POWER PLANT CONSTRUCTION
ENGINEERING
PURCHASE PROCESS
MANAGEMENT
COMMISSIONING AND TESTING
PLANT ERECTION
CIVIL WORKS
TRANSPORTATION
FABRICATION OF ITEMS
Basic design Submission and approval of engineering set of drawings
Permit and authorizations based on basic design
HRSG and diffuser Gas treatment and Compression station gas turbine
generator and gear box set
steam turbine steam boiler steam condenser
Site installation Plant civil works Construction control room and office building
Gas cycle
Steam Cycle
Project management
Site management
Expediting and item pre-test to the supplier's plant
Stack Transformer Station
Detailed Engineering
Detailed Engineering building
Detailed Engineering gas cycle system
Detailed Engineering civil works
Detailed engineering steam cycle system
KPO (control room and office)
Aalborg engineering Steelcom (stack) Siemens GESeeger engineering AG
(Steam boiler)Alstom Power
(steam condenser)SES Ltd
(transformer yard)
HRSG
Diffuser
Compressor Gas Turbine Steam Turbine Generator
Gear box set
Gas cycle Steam cycle
B.O.M. and take-offs
Request for proposal
Gathering of proposals
Competitive proposal analysis
B.O.M. and take-offs
Request for proposal
Gathering of proposals
Competitive proposal analysis
Gas treatment and Compression station
Stack Erection
HRSG and Diffuser erection
Steam Turbine Erection
Steam boiler erection
Steam condenser erection
Electrical Items
Generator and gear box set erection
Transformer erection
Order of components Order of components
Supervising Control Erection Process
UK
KPO (Control room and office)
GE
Generator Gearbox
SES Ltf (transformer yard)
Denmark
Aalborg engineering
Steelcom (Stack)
HRSG
Diffuser
Germany
Siemens
Seeger engineering AG(Steam boiler)
Compressor Gas turbine Steam turbine
France (Alstom Power,Steam condenser)