Welcome
Donlands and Greenwood StationsSecond Exits
Public Consultation Meeting
Monday July 12, 2010
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
1
Agenda
1. Introductions – Facilitator (LURA)
2. Welcome – TTC Chair
3. Presentation – TTC Staff
4. Facilitated Question and Answer
5. Next Steps
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
2
Presentation
1. Background
2. TTC Options Considered
3. Public Options Considered
4. Conclusions
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
3
Background
• Subway stations were not part of the Ontario Building Code until 1993
• Ontario Building Code applicable to new construction only
• Retained Fire Life & Safety expert, Harold Locke, LMDG & Associates Ltd. to evaluate existing subway stations egress risk
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
4
LMDG Study Criteria
• OBC 3.12 (now 3.13) and NFPA 130 requirements for new construction
• 2 means of egress from each platform• independent and remote• from platform to point of safety (ie. exterior of station)• separated at platform level >25 metres
• Platform Evacuation Time• “Occupant Load” clear off platform in 4 mins.
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
5
LMDG Study Findings
• Identified 14 High Priority subway stations
• Lacking second means of egress
• Include Greenwood and Donlands Stations
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
6
TTC Response
• Additional funds included in the Fire Ventilation Upgrade project in the 2003‐07 Capital Program to provide second means of egress at 14 stations
• Project Design Objective• provide alternate means of egress from platforms
• Evacuate “Occupant load” to safe environment as quickly as possible
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
7
Project Design Principles
• Second exits shall be remote and separate (minimum 25 m) from existing egresses
• Design shall consider the proximity of existing vent shafts and potential for contaminated air recirculation
• Exit shall be for daily use • “Dead end” distance should be a maximum of 25m
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
8
Project Design Principles
25m minimum
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
9
Exit Stair Widths
• Design stair width to ensure emergency air velocity does not exceed code requirements• Stairs off platform – minimum 2.4 m wide
• Stairs to street from one platform - minimum 2.4 m wide
• Stairs to street from two platforms - minimum 3.5 m wide
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
10
Other Egress Options Considered
• Emergency exit building• Passengers unfamiliar with exit may not find or use it in
an emergency• Stairs in vent shafts
• Insufficient space • Risk of exposure to smoke• Unfamiliar exit for passengers
• Stairs to hatches at street level• Unfamiliar exit for passengers • May not be reliable in emergency
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
11
Options Screening Criteria
1st Screen• Project objective/design principles
2nd Screen• Neighbourhood Impact
• Property requirements
• Constructability
• Security
• Cost
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
12
Greenwood ‐ TTC Options
OPTION 1
OPTION 2
OPTION 3
OPTION 4
OPTION 5
OPTION 6
LEGEND
2 3 5
1
6 1,4
FIRE VENTILATION UPGRADE PROJECTSECOND EXIT
DONLANDS AND GREENWOOD STATIONS
13
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
14
CriteriaOption 1
Two Daily Exits at 253, 255, 252, & 254 Strathmore
Option 2One Daily Exit at
244 & 246 Strathmore
Option 3One Daily Exit at
254 & 256 Strathmore
Option 4One Daily Exit at
253 & 255 Strathmore
Option 5One Daily Exit at
258 & 260 Strathmore
Option 6One Daily Exit at
245 & 247 Strathmore
Neighbourhood Impact
Severe(2)
Severe(2)
Severe(2)
Severe(2)
Severe(2)
Severe(2)
Property Requirements
Severe(4)
Moderate(2)
Moderate(2)
Moderate(2)
Moderate(2)
Moderate(2)
ConstructabilityBetter(0)
Worse(2)
Worse(2)
Neutral(1)
Worse(2)
Better(0)
SecurityBetter(0)
Worse(2)
Worse(2)
Neutral(1)
Neutral(1)
Better(0)
Total 6 8 8 6 7 4
OME Construction Estimate (Property excluded)
$5.0 M $8.5 M $8.5 M $7.5 M $10.0 M $7.5 M
Ranking 2 5 6 3 4 1
Greenwood – TTC Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
15
Greenwood ‐ Public Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
16
Greenwood – Option P1
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
17
Greenwood ‐ Option P1
Insert drawing showing option
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
18
Insert drawing showing option
Greenwood - Option P2
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
19
Greenwood ‐ Option P2
Insert drawing showing option
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
20
Greenwood ‐ Option P2
Insert drawing showing option
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
21
Insert drawing showing option
Greenwood – TTC Additional Option
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
22
CriteriaOption P1
One Daily Exit at 9 Linnsmore
Option P2One Daily Exit on
Danforth
TTC Additional Option
Daily Exit Stairs on Strathmore
TTCOption 6
Project Objective Design Principles
Neutral(1)
Worse(2)
Neutral(1)
Better(0)
Neighbourhood Impact
Moderate(1)
None(0)
Extreme (3)
Severe(2)
Property Requirements
Moderate(1)
Moderate(2)
None(0)
Moderate(2)
ConstructabilityWorse(2)
Extreme(3)
Neutral(1)
Better(0)
SecurityNeutral (1)
Worse(2)
Worse(2)
Better(0)
Total 6 9 7 4
OME Construction Estimate (Property excluded)
$10.0M $20.5M $8.9M $7.5 M
Ranking 2 4 3 1
Greenwood – Public Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
23
Conclusions
Greenwood Second Exit:
• Public Option #1 located on Linnsmore Cres. is acceptable to the TTC
• TTC will proceed with this option
• Should some unforeseen conditions arise, then TTC will revert to its preferred option and advise the community
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
24
Insert drawing showing all options numbered
Donlands ‐ TTC Options
2 5,6
1,3,4 2
OPTION 1
OPTION 2
OPTION 3
OPTION 4
OPTION 5
OPTION 6
LEGEND1,3,4 2
5
6
2
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
25 TORONTO TRANSIT COMMISSIONENGINEERING & CONSTRUCTION BRANCH
25
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
26
CriteriaOption 1
One Daily Exit at 1 & 3 Strathmore
Option 2Two daily Exits at 9, 10, 11, & 12 Strathmore
Option 3One Daily Exit at 1 & 3 Strathmore
Option 4One Daily Exit at 1 & 3 Strathmore
Option 5One Daily Exit at
14 & 16 Strathmore
Option 6One Daily Exit at
14& 16 Strathmore
Neighbourhood Impact
Moderate(1)
Severe(2)
Moderate(1)
Moderate(1)
Severe(2)
Severe(2)
Property Requirements
Moderate(2)
Severe (4)
Moderate (2)
Moderate(2)
Moderate(2)
Moderate(2)
ConstructabilityWorse(2)
Better(0)
Neutral(1)
Worse(2)
Worse(2)
Worse(2)
SecurityNeutral(1)
Better(0)
Neutral(1)
Neutral(1)
Worse(2)
Worse(2)
Total 6 6 5 6 8 8
OME Construction Estimate (Property excluded)
$9.0 M $5.5 M $7.6 M $8.0 M $7.0 M $8.5 M
Ranking 4 2 1 3 5 6
Donlands – TTC Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
27
Donlands ‐ Public Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
28
Insert drawing showing option
Donlands ‐ Option P1
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
29
Insert drawing showing option
Donlands – Option P2
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
30
Insert drawing showing option
Donlands – Option P2
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
31
Insert drawing showing option
Donlands ‐ Option P3
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
32
Insert drawing showing option
Donlands ‐ Other OptionsEast & West of Dewhurst
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
33
CriteriaOption P1
One Daily Exit at TPA Parking Lot
Option P2One Daily Exit at
17 & 19 Dewhurst
Option P3One Daily Exit on Dewhurst Curb
Lane
Other OptionsOne Daily Exit on
East Side of Dewhurst
Other OptionsOne Daily Exit on West Side of Dewhurst
TTCOption 3
Project Objective Design Principles
Worse(2)
Worse(2)
Neutral(1)
Worse(2)
Worse(2)
Better(0)
Neighbourhood Impact
Minor(0)
Minor(0)
Severe(2)
Minor(0)
Minor(0)
Moderate(1)
Property Requirements
Minor(0)
Moderate(2)
Minor(0)
Moderate(1)
Moderate (1)
Moderate(2)
ConstructabilityWorse(2)
Worse(2)
Worse(2)
Worse(2)
Worse(2)
Neutral(1)
SecurityWorse(2)
Worse(2)
Neutral(1)
Worse(2)
Worse(2)
Neutral(1)
Total 6 8 6 7 7 5
OME Construction Estimate (Property excluded)
$13.1M $10.9M $8.5M $9.6M $11.1M $7.6 M
Ranking 4 6 2 3 5 1
Donlands – Public Options
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
34
Conclusions
Donlands Second Exit:
• Public Option #3 located on east of Dewhurst Blvd. beside and immediately west of 1 Strathmore Blvd. is acceptable to the TTC
• Subject to City’s acceptance of road narrowing and associated community traffic impact, the TTC is prepared to proceed with Public Option #3
• Should this option not be workable, then TTC will revert to its preferred option and advise the community
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
35
Construction Mitigation Measures
• Construction Impacts will be investigated in detail during the detailed design
• Typical measures include:• Construction site safety
• Traffic planning and staging
• Pre and post construction surveys of properties
• Noise bylaws
• Vibration monitoring during construction
• Dust control measures during construction
Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010
36
END OF PRESENTATION