WATER QUALITY MONITORING PROJECT FOR DEMONSTRATION OF CANAL REMEDIATION METHODS
FLORIDA KEYS Report #1: Canal Water Characterization
FKNMS Canal Subcommittee Meeting01/16/2015
Henry O. Briceño & Alexandra Serna
Southeast Environmental Research CenterFlorida International University
Miami, FL 33199
Phase 1Characterization of canal waters before remediation
Phase 2Monitoring water quality changes after remediation.
SELECTED CANALS FOR REMEDIATION AND CONTROLControl canals highlighted in yellow
Organic Removal
Weed Barrier & Organic Removal
Pumping Backfilling
#137 Plantation Key Treasure Harbor
#148 Lower Matecumbe Key Mate-Lido Beach
#287 Big Pine Hollerich Subdivision
#290 Big Pine Between Ave I & J
#266 Big Pine. Dr Arm Subdivision
#278 Big Pine. Eden Pines Colony Subdivision
#277 Big Pine. Tropical Bay Subdivision
#459 Geiger. Boca Chica Ocean Shores Subdivision
#29 Key Largo Sexton Cove Estates Subdivision
#472 Geiger. Geiger Mobile Homes Subdivision
#132 Plantation Key
#147 Matecumbe K
#282 Big Pine #458 Geiger # 28 Key Largo
Culvert Installation
#293 Big Pine
Weed Barrier
Reduction of weed wrack
loading
Installation of culverts and/or
pumps
Removal of accumulated
organic sediments
Backfilling of canalsACTION
Reduction of Organic
Matter Load
Increase Water
Exchange and Flushing
Reduce Bottom Water
Hypoxia
Reduce Excessive Depth to Improve
Circulation
Reduction Benthic Flux
Higher Seawater
Contribution
Bacterial Population
H2S Reduction
DOM & POMNutrient
Load
Mixing Rate
Stratification
Benthic Community
GOAL
PRO
BABL
E CH
AN
GES
TOC DOH2S
pH
N & PqPCR SAL TURINDEX
Algae Bloom
PROFILESDEPTH KdTEMP SALDO H2SCHLa TUR pH DOM
KdDOM
CHLa
CDOM Parafax
PAM
BEN
THIC
CO
MM
UN
ITY
SURV
EYS
FieldLab
Legend
CONCEPTUAL MODEL FOR MONITORING DESIGN
02468
1012141618
0 0.5 1 1.5 2 2.5
Dept
h (ft
)
Oxygen (mg/L)
02468
1012141618
0 400 800 1200 1600 2000
Dept
h (ft
)
PAR/ Irradiance
02468
1012141618
37.0 37.5 38.0 38.5
Dept
h (ft
)
Salinity (PSU)
02468
1012141618
23.0 23.5 24.0 24.5 25.0 25.5
Dept
h (ft
)
Temperature ᴼC
02468
1012141618
34.0 38.0 42.0 46.0 50.0 54.0 58.0 62.0
Dept
h (ft
)CDOM (mg/m3)
02468
1012141618
0 5 10 15 20 25 30
Dept
h (ft
)
%DO Saturation
0.000
0.010
0.020
0.030
0.040
0.050
0.06002
8A -
B02
8A -
S02
9A -
B02
9A -
S02
9B -
B02
9B -
S13
2A -
B13
2A -
S13
7A -
B13
7A -
S13
7B -
B13
7B -
S14
7A -
B14
7A -
S14
8A -
B14
8A -
S14
8B -
B14
8B -
S26
6A -
B26
6A -
S26
6B -
B26
6B -
S27
7A -
B27
7A -
S27
7B -
B27
7B -
S27
8A -
B27
8A -
S27
8B -
B27
8B -
S28
2A -
B28
2A -
S28
7A -
B28
7A -
S29
0A -
B29
0A -
S29
0B -
B29
0B -
S29
3A -
B29
3A -
S45
8A -
B45
8A -
S45
9A -
B45
9A -
S45
9B -
B45
9B -
S47
2A -
B47
2A -
S47
2B -
B47
2B -
S
FKC01 NO3-N(ppm)
0.000
0.020
0.040
0.060
0.080
0.100
0.120
028A
-B
028A
-S
029A
-B
029A
-S
132A
-B
132A
-S
132B
S
132B
-B
137A
-B
137A
-S
137B
S
137B
-B
147A
-B
147A
-S
148A
-B
148A
-S
266A
-B
266A
-S
277A
-B
277A
-S
278A
-B
278A
-S
278B
S
278B
-B
282A
-B
282A
-S
287A
-B
287A
-S
290A
-B
290A
-S
293A
-B
293A
-S
458A
-B
458A
-S
459A
-B
459A
-S
472A
-B
472A
-S
FKC02 NO3-N(ppm)
0.00
0.02
0.04
0.06
0.08
0.10
0.12
028A
- B
028A
- S
029A
- B
029A
- S
132A
- B
132A
- S
137A
- B
137A
- S
147A
- B
147A
- S
148A
- B
148A
- S
266A
- B
266A
- S
277A
- B
277A
- S
278A
- B
278A
- S
282A
- B
282A
- S
287A
- B
287A
- S
290A
- B
290A
- S
293A
- B
293A
- S
458A
- B
458A
- S
459A
- B
459A
- S
472A
- B
472A
- S
472B
- B
472B
- S
NO3-N(ppm) NO3-N(ppm)
WQ Samples DIEL Profiles EC DO384 288 414 288 41,886
76 64 92 94 17,636
20% 22% 22% 33% 42%
Proposed Work
Done
Phase 1Characterization of canal waters before remediation
IS DONE
Phase 2Monitoring water quality changes after remediation.
TO BE DONE