 % of reading

d. Valve Stroke Setup and Check 1) For all valve actuator positions, verify the actual position against the

control signal.

Page 71: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-6

2) Set pumps to normal operating mode. Command valve closed, visually verify that valve is closed and adjust output zero signal as required. Command valve open, verify position is full open and adjust output signal as required. Command valve to at ;east one intermediate position. If actual valve or damper position doesn’t reasonably correspond, repair or replace actuator.

3) Closure for normally closed valves: Disconnect power to the actuator motor, and verify the valve moves to full closed position. Restore to normal.

4) Normally open valves: disconnect power to the actuator motor, and verify the valve moves to full open position. Restore to normal.

e. Stephen Turner Inc. will witness the Initial tests. Each contractor will be responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to witness the testing. Where Stephen Turner Inc. develops a procedure for the test, the contractor shall implement the test to the satisfaction of Stephen Turner Inc.

5. Intermediate Testing a. The Plumbing TAB contractor shall, upon request by Stephen Turner Inc.

if necessary during system troubleshooting, provide Stephen Turner Inc. with the technician(s) who accomplished the TAB, along with the specific equipment used for the TAB, to verify and re-test between 10% and 20% of the TAB final report.

b. Included in this work will be: 1) Sample-based verification of measured quantities 2) Review of firm qualifications 3) Review of instrument calibration records 4) Review of basic procedures. Particular emphasis will be placed on

the use of iterative methods (repeat measurements) acknowledging the fact that changes in branch flows have an overall system effect.

c. The TAB Contractor shall provide the field reports or draft TAB reports to Stephen Turner Inc. within one week of completion for each system or area, before functional performance testing.

d. The TAB Contractor shall make skilled technicians and instruments used during TAB available to address functional performance test results that are at variance with TAB reports.

6. System Level Testing a. Additional commissioning testing will be conducted after testing of the

control system and TAB work. This testing will provide both the owner and Contractor with documentation that the system operated correctly according to the Owner’s Project Requirements.

b. Stephen Turner Inc. will lead this portion of commissioning testing. Each Contractor will be responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to witness the testing. Where Stephen Turner Inc. develops a procedure for the test, the Contractor shall implement the test to the satisfaction of Stephen Turner Inc.

Page 72: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF PLUMBING 22 08 00-7

c. Contractors shall attend and operate equipment during commissioning testing as required by the specific test being performed.

7. Inter-System Testing a. Additional inter-system testing is required under the Owner’s

Commissioning process to ensure that work in this Division is properly interoperable with other work. Contractors shall participate in system level and inter-system testing. Testing will include operation under both normal power and emergency power where applicable, and complete exercising of systems through all modes and sequences. The inter-system functional performance tests will address all systems with interface to other systems. These systems include but are not limited to: 1) HVAC and hot water systems 2) BAS system 3) Fire detection and life safety systems 4) Metering system 5) Plumbing systems including but not limited to Domestic Hot Water

and pumps 6) Power systems 7) Emergency power systems, including recovery from utility power

loss

3.9 SITE OBSERVATIONS AND VERIFICATION

A. No additional requirements for this Division.

3.10 DOCUMENTATION OF COMMISSIONING ISSUES

A. Additional requirements for this Division: 1. Each direct equipment supplier, and each supplier of other equipment not

adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in resolving commissioning issues.

3.11 TRAINING

A. No additional requirements for this Division.

3.12 AS-BUILT DRAWINGS

A. No additional requirements for this Division.

END OF SECTION 22 08 00

Page 73: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-1

SECTION 23 08 00 – COMMISSIONING OF HVAC

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. This section presents specific commissioning requirements for the City of Cambridge 859 Massachusetts Avenue Renovation project to be met in addition to other commissioning requirements, including but not limited to Section 01 91 13 “General Commissioning Requirements.”

1.2 RELATED COMMISSIONING SECTIONS

A. Section 01 91 13 General Commissioning Requirements

B. Section 22 08 00 Commissioning of Plumbing

C. Section 26 08 00 Commissioning of Electrical

1.3 ABBREVIATIONS

A. See Section 01 91 13 for abbreviations and definitions.

1.4 CONTRACTOR REQUIREMENTS

B. Meet all the requirements of Section 01 91 13 “General Commissioning Requirements.”

C. Provide factory start-up and required technical personnel for participation in Owner’s Commissioning.

D. Construction and Acceptance Phase 1. Provide submittal data, commissioning documentation, O&M data and training

related to Commissioning, including information from equipment suppliers. 2. Attend meetings necessary to facilitate the Commissioning process (refer to

Section 01 91 13 and PART 3 of this specification for more information on meetings).

3. Review the commissioning Issues Log for items related to contracted work and assist the commissioning team in addressing and resolving these issues.

4. Complete commissioning checklists provided by Stephen Turner Inc. and return completed checklists to the Commissioning Team. Startup checklists may require specific input from the Equipment Supplier such as a copy of the Manufacturer’s Startup Checklist.

5. Address any available Owner and Design Professional punch list items before final commissioning testing. Discrepancies and problems shall be remedied before commissioning testing of the respective systems.

6. Install a P/T plug at each water sensor that is an input point used for active control by the control system.

7. Complete water and air TAB with discrepancies and problems remedied before commissioning testing of the respective air or water-related systems.

8. Execute commissioning tests, which will be developed and led by Stephen Turner Inc. Testing will start at the components level, will proceed to the system level, and will end with inter-system testing.

Page 74: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-2

9. Correct issues (differences between required and observed performance) as interpreted by Stephen Turner Inc., the Owner, and the Design Professional and retest the equipment.

10. Provide training of the Owner’s operating staff, as required in PART 3 of this specification and elsewhere in the Contract Documents.

11. Assist and cooperate with Stephen Turner Inc. Provide skilled technicians familiar with this building to assist with commissioning testing.

E. Warranty Period 1. Execute seasonal or deferred commissioning testing, as applicable, witnessed

by Stephen Turner Inc. Correct deficiencies and make necessary adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.

1.5 INCLUDED SYSTEMS

A. For the following systems and components, Stephen Turner Inc. will develop pre-functional checklists (PFCs) that are completed by the Trade Contractors (TC) and Functional Performance Tests (FPTs) that are executed by the Trades with Stephen Turner Inc., as indicated.

Building Systems to be Commissioned Pre-Functional

Checklists Functional Performance

Testing

HVAC Systems and Associated Controls

Geothermal System Loop Pumps Yes 100%

HHW Loop Pumps Yes 100%

Water Cooled Condensing Unit Yes 100%

Heat Exchangers Yes 100%

Glycol Systems Yes 100%

BTU Meter Yes 100%

Branch Circuit Controllers Yes 100%

Energy Recovery Ventilation Units Yes 100%

Ductless Split Systems Yes 25%

Condensate Pumps Yes 25%

HW Radiation Wall Units Yes 25%

HW Unit Heaters Yes 25%

Metering and Monitoring Yes 100%

B. The work provided under this Division that is listed above is included in the scope of the Commissioning activities to meet the Owner’s goals.

C. In addition to component and systems level commissioning of the work listed, participation in inter-system testing and integrated commissioning of interrelated work is required. For list of all commissioned work see Section 01 91 13 “General Commissioning Requirements.”

Page 75: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-3

PART 2 – PRODUCTS

2.2 P/T PLUGS

A. 1/4” & 1/2” NPT Pressure/Temperature Test Plugs & Caps: 1. P/T plugs shall have a self-sealing pierce-able rubber core that is rated at

1000 PSI and 275°F. 2. Pressure/Temperature test plugs shall be provided at each pressure or

temperature sensor on chilled and hot water systems where other means do not exist for temporary pressure and temperature measurement access in hydronic systems without disturbing the process.

PART 3 - EXECUTION

3.1 COMMISSIONING TEAM PARTICIPATION

A. Each trade including all Sub-contractors, Tier Contractors, manufacturers’ start-up personnel, as well as direct Equipment Suppliers shall designate personnel to be responsible for coordinating commissioning activities with the Commissioning Authority as required in Section 01 91 13 “General Commissioning Requirements.”

3.2 CONTRACTOR RESPONSIBILITIES

A. Execution requirements for the following are in Section 01 91 13 “General Commissioning Requirements” with additional specific requirements for this Division stated below:

3.3 COMMISSIONING MEETINGS

A. Additional requirements for this Division: 1. Attendance of regularly scheduled commissioning meetings is required by at

least one (1) representative from the Contractor(s) for the systems being commissioned during delivery, installation, and start-up, and when checklists and tests are being performed.

2. As specific issues arise, a representative from each direct equipment supplier, and each supplier of other equipment not adequately represented by technical personnel from the responsible Contractor will be required to attend the meeting to assist in resolutions.

3.4 SUBMITTALS

A. Additional requirements for this Division: 1. If the engineer’s specified sequences are not clear or do not contain enough

detail for Stephen Turner Inc. to develop detailed functional test procedures for evaluation in the field, the BAS vendor shall elaborate on or expand on them in the BAS Submittal, or shall submit RFIs in advance of the BAS Submittal requiring the Design Professional to provide such elaboration or clarification. The Design Professional shall coordinate such clarifications and ensure that they are contained in the BAS Submittal prior to circulating it for review.

2. The BAS Submittal shall include a list of proposed alarms with the priority code for alarm annunciation and alarm clear for each alarm listed.

Page 76: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-4

3. HVAC product data submittals for any packaged or skid-mounted equipment that includes factory OEM controls shall include detailed sequences including setpoints, inputs, outputs, and logic in sufficient detail for Stephen Turner Inc. to develop specific functional testing procedures to verify controls functionality. Points lists, communication protocol (BACnet or other), and lists of preprogrammed alarms shall be included.

4. HVAC coordination drawing submittals shall include complete thermal metering plans, if applicable, demonstrating compliance with the Owner’s metering standard and interface to the building metering system.

5. The TAB Contractor shall submit a project-specific TAB Submittal six (6) weeks prior to starting TAB work. This plan will be developed after the TAB Contractor has some familiarity with the systems and associated control systems. The Submittal shall address each system and component, and shall include but not be limited to: a. TAB Contractor’s certifications and credentials to perform the contracted

work. b. Certification that the TAB has reviewed the construction documents and

the systems with the design engineers and contractors to sufficiently understand the design intent for each system.

c. The identification and types of measurement instruments to be used and their most recent calibration date.

d. All field checkout sheets and logs to be used that list each piece of equipment to be tested, adjusted and balanced with the data to be gathered for each.

e. Final test report forms to be used. f. Detailed step-by-step procedures for TAB work for each system and

issue. g. List of all air flow, water flow, sound level, system capacity and efficiency

measurements to be performed and a description of specific test procedures, parameters, formulas to be used.

h. Details of how total flow will be determined. 1) Air: sum of terminal flows via BAS calibrated readings or via hood

readings of all terminals, supply (SA) and return air (RA) pitot traverse, SA or RA flow stations.

2) Water: pump curves, circuit setter, flow station, ultrasonic, etc. i. Specific procedures that will ensure that both air and water side are

operating at the lowest possible pressures and provide methods to verify this.

j. Confirmation that TAB contractor understands the outside air ventilation criteria under all conditions. 1) Details of whether and how minimum outside air cfm will be verified

and set, and for what level (total building, zone, etc.). 2) Details of how any CO2-based demand controlled ventilation airflow

rates will be verified at various CO2 levels. 3) Details of verification for any unoccupied setbacks from maximum

required ventilation rate (based on both number of occupants and square feet per ASHRAE Standard 62.1, for example) to minimum required ventilation rate (based on square feet only per ASHRAE Standard 62.1)

Page 77: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-5

k. Plan for formal deficiency reports (scope, frequency and distribution list). l. Procedures for addressing partial build-out, diversity, and part load

issues including false loading or other approaches where allowed. m. Methods to make all specified coil and system capacity measurements. n. Specific procedures to ensure both water and air distribution systems

operate at the lowest possible pressures and the methods to verify and document this.

6. The HVAC Submittals shall: a. Include ranges for all thermometers, pressure gauges, flow meters, and

other measuring devices. b. Provide performance data including range, accuracy, data storage, local

read-out, and data connections for each meter type submitted. c. Include service designation for each individual system, including each

duct system and piping system, fittings and joining materials, each insulation system, all valves, all piping specialties, and all accessories. These shall be presented in table format, to clearly indicate where each type of material will be used for each system. Generic cut sheets that do not indicate the specific application are not acceptable. Copies of the project specifications are not acceptable.

d. Provide detailed product data for each piece of equipment including capacities, electrical components and requirements, including all specified product attributes.

e. Provide performance curves (full and part-load as applicable) for each pump, fan, and piece of unitary equipment submitted.

f. Provide Manufacturers’ detailed installation requirements clearly marked (arrow, underline, circled, etc.) to indicate only the intended item.

g. Provide Manufacturers’ detailed start-up requirements and procedures clearly marked (arrow, underline, circled, etc.) to indicate only the intended item.

h. Provide Manufacturers’ operation instructions clearly marked (arrow, underline, circled, etc.) to indicate only the intended item.

i. Provide Manufacturers’ recommended maintenance and troubleshooting procedures clearly marked (arrow, underline, circled, etc.) to indicate only the intended item.

j. Provide Warranty and clear statement of Owner’s obligations to maintain equipment to preserve warranty.

3.5 PRE-FUNCTIONAL CHECKLISTS

A. No additional requirements for this Division.

3.6 O&M MANUALS

A. Additional requirements for this Division: 1. Within 4 weeks of completing the submittal review (“Approved” Product or

Shop Drawing Submittal), provide final, or if that is not yet available, draft electronic format O&M Manual to Stephen Turner Inc. for use in developing Functional Performance Tests.

2. Final BAS/Controls O&M Manuals shall include:

Page 78: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-6

k. Calibration requirements and intervals by sensor and positioned or actuator type.

l. Specific instructions on how to perform all functions, access all features, and switch to each mode in the workstations and controllers.

m. Software version and security update requirements.

3.7 EQUIPMENT START-UP

A. Additional requirements for this Division: 1. For all commissioned systems and equipment, one copy of the equipment

manufacturer’s or Contractor’s start-up report shall be provided to Stephen Turner Inc. for review and to document that the equipment is installed, operational, and ready for commissioning testing.

2. Copies of additional testing performed including but not limited to vibration analysis required elsewhere in the specifications shall be provided to Stephen Turner Inc.

3. For all third party testing required elsewhere in this specification or by code, provide test reports to Stephen Turner Inc. for review and to document that the testing has been performed. Coordinate dates for third party testing in advance with Stephen Turner Inc. to allow commissioning personnel to witness selected tests.

4. The Contractor shall ensure that the actual room numbers as posted in the building are used in the controls programming and point names.

3.8 COMMISSIONING TESTING

A. Additional requirements for this Division: 1. Each direct equipment supplier, and each supplier of other equipment not

adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in commissioning testing.

2. The BAS/Controls Contractor shall assist and cooperate with Stephen Turner Inc. Skilled technicians familiar with this project shall execute the functional performance testing of the controls system, and shall assist in the functional performance testing of controlled systems and equipment, including systems with interlocks, interfaces, or other interaction with the BAS.

3. The systems in the building will be operated in different modes of operation to verify the control system responds properly. This testing provides both the Owner and Contractor with documentation that the control system was operating properly at Project Acceptance. a. Operator’s Workstation graphics display b. Trend logs c. Status review screens, out of bounds checks, and alarming

4. Stephen Turner Inc. will witness the Initial tests. Each contractor will be responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to witness the testing. Where Stephen Turner Inc. develops a procedure for the test, the contractor shall implement the test to the satisfaction of Stephen Turner Inc.

5. Stephen Turner Inc. will provide all commissioning team members (construction manager, contractors, Design Professional, Owner, etc.) the

Page 79: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-7

commissioning test procedures prior to scheduled testing. If no comments are received from a particular commissioning team member, that shall constitute acceptance of the commissioning test procedures as is.

6. Stephen Turner Inc. shall schedule and witness the testing once all commissioning checklists (with exception of the TAB Checklists) have been completed by the contractors and accepted by Stephen Turner Inc.

7. Intermediate Testing a. The TAB Contractor shall provide the field reports or draft TAB reports to

Stephen Turner Inc. within one week of completion for each system or area, before functional performance testing.

b. The TAB Contractor shall make skilled technicians and instruments used during TAB available to address functional performance test results that are at variance with TAB reports.

8. System Level Testing a. Additional commissioning testing will be conducted after testing of the

control system and TAB work, but prior to occupancy of the building. This testing will provide both the Owner and Contractor with documentation that the system operated correctly according to the Owner’s Project Requirements. These tests are typically performed at the room level, where a sample of rooms is selected for review.

b. Stephen Turner Inc. will lead this portion of commissioning testing. Each Contractor will be responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to witness the testing. Where Stephen Turner Inc. develops a procedure for the test the Contractor shall implement the test to the satisfaction of Stephen Turner Inc.

c. Contractors shall attend and operate equipment during commissioning testing as required by the specific test being performed.

d. Stephen Turner Inc. shall schedule and administer the testing once all commissioning checklists have been completed by the Contractors and accepted by the Commissioning Authority.

9. Inter-System Testing a. Additional inter-system testing is required under the Owner’s

Commissioning process to ensure that work in this Division is properly interoperable with other work. Contractors shall participate in system level and inter-system testing.

3.9 SITE OBSERVATIONS AND VERIFICATION

A. No additional requirements for this Division.

3.10 DOCUMENTATION OF COMMISSIONING ISSUES

A. Additional requirements for this Division: 1. Each direct equipment supplier, and each supplier of other equipment not

adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in resolving commissioning issues.

Page 80: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF HVAC 23 08 00-8

3.11 TRAINING

A. No additional requirements for this Division.

3.12 AS-BUILT DRAWINGS

A. Additional requirements for this Division: 1. Sequences of operations for each piece of equipment. 2. Final points list including cross-references to final room numbers and

equipment designations provided by the Owner during Construction. 3. Full as-built file of all schedules and setpoints in electronic format as specified

in the contract documents. 4. Full as-built file of all software programs in electronic format on DVD-ROM of

the complete programs for this project in format compatible with BAS per the Owner’s requirements.

5. Actual room numbers as posted in the building shown on controls drawings. END OF SECTION 23 08 00

Page 81: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF ELECTRICAL 26 08 00-1

SECTION 26 08 00 - COMMISSIONING OF ELECTRICAL

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. This section presents specific commissioning requirements for the City of Cambridge 859 Massachusetts Avenue Renovation project to be met in addition to other commissioning requirements, including but not limited to Section 01 91 13 “General Commissioning Requirements.”

1.2 RELATED COMMISSIONING SECTIONS

A. Section 01 91 13 General Commissioning Requirements

B. Section 22 08 00 Commissioning of Plumbing

C. Section 23 08 00 Commissioning of HVAC

1.3 ABBREVIATIONS

A. See Section 01 91 13 for abbreviations and definitions.

1.4 CONTRACTOR REQUIREMENTS

A. Meet all the requirements of Section 01 91 13 “General Commissioning Requirements.”

B. Provide factory start-up and required technical personnel for participation in Owner’s Commissioning.

C. Construction and Acceptance Phase 1. Provide submittal data, commissioning documentation, O&M data and training

related to Commissioning, including information from equipment suppliers. 2. Attend meetings necessary to facilitate the Commissioning process (refer to

Section 01 91 13 and PART 3 of this specification for more information on meetings).

3. Review the commissioning Issues Log for items related to contracted work and assist the commissioning team in addressing and resolving these issues.

4. Complete commissioning checklists provided by Stephen Turner Inc. and return completed checklists to the Construction Manager. Startup checklists may require specific input from the Equipment Supplier such as a copy of the Manufacturer’s Startup Checklist.

5. Address any available Owner and Design Professional punch list items before final commissioning testing. Discrepancies and problems shall be remedied before commissioning testing of the respective systems.

6. Execute commissioning tests, which will be developed and led by Stephen Turner Inc. Testing will start at the components level, will proceed to the system level, and will end with inter-system testing.

7. Correct issues (differences between required and observed performance) as interpreted by Stephen Turner Inc., the Owner, and the Design Professional and retest the equipment.

Page 82: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF ELECTRICAL 26 08 00-2

8. Provide training of the Owner’s operating staff, as required in PART 3 of this specification and elsewhere in the Contract Documents.

9. Assist and cooperate with Stephen Turner Inc. Provide skilled technicians familiar with this building to assist with commissioning testing.

D. Warranty Period 1. Execute seasonal or deferred commissioning testing, as applicable, witnessed

by Stephen Turner Inc. Correct deficiencies and make necessary adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.

1.5 INCLUDED SYSTEMS

A. For the following systems and components, Stephen Turner Inc. will develop pre-functional checklists (PFCs) that are completed by the Trade Contractors (TC) and Functional Performance Tests (FPTs) that are executed by the Trades with Stephen Turner Inc., as indicated.

Building Systems to be Commissioned Pre-Functional Checklists

Functional Performance Testing

Electrical Systems

Lighting and Lighting Controls Yes 25%

Normal Power Distribution Yes 100%

Photovoltaic System Yes 100%

Metering and Monitoring Yes 100%

B. The work provided under this Division that is listed above is included in the scope of the Commissioning activities to meet the Owner’s goals.

C. In addition to component and systems level commissioning of the work listed, participation in inter-system testing and integrated commissioning of interrelated work is required. For list of all commissioned work see Section 01 91 13 “General Commissioning Requirements.”

PART 2 – PRODUCTS – NOT USED

PART 3 - EXECUTION

3.1 COMMISSIONING TEAM PARTICIPATION

A. Each trade including all Sub-contractors, Tier Contractors, manufacturers’ start-up personnel, as well as direct Equipment Suppliers shall designate personnel to be responsible for coordinating commissioning activities with the Commissioning Authority as required in Section 01 91 13 “General Commissioning Requirements.”

Page 83: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF ELECTRICAL 26 08 00-3

3.2 CONTRACTOR RESPONSIBILITIES

A. Execution requirements for the following are in Section 01 91 13 “General Commissioning Requirements” with additional specific requirements for this Division stated below:

3.3 COMMISSIONING MEETINGS

A. Additional requirements for this Division: 1. Attendance of regularly scheduled commissioning meetings is required by at

least one (1) representative from the Contractor(s) for the systems being commissioned during delivery, installation, and start-up, and when checklists and tests are being performed.

2. As specific issues arise, a representative from each direct equipment supplier, and each supplier of other equipment not adequately represented by technical personnel from the responsible Contractor will be required to attend the meeting to assist in resolutions.

3.4 SUBMITTALS

A. Additional requirements for this Division:

1. Electrical coordination drawing submittals shall include complete photovoltaic array, inverters, and electrical metering plans and interface to the non-electrical meters that are integrated with the system.

3.5 PRE-FUNCTIONAL CHECKLISTS

A. No additional requirements for this Division.

3.6 O&M MANUALS

A. No additional requirements for this Division.

3.7 EQUIPMENT START-UP

A. Additional requirements for this Division: 1. For all commissioned systems and equipment, one copy of the equipment

manufacturer’s or Contractor’s start-up report shall be provided to Stephen Turner Inc. for review and to document that the equipment is installed, operational, and ready for commissioning testing.

2. For all third party testing required elsewhere in this specification or by code, provide test reports to Stephen Turner Inc. for review and to document that the testing has been performed. Coordinate dates for third party testing in advance with Stephen Turner Inc. to allow commissioning personnel to witness selected tests.

3.8 COMMISSIONING TESTING

A. Additional requirements for this Division: 1. Each direct equipment supplier, and each supplier of other equipment not

adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in commissioning testing.

Page 84: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF ELECTRICAL 26 08 00-4

2. Initial Testing a. Stephen Turner Inc. will witness the Initial tests. The contractor will be

responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to perform the testing.

b. Stephen Turner Inc. will provide all commissioning team members (construction manager, contractors, Design Professional, Owner, etc.) the commissioning test procedures prior to scheduled testing. If no comments are received from a particular commissioning team member, that shall constitute acceptance of the commissioning test procedures as is.

c. Stephen Turner Inc. shall schedule the commissioning testing once all commissioning checklists have been completed by the contractor and accepted by Stephen Turner Inc.

3. System Level Testing a. Commissioning testing will be conducted after initial testing but prior to

occupancy of the building. This testing will provide both the owner and Contractor with documentation that the system operated correctly according to the Owner’s Project Requirements. These tests are typically performed at the room level, where a sample of rooms is selected for review.

b. Stephen Turner Inc. will lead this portion of commissioning testing. The contractor will be responsible, as required, to put the system in various modes of operation, to fix minor problems found during the test (i.e. problems that can be fixed without delaying the completion of the test), and to witness the testing. Where Stephen Turner Inc. develops a procedure for the test the contractor shall implement the test to the satisfaction of Stephen Turner Inc.

c. Contractors shall attend and operate equipment during commissioning testing as required by the specific test being performed.

4. Inter-System Testing a. Additional inter-system testing is required under the Owner’s

Commissioning process to ensure that work in this Division is properly interoperable with other work. Contractors shall participate in system level and inter-system testing. Testing will include operation under both normal power and emergency power where applicable; change-over and transition between different operating modes; and complete exercising of systems through all modes and sequences. 1) HVAC and hot water systems 2) BAS system 3) Fire detection and life safety systems 4) Metering system 5) Plumbing systems including but not limited to Domestic Hot Water

and pumps 6) Tel/data systems 7) Lighting controls, indoor and outdoor 8) Power systems

Page 85: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

HMFH PROJECT #223016.1 859 MASSACHUSETTS AVENUE FEBRUARY 1, 2017 CAMBRIDGE, MA

COMMISSIONING OF ELECTRICAL 26 08 00-5

9) Emergency power systems, including recovery from utility power loss

3.9 SITE OBSERVATIONS AND VERIFICATION

A. No additional requirements for this Division.

3.10 DOCUMENTATION OF COMMISSIONING ISSUES

A. Additional requirements for this Division: 5. Each direct equipment supplier, and each supplier of other equipment not

adequately represented by technical personnel from the responsible Contractor shall assist the installing contractor in resolving commissioning issues.

3.11 TRAINING

A. No additional requirements for this Division.

3.12 AS-BUILT DRAWINGS

A. No additional requirements for this Division.

END OF SECTION 26 08 00

Page 86: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER1"=10' AAZSCALE: DATE: DRAWN: CHECKED:02/17/2017 223016.1

859 Massachusetts AvenueCambridge, Massachusetts SKC

3ADD

3ADD

Page 87: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

5/8

"8"

3/4

"5/8

"

4"

3/4

"

076100.07

076100.03

061600.05

072700.01

092900.32

072100.09

072100.17

EXG SHEATHING TO REMAIN,REPLACE ALL ROTTED SHEATHING

EDGE OF EXG. RAFTER

061000.04

AT ENDS OF EXG. RAFTERS ASREQ. TO PROVIDE INSULATION

THICKNESS SHOWN

FLAT SEAM ROOFING SYSTEM R7

ADD

3

075400.02

061600.02

Page 88: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

P O

S T

S

U P

P O

R T

051200.06

075400.07

072100.04

075400.12

075400.12

075400.01

TAPE VAPOR RETARDER TO PIPETO FORM AN AIR TIGHT SEAL

8"

MIN

.

075400.11

075400.26

075400.08

072100.04

075400.10

ROOF SYSTEM( SEE SCHEDULEDROOF TYPE )

FORM ANAIRTIGHT SEAL

FILL POST TO THICKNESS EQUAL TOROOF INSULATION (HOLE IN POSTPROVIDED BY SECTION 051200 OR 055000AS APPLICABLE

PROVIDED BYSECTION075400

1 1/2" = 1'-0"7

TYP. PENETRATION @ THERMOPLASTIC ROOF

ADD

3

Page 89: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

076100.07

076100.08

076100.06

6"

6"

076100.01

076100.03

073126

076100.06

DORMERROOF

MA

NS

AR

D

RO

OF

1 1/2" = 1'-0"8

VALLEY @ DORMER ROOF

ADD

3

Page 90: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

A 22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

Second Floor10' - 11 1/2"

076100.07

074610.01

8"

076100.04

076100.15

061000

062010.16

CUSTOM PAINTED WOOD BRACKET @EACH SIDE OF CANOPY, SEE STRUCTURAL

DRAWINGS FOR CONNECTIONS

7" 3' - 6"

062010.17

076100.08

062010.12

TRIM TO CONTINUE ALONGSIDES AND ENDS OF BRACKETS

061000

EXG. FRAMING IN THIS AREATO BE VERIFIED IN FIELD

061000

2' -

1"

1 3

/4"

11

1/2

"

9 1/2"

061000.15

ANCHORED TOSTRUCTURAL FRAMING

STRUCTURALFRAMING BEYOND

062010.17

AT ALL FOUR SIDES OF BEADBOARD SOFFIT

062010.17

076100.07

076100.06076100.03

OPEN

FIXED TRANSOM WINDOW,SEE WINDOW SCHEDULE

1"

NEW DOOR, SEE DOOR SCHEDULE

062010.17

ADD

3

PROVIDE DRIP EDGEALONG SIDES OF CANOPY

072700.01

WA2

A6.8

2SIM

1 1/2" = 1'-0"2

SECTION @ CANOPY

Page 91: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

Second F

loor

10' - 1

1 1

/2"

2"

WA2

SIM

WA2

A6.8

2S

IM

06

20

10.1

2

06

20

10.1

7

06

20

10.1

7

06

20

10.1

2

07

61

00.0

6

07

61

00.0

7

RE

MO

VE

EX

G.

DE

CK

ING

AS

RE

Q.

09

29

00.3

2

TO

EX

TE

ND

TO

EX

G. S

TR

UC

TU

RE

VE

RIF

Y E

XG

. ST

RU

CT

UR

E IN

FIE

LD

VE

RIF

Y E

XG

.S

TR

UC

TU

RE

IN F

IELD

R7

AD

D

3

1 1

/2" =

1'-0

"3

RO

OF

@ W

ES

T B

AY

Page 92: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

REF.

1

A4.404B

N

1.6

2.5

2

A6.8

ADD

3

Page 93: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

A4.2

1

B

3

A6.8

.1

HIJK

G.9

R7

ADD

3A4.1

Page 94: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

A 22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

5

A6.1

SLOPE DN.1/4" / 1'-0"

A2

3' -

2 1

/8"

1' -

8"

4

A6.8

4A

A6.8

8' -

0 7

/8"

SLO

PE

DN

.1/4

" /

1'-0"

AD

D

3

1/4

" =

1'-0"

2S

EC

ON

D F

LO

OR

PL

AN

1/4

" =

1'-0"

1E

AS

T E

LE

VA

TIO

N -

CO

NS

TR

UC

TIO

N

1/4

" =

1'-0"

2N

OR

TH

EL

EV

AT

ION

- C

ON

ST

RU

CT

ION

1/4

" =

1'-0"

1R

ET

UR

N @

EN

TR

Y -

NO

RT

HFirst F

loor

0' -

0"

Second F

loor

10' -

11 1

/2"

Third F

loor

20' -

11"

Roof

30' -

7"

07

61

00.0

7

07

61

00.0

7

4A

A6.8

AD

D

3

1' - 8"

WD

23

08

80

00.0

6A

DD

3

07

61

00.0

7

4A

A6.8

AD

D

3

07

61

00.0

7

A4.1A2

.2

A4.2

A4.3

Page 95: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

A 22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

Second Floor10' - 11 1/2"

1' - 2" 6' - 0"

076100.07

076100.06

076100.07

076100.06

062010.12

062010.17

062010.16

061600.05062010.12

061000.01

076100.07

076100.03

061600.05 061000.01

076100.08

WA3SIM

076100.01

CANT STRIP076100

061000

2X4 @ 16" O.C.,ANCHOR TOSTRUCTURE ABOVE

POST BEYOND

072700.01

072100.17

WA3SIM

GRAVEL STOP, TYP. AT ALLSIDES OF ROOF EXCEPT AT

CONDUCTOR HEAD

ADD

3 1 1/2" = 1'-0"4

SECTION @ ENTRY PORCH

EDGE OF STANDINGSEAM METAL BEYOND

CLAPBOARDSBEYOND

076100.06

076100.07

076100.06

076100.07

076100

CONDUCTOR HEAD,6" X 6" X 12"

062010.12

062010.17

061000

061000.02

076100.11

062010.12

ADD

3

1 1/2" = 1'-0"4A

SCUPPER @ ENTRY PORCH

Page 96: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

A1.42

DEMOLITION OF EXG. FLUE BY MASONRYCONTRACTOR, SAVE BRICKS FOR RE-USE.CARE IS TO BE TAKEN NOT TO DAMAGEADJACENT PIER TO REMAIN

ADD

3

DEMOLISH EXG. FOUNDATION FOR NEWOPENING, DEMOLITION TO BE PERFORMEDBY MASONRY CONTRACTOR. SAVE BRICKSFOR RE-USE

3' - 10 1/8"

ADD

3

1/4" = 1'-0"2

DEMOLITION BASEMENT PLAN

1/4" = 1'-0"2

DEMOLITION BASEMENT PLAN

Page 97: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

Third

Flo

or

20' - 1

1"

07

54

00.1

2

07

54

00.3

906

10

00.0

2

6 1/4"

1"

R4

A6.2

3

R3

RO

OF

AIR

BA

RR

IER

TO

OV

ER

LA

P

MIN

ER

AL W

OO

L IN

SU

LA

TIO

NT

O C

ON

TIN

UE

TO

ED

GE

OF

RO

OF

AS

SE

MB

LY

07

54

00.0

1

07

62

00.0

9

07

92

00.0

3

PR

OV

IDE

AIR

VE

NT

, SIM

ILA

R T

OD

ET

AIL

@ W

ES

T F

AC

AD

E

07

61

00.0

6

AD

D

3

8" MIN. (TO FASTENER)

1 1

/2" =

1'-0

"5

FL

AT

RO

OF

@ E

XG

. BU

ILD

ING

Page 98: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

METAL VALLEYFLASHING BEYOND

1" HIGH V CRIMP

6"

8" MIN

2" WIDE METALCLIPS @ 24" O.C.

073113.09

ASPHALT SHINGLESBEYOND

EXISTING RAFTERTO REMAIN

073113.07

073113.05

TYP. ROOFCONSTRUCTION

ADD

3 1 1/2" = 1'-0"9

TYP. VALLEY @ ASPHALT SHINGLE ROOF

Page 99: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

0852

076

WINDFLASHING T

WITH ROOF FL

Third Floor20' - 11"

4

8"

MIN

, T

O F

AS

TE

NE

R

WA3

R3 075400.12

075400.39

075400.01

076200.10

075400.39

076200.09

ADD

3

1 1/2" = 1'-0"10

FLAT ROOF @ RISING WALL

Page 100: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

AREAS OF EXISTING FLOOR STRUCTURE TO BEDEMOLISHED

DASHED LINES INDICATE ITEMS TO BEDEMOLISHED AND REMOVED. ALL ELEMENTS ARENOTED EXCEPT FOR INTERIOR NON-LOAD BEARINGPARTITION SYSTEMS AND ASSOCIATED OPENINGSWHICH ARE TO BE REMOVED IN THEIR ENTIRETY.

DEMOLISH AND REMOVE DOOR AND HARDWARECOMPLETELY UNLESS NOTED OTHERWISE

EXISTING WALL TO REMAIN

X EXISTING ARTIFACT TO BE SALVAGED

EXISTING LOAD-BEARING INTERIOR WALLSADD

3

P

DEMOLITION - LEGEND

Page 101: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

5"

5 5

/8"

7 1/4"

TYP. WIDTH OF EXG.SLATE SHINGLE, VIF

TYP. HEIGHT OF EXG.SLATE SHINGLECOURSE, VIF

CHAMFEREDCORNERS AT

SLATE AS SHOWN

ADD

3

Page 102: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DRAWING NUMBER

JOB NUMBER

SKA

SCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, MA 02139

073113.06

073113.04

SHIELD

073113.05

073113.01

ALIGNED WITH TOP OFCOMPOSITE INSULATION BOARD

062010.03

062010.025"

R4

1 3

/4"

062010.02

WOOD BAFFLE @ 16" O.C. TO PROVIDESTRUCTURE FOR CORNICE

TO PROVIDE ANCHOR POINT FOR PLYWOODBAFFLES, ANCHORED TO ROOF ASSEMBLY

061000.01

MITER ENDS OF COMPOSITE INSULATION BOARD

LOWER EDGE TO OVERLAP TOPCOURSE OF SLATE AS SHOWN

061000.09

076200.09

ADD

3

3" = 1'-0"1

UPPER ROOF EDGE

Page 103: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Bathroom

302b

G.9 G FD.9

2.8

3 3

4

3

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKSKSKSK

CHECKED: 1/4" = 1'-0"

FPO01FPO01FPO01FPO01

859 Massachusetts Avenue

Cambridge, MA 02139

PARTIAL THIRD FLOOR CEILINGPARTIAL THIRD FLOOR CEILINGPARTIAL THIRD FLOOR CEILINGPARTIAL THIRD FLOOR CEILING

PLANPLANPLANPLAN

RCD CMG 000000002/17/17

ADD #3

Page 104: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

SCHEMATIC WATER SERVICE PIPING3

N.T.S.

FIN. FLR. SLAB

FIN GRADE

1 1/2" DOM. WATER

MIN 5' COVER

1 1/2" CW TO SYSTEM

TYP. SLEEVE

1 1/2" BALL VALVE

1 1/2" STRAINER

3/4" TRAP PRIMERBELOW SLAB -

PITCH TO DRAIN

METER PER LOCAL WATERDEPARTMENT STANDARDS

POURED CONC. PAD -MIN 6" HIGH (BY

SECTION 033000)

TRAP PRIMERVALVE

TYPICAL PRESSUREGAGE

3/4" DRAINVALVE

1 1/2"

3/4"

P001

6

SERVICE

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKSKSKSK

CHECKED:

P0O1P0O1P0O1P0O1

859 Massachusetts Avenue

Cambridge, MA 02139

SCHEMATIC WATER SERVICESCHEMATIC WATER SERVICESCHEMATIC WATER SERVICESCHEMATIC WATER SERVICE

PIPINGPIPINGPIPINGPIPING

RCD CMG 000000002/17/17NTS

ADD #3

Page 105: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Storage

CO

P-6

P-5

H G.9 D.9 E.2

4

4"

CO

1/2" CW UP2" W UP

1/2" HW UP1/2" HWR UP

4" S UP

2"

3/4” 1 1/4"

IW

1 1/4”

1 1/4" IW UP TOLAUNDRY PAN

3

3

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKSKSKSK

CHECKED: 1/4" = 1'-0"

P002P002P002P002

859 Massachusetts Avenue

Cambridge, MA 02139

PARTIAL BASEMENT PLUMBINGPARTIAL BASEMENT PLUMBINGPARTIAL BASEMENT PLUMBINGPARTIAL BASEMENT PLUMBING

PLANPLANPLANPLAN

RCD CMG 000000002/17/17

ADD #3

Page 106: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

FCO

4"

D C B A

1

2

2.3

2.8

3

4

4" FD "B"

FCO

4"

2" V UP4" SAN UP

INV. 37.20'

4" FD "B"

2" V UP

4"

INV. 36.78'

3

3

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKSKSKSK

CHECKED: 1/4" = 1'-0"

P003P003P003P003

859 Massachusetts Avenue

Cambridge, MA 02139

PARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBING

PLANPLANPLANPLAN

JIG CMG 000000002/17/17

ADD #3

Page 107: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

FE

-R

Lau

nd

ry

Hallw

ay

Sto

rag

e FC

O

FC

O

4"

FC

O4"

4" F

D "B

"

4"

4"

4" S

AN

UP

2.5

LK

JI

HG

.9G

FD.9

2.3

2.834

4" F

D "B

"

4"

4"

4"

FC

O

4"

6"

2" V

UP

4"

2" V

UP

2" W

UP

INV

. 36.1

2'

4" S

S U

P

INV

. 37.0

0'

FC

O 3

3

DRAWING NUMBER

JOB NUMBER

SKSKSKSK

SCALE: DATE: DRAWN: CHECKED: 1/4" = 1'-0"

P004P004P004P0040000000

859 Massachusetts Avenue

Cambridge, MA 02139

PARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBINGPARTIAL BELOW SLAB PLUMBING

PLANPLANPLANPLAN

JIG CMG02/17/17

ADD #3

Page 108: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Bed

roo

m 1

03

Bed

roo

m 1

02

Lau

nd

ry

To

ilet

Cl.

Bath

roo

m

Hallw

ay

Cl.

Vestib

ule

2" V

S

4" S

S

3/4

” CW

UP

& D

N

3/4

" HW

UP

& D

N

3/4

" HW

R U

P &

DN

P-2

A

P-1

A

P-2

A

P-1

A

P-2

P-1

P-5

4" S

S U

P &

DN

2" V

S U

P &

DN

3/4

" CW

UP

& D

N

3/4

" HW

UP

& D

N

3/4

" HW

R U

P &

DN

CO

4"

2.5

1.6

KJ

IH

G.9

GFD

.9E

.2

22.3

2.834

2" V

S

4" S

S

3/4

" CW

UP

& D

N

3/4

" HW

UP

& D

N

3/4

" HW

R U

P &

DN

3/4

" CW

TO

P-1

3/4

" CW

UP

& D

N

2" V

UP

& D

N

2" W

UP

& D

N

1/2

" HW

UP

& D

N

1/2

" HW

R U

P &

DN

2" W

& T

UP

1/2

" HW

R U

P &

DN

3/4

" HW

UP

& D

N

2" W

UP

& D

N

2" V

UP

& D

N

3/4

" CW

DN

, 1/2

" CW

UP

3/4

" CW

TO

P-1

2" W

DN

P-3

A4” S

UP

4” S

DN

2" W

DN

P-3

A

2” W

DN

2" W

DN

1/2

" C&

HW

DP

1/2

"

3

1/2

"

1/2

" C&

HW

DP

3

1/2

"

1/2

" C&

HW

DP

3

DRAWING NUMBER

JOB NUMBER

SKSKSKSK

SCALE: DATE: DRAWN: CHECKED: 1/4" = 1'-0"

P005P005P005P0050000000

859 Massachusetts Avenue

Cambridge, MA 02139

PARTIAL FIRST FLOOR PLUMBINGPARTIAL FIRST FLOOR PLUMBINGPARTIAL FIRST FLOOR PLUMBINGPARTIAL FIRST FLOOR PLUMBING

PLANPLANPLANPLAN

JIG CMG02/15/17

ADD #3

Page 109: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

SOLAR/ELECTRIC WATER HEATER PIPING DETAIL

CT

3

3

3

3

3

1"

2

CP

1 1/4" 3/4"

1 1/4"

1/2"

1 1/4"

MOUNT CL. 12" MIN BELOW TOP OF TANKTHERMOSTATIC MIXING VALVE ASSEMBLY

VALVE W/BALANCING

VACUUM

BRONZECIRC. PUMP

TG

TG

TGTG

PG

POURED CONCRETE PAD (BY GC)

MIN 4" HIGH x TANK O.D. + 12" SQUARE

TANK DRAIN

SOLAR LOOP CIRC. (115V)

EXPANSIONTANK

SHUTOFF VALVE, STRAINER, & CHECKVALVE (SEPARATE OR INTEGRAL)

TIME CLOCK

TEMPERATURE GAUGE (TG)

BREAKER

TANKEXPANSION

AQUASTAT

MEMORYSTOP (TYP)

SENSORTANK TEMPERATURE

CHECK VALVE(TYP)

PRESSURE GAUGE (PG)

SOLAR COLLECTOR COOL FEED IN

SOLAR COLLECTOR HOT RETURN OUT

(4) SOLAR COLLECTORS

NTS

EWH-5

1

CP

IMMERSION TYPETEMPERATURE SENSOR3/4" TEMPERATURE PROBEBY ATC

P001

1

DRAIN DOWN TANK

SYSTEM DESCRIPTION

SEQUENCE OF OPERATION (SOLAR COLLECTORS)

SENSORS

(4)

ELEMENTELEC.

EWH-4

FULL SIZE T&P DISCH

ARGE TO WITHIN 12"OF FINISH FLOOR

UNION (TYP)DIELECTRIC

HEAT EXCHANGERINTEGRAL EWH

NOTES:

AND NUMBER OF BENDS IN ORDER TO ACHIEVE 50% DRAW FROM EACH.

FITTINGS ARE EQUAL WITH RESPECT TO EACH HEATER FOR THE LENGTH OF RUN

1. PARALLEL INSTALLATIONS SHOULD BE PIPED SO THAT PIPING, VALVES AND

2. REFER TO PLANS FOR PIPE SIZE.

TYPICAL

TYPICAL

TYPICAL

TYPICAL

(3)(2)(1)

IW

3 WAY VALVEBY SECTION 230000

WIRING BYDIV 26

HEAT EXCHANGERTACO TFP5X 12-12BY DIV. 22

SUPPLY & RETURNPIPING FROM HVACHEAT PUMPS BYDIVISION 23

TEMPERATURESENSORS ANDPUMP RELAY WIREDTO BMS BY DIV. 23

WIRING FROMSENSOR TO BMS BYATC

PUMP RELAYS FROMCIRC. PUMP TO BMSBY ATC

WIRING FROMSENSOR TO BUILDINGMANAGEMENTSYSTEM (BMS) BY ATC

DRAIN PAN. PIPE 1 1/4"INDIRECT WASTE TOBASEMENT MECH. RMFLOOR DRAIN

SOLAR THERMAL SYSTEM INCLUDES A DRAIN-BACK SYSTEM TO PROVIDE FOR FREEZEPROTECTION AND HIGH-LIMIT PROTECTION. SOLAR COLLECTORS SHALL BE INSTALLED TOALLOW FOR EMPTYING BY GRAVITY WHEN THE SYSTEM PUMP (CP-1) IS NOT OPERATING.

ALL CONTROL WIRING, SENSORS, RELAYS, CONDUITS,CURRENT SENSORS, PROGRAMMING, BMS INTEGRATION, GRAPHIC DISPLAYS AND POINTMAPPING SHALL BE PROVIDED BY DIVISION 23 (ATC CONTRACTOR). REFER TO HVACCONTROL DRAWINGS FOR FURTHER INFORMATION AND REQUIREMENTS.

SOLAR PUMP ON: SOLAR PUMP (CP-1) TURN ON WHEN THE TEMPERATURE DIFFERENCEBETWEEN THE SENSOR ON THE SOLAR COLLECTOR LOOP (T1) AND THE SENSORS INTHE SOLAR STORAGE TANKS (T2 & T3) EXCEEDS THE DELTA-T TEMPERATURE

DIFFERENCE OF 25 DEGREES F.

SOLAR PUMP OFF: SOLAR PUMP (CP-1) TURN OFF WHEN THE TEMPERATUREDIFFERENCE DECREASES AND FALLS BELOW 4˚ F.

SOLAR STORAGE TANK HIGH LIMIT : WHEN THE TEMPERATURE (T2 & T3) IN THE STORAGETANK EXCEEDS THE HI- LIMIT SETTING OF 180 DEGREES F, THE SOLAR PUMP (CP-1) RELAYWILL BE TURNED OFF WITHOUT DELAY REGARDLESS OF THE STATUS OF THETEMPERATURE DIFFERENCE THAT EXISTS BETWEEN THE SOLAR STORAGE TANK ANDTHE SOLAR COLLECTORS. WHEN THE STORAGE TANK TEMPERATURE FALLS 4˚ F BELOW

THE SETTING IN THE HI-LIMIT, THE CONTROLLER WILL THEN RESUME NORMALOPERATION.

SOLAR MINIMUM OPERATING TEMPERATURE : THE CIRCULATION PUMPS WILL BE

DEACTIVATED ANYTIME THE SOLAR COLLECTOR SENSOR (T1) IS BELOW 50 DEGREES F.NORMAL CONTROL OPERATION WILL NOT RESUME UNTIL THE COLLECTOR TEMPERATURERETURNS TO 70 DEGREES F. OR ABOVE.

HIGH LIMIT CONTROL: WHEN THE TEMPERATURE IN THE STORAGE TANKS EXCEEDS THEHI-LIMIT SETTING OF 180 DEGREES F, THE SOLAR PUMP RELAY WILL BE TURNED OFFWITHOUT DELAY REGARDLESS OF THE STATUS OF THE TEMPERATURE DIFFERENCE THAT

EXISTS BETWEEN THE SOLAR TANK AND THE SOLAR COLLECTORS. WHEN THE TANKTEMPERATURE IS LOWERED TO 175 DEGREES F. THE CONTROLLER WILL THEN RESUMENORMAL OPERATION.

IF TANK TEMPERATURE FALL TO 130 DEGREES F, ELECTRIC HEATING ELEMENT IN TANK SHALLBE ACTIVATED AND LOW WATER TEMPERATURE ALARM SHALL BE SENT TO BMS OPERATOR.

ALL TEMPERATURE SENSORS SHALL BE IMMERSION TYPE. TEMPERATURE SENSORS SHALL BEFURNISHED AND INSTALLED BY DIVISION 23. DIVISION 22 SHALL COORDINATE WITH DIVISION 23AND PROVIDE ALL NECESSARY PIPE AND TANK FITTINGS TO ACCEPT TEMPERATURE SENSORS.

(T2)(T3)

(T1)

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

SK

SK

SK

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

SO

LAR

/E

LEC

TR

IC W

AT

ER

HE

AT

ER

SO

LAR

/E

LEC

TR

IC W

AT

ER

HE

AT

ER

SO

LAR

/E

LEC

TR

IC W

AT

ER

HE

AT

ER

SO

LAR

/E

LEC

TR

IC W

AT

ER

HE

AT

ER

PIP

ING

DE

TA

ILP

IPIN

G D

ET

AIL

PIP

ING

DE

TA

ILP

IPIN

G D

ET

AIL

JIG

CM

G0

2/1

7/1

7

PP PP00 00

00 0066 66

NT

S

AD

D #

3

Page 110: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DOMESTIC WATER RISER DIAGRAMS

3

SSSS SS SSSSSS S SS SSSSSS S SS S S

(3)DOV

3/4"

3/4"

3/4"

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

ROOF

BASEMENT

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

ROOF

BASEMENT

P-3P-1

3/4"

SA A

3/4"3/4"3/4"

P-2

1/2" 3/4"

P-3P-1

3/4"

SA A

3/4"3/4"3/4"

P-2

1/2" 1/2"

P-3P-1

3/4"

SA A

3/4"3/4"3/4"

P-2

1/2"

P-4

1/2" 1/2"

INSTANT

WATER

HEATER

3/4"

P-3P-1

3/4"

3/4"3/4"

3/4"

P-2

3/4" 3/4"

3/4"

P-3P-1

3/4"

SA A

3/4"3/4"3/4"

P-2

1/2" 3/4"

3/4"

3/4"3/4"

P-4

1/2" 1/2"

INSTANT

WATER

HEATER

3/4"

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"3/4"

3/4"

3/4"3/4" 3/4"

P-3P-1

3/4"

SA A

3/4"3/4"

3/4"

P-2

1/2" 1/2"

P-3 P-1

3/4"

SA A

3/4"3/4"

P-2

1/2"1/2"

P-1

3/4"

3/4"

P-2

3/4" 3/4"

P-3AP-1

3/4"

SA A

3/4"3/4"3/4"

P-2

1/2" 3/4"

3/4"

3/4"3/4"

P-4

1/2"

INSTANT

WATER

HEATER

3/4"

3/4"

3/4"

3/4" 3/4"

3/4"

3/4"3/4"

3/4"3/4" 3/4"

P-3AP-1

3/4"

SA A

3/4"3/4"

3/4"

P-2

P-3A

P-1

3/4"

SA A

3/4"3/4"

P-2

3/4"

3/4"

3/4"3/4"

1/2"1/2"

P-5

(3)DOV

3/4"

3/4"

3/4"

(3)DOV

3/4"

3/4"

3/4"

3/4"

3/4"

(2)DOV

3/4"

3/4"3/4"

3/4"3/4"

3/4"3/4"3/4"

3/4"

3/4"

3/4"

3/4"3/4"

3/4"

3/4"

(2)DOV

3/4"

3/4"

3/4"DOV

3/4"

(3)DOV(3)DOV

3/4"

3/4"

3/4"

(3)DOV

3/4"

3/4"

3/4"

(3)DOV

N.T.S.

2

P103

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

SK

SK

SK

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

DO

ME

ST

IC W

AT

ER

RIS

ER

DIA

GR

AM

DO

ME

ST

IC W

AT

ER

RIS

ER

DIA

GR

AM

DO

ME

ST

IC W

AT

ER

RIS

ER

DIA

GR

AM

DO

ME

ST

IC W

AT

ER

RIS

ER

DIA

GR

AM

PLU

MB

ING

PLU

MB

ING

PLU

MB

ING

PLU

MB

ING

JIG

CM

G0

2/1

5/1

7

PP PP00 00

00 0077 77

AD

D #

3

Page 111: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

SANITARY WASTE & VENT RISER DIAGRAMS

3

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

ROOF

BASEMENT

2"

2"

P-2

P-1

2"

P-4

2"

P-3

2"

2"

P-2

P-1

2"

P-3

2"2"

4"

2"2"

2"

2"

P-2

P-1

2"

P-3

2"2"

4"

2"2" 4"

4"

4"

4"

2"

2"

4"

4"

2"

2"

P-2

P-1

2"

P-3

2"2"

4"

4"

4"

4"

4"

2" 2"

2"2"

2"

2"

P-2

P-1

2"

P-3

2"2"

4"

4"

4"

4"

2"

2"

2"2"

2"3"

2"

4"VTR

4"

4"VTR

4"

4"

2"

2"

P-2

P-1

2"

P-3

2"2"

4"

2"

2"

4"

2"

4"

2" 2"

2"

2"

4"2"

P-4

2"3"

2"

P-3

2"

P-1

2"P-2

2"

2"

2"4"

2"

P-4

2"3"

2"

CO

4"

2"

2"

P-2

P-1

2"

P-3

2"

4"

4"

4"

2"

2"

2"

2"

CO

4"

2"

2"

2"

P-2

P-1

2"

P-3

2"

4"

2"

2"

2" 2"

P-3

2"

P-1

2"P-2

2"

2"

2"4"

4"

2"

CO

4"

CO4"

4"

2"

CO

4"

2"

2"

P-2

P-1

2"

P-3

2"

2"

4"

2"

4"

2" 2"

4"

CO

4"

CO

4"

P-5

2"FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

ROOF

BASEMENT

N.T.S.

3

P103

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

SK

SK

SK

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A 0

21

39

SA

NIT

AR

Y W

AS

TE

& V

EN

T R

ISE

RS

AN

ITA

RY

WA

ST

E &

VE

NT

RIS

ER

SA

NIT

AR

Y W

AS

TE

& V

EN

T R

ISE

RS

AN

ITA

RY

WA

ST

E &

VE

NT

RIS

ER

DIA

GR

AM

PLU

MB

ING

DIA

GR

AM

PLU

MB

ING

DIA

GR

AM

PLU

MB

ING

DIA

GR

AM

PLU

MB

ING

JIG

CM

G0

2/1

5/1

7

PP PP00 00

00 0088 88

AD

D #

3

Page 112: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Mechanical006 G1

Storage007 G2

2 1/2" CWS&R PIPING TO GEOTHERMALWELLS (BY OTHERS). REFER TO CIVILDRAWINGS FOR WELL LOCATIONS.

1"ø1"ø

3/4"ø3/4"ø

1 1/2"ø1 1/2"øRL/RS PIPING UP

1 1/2"ø1 1/2"ø1 1/4"ø1 1/4"ø

3/4"ø3/4"ø

BALANCING VALVE FOR GEOTHERMALWATER LOOP. REFER TO M3.1 FOR ALLNECESSARY VALVES.

BY HVAC BY GEOTHERMALCONTRACTOR

3/4"ø3/4"ø

1"ø

1"ø

2 1/2"ø2 1/2"ø

1 1/2"ø

3

3

3

3

3

G.9

G F

E.9 E.2

E

D.8

D C B A

1

2

2.3

2.83

4

1

ERV

3

UH

1

HEX

1

WCC

1

P

2

P

1

BCC

2

ET

2

AS

1

ET

1

AS

3

P

4

P GM

1

3/4" DOMESTIC HOT WATERPIPING TO DOMESTIC HOTWATER HEATER BYPLUMBING CONTRACTOR

3/4"ø

NOTE: REFER TO CONTROL/PIPINGFLOW DIAGRAM AND DETAILS FORADDITIONAL REQUIREMENTS.

3

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

ass

ach

use

tts

SK

M 1

/4"

= 1

'-0

"

Re

vis

ion

s to

M1

.1 B

ase

me

nt

Flo

or

Pla

ns

- H

VA

C -

Me

cha

nic

al R

oo

m

RP

DP

02

/17

/17

00

1

AD

D #

3

Page 113: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Stair 1-3ST1-3 E1

TO WRU-1 LOCATEDON BASEMENT ANDSECOND FLOOR.

3

L

E.10 K

1

2

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, Massachusetts SKM

1/4" = 1'-0"

002Revisions to M1.4 Third Floor Plans

- HVAC - Stair 1-3

Author Checker02/14/17

ADD #3

Page 114: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

Stair 2-3ST2-3 E1

G2Storage307

TO WRU-1 LOCATEDON BASEMENT ANDSECOND FLOOR.

3

E.9 E.2 E D C B

4

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN: CHECKED: 223016.1

859 Massachusetts Avenue

Cambridge, Massachusetts SKM

1/4" = 1'-0"

003Revisions to M1.4 Third Floor Plans

- HVAC - Stair 2-3

Author Checker02/14/17

ADD #3

Page 115: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

3

3

T P

T P

BALANCING VALVE

BALL VALVE WITH ELBOWAND CAP FOR TESTINGWELL WATER

TEMPERATURE SENSOR TOFEEDBACK TO DDC SYSTEM. (TYP.)

AIR AND DIRT

GWS

GWR

P-3/P-4

RLRSTO GEOTHERMAL

WELLS (BY OTHERS)

FLOW SWITCH INTERLOCKEDTO CONDENSING UNIT

P-3-O

P-3VFD OR ECM

P-3-CP-3-S

P-4-O

P-4

P-4-CP-4-S

TO DHW SYSTEM

DOMESTIC HOT WATERDIVERTING VALVE

VFD OR ECM

T

BALANCINGISOLATION VALVE

WCC CONDENSING UNIT*PROVIDE GWS/R PIPING& VALVE CONNECTIONSPER MANUFACTURER'SREQUIREMENTS

PRESSURE SENSOR TO FEEDBACKTO DDC SYSTEM (TYP.)

CONNECTIONS PER SHEET M2.3

GEOTHERMALCONTROL VALVE SEPARATOR (TYP.)

EXPANSION TANK *PROVIDE PIPING & VALVE*PROVIDE PIPING & VALVEGLYCOL/MAKE-UP SYSTEM

CONNECTIONS PER SHEET M2.3

TEMPERATURE &PRESSURE TEST PORTS

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

ass

ach

use

tts

SK

M 1

/8"

= 1

'-0

"

Re

vis

ion

s to

M3

.1 C

on

tro

ls I

- H

VA

C

- P

ipin

g D

iag

ram

Au

tho

rC

he

cke

r0

2/1

4/1

7

00

4

AD

D #

3

Page 116: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

3

3

3

RLRS

P-1/P-2

T P

T P

RL

RS

HEX-1

HWS TOSYSTEM

HWR FROMHW LOOP

AQUASTAT SET @130°F (ADJ.)

HHW DIFF. PRESSUREBYPASS VALVE

MODULATING ISOLATIONCONTROL VALVE

P-1-O

P-1 P-2

P-1-CP-1-S

P-2-CP-2-S P-2-O

VFD OR ECM VFD OR ECM

HEAT EXCHANGER / BOOSTER

BCC-1RLRS

HHWR

HHWS

HLHHW-DP

FIELD LOCATEDOWNSTREAMAT END OFHHWS/R RUN

EXPANSION TANK

AIR AND DIRTSEPARATOR (TYP.)

*PROVIDE HHWS/R PIPING & VALVE CONNECTIONSPER MANUFACTURER'S REQUIREMENTS

BALANCINGISOLATION VALVE

TEMPERATURE &PRESSURE TESTPORTS

MAIN BRANCHCIRCUIT CONTROLLER

TO TERMINAL DCU'S & SUBBC CONTROLLER BCC-2(REFER TO VRF SYSTEMSCHEMATIC DRAWING)

FLOW SWITCHINTERLOCKED TO HEX

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

22

30

16

.1

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

ass

ach

use

tts

SK

M 1

/8"

= 1

'-0

"

Re

vis

ion

s to

M3

.1 C

on

tro

ls I

- H

VA

C

- P

ipin

g D

iag

ram

(co

nt.

)

Au

tho

rC

he

cke

r0

2/1

5/1

7

00

5

AD

D #

3

Page 117: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

?D

FE-R

Office

003 D2

Laundry

002 F3

Hallway

001 A2

Storage

007 G2

M

3

3

3

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ED

SE

CU

RIT

Y P

LAN

S -

RE

VIS

ED

SE

CU

RIT

Y P

LAN

S -

RE

VIS

ED

SE

CU

RIT

Y P

LAN

S -

RE

VIS

ED

SE

CU

RIT

Y P

LAN

S -

BA

SE

ME

NT

BA

SE

ME

NT

BA

SE

ME

NT

BA

SE

ME

NT

MLP

GG

D0

2/1

4/1

7

00 0000 00

11 11

SCALE: 1/4" = 1'-0"001

1 BASEMENT FLOOR PLAN - SECURITY - ADDENDUM #3

AD

D #

3

ADD

ADD

ADD

ADD

Page 118: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

REF.

REF.

?

RE

F.

REF.

OV

EN

WC - W

FE-R

Bedroom 103

103a B1

B1

Bedroom 102

102a

Bedroom 101

101a B1

Toilet

108 F1

Bathroom

103b B2

Closet

102c B1

Bathroom

101b B2

Bathroom

102b B2

Closet

103c B1

Hallway

106 A2

Closet

101c B1

Kitchen

107 C1

Stair 1-1

ST1-1 E1

CH

5

E5.10

SEE DETAIL5

E5.10 3

3

TYPICAL ON FIRST,

SECOND AND

THIRD FLOORS.

COORDINATE

LOCATION WITH

ARCHITECT

3

LOCATED ON THIRD FLOOR IN

LIVING ROOM 305. COORDINATE

LOCATION WITH ARCHITECT.

3

WP

DC

DJ

EH

EH

PT

REX

TS37

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ED

SE

CU

RIT

Y P

LAN

-R

EV

ISE

D S

EC

UR

ITY

PLA

N -

RE

VIS

ED

SE

CU

RIT

Y P

LAN

-R

EV

ISE

D S

EC

UR

ITY

PLA

N -

FIR

ST

FLO

OR

FIR

ST

FLO

OR

FIR

ST

FLO

OR

FIR

ST

FLO

OR

Au

tho

rC

he

cke

r0

2/1

5/1

7

00 0000 00

22 22

SCALE: 1/4" = 1'-0"002

1 FIRST FLOOR PLAN - SECURITY -ADDENDUM #3

AD

D #

3

ADD

ADD

ADD

ADD

Page 119: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

? D

DN

PT

D-R

WC - W

Play Room

110 A2

Laundry

111 F2

Toilet

108 F1

Bathroom

102b B2

Stair 2-1

ST2-1 E1

Vestibule

104 A1

CR

CR

K

WP

ICB

SECURITY BEACON

PANIC PUSHBUTTON

(TYPICAL)

DC

DJ

EH

EH

PT

REX

TS

DC

DJ

EH

EH

PT

REX

TS

WP

PP1-37

37

37

DC

3

SEE DETAIL5

E5.10

3

WP

3

WP

FOR PARKING AND MAIN ENTRY.

COORDINATE LOCATION WITH

ARCHITECT.

3 3

LOCATE AT EACH SECOND AND THIRD

FLOOR STAIR LANDINGS. COORDINATE

LOCATION WITH ARCHITECT.

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ED

SE

CU

RIT

Y P

LAN

-R

EV

ISE

D S

EC

UR

ITY

PLA

N -

RE

VIS

ED

SE

CU

RIT

Y P

LAN

-R

EV

ISE

D S

EC

UR

ITY

PLA

N -

FIR

ST

FLO

OR

FIR

ST

FLO

OR

FIR

ST

FLO

OR

FIR

ST

FLO

OR

Au

tho

rC

he

cke

r0

2/1

5/1

7

00 0000 00

33 33

SCALE: 1/4" = 1'-0"003

1 FIRST FLOOR PLAN - SECURITY - ADDENDUM #3

AD

D #

3

ADD

ADD

ADD

ADD ADD

ADD

Page 120: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

ACCESS CENTRAL/INTRUSION RISER DIAGRAM

E3.01

5

SCALE: N.T.S.

WALL MNT

INTRUSION

POWER

SUPPLY

IAPS

IACP

ACP

PP2-58

WALL MNT

ACCESS

CONTROL

PANEL

MDF (MECHANICAL 006)

2

LIGHTING INTERFACE

2

FIRE ALARM INTERFACE

M M

AM AM AM

M M M

AM AM

M M

AM AM

DC

CR

DC

DC

3

4

6

1

REX

REX

REX

1

K

5

9

9

PT

2

7

TVM

9

WALL MNT

DMP

ADDRESSABLE

CONTROL

PANEL

7

PP2-60

SVR

VIDEO

SERVER FOR

VIDEO

STORAGE

WALL MTD

CAMERA

POWER

SUPPLY

PP2-62

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE 0

00

00

00

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ED

SE

CU

RIT

Y R

ISE

R D

IAG

RA

MR

EV

ISE

D S

EC

UR

ITY

RIS

ER

DIA

GR

AM

RE

VIS

ED

SE

CU

RIT

Y R

ISE

R D

IAG

RA

MR

EV

ISE

D S

EC

UR

ITY

RIS

ER

DIA

GR

AM

MLP

GG

D0

2/1

4/1

7

00 0000 00

44 44

3

3

3

AD

D #

3

ADD

ADD

ADD

3

ADD

Page 121: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

DOOR INTERCOM SYSTEM5

SCALE: N.T.S.

IC

E5.10

RING.COM VIDEO DOOR ENTRY STATION WITH

CAMERA. FINISH SELECTED BY ARCHITECTT

120VAC/16VAC DOOR BELL

TRANSFORMER

PP2-56

CH

REMOTE DOOR CHIME.

NUTONE #LA11W

NOTE:

ELECTRICAL CONTRACTOR SHALL

PROVIDE COMPLETE RING.COM VIDEO

DOOR BELL SYSTEM WITH 720P CAMERA.

1.

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKESKESKESKE

CHECKED:

005005005005

859 Massachusetts Avenue

Cambridge, MA

REVISED DOOR INTERCOM SYSTEMREVISED DOOR INTERCOM SYSTEMREVISED DOOR INTERCOM SYSTEMREVISED DOOR INTERCOM SYSTEM

RISERRISERRISERRISER

MLP GGD 000000002/14/17

3

ADD #3

ADD

Page 122: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

LIGHT SOURCE

DESCRIPTIONMTG.MANUFACTURER MODEL / SERIESTYPE

LIGHTING FIXTURE SCHEDULE

VOLTAGE

LUMENS WATTS TYPE

1

WAGNER ARCH.SL6 120/24VDCCLED LIGHT STICK. PROVIDE ALL EQUIPMENT NECESSARY TO ACHIEVE

LENGTHS AS SHOWN ON PLANS & NEMA 3 DRIVER ENCLOSURELULS3K60MF-XX 1.7/FT57.9/FT-

3000K

LED

BRICK SIDEWALK

CHAIN LINK

FENCE

METAL FENCE

OHW

OHW

TEC

LIMIT OF WORK

NEW UNDERGROUND CATV SERVICE

CONDUITS BY E.C. ACROSS ROAD.

AA

SL5E

SL4M

FIRE ALARM MASTER

BOX. SEE FLOOR PLAN

FOR EXACT LOCATION.

B

B

SEE DETAIL4

E0.03

NOTE:

ALL NEW UNDERGROUND

CONDUIT SHALL BE

COORDINATED WITH

GEOTHERMAL EQUIPMENT.

J

FOR CONNECTION TO ARCHITECTURAL

LIGHTED HANDRAIL. SEE 'L' SERIES

DRAWINGS FOR EXACT LOCATION.

FOR CONNECTION TO ARCHITECTURAL

LIGHTED HANDRAIL. SEE 'L' SERIES

DRAWINGS FOR EXACT LOCATION.

GROUNDING COUNTERPOISE

SEE DETAIL4

E3.01

EXISTING OVERHEAD WIRING TO BE

REMOVED BY UTILITY COMPANY.

E.C. TO COORDINATE.

XX

XX

E.C. TO CONNECT TO UTILITY

COMPANY CONDUITS

SEE DETAIL3

E0.03

LP-24 VIA TC AND

PHOTOCELL

LP-25 VIA TC AND

PHOTOCELL

24

17

25

J25

J25

EXISTING UTILITY POLE SHALL BE

REMOVED BY UTILITY COMPANY. E.C.

SHALL COORDINATE REMOVAL WITH

UTILITY COMPANY.

X

3

3

SL6

SL6

SL6

3

J

PROVIDE NEW 12" SQ PULL BOX FOR

FIRE ALARM. CONNECT TO EXISTING

FIRE ALARM MUNICAPALCONDUIT.

2" CONDUIT WITH IMSA CABLE.

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1"

= 1

0'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

TO

SIT

E P

LAN

AN

DR

EV

ISIO

N T

O S

ITE

PLA

N A

ND

RE

VIS

ION

TO

SIT

E P

LAN

AN

DR

EV

ISIO

N T

O S

ITE

PLA

N A

ND

FIX

TU

RE

SC

HE

DU

LEF

IXT

UR

E S

CH

ED

ULE

FIX

TU

RE

SC

HE

DU

LEF

IXT

UR

E S

CH

ED

ULE

MLP

GG

D0

2/1

5/1

7

00 0000 00

66 66

SCALE: 1" = 10'-0"006

1 ELECTRICAL SITE PLAN - ADDENDUM #3

AD

D #

3

ADD

ADD

ADD

ADD

3

ADD

Page 123: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

L

EB

SL5E

RS1

RS1

RS1

15

15

15

LP-17

VIA T.C &

PHOTOCELL

17

3

SL5

27 27

27

27

SL5

27

LP-27

VIA T.C &

PHOTOCELL

COORDINATE EXACT LOCATION

OF PLAY AREA LIGHTING WITH

LANDSCAPE DRAWINGS.

(TYPICAL)

SL5

27

PROVIDE FIXTURE WITH REMOTE BATTERY

BACK-UP DRIVER. COORDINATE LOCATION

IN FIELD WITH ARCHITECT

3

3

DRAWING NUMBER

JOB NUMBERSCALE: DATE: DRAWN:

SKESKESKESKE

CHECKED: 1/4" = 1'-0"

007007007007

859 Massachusetts Avenue

Cambridge, MA

REVISED LIGHTING PLAN -REVISED LIGHTING PLAN -REVISED LIGHTING PLAN -REVISED LIGHTING PLAN -

FIRST FLOORFIRST FLOORFIRST FLOORFIRST FLOOR

Author Checker 000000002/15/17

SCALE: 1/4" = 1'-0"007

1 FIRST FLOOR PLAN - LIGHTING - ADDENDUM #3

ADD #3

ADD

ADD

Page 124: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

AREA OF SOLAR SHINGLES

SOLAREDGE SE10000A-SE INVERTER AND

COMBINER OR EQUAL MOUNTED PER MFG.

REQUIREMENTS MOUNT WITHIN 10' OF PV ARRAY.

MOUNT PV INVERTER ON UNISTRUT.

INV #1

SEE PV SYSTEM DETAIL4

E2.13

INVERTER BY ROOF CONTRACTOR

WITHIN 10' OF ARRAY.

J

J

J

J

3

1 1/4"C

1 1/4"C

1 1/4"C

1 1/4"C

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

TO

RO

OF

PLA

N -

PO

WE

RR

EV

ISIO

N T

O R

OO

F P

LAN

- P

OW

ER

RE

VIS

ION

TO

RO

OF

PLA

N -

PO

WE

RR

EV

ISIO

N T

O R

OO

F P

LAN

- P

OW

ER

JMB

GG

D0

2/1

5/1

7

00 0000 00

88 88

ADD

AD

D #

3

Page 125: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

? D

PT

D-R

WC - W

REF.

Laundry

111 F2

Toilet

108 F1Closet

103c B1

T

T

T

30/2

T

1

CP

1

CP

12

15

15

PP1-18

18

PP1-20

20

PP1-34,36PP1-33

33 34,36

30A/2P4#10-3/4"W

19

54"

FOR PV KIOSK

MOUNTED AT

54" A.F.F.

FOR PV KIOSK

MOUNTED AT

54" A.F.F.

3

Living Room

305 A2

Stair 1-3

ST1-3 E1

T

T

T T

T

W

17

DCUe

BCC

2

@ATTIC

1

CP

1

CP

PP3-10

9

10

10

10

10

UH

4

@ATTIC

1V

/2D

3

Kitchen

207 C1

50/2

FOR ABOVE COUNTER

MICROWAVE OVEN

REF GFC

GFC

GFC

TT

T

T

T

T

18

PP2-19

19

PP2-20

PP2-21

PP2-17

18

20

20

21

17

23,25

50A/2P

3#6 & 1#10G -3/4"H

J22

RANGE HOODPP2-22

PP3-3(3RD FLOOR)

PP3-4(3RD FLOOR)

PP3-5(3RD FLOOR)

PP3-6(3RD FLOOR)

PP3-7(3RD FLOOR)

EWH

2

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

TO

PO

WE

R P

LAN

SR

EV

ISIO

N T

O P

OW

ER

PLA

NS

RE

VIS

ION

TO

PO

WE

R P

LAN

SR

EV

ISIO

N T

O P

OW

ER

PLA

NS

Au

tho

rC

he

cke

r0

2/1

5/1

7

00 0000 00

99 99

SCALE: 1/4" = 1'-0"009

1 FIRST FLOOR PLAN - POWER - ADDENDUM #3

SCALE: 1/4" = 1'-0"009

2 THIRD FLOOR PLAN - POWER - ADDENDUM #3

ADD

ADD

SCALE: 1/4" = 1'-0"009

3 SECOND FLOOR PLAN - POWER - ADDENDUM #3

ADD

AD

D #

3

Page 126: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

SCALE : N.T.S.

ONE LINE RISER DIAGRAM1

E3.01

SEE MDP SCHED.

FOR CONT.

MAIN DISTRIBUTION

PANEL "MDP"

400A

TO EXISTING UTILITY

COMPANY NETWORK

MANHOLE. SEE SITE

PLAN.

4

E3.01

PROVIDE #3/0 SERVICE GROUND IN

CODE SIZE CONDUIT PER CODE -

SEE DETAIL

G

N

MAIN BONDING

JUMPER

M

UTILITY COMPANY METER ON

EXTERIOR OF BUILDING.

METER SOCKET (CLASS 320)

WITH KYZ OUTPUT SHALL BE

FURNISHED & INSTALLED BY

E.C., WIRED BY UTILITY CO.

E.C. SHALL PROVIDE BACNET

OUTPUT TO IP GATEWAY IN

MAIN ELECTRIC ROOM.

CONNECT TO DPW ENERGY

MANAGEMENT SYSTEM .

4#500KCMIL (CU) IN 4"C. AND

(1) 4"C. SPARE WITH PULL

WIRE.

1"C TO BMS SYSTEM

IN MECH ROOM

SPD

SURGE PROTECTION DEVICE "SPD"

MOUNT AS CLOSE AS POSSIBLE TO

'MDP' PANEL

600A, 120/208V, 3∅, 4W, 100K COPPER BUSSING

CURRENT LIMITING MAIN

CIRCUIT BREAKER, MAX

AIC LET-THRU SHALL BE

10K.

PROVIDE LIMITER LUG

CABINET, CONFIRM

EXACT LOCATION WITH

UTILITY CO.

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE 0

00

00

00

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

S T

O O

NE

-LIN

E R

ISE

RR

EV

ISIO

NS

TO

ON

E-L

INE

RIS

ER

RE

VIS

ION

S T

O O

NE

-LIN

E R

ISE

RR

EV

ISIO

NS

TO

ON

E-L

INE

RIS

ER

DIA

GR

AM

DIA

GR

AM

DIA

GR

AM

DIA

GR

AM

Au

tho

rC

he

cke

r0

2/1

5/1

7

00 0011 11

00 00

3

3

ADD

AD

D #

3

ADD

Page 127: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

120/208V, 3PHASE, 4W, 10 KAIC

PANEL

PANEL SCHEDULE

AMPS

BUS

MAIN

NO.

LOCATION MTG 1 POLE

BRANCH CKT BREAKER (AMPS)

2015

MAIN

CB

3020152015

OTHERS

50

POLES

TOTAL

1

30 30

1 PP1 ELECTRIC RM. S 225 - - - 10 2 - 4 - -- 8440 (2)40/2, (1) 60/3

2

SINGLE TUB, TALLER IN HEIGHT.

PP2 S 225 - - - - 3 -- 28 84ELECTRIC RM. 6 2

REMARKSCOND.

SIZEFEEDER SIZECIRCUIT

DEVICES

TRIP FRAME

3

4

OVER CURRENT

400A MCB, 120/208V, 3 PHASE, 4W, 100 KAIC

2

1

No.

DISTRIBUTION PANEL MDP SCHEDULE

LOCATION: ELECTRICAL ROOM

5

6

100- SPACE PROVISIONS --

225- SPACE PROVISIONS --

7

8

9

225200 SPARE --

225200 PP1 2"4#3/0&#6G.

225200 PP2 2"

225150 PP3 2"

100100 LP

10060 SPARE -

4#1/0&#6G

PP3 S 225 - - - - - 1- 20 42ELECTRIC RM. 5 -

2

PROVIDE CURRENT LIMITING BREAKER.

SERVICE ENTRANCE RATED.

1

3

2

PROVIDE ENERGY-REDUCING MAINTENANCE SWITCHING WITH LOCAL STATUS INDICATOR FOR ARC ENERGY REDUCTION.

1

1

1

4#3/0&#6G.

4#1/0&#6G.

1 1/2"4#2&#8G.

2 POLE 3 POLE

LP S 100 - - - - - -- 30 42ELECTRIC RM. - -

(1)50/2, (1) 60/3

(1)50/2, (1) 60/3

1

1

225150 PV SYSTEM 2"C

PROVIDED WITH ARC FAULT CIRCUIT BREAKERS

2

2

2

2 (1) 60/3

-

-

-

PV MECHANICAL ROOM 006 S 225 - - - - 1 - - - -- 30- (2)60/2

600A BUS

1

1

1

3

-

GFI BREAKER

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

ES

KE

SK

ES

KE 0

00

00

00

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

S T

O O

NE

-LIN

E R

ISE

RR

EV

ISIO

NS

TO

ON

E-L

INE

RIS

ER

RE

VIS

ION

S T

O O

NE

-LIN

E R

ISE

RR

EV

ISIO

NS

TO

ON

E-L

INE

RIS

ER

DIA

GR

AM

DIA

GR

AM

DIA

GR

AM

DIA

GR

AM

Au

tho

rC

he

cke

r0

2/1

5/1

7

00 0011 11

11 11

3

ADD

AD

D #

3

Page 128: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

? D

PT

D-R

WC - W

TV

C

Laundry

111 F2

Toilet

108 F1Closet

103c B1

W

FOR PV KIOSK

MOUNTED AT

54" A.F.F.

3

Living Room

305 A2

Hallway

303 A2

Stair 1-3

ST1-3 E1

AN

W

1V

/2D

3

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

TS

KT

SK

TS

KT

1/4

" =

1'-

0"

00

00

00

0

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ED

FLO

OR

PLA

NS -

RE

VIS

ED

FLO

OR

PLA

NS -

RE

VIS

ED

FLO

OR

PLA

NS -

RE

VIS

ED

FLO

OR

PLA

NS -

TE

CH

NO

LOG

YT

EC

HN

OLO

GY

TE

CH

NO

LOG

YT

EC

HN

OLO

GY

Au

tho

rC

he

cke

r0

2/1

5/1

7

OO OOOO OO

11 11

SCALE: 1/4" = 1'-0"OO1

1 FIRST FLOOR PLAN - TECHNOLOGY - ADDENDUM #3

SCALE: 1/4" = 1'-0"OO1

2 THIRD FLOOR PLAN - TECHNOLOGY - ADDENDUM #3

ADD

AD

D #

3

ADD

Page 129: Welcome to the City of Cambridge - City of Cambridge, MA€¦ · HMFH PROJECT NO. 223016.1 FEBRUARY 24, 2017 ADDENDUM NO. 3 PAGE 3 OF 18 859 MASSACHUSETTS AVENUE CAMBRIDGE, MA Item

CAT 6A (RJ45)

DATA PORTS

MAIN DISTRIBUTION FRAME MDF

LOCATION: MDF (MECHANICAL 006)

CAT 6A (RJ45)

VOICE PORT

USED SPARE USED SPARE PATCH PANEL

SIZE

PATCH PANEL

SIZE

(1) 24 PORT

(1) 24 PORT399 3858 (2) 48 PORT

DISTRIBUTION

WORKSTATION

TOTAL

QUANTITY OF DEVICES

MDF (MECHANICAL 006)

DATA (CAT 6A) VOICE (CAT 6A)

-

4

-

5

58

14

-

4

10

9

30 -

2

5

7

15

4

CATV

15

-

-

-

-

15

-

THIRD FLOOR

SECOND FLOOR

ROOF

FIRST FLOOR

TVC =

2

W

=

1V/2D

AN

=

=

=

101a

BEDROOM 101

102a

BEDROOM 102

TVC

103a

BEDROOM 103

TVC

106

HALLWAY

ANTVC

107

KITCHEN

W

109

OFFICE

TVC1V/2D

110

PLAYROOM

TVCAN

201a

BEDROOM 201

202a

BEDROOM 202

TVC

203a

BEDROOM 203

TVCTVC

206

HALLWAY

AN

207

KITCHEN

WAN

204a

BEDROOM 204

TVC

205a

BEDROOM 205

TVC

301a

BEDROOM 301

302a

BEDROOM 302

TVCTVC

304

KITCHEN

W

305

LIVING ROOM

TVC

303

HALLWAY

AN AN W

MDF (MECHANICAL 006)

7 TYP. 5 TYP.

1V/2D

2

DR

AW

ING

NU

MB

ER

JOB

NU

MB

ER

SC

ALE

:D

AT

E:

DR

AW

N:

CH

EC

KE

D:

SK

TS

KT

SK

TS

KT 0

00

00

00

85

9 M

assa

ch

use

tts A

ve

nu

e

Ca

mb

rid

ge

, M

A

RE

VIS

ION

S T

O T

EC

HN

OLO

GY

RE

VIS

ION

S T

O T

EC

HN

OLO

GY

RE

VIS

ION

S T

O T

EC

HN

OLO

GY

RE

VIS

ION

S T

O T

EC

HN

OLO

GY

DE

TA

ILS

DE

TA

ILS

DE

TA

ILS

DE

TA

ILS

Au

tho

rC

he

cke

r0

2/1

5/1

7

OO OOOO OO

22 22

3

3

3 3

3

3

3

ADD

AD

D #

3

ADD

ADD

ADD

ADDADD

ADD