Upload
joo123456789
View
2
Download
1
Embed Size (px)
DESCRIPTION
Waterflood
Citation preview
WATERFLOODING
1. MENENTUKAN WATER SATURATION PROFILE SETELAH PERIODE WAKTU TERTENTU:PROBLEMS:
2. Breakthrough (kapan terjadi, kumulatif air yg diinjeksi, total pore volume yang diinjeksi @ breakthrough)Solution
3. Problems:
4. Performance Curve (To Abandonment)Problems:
Solution: