Upload
truongminh
View
221
Download
2
Embed Size (px)
Citation preview
Welcome from Golder Associates Inc.
Proud to be a part of theAgriculture Community!
Who is Golder Associates?
Engineering and Environmental Company 5 Michigan Offices
Lansing Bay City Detroit Gladstone Marquette
Types of Projects Manure Storage Site Planning Storage Evaluation Wetland Restoration
Wetland Restoration Complete
During construction
Wetland Restoration
Earthen Lined Storage Facility Under Construction
Waste Storage Facility
Concrete Lined Storage Facility
Waste Storage Facility
Earthen Lined Storage Facility Under Construction
Waste Storage Facility
Placing Cover Material Over Clay Liner
Waste Storage Facility
Covered Waste Storage Facility
Waste Storage Facility
Public Service Announcement
6 months of manure storage required All storages need to be certified to NRCS stds. Collect all bunker run-off
CAFO Engineering Requirements
Waste Storage Facility Requirements
Sealed/Certified by a Professional Engineer Evaluated by a Professional Engineer using MDEQ
criteria – may require corrective actions New manure storages designed and certified
2014 Case Studies
Iciek Dairy Farm – Gladwin, Michigan Mid-Michigan Dairy
Iciek Dairy Farm
Iciek Dairy Farm
Iciek Dairy Farm
Mid-Michigan Dairy
Mid-Michigan Dairy
Mid-Michigan Dairy
Mid-Michigan Dairy
Mid-Michigan Dairy
Questions?
Eric Rupprecht 989-860-6656 Brent Barringer 989-860-8282
Thank you