5%
The Computer network application competition, which applies the
real cases in company and combined the requirements of teaching,
tests students' basic information of wireless network equipment
configuration, network building and disaster recovery plan, the
deployment of mobile the Internet construction and network
optimization, export safety protection and remote access, cloud
computing services to build enterprise applications, integrated
wiring design and planning, specification and document
standardization etc. playing skills. The main knowledge and skills
involved are as follows:
Module one: wireless network planning and Implementation
(10%)
Module two: device base information configuration (5%)
Module three: building the network deployment and disaster recovery
plan (20%)
Module four: Mobile Internet construction and network optimization
(15%)
Module five: export security protection and remote access
(10%)
Module six: cloud computing services and enterprise applications
(20%)
Module seven: integrated wiring planning and design (15%)
Module eight: court rules and documentation standards (5%)
Module one: wireless network survey and planning (10%)
According to the building layout to provide drawing construction
plan, to complete the wireless environment survey drawing AP point
diagram, AP output image, equipment list and price list. According
to the AP location determined by geological exploration and the
location information of IDC computer room, the horizontal wiring
diagram of the integrated wiring project, the installation diagram
of the engine room cabinet, the label of the network distribution
frame and the system integration BOM are put forward.
Module two: device base information configuration (5%)
According to the basic knowledge of network topology structure,
completed: the headquarters and the branch of internal network
planning and design, deployment and configuration of the basic
information and function of equipment, password recovery software
version upgrade; network infrastructure security, including network
security policy equipment test and safety and security
reinforcement.
Module three: building the network deployment and disaster recovery
plan (20%)
According to the basic knowledge of network topology structure,
virtualization deployment to complete the design of the
headquarters and the branch of the internal network and build and
server area network equipment, and to optimize the routing and
redundant configuration to ensure uninterrupted connectivity within
the network business.
Module four: Mobile Internet construction and network optimization
(15%)
Based on the construction of the cable network for the convenience
of mobile office and Internet access needs, according to the
topological structure of wireless network set up, strengthening,
wireless data security of wireless performance and reliability
optimization, wireless network optimization and privilege services
for different user groups.
Module five: export security protection and remote access
(10%)
Data transmission security, to ensure that the information
transmitted through the network environment is encrypted by
security policy. Tunnel technology, plaintext capture and
encryption strategy are introduced;
Export equipment information audits to ensure compliance within
network users and to be traceable later. It includes user
authentication, behavior control, behavior auditing strategy and
audit analysis report generation;
Remote VPN access configuration, deployment and optimization, based
on SSL, VPN, IPSEC, VPN, L2TP and other remote access headquarters
resources, to achieve the sharing of resources and content.
Module six: cloud computing services and enterprise applications
(20%)
Through virtualization management software, and in the cloud
platform deployment Windows/ Linux system to build a variety of
network services such as FTP service, Email service, network
sharing service, virtual network devices, including virtual router,
virtual switch, build the OpenDayLight open source controller,
realize the surface flow virtual platform on OVS and Mininet issued
and topology discovery.
Module seven: integrated wiring planning and design (15%)
Carry out the project plan according to the attached drawings,
select the specifications of the engineering materials and
calculate the quantities. The installation specification, in line
with the title, including work area, management, equipment,
subsystem level, vertical subsystem, building system construction
and installation of copper wiring, installation and wiring
installation, wiring rack, wire frame and other commonly used
equipment for open channel pipe or dark tube terminal. Network
equipment wiring neat, equipment identification tag orderly,
civilized construction, finishing the scene etc..
Module eight: court rules and documentation standards (5%)
Candidates should arrive at the examination room at the appointed
time of the competition and strictly observe the examination
procedure. All documents submitted by the candidates must be named
in accordance with the naming rules specified in the competition,
and shall not be reflected in any form, such as the competition
institution, station number, etc.. Submit the template WORD file
and the corresponding PDF file according to the title
requirement.