WELCOME! MURRAY BASIN CSO CONTROL PROJECT Community Design Charette Public Meeting October 29, 2011

WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

WELCOME!

MURRAY BASIN

CSO CONTROL PROJECT

Community Design Charette Public Meeting

October 29, 2011

Page 2: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Today’s Program

Introductions and meeting goals

CSO overview and project background information

Dialogue on values

Required facility components

Lunch

Small group discussion and input

Small group reports to large group

Closing and next steps

Page 3: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

A productive and respectful discussion

will include:

Listening, encouraging others to speak, and allowing others to speak without being interrupted.

Avoiding side conversations.

Raising your hand before speaking in full group discussions.

Respecting each person’s opinions; acknowledging the value of different perspectives.

Participating in a problem-solving atmosphere.

Since we have limited time & everyone should get a chance to speak:

Sharing the air time

Contributing ideas & opinions as clearly & succinctly as you can

Setting cell phones to silent.

Page 4: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Introductions & Goals for Today

State your name (and affiliation or interest)

What do YOU want to get out of this workshop?

Page 5: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

What is a CSO?

Most older cities—including Seattle—built one conveyance system to carry both wastewater and stormwater to treatment plants.

Combined Sewer Overflows (CSOs) are untreated overflows sent directly to Seattle water bodies during storms when sewers are full.

CSOs are a safety valve to prevent sewer backups in homes and streets, but they contain harmful chemicals and disease-causing pathogens.

Page 6: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

King County CSO Control Program

CSO control required by state and federal law

State standard for untreated overflows=1 per year

average

Highest priority projects along Puget Sound beaches

For more information on King County’s efforts, visit:

http://www.kingcounty.gov/environment/wastewate

r/CSO/ProgramReview.aspx

Page 7: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being
Page 8: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Murray Basin-CSO General Site Features Layout

PLACEHOLDER: MAP THAT HIDES CURRENT

HOUSING ON STORAGE TANK SITE +

SHOWS BROADER AREA WOULD BE IDEAL

Page 9: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being
Page 10: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Next Steps & Upcoming Process

Open house in November (workshop summary)

Synthesized information from design charette

Presentation and input on your design ideas

Keep your feedback coming (via comment forms, website, contacting King County)

Visit project website: www.kingcounty.gov/environment/wtd/Construction/Seattle/ MurrayCSOStorage.aspx

Design Advisory Group meetings (open to the public)

Contact Doug Marsano

[email protected]

206-684-1235

Page 11: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Dialogue on Values

What do you want to see embodied in this site

when it’s completed?

Page 12: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

MURRAY CSO CONTROL FACILITY

Page 13: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Murray Ave Pump Station

Lowman

Beach Park

North

Existing Murray

Ave Pump Station

Flows to

Pump Station

CSO Outfall

Page 14: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being
Page 15: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Tanks: Shapes and Sizes

Volume = 1.0 Million Gallons

Plan (Footprint)

Isometric

Depth Depth Depth

Page 16: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Facility Components

Odor Control Equipment

Carbon Scrubber or Equivalent

Fans

Ductwork

Exhaust Stack

Electrical Panels and Control Panels

Engine Generator

Sound Reduction

Fuel Tank

Exhaust Stack

Miscellaneous Mechanical Equipment

Storage Tank Cleaning Equipment

HVAC Equipment

Page 17: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Odor Control Equipment

Carbon Scrubber Vessel

Design Considerations

•Operator and public

safety

•Equipment access for

maintenance and

operation

•Ability to replace

carbon media

Page 18: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Odor Control Room General Layout

Odor Control Vessel

55 Feet Long

Foul Air

From Pump

Station &

Storage

Tank

Treated Air

Exhaust Stack

Exhaust

Fan

Grease

Eliminator

25

Feet

Wid

e

Silencer

Page 19: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Electrical Room General Layout

Electrical

Panels

40 Feet Long

18

Feet

Wid

e

Design Considerations

•Operator safety

•Codes and regulations

•Equipment access for maintenance and replacement Electrical Panels

Page 20: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Engine Generator Equipment

Engine Generator

Louver

Page 21: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Engine Generator Room

General Layout

Engine Generator

and Fuel Storage

Ambient

Air

Exhaust Air Intake

Sound Reduction

Components

36 Feet Long

22

Feet W

ide

Engine Generator

Exhaust Silencer

Exhaust

Stack

Design Considerations

•Operator safety

•Codes and regulations

•Refueling

Louver

Louver

Page 22: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Miscellaneous Mechanical Equipment

Tank Cleaning Systems

Page 23: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Mechanical Equipment General Layout

12 Feet Long

12

Feet

Wid

e

Water Tanks

Water Pumps

Water

To Wash Systems

Page 24: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

All Together

Odor Control Room

Page 25: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

All Together

Odor Control Room

Gene

rato

r

Room

Electrical Room

Building Footprint

Page 26: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

All Together

Od

or C

ontro

l Room

Generator

Room

Electrica

l Room

Building Footprint

Page 27: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Imagining surface design

Page 28: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Small Group Work

Parameters for activity

Questions for discussion

Written comments by end of day today if possible

Report back to full group – small groups need:

Scribe

Reporter

Page 29: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

SMALL GROUP

DISCUSSION TOPICS

• Theme and character of the site • Site use • Aesthetics of visible elements • Landscaping • Green building opportunities • Miscellaneous (Lighting, fencing,

ventilation stacks, etc.)

Page 30: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

SMALL GROUP REPORTS

Page 31: WELCOME! MURRAY BASIN CSO CONTROL PROJECT · A productive and respectful discussion will include: Listening, encouraging others to speak, and allowing others to speak without being

Next Steps & Upcoming Process

Open house in November (workshop summary)

Synthesized information from design charette

Presentation and input on your design ideas

Keep your feedback coming (via comment forms, website, contacting King County)

Visit project website: www.kingcounty.gov/environment/wtd/Construction/Seattle/ MurrayCSOStorage.aspx

Design Advisory Group meetings (open to the public)

Contact Doug Marsano

[email protected]