37
Welcome Donlands and Greenwood Stations Second Exits Public Consultation Meeting Monday July 12, 2010

Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Welcome

Donlands and Greenwood StationsSecond Exits

Public Consultation Meeting

Monday July 12, 2010

Page 2: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

1

Agenda

1. Introductions – Facilitator (LURA)

2. Welcome – TTC Chair

3. Presentation – TTC Staff

4. Facilitated Question and Answer

5. Next Steps

Page 3: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

2

Presentation

1. Background

2. TTC Options Considered

3. Public Options Considered

4. Conclusions 

Page 4: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

3

Background

• Subway stations were not part of the Ontario Building Code until 1993

• Ontario Building Code applicable to new construction only 

• Retained Fire Life & Safety expert, Harold Locke, LMDG & Associates Ltd. to evaluate existing subway stations egress risk

Page 5: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

4

LMDG Study Criteria

• OBC 3.12 (now 3.13) and NFPA 130 requirements for new construction

• 2 means of egress from each platform• independent and remote• from platform to point of safety (ie. exterior of station)• separated at platform level >25 metres

• Platform Evacuation Time• “Occupant Load” clear off platform in 4 mins.

Page 6: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

5

LMDG Study Findings

• Identified 14 High Priority subway stations

• Lacking second means of egress

• Include Greenwood and Donlands Stations

Page 7: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

6

TTC Response

• Additional funds included in the Fire Ventilation Upgrade project in the 2003‐07 Capital Program to provide second means of egress at 14 stations

• Project Design Objective• provide alternate means of egress from platforms

• Evacuate “Occupant load” to safe environment as quickly as possible

Page 8: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

7

Project Design Principles

• Second exits shall be remote and separate (minimum 25 m) from existing egresses

• Design shall consider the proximity of existing vent shafts and potential for contaminated air recirculation

• Exit shall be for daily use • “Dead end” distance should be a maximum of 25m

Page 9: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

8

Project Design Principles

25m minimum

Page 10: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

9

Exit Stair Widths

• Design stair width to ensure emergency air velocity does not exceed code requirements• Stairs off platform – minimum 2.4 m wide

• Stairs to street from one platform - minimum 2.4 m wide

• Stairs to street from two platforms - minimum 3.5 m wide

Page 11: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

10

Other Egress Options Considered

• Emergency exit building• Passengers unfamiliar with exit may not find or use it in

an emergency• Stairs in vent shafts

• Insufficient space • Risk of exposure to smoke• Unfamiliar exit for passengers

• Stairs to hatches at street level• Unfamiliar exit for passengers • May not be reliable in emergency

Page 12: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

11

Options Screening Criteria

1st Screen• Project objective/design principles

2nd Screen• Neighbourhood Impact

• Property requirements

• Constructability

• Security

• Cost

Page 13: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

12

Greenwood ‐ TTC Options

OPTION 1

OPTION 2

OPTION 3

OPTION 4

OPTION 5

OPTION 6

LEGEND

2 3 5

1

6 1,4

Page 14: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

FIRE VENTILATION UPGRADE PROJECTSECOND EXIT

DONLANDS AND GREENWOOD STATIONS

13

Page 15: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

14

CriteriaOption 1

Two Daily Exits at 253, 255, 252, & 254 Strathmore

Option 2One Daily Exit at 

244 & 246 Strathmore

Option 3One Daily Exit at 

254 & 256 Strathmore

Option 4One Daily Exit at 

253 & 255 Strathmore

Option 5One Daily Exit at 

258 & 260 Strathmore

Option 6One Daily Exit at 

245 & 247 Strathmore

Neighbourhood Impact

Severe(2)

Severe(2)

Severe(2)

Severe(2)

Severe(2)

Severe(2)

Property Requirements

Severe(4)

Moderate(2)

Moderate(2)

Moderate(2)

Moderate(2)

Moderate(2)

ConstructabilityBetter(0)

Worse(2)

Worse(2)

Neutral(1)

Worse(2)

Better(0)

SecurityBetter(0)

Worse(2)

Worse(2)

Neutral(1)

Neutral(1)

Better(0)

Total 6 8 8 6 7 4

OME Construction Estimate (Property excluded)

$5.0 M $8.5 M $8.5 M $7.5 M $10.0 M $7.5 M

Ranking 2 5 6 3 4 1

Greenwood – TTC Options

Page 16: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

15

Greenwood ‐ Public Options

Page 17: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

16

Greenwood – Option P1

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

Page 18: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

17

Greenwood ‐ Option P1

Insert drawing showing option

Page 19: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

18

Insert drawing showing option

Greenwood - Option P2

Page 20: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

19

Greenwood ‐ Option P2

Insert drawing showing option

Page 21: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

20

Greenwood ‐ Option P2

Insert drawing showing option

Page 22: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

21

Insert drawing showing option

Greenwood – TTC Additional Option

Page 23: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

22

CriteriaOption P1

One Daily Exit at 9 Linnsmore

Option P2One Daily Exit on 

Danforth

TTC Additional Option 

Daily Exit Stairs on Strathmore

TTCOption 6

Project Objective Design Principles

Neutral(1)

Worse(2)

Neutral(1)

Better(0)

Neighbourhood Impact

Moderate(1)

None(0)

Extreme (3)

Severe(2)

Property Requirements

Moderate(1)

Moderate(2)

None(0)

Moderate(2)

ConstructabilityWorse(2)

Extreme(3)

Neutral(1)

Better(0)

SecurityNeutral (1)

Worse(2)

Worse(2)

Better(0)

Total 6 9 7 4

OME Construction Estimate (Property excluded)

$10.0M $20.5M $8.9M $7.5 M

Ranking 2 4 3 1

Greenwood – Public Options

Page 24: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

23

Conclusions

Greenwood Second Exit:

• Public Option #1 located on Linnsmore Cres. is acceptable to the TTC

• TTC will proceed with this option

• Should some unforeseen conditions arise, then TTC will revert to its preferred option and advise the community

Page 25: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

24

Insert drawing showing all options numbered

Donlands ‐ TTC Options

2 5,6

1,3,4 2

OPTION 1

OPTION 2

OPTION 3

OPTION 4

OPTION 5

OPTION 6

LEGEND1,3,4 2

5

6

2

Page 26: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

25 TORONTO TRANSIT COMMISSIONENGINEERING & CONSTRUCTION BRANCH

25

Page 27: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

26

CriteriaOption 1

One Daily Exit at 1 & 3 Strathmore

Option 2Two daily Exits at 9, 10, 11, & 12 Strathmore

Option 3One Daily Exit at 1 & 3 Strathmore

Option 4One Daily Exit at 1 & 3 Strathmore

Option 5One Daily Exit at 

14 & 16 Strathmore

Option 6One Daily Exit at 

14& 16 Strathmore

Neighbourhood Impact

Moderate(1)

Severe(2)

Moderate(1)

Moderate(1)

Severe(2)

Severe(2)

Property Requirements

Moderate(2)

Severe (4)

Moderate (2)

Moderate(2)

Moderate(2)

Moderate(2)

ConstructabilityWorse(2)

Better(0)

Neutral(1)

Worse(2)

Worse(2)

Worse(2)

SecurityNeutral(1)

Better(0)

Neutral(1)

Neutral(1)

Worse(2)

Worse(2)

Total 6 6 5 6 8 8

OME Construction Estimate (Property excluded)

$9.0 M $5.5 M $7.6 M $8.0 M $7.0 M $8.5 M

Ranking 4 2 1 3 5 6

Donlands – TTC Options

Page 28: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

27

Donlands ‐ Public Options

Page 29: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

28

Insert drawing showing option

Donlands ‐ Option P1

Page 30: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

29

Insert drawing showing option

Donlands – Option P2

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

Page 31: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

30

Insert drawing showing option

Donlands – Option P2

Page 32: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

31

Insert drawing showing option

Donlands ‐ Option P3

Page 33: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

32

Insert drawing showing option

Donlands ‐ Other OptionsEast & West of Dewhurst

Page 34: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

33

CriteriaOption P1

One Daily Exit at TPA Parking Lot

Option P2One Daily Exit at 

17 & 19 Dewhurst

Option P3One Daily Exit on Dewhurst Curb 

Lane

Other OptionsOne Daily Exit on 

East Side of Dewhurst

Other OptionsOne Daily Exit on  West Side of Dewhurst

TTCOption 3

Project Objective Design Principles

Worse(2)

Worse(2)

Neutral(1)

Worse(2)

Worse(2)

Better(0)

Neighbourhood Impact

Minor(0)

Minor(0)

Severe(2)

Minor(0)

Minor(0)

Moderate(1)

Property Requirements

Minor(0)

Moderate(2)

Minor(0)

Moderate(1)

Moderate (1)

Moderate(2)

ConstructabilityWorse(2)

Worse(2)

Worse(2)

Worse(2)

Worse(2)

Neutral(1)

SecurityWorse(2)

Worse(2)

Neutral(1)

Worse(2)

Worse(2)

Neutral(1)

Total 6 8 6 7 7 5

OME Construction Estimate (Property excluded)

$13.1M $10.9M $8.5M $9.6M $11.1M $7.6 M

Ranking 4 6 2 3 5 1

Donlands – Public Options

Page 35: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

34

Conclusions

Donlands Second Exit:

• Public Option #3 located on east of Dewhurst Blvd. beside and immediately west of 1 Strathmore Blvd. is acceptable to the TTC

• Subject to City’s acceptance of road narrowing and associated community traffic impact, the TTC is prepared to proceed with Public Option #3

• Should this option not be workable, then TTC will revert to its preferred option and advise the community

Page 36: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

35

Construction Mitigation Measures

• Construction Impacts will be investigated in detail during the detailed design

• Typical measures include:• Construction site safety

• Traffic planning and staging

• Pre and post construction surveys of properties

• Noise bylaws

• Vibration monitoring during construction

• Dust control measures during construction

Page 37: Welcome [] · 2020-01-04 · 2. Welcome –TTC Chair 3. Presentation –TTC Staff 4. Facilitated Question and Answer 5. Next Steps. Donlands and Greenwood Second Exits Public Consultation

Donlands and Greenwood Second Exits Public Consultation Meeting July 12, 2010

36

END OF PRESENTATION