2
WOODEN BOAT CONSTRUCTION 1 LCD 20702 PRACTICAL TEST 1 Making Mould Frames Instruction: o Individually, or in a group, you are required to develop frames according to lofted plan. o This will include the related features of frames such as notches, rabbet, gusset etc. o You will be given 4 week to complete the task. The following is the suggestion of steps should be taken for the frame construction; i. Copying the frame templates from lofted plan ii. Cutting frames and their notches iii. Frame Assembly iv. Rabbeting Assessment You will be assessed on the following criteria; o Safety o Woodworking technique o Boatbuilding technique o Finished product o Timing o Group contribution

WBC 1 - TEST 1 Making Mould Frame - 18aug10

Embed Size (px)

DESCRIPTION

mould

Citation preview

Page 1: WBC 1 - TEST 1 Making Mould Frame - 18aug10

WOODEN BOAT CONSTRUCTION 1

LCD 20702

PRACTICAL TEST 1 – Making Mould Frames

Instruction:

o Individually, or in a group, you are required to develop frames

according to lofted plan.

o This will include the related features of frames such as notches,

rabbet, gusset etc.

o You will be given 4 week to complete the task.

The following is the suggestion of steps should be taken for the frame

construction;

i. Copying the frame templates from lofted plan

ii. Cutting frames and their notches

iii. Frame Assembly

iv. Rabbeting

Assessment

You will be assessed on the following criteria;

o Safety

o Woodworking technique

o Boatbuilding technique

o Finished product

o Timing

o Group contribution

Page 2: WBC 1 - TEST 1 Making Mould Frame - 18aug10

ASSESMENT SCHEME – LCD 20702 WBC1

NAME: _______________________________________________

STUDENT ID: ____________________________________________

FRAME CONSTRUCTION

No. Criteria Rating

1. Cutting the correct size of timber for frame

according to lofted plan.

- transfer lofted plan into template

- transfer template into frame

1 2 3 4 5

1 2 3 4 5

2. Making frames features perfectly

- Making gusset properly

- notches for keel, sheer and chine battens

- Limber holes for each frame.

1 2 3 4 5

1 2 3 4 5

1 2 3 4 5

3. Trimming frame for rabbet according to lofted plan

1 2 3 4 5

4. Finish making all frames according to bodyplan

2 4 6 8 10

5. Assignment / REPORT

2 4 6 8 10

Total

50

Overall Performance

WEAK FAIR EXCELLENT

Checked by: Received by:

………………………………… …………………………………….

KAMARUL NASSER MOKRI ( )

Assistant Lecturer Student ID:

Date: Date: