14
WBIF: Energy Efficiency Framework: ESCO Framework: ESCO Pipeline Preparation of two projects in BiH Pilot projekat: Kantonalna bolnica Zenica REEP (Regional Energy Efficiency Programme) –funded by the EU’s Western Balkans Investment Framework (WBIF) and the Western Balkans Joint Fund, developed and run by EBRD; www.wb-reep.org

WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

WBIF: Energy Efficiency Framework: ESCO Framework: ESCO

Pipeline Preparation of two projects in BiH

Pilot projekat:

Kantonalna bolnica Zenica

REEP (Regional Energy Efficiency Programme) – funded by the EU’s Western Balkans Investment

Framework (WBIF) and the Western Balkans Joint Fund, developed and run by EBRD; www.wb-reep.org

Page 2: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Kratak opis bolničkog kompleksa

• Grijana površina: 31,488 m2

• Bolnički kompleks: 6 objekata (zgrada)

• Broj uposlenih i broj korisnika: 1.626 / 912

• Godina izgradnje bolničkih objekata: 1953/1958/1974/1986/2009

Page 3: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Situacioni prikaz

Page 4: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Obilazak objekta...

Page 5: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Obilazak objekta...

Page 6: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Potrebe za energijom

Toplotna energija:

• Grijanje (3.8 MW)

• Para za vešeraj (1,5 MW)

• Para za sterilizaciju i kuhinju (260 kW)

Električna energija:

• Rasvjeta

• Medicinski uređaji

• Kuhinja

• klimatizacijakW)

• Topla potrošna voda (580 kW)• klimatizacija

• Vešeraj

• Pumpe

• Ostalo

Page 7: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Potrošnja energije

Lokalni ugalj (18 GJ/t)

– 2.772 t/god

– 392.477 KM/god (200,670 EUR)

400,0

600,0

800,0

1.000,0

1.200,0

1.400,0

1.600,0

Električna energija

- 2.643 MWh/god

- 434.346 KM/god (222,075 EUR)

0,0

200,0

jan

feb

ma

r

ap

r

ma

y

jun

jul

au

g

sep

oct

no

v

de

c

Grijanje (MWh) Tehnologija (MWh) PTV (MWh)

Page 8: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Proizvodnja i distribucija toplotne energije

� 3 parna kotla na ugalj� 2x3,65 MW (1959.);

� 1x4,5 MW (1987.)

� Dužina parovoda: 525 m

� Dužina toplovoda: 70 m

� Broj toplotnih podstanica: 5� Broj toplotnih podstanica: 5

� Sistem regulacije: ručni

Page 9: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Obilazak objekta...

Page 10: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Mjere

• Zamjena kotla/energenta: sa uglja na biomasu (drvna sječka)– Kogeneracija na biomasu 1 MWe (+3,5 MWth)

– Toplotna energija na biomasu

• Preprojektovanje sistema distribucije toplotne energije – nove podstanice, toplovodi... podstanice, toplovodi...

• Toplotna sanacija ovojnica objekata (zamjena prozora, TI vanjskih zidova, TI krovova…)

Page 11: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Pravna osnova

• Nedostajuća legislativa

– Zakon o energijskoj efikasnosti je još uvijek u fazi usvajanja (U septembru

2014. Parlament FBiH usvojio predloženi nacrt Zakona).

• Trenutno dostupna legislativa• Trenutno dostupna legislativa

- Zakon o javno-privatnom partnerstvu je usvojen na nivou Ze-Do kantona

- Novi Zakon o javnoj nabavci je na snazi od 27. novembra 2014.

- Zakon o dugu, zaduživanju i garancijama u Federaciji BiH

Page 12: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Vremenski okvir za realizaciju projekta

Priprema odabranog EnPC projekta

- Priprema tenderske dokumentacije 28. mart 2015.

- Uspješno nadmetanje 28. April 2015.

- Ugovaranje sa ESCO [očekivano: juni 2015. ]- Ugovaranje sa ESCO [očekivano: juni 2015. ]

Implementacija EnPC projekta 28. Januar 2016.

Page 13: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Pozivamo vas...

Prva radionica:

Sarajevo,Sarajevo,

03.02.2015.

Page 14: WBIF: Energy Efficiency Framework: ESCO Pipeline ... file• Zamjena kotla/energenta: sa uglja na biomasu (drvna sje čka) – Kogeneracija na biomasu 1 MWe (+3,5 MWth) – Toplotna

Hvala na pažnji!

CETEOR d.o.o. Sarajevo

Topal Osman Paše 32 b

BA, 71000 Sarajevo

Tel/fax: +387 33 563 580/+387 33 205 725

e-mail: [email protected]

www.ceteor.ba