Upload
cori-benson
View
214
Download
0
Embed Size (px)
Citation preview
Webinar: Enhanced eQuote Features and Functions
State Purchasing Division
www.DOAS.GA.GOVProfessional Development
Providing Training for State Purchasing Professionals
Professional DevelopmentProviding Training for State Purchasing Professionals
April 4, 2008
Sta
te P
urch
asin
g D
ivis
ion
Your instructor
Title: Procurement Training Specialist
Experience:
DOAS State Purchasing 2002-present
DOAS Human Resources 1997-2002
Department of Corrections 1990-1997
Education: Ed.S. Counseling and Psychological Services, Georgia State University 1987
Contact: [email protected]
404-656-6131
Gayle Porster
Sta
te P
urch
asin
g D
ivis
ion
Webinar objectives
Provide updated information from February’s webinar
Display the newly added features available in the enhanced eQuote for both purchasing agents and suppliers
Explain the policies and procedures regarding using eQuote
Participate in a question and answer session on using eQuote
Sta
te P
urch
asin
g D
ivis
ion
Enhanced eQuote Features
1. Ability to post eQuote up to DPA and beyond DPA with SPD approval
2. No dollar amount limit for non-state or exempt entities or for exempt purchases
3. Ability to enter numerous NIGP Codes on the header, and then select one per line— distinct header and line sections
4. Can split eQuote awards
5. Unlimited number of documents added at header and also at line level for both buyer AND vendor
6. Edit/addenda capability for both buyer AND vendor
7. Ability to copy previous eQuote for similar buys—useful in creating an eQuote template
8. Ability to save eQuote for up to 30 days
9. Vendor required to check “I Agree” to Terms and Conditions
10. System-generated invitation to selected vendors not registered to include links to vendor’s guide and VRS
11. Ability to re-award to different vendor if selected vendor cannot meet requirements
12. Tied into GPR for public access for higher monetary eQuotes
Sta
te P
urch
asin
g D
ivis
ion
Manuals on Website: Totally Rewritten and updates planned
eQuote step by step with examples and screenshots
Available on DOAS State Purchasing webpage
Includes FAQs
Includes eQuote vendor instructions and standard terms and conditions
Sta
te P
urch
asin
g D
ivis
ion
eQuote Training—totally Rewritten
Training schedule posted on the State Purchasing website
To include training throughout the state
Atlanta—April 9 and April 18 and May 9
Macon—to be rescheduled
Coosa Valley Gordon Campus—April 11
Valdosta—April 18 and April 19
Athens—April 25
Columbus—April 25
Augusta—April 30
Savannah—April 30 and May 1
Waycross—May 7 and May 8
Albany—May 13 and May 14
Rome—May 16
Dublin—May 23
Sta
te P
urch
asin
g D
ivis
ion
Under $5000 P-card, fax, email, phone (competition not required)
$5,000-$9999 Fax, eQuote or GPR
$10,000-$49,999
eQuote or GPR, Posted to GPR by link available to vendors explaining how to obtain access
$50,000-$99,999
GPR, eQuote, eQuote with SPD approval for agencies with <$100,00 DPA, Posted to GPR by link available to vendors explaining how to obtain access
$100-000+ GPR, eQuote with approval from SPDfor agencies with $100,000+ DPA, eQuote for SPD, Posted to GPR by link available to vendors explaining how to obtain access
Using eQuote
Can’t be used for RFPs and for non-maintenance/non-repair Construction
Sta
te P
urch
asin
g D
ivis
ion
eQuote/GPR Posting Explained
An Agency must advertise all eQuotes with estimated contract values of $50,000 or more on the Georgia Procurement Registry. To comply with this requirement, the Agency must either (1) create a listing on the Georgia Procurement Registry, which directs the vendor to submit an electronic bid through the eQuote system* or (2) utilize the automatic process for listing open and pending eQuotes on the Georgia Procurement Registry once this automatic process becomes available
* Template to assist with this provided in manual
Sta
te P
urch
asin
g D
ivis
ion
How Long Does an eQuote Have to be Posted?Sole Source Solicitation 3 business days on GPR only Cannot use eQuote
Solicitations valued from $0 to $9999.99
eQuote post minimum of three (3) business days; recommended for (3) business days
Recommended minimum; must receive written approval from SPD for less than minimum
Solicitations from $10,000.00-$49,999.99
eQuote post minimum of SEVEN (7) calendar days; recommended for ten (10 calendar days
Recommended minimum—must be justified; must receive written approval from SPD or less than minimum
Solicitations from $50,000.00-$99,999.99
eQuote post minimum of eight (8) calendar days; plus posted to GPR. recommended for fifteen (15) calendar days
Recommended minimum—must be justified; must receive written approval from SPD or less than minimum
Solicitations from $100,000.00-$249,999.99
eQuote post minimum of ten (10) calendar days; plus posted to GPR, recommended for twenty (20) calendar days
Recommended minimum—must be justified; must receive written approval from SPD or less than minimum
Any solicitation valued at $250,000 and above
eQuote posting minimum of fifteen (15) calendar days plus posting to GPR; recommended for thirty (30) calendar days
Required number of days (mandated by law); no approval for less than minimum
Sta
te P
urch
asin
g D
ivis
ion
eQuote: Access eQuote through the Georgia Procurement Registry (GPR)
Agency Procurement Officer (APO) determines who has access and level
Level 6—for APO and Senior Manager
Level 1 or 2—for Buyers with GPR and eQuote
Level 0—eQuote only
Sta
te P
urch
asin
g D
ivis
ion
What type of eQuote bid is it? eQuote for those State of Georgia governmental entities that are
Exempt from OCGA and the GPM
All other Agencies and College and Universities
Is this an Exempt purchase?
Is this Not an Exempt purchase?
Is the purchase under your agency’s DPA? If so, needs approval from SPD
$100,000 or above, also needs NOIA before NOA
If $50,000+ also needs public posting, opening, and reading
– Through link provided to vendors on Public GPR
– Or through subsequent posting using template language
eQuote for non-State of Georgia governmental entities (city, county, public schools)
Sta
te P
urch
asin
g D
ivis
ion
Click here to enter New
eQuote Menu
Old eQuote Menu still on
screen
Sta
te P
urch
asin
g D
ivis
ion
eQuote Menu—totally revised to reflect increased and improved functionality!
Reports not yet available
Sta
te P
urch
asin
g D
ivis
ion
Ability to include with your eQuote—same as currently with RFQ using GPR Well-defined specifications or a clear description of the scope of
work
All contractual terms and conditions
Delivery requirements
Quality expected, including performance requirements
Samples possibly
Packaging requirements
Warranty information
Insurance and/or bonds requirement if applicable
Pre-bid conference or site visit information-if applicable (must not be less than 5 business days before eQuote closing date)
References required—if requesting these
Training requirements
Maintenance or installation requirements
Sta
te P
urch
asin
g D
ivis
ion
Click Yes for Exempt
Sta
te P
urch
asin
g D
ivis
ion
An Exempt Purchase—must provide justification/explanation
Sta
te P
urch
asin
g D
ivis
ion
eQuote for an Agency making a non-exempt purchase
Leave at No
Sta
te P
urch
asin
g D
ivis
ion
Ability to copy from
prior eQuotes
eQuote number
Automatically enters name, email and FY
FY of posting
date
Sta
te P
urch
asin
g D
ivis
ion
Suggested wording regarding possible early-pay discounts
Sta
te P
urch
asin
g D
ivis
ion
Adding Agency Contract or additional Terms and Conditions
eQuote’s Terms and Conditions are very, very general
The vendor MUST agree to those Terms and Conditions
You may add a document that has agency-specific or solicitation-specific Terms and Conditions or an agency contract
This must be signed by both sides
You should include the ability for the vendor to submit exceptions to those with the eQuote response
Exceptions to your contract or Terms and Conditions can be approved and incorporated into the final eQuote award
Sta
te P
urch
asin
g D
ivis
ion
Chart to help
Sta
te P
urch
asin
g D
ivis
ion
The Agency must perform a formal public opening and reading of electronic bids for any eQuote with an estimated value of $100,000 or more. The Agency must accommodate any vendor desiring to attend the opening of the electronic bids regardless of the dollar amount. The time and date of the public opening and reading is the same as the eQuote closing time and date.
The eQuote must state the location for the public opening and reading of the electronic bids received. (Usually, the public opening is held in an Agency office which is easily accessible to the public.) At a minimum, the Agency will read aloud the names of the vendors submitting bids and the corresponding bid prices.
Vendors are welcome to attend the formal public opening
As an alternative, all vendors are welcome to view the electronic bids using the “automated public opening”
Requirement to add to eQuote eQuotes $100,000+
Sta
te P
urch
asin
g D
ivis
ion
NIGP Code Added to Header
Note brief description
Sta
te P
urch
asin
g D
ivis
ion
Another NIGP Code is Added to Header (unlimited)
Added NIGP Code—can
also change your mind and
delete an NIGP Code
Sta
te P
urch
asin
g D
ivis
ion
Add Documents to Header
Sta
te P
urch
asin
g D
ivis
ion
Upload documents to header
Sta
te P
urch
asin
g D
ivis
ion
Document has been Attached
Click on document to
make sure it is correct
Can add more
documents!
Sta
te P
urch
asin
g D
ivis
ion
Document with Additional T’s & C’s
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Then decide: Update Header even more, Save the eQuote, Add Your Lines or Cancel
Options available
Sta
te P
urch
asin
g D
ivis
ion
Decided to Save
Sta
te P
urch
asin
g D
ivis
ion
When You Want to Return to that eQuote
Review and Maintenance
Sta
te P
urch
asin
g D
ivis
ion
Saved eQuotes—in own section on menu
Sta
te P
urch
asin
g D
ivis
ion
Same Options—Update, Save, Add Your Lines or Cancel (need to update closing date)
Sta
te P
urch
asin
g D
ivis
ion
Adding Lines: Start with Line 1
Drop-down has all the NIGP Codes
from Header
Sta
te P
urch
asin
g D
ivis
ion
Can add document(s) to each line
Sta
te P
urch
asin
g D
ivis
ion
As Before, You Can Delete the Document, Add More Documents, and Review the Added Document
Sta
te P
urch
asin
g D
ivis
ion
Shows Line 1—with Document
Sta
te P
urch
asin
g D
ivis
ion
Back to the BLUE—with Line 1
Sta
te P
urch
asin
g D
ivis
ion
Choices—Add another Line, Cancel, Save, Release—and Can Always Update
Sta
te P
urch
asin
g D
ivis
ion
Adding Line 2
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Random Vendor List—REVISED –suggest using COMPLETE LIST required for $250,000+)
Sta
te P
urch
asin
g D
ivis
ion
If don’t go with complete list can add more vendors geographically
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
You receive an email confirmation
Sta
te P
urch
asin
g D
ivis
ion
eQuote is now an Open eQuote
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
For eQuotes $50,000+ must be publically posted
Must create eQuote FIRST Then go into GPR and post information with NIGP
Codes Use template information in Description section
explaining to vendors how to contact you to get access to eQuote
Vendors with selected NIGP Codes will get duplicate emails
Vendors without selected NIGP Codes or not registered will have to contact buyer for eQuote access
Have electronic posting of eQuotes that satisfy this requirement
Sta
te P
urch
asin
g D
ivis
ion
Vendor Receives eQuote invitation email (top part)
Email Includes:
•Name of vendor•Business name•Agency Name•eQuote Title•eQuote closing date and time•Buyer name and email address•One-time userid and password•Link to access the eQuote•Access link to Vendor’s Guide•Reminder not to fax eQuote bid
Sta
te P
urch
asin
g D
ivis
ion
Vendor eQuote invitation email (bottom part)
Sta
te P
urch
asin
g D
ivis
ion
Vendor accesses eQuote using link and enters userid and password
Sta
te P
urch
asin
g D
ivis
ion
Vendors view of eQuote (top)Includes:
•eQuote number•Agency Name•Buyer name, phone and email •eQuote Title•Info added in Description area•Estimated value*•NIGP Code(s)•eQuote release date/time•eQuote closing date/time•Added documents at Header•Vendor’s Guide access
Sta
te P
urch
asin
g D
ivis
ion
Vendor view of eQuote (bottom)—choices Not to bid, Bid later, Bid now
Includes:•Each line item with description, NIGP Code and unit of measure•Each line’s added document(s)
Sta
te P
urch
asin
g D
ivis
ion
If clicks “I WILL NOT BID ON THIS EQUOTE”—system takes vendor to Public GPR
Sta
te P
urch
asin
g D
ivis
ion
If that vendor tries to return….
Sta
te P
urch
asin
g D
ivis
ion
What if vendor decides he made a mistake? Has to contact buyer to get access again-how that works:
Sta
te P
urch
asin
g D
ivis
ion
Find the eQuote access is wanted for:
Sta
te P
urch
asin
g D
ivis
ion
Buyer gets confirmation vendor was sent an email again giving access
Sta
te P
urch
asin
g D
ivis
ion
Re-access email to vendor
Sta
te P
urch
asin
g D
ivis
ion
If vendor clicks BID AT A LATER TIME—will be able to return up to closing using same userid and password
Sta
te P
urch
asin
g D
ivis
ion
If vendor clicks BID NOW
Sta
te P
urch
asin
g D
ivis
ion
Opens eQuote Bid Response—top section
Includes:•eQuote number and title•Agency and buyer info•Posting and closing date/time•Buyer added documents •NIGP Code(s)•Area for vendor to attach documents•Name of Vendor•Vendor phone and email•Area for vendor to add comments
Sta
te P
urch
asin
g D
ivis
ion
Vendor adds a document at Header—can add more or delete this document
Sta
te P
urch
asin
g D
ivis
ion
Returns to eQuote Bid with name of vendor (not company), email, phone, comments
Buyer does not have access to comments
until after eQuote closed
Sta
te P
urch
asin
g D
ivis
ion
eQuote Bid cont.—middle section
Must click here
Very basic T’s & C’s
Again, Vendor’s Guide
Sta
te P
urch
asin
g D
ivis
ion
eQuote bid—bottom section
Opens Description
of Line 1
Vendor bid for Line 1 Comment
added for Line 1
Buyer’s Line 1
Document
Vendor can add
Documents to each Line
Total calculated
When bottom is completed, Vendor clicks “Submit” button
Price per line is to include
shipping cost
Sta
te P
urch
asin
g D
ivis
ion
This notice appears….
Clicks OK button
Sta
te P
urch
asin
g D
ivis
ion
This screen follows
eQuote number, title, closing
date/time and Amount of total bid
Says buyers ability to view who
responded but not amount and that
they will get confirming email
Sta
te P
urch
asin
g D
ivis
ion
Confirmation email to vendor
Sta
te P
urch
asin
g D
ivis
ion
If the vendor does not receive this email, the vendor’s computer did not
communicate with the eQuote system.
Also, the time RECEIVED by the eQuote system is considered and not
time the vendor might have sent the bid response…sometimes it takes 2-3
minutes to be received!
Sta
te P
urch
asin
g D
ivis
ion
Another vendor response—with NO BID of Line 2
Sta
te P
urch
asin
g D
ivis
ion
Here is all that can be done while an eQuote is open
Sta
te P
urch
asin
g D
ivis
ion
Edit the eQuote
Email to inform Vendors
Sta
te P
urch
asin
g D
ivis
ion
Edited—added another Line
Must click here
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Email notice to vendor who submitted a bid (must be reset)
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor who has not yet responded
Sta
te P
urch
asin
g D
ivis
ion
Can View Bid Responses
Sta
te P
urch
asin
g D
ivis
ion
Only see who responded—not amount
Note Buyer
selected vendor
Sta
te P
urch
asin
g D
ivis
ion
Cancel eQuote: Must provide reason
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor about Cancellation
Sta
te P
urch
asin
g D
ivis
ion
Can send email to ALL Vendors: Allows them to re-enter the eQuote to make adjustments
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor of change plus ability to re-enter for vendor who has not responded yet
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor who has responded—has to be reset
Sta
te P
urch
asin
g D
ivis
ion
Resend Notice to vendors who did not receive first email or deleted it
Sta
te P
urch
asin
g D
ivis
ion
Select vendor(s) to resend notice
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Email (Resend) to vendor
Sta
te P
urch
asin
g D
ivis
ion
Adding a vendor to the random and geographically selected list
Sta
te P
urch
asin
g D
ivis
ion
Add a Registered Vendor
Sta
te P
urch
asin
g D
ivis
ion
Must know at least one word of company name—enter that and click Search button
Sta
te P
urch
asin
g D
ivis
ion
List of vendors with that word in company name—select vendor
Sta
te P
urch
asin
g D
ivis
ion
Click to add
Sta
te P
urch
asin
g D
ivis
ion
Registered vendor has been added—now add a nonregistered vendor
Sta
te P
urch
asin
g D
ivis
ion
Called Adding a Vendor on the Fly
Must know Company Name
and email
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Vendor Added on the Fly
Will be sent the same eQuote email invitation
When vendor accesses eQuote, before entering the eQuote, will be taken to the Vendor Registration System to register
Will be registered under NIGP Code(s) selected for this eQuote
Will be encouraged to return to Vendor Registration System to add relevant NIGP Code(s)
Upon completion of registration process, will be taken into the eQuote to complete the eQuote process
Sta
te P
urch
asin
g D
ivis
ion
Changes in the Solicitation while eQuote is still Open
By buyer
Using editing function (already shown)
By vendor
May modify a submitted bid at any time before closing
May withdraw bid before closing
Sta
te P
urch
asin
g D
ivis
ion
Vendor edit function: Vendor can change price/documents while eQuote is still open
Vendor Contacts Purchasing Agent to Request Ability to Edit Bid Response
Sta
te P
urch
asin
g D
ivis
ion
Find eQuote and THIS VENDOR
Sta
te P
urch
asin
g D
ivis
ion
Email goes to vendor allowing vendor access to eQuote to update bid response
Sta
te P
urch
asin
g D
ivis
ion
eQuote closes….Decision Time
Responsive means the vendor, whether a company or an individual, has submitted a timely offer which materially conforms to the requirements and specifications of the solicitation.
Responsible means the vendor, whether a company or an individual, has appropriate legal authority to do business in the State of Georgia, a satisfactory record of integrity, appropriate financial, organizational and operational capacity and controls, and acceptable performance on previous governmental and/or private contracts, if any. Examples of non-responsible vendors include, but are not limited to, a bidder’s history of nonperformance or performance problems on other contracts (public or private), a record of financial difficulty, business instability, criminal sanctions, civil sanctions, and/or tax delinquency. Non-responsibility will be determined by the State on a case-by-case basis taking into consideration the unique circumstances of the individual procurement. A non-responsibility determination of a vendor must be put in writing
Sta
te P
urch
asin
g D
ivis
ion
After the eQuote closes, vendors can go to the GPR to see the eQuotes that have closed. Will show the responses, not the results of the evaluation or award decision!! Or can come to the agency office for opening and reading
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Reciprocal Preference
Locate the Reciprocal Preference section on the State Purchasing webpage (under Resources, Agency Tools)
Find the low bidder’s state
Determine if that state provides “preference” for its vendors FOR THAT COMMODITY OR SERVICE
If so, add that amount to that vendor’s price FOR EVALUATION PURPOSES ONLY
If not, disregard as this is not applicable
Sta
te P
urch
asin
g D
ivis
ion
Discounts
If the vendor offers an early-pay discount you should incorporate that discount amount UP TO 5% in the price submitted—but you need to do this “off line” and justify your award in that section
For example, let’s say Vendor A bids $10,010 with no cash discount. Vendor B bids $10,050 with a 5% discount (or a $50 discount for prompt payment) in the event the state makes payment within 30 days. Using our general evaluation rule from the GPM (up to 5% discount for payment within 30 days may be considered for the purposes of evaluation), Vendor B has actually bid $10,000 (for the purposes of evaluation) and will win the award over Vendor A. If the state does not make payment within 30 days to Vendor B, the state will have to pay the higher price - $10,050. In other words, based on our expectation that we will meet the 30 day turnaround for payment of $10,000, we believe it is a better business decision to contract with Vendor B
Sta
te P
urch
asin
g D
ivis
ion
Ready to evaluate bid responses and make the award
Sta
te P
urch
asin
g D
ivis
ion
Options—View responses, cancel, edit or award
Sta
te P
urch
asin
g D
ivis
ion
After eQuote closes—only edit that can be done is to add documents!
Sta
te P
urch
asin
g D
ivis
ion
Can View Bid Responses
Note that added
vendors responded
Open to review the bid
response
Sta
te P
urch
asin
g D
ivis
ion
Can Make the Award
Vendor NO BID this line
Indicates vendor’s State for
Reciprocal Preference
Ability not to award the line
Bids for Line 1 from low to high
Sta
te P
urch
asin
g D
ivis
ion
Must award or opt to Not Award and write justification for
Sta
te P
urch
asin
g D
ivis
ion
Shows price when award all lines to lowest bidder
Sta
te P
urch
asin
g D
ivis
ion
Shows pricing difference when lowest bidder is not awarded each line
Sta
te P
urch
asin
g D
ivis
ion
Also ability to award to one vendor—must provide justification if not lowest
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Then click the “Click to process the Award configuration above” button
Sta
te P
urch
asin
g D
ivis
ion
Final step-click to finish
Sta
te P
urch
asin
g D
ivis
ion
Vendor receiving all or part of award receives an email notice
Sta
te P
urch
asin
g D
ivis
ion
Vendor NOT receiving all or part of the award gets an email notice
Sta
te P
urch
asin
g D
ivis
ion
Posting award (besides link on Public GPR)
eQuotes $50,000 to $99,999.00---post NOA to GPR if used
eQuotes $100,000+ post NOIA to GPR and then NOA to GPR if used
eQuotes less than $50,000—post notice in office of award
Sta
te P
urch
asin
g D
ivis
ion
Additional Function—ability to re-award
Sta
te P
urch
asin
g D
ivis
ion
Go to Awarded eQuotes
Sta
te P
urch
asin
g D
ivis
ion
Find eQuote to re-award
Sta
te P
urch
asin
g D
ivis
ion
Click Re-award
Sta
te P
urch
asin
g D
ivis
ion
In RED vendor(s) who received award—should limit to 60-90 days—vendors are notified by email of re-award
Provide re-award
justification
Re-awarded to this vendor
Sta
te P
urch
asin
g D
ivis
ion
Example: Copying an eQuote
Sta
te P
urch
asin
g D
ivis
ion
Select the correct eQuote to Copy and fill in the data. Why copy? Perhaps cancelled and want to re-solicit bids or to create a template.
Note new eQuote number
Sta
te P
urch
asin
g D
ivis
ion
This time over DPA, over $100,000—for non-exempt State agency only
Sta
te P
urch
asin
g D
ivis
ion
eQuote over DPA
Sta
te P
urch
asin
g D
ivis
ion
The same as if go above DPA with GPR
Sta
te P
urch
asin
g D
ivis
ion
Provide Justification
Sta
te P
urch
asin
g D
ivis
ion
Notice that eQuote is going to SPD
Sta
te P
urch
asin
g D
ivis
ion
At SPD
Sta
te P
urch
asin
g D
ivis
ion
SPD sends response
Sta
te P
urch
asin
g D
ivis
ion
One Time Request to Exceed DPA—amended to include eQuote
Sta
te P
urch
asin
g D
ivis
ion
Award over $100,000—must post NOIA. Also on GPR!
Sta
te P
urch
asin
g D
ivis
ion
NOIA email to vendor
Sta
te P
urch
asin
g D
ivis
ion
Notice of Award Policy
Estimated Solicitation
First Post NOIA? Post NOA?
Less than $50,000
No Yes1.send via email to all participants AND2.publicly display in a conspicuous place in the Agency’s office
$50,000 - $99,999.99
No Yes1.send via email to all participants AND2.post to GPR listing
$100,000 or more
Yes1.send via email to all participants AND2.post to GPR listing
Yes*1.send via email to all participants AND2.post to GPR listing
Sta
te P
urch
asin
g D
ivis
ion
Tracking the NOIA
Sta
te P
urch
asin
g D
ivis
ion
Fast forward—10 days have passed and eQuote is ready for NOA
Click on eQuote
Sta
te P
urch
asin
g D
ivis
ion
This screen appears..
Click on Award eQuote
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor not getting award
Sta
te P
urch
asin
g D
ivis
ion
Email to vendor awarded the eQuote
Sta
te P
urch
asin
g D
ivis
ion
NOIA and then NOA--explained
Unless otherwise authorized in writing by the SPD Deputy Commissioner or DOAS Commissioner, the NOA should be posted (1) no earlier than 10 calendar days following the posting of the NOIA and (2) in the event a protest is received, only after the protest has been resolved.
Sta
te P
urch
asin
g D
ivis
ion
Additional NOA requirement
NOA must be publicly posted on GPR using link available on Public GPR and also if you posted to the GPR
Sta
te P
urch
asin
g D
ivis
ion
Another SPD issue--when Agency posts eQuote for UNDER DPA but attempt to award OVER DPA
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
SPD decides how to handle this
Sta
te P
urch
asin
g D
ivis
ion
Sta
te P
urch
asin
g D
ivis
ion
Bid responses received for this eQuote
eQuote Agency
processedSPD
authorization decision
Sta
te P
urch
asin
g D
ivis
ion
Other Additions and Changes
Ability for SPD to use eQuote for agency work being handled by SPD
Ability for SPD to use eQuote for Statewide Contracts when RFPs are not being used
Amendments to GPM and VPM to reflect enhanced eQuote functionality
Sta
te P
urch
asin
g D
ivis
ion
Help Desk Support and Assistance
404-657-6000
All trained on eQuote
2 Additional Tier Levels of Help
Sta
te P
urch
asin
g D
ivis
ion
Questions
Contact me at: [email protected] or call me at 404-656-6131