AFRICAN DEVELOPMENT BANK
BANQUE AFRICAINE DE DEVELOPPEMENT
WATER AND SANITATION DEPARTMENT (OWAS)
WATER PARTNERSHIP PROGRAM
(WPP)
2010 ANNUAL PROGRESS REPORT 1
ST JANUARY TO 31
TH DECEMBER 2010
FEBRUARY 2011
WPP 2010 ANNUAL PROGRESS REPORT
i
TABLE OF CONTENTS
TABLE OF CONTENTS i
MDWPP LOGICAL FRAMEWORK ANALYSIS iv
SUMMARY 1
1 BACKGROUND 1
1.1 Introduction 1
1.2 WPP Strategic Contribution and Results 2
2 OVERVIEW OF WPP 2010 IMPLEMENTATION PLAN 3
3 PROGRESS OVER THE REPORTING PERIOD 3
3.1 Overview of Status of Implementation 3
4 FINANCIAL STATUS 4
4.1 Contribution to the Funds 4
4.2 Fund Utilization as at 31st December 2010 5
5 ACHIEVEMENTS, IMPLEMENTATION ISSUES AND RECOMMENDATIONS 6
5.1 Achievements and Impact 6
5.2 Main Impact 7
5.3 Cumulative Achievements to End of 2009 7
5.4 Key Achievements in 2010 8
5.5 Issues and Recommendations 9
ANNEXES 11
ANNEX 1: IMPLEMENTATION ARRANGEMENTS, MONITORING & EVALUATION 12
Annex 2: Summary of Completed and Ongoing Activities 13
Annex 2A: Completed Activities 14
Annex 2B: Activities with Active Budget Lines 19
Annex 3: Implementation Status of Activities as at 31st December 2010 22
ANNEX 4: FINANCIAL STATEMENTS FOR MDWPP AND BNWPP 24
Annex 4A: Multi-Donor Water Partnership Programme (MDWPP): 25
Annex 4B: Bank Netherlands Water Partnership Programme (BNWPP) 30
ANNEX 5: 2010 BUDGET AND CUMULATIVE DISBURSEMENT AS AT 31/12/10 34
ANNEX 6: EXPECTED RESULTS, TARGETS AND ACHIEVEMENTS 36
WPP 2010 ANNUAL PROGRESS REPORT
ii
ACRONYMS AND ABBREVIATIONS
ADF African Development Fund
AfDB African Development Bank
AgWA Agricultural Water Management in Africa
AMCOW African Ministers Counsel on Water
AWB Annual Workprogram and Budget
AWF African Water Facility
AWV African Water vision
BNWPP African Development Bank-Netherlands Water Partnership Program
ECA Economic Commission for Africa
FAO Food and Agricultural Organization of the United Nations
FFA AWV Framework for Action of the Africa Water Vision
GWP Global Water Partnership
IFAD International Fund for Agricultural Development
IWMI International Water Management Institute
IWRM Integrated Water Resources Management
MDG Millennium Development Goals
UNEP United Nations Environment Program
MDWPP Multi Donor Water Partnership Program
NEPAD New Partnership for Africa‟s Development
NGOs Non-Governmental Organizations
AU African Union
ORPC Operational Resources and Policies
ORRU Partnerships and Cooperation Unit
OSAN Operations Agriculture and Agro Industry
OWAS Operations Water and Sanitation
PM Program Manager
POPR Operations Policies and Review Department
PPP Private Public Partnership
PRSP Poverty Reduction Strategy Paper
RMC Regional Member Country
RWSS Rural Water Supply and Sanitation Initiative
SADC Southern African Development Community
TAC Technical Advisory Committees
TM Task Manager
TWG Technical Working Group
UNSGAB United Nations Secretary General Advisory Body
WB World Bank
WMO World Meteorological Organization
WSSD World Summit on Sustainable Development
WUP Water Utility Partnership
WWAP World Water Assessment Program
WWF World Water Forum
WPP 2010 ANNUAL PROGRESS REPORT
iii
WATER PARTNERSHIP PROGRAM (WPP) LOGICAL MODEL
ACTIVITIES OUTPUTS OUTCOMES IMPACT
Support Bank Operations
Capacity
Conduct strategic studies of
water sector operations,
programs and policies
Develop/revise policies
guidelines, tools, checklists
Provide training and fora for
dialogue for Bank staff
IWRM mainstreamed in
Bank policies, programs
and operations
Bank staff have
increased skills and
competences in IWRM
AfDB IWRM Capacity
AfDB water sector
programs and policies are
strengthened;
new water initiatives /
strategies are developed
and Bank activities are
better coordinated
Improved
access to water
resources in
Africa through
enhanced
capacities,
knowledge and
dialogue
Water Information & Data
Management at AfDB
Collect and analyse data and
information generated by
Bank operations for Bank
functions
Establish water sector
indicators and benchmarks.
Bank staff have
increased access to
information and data for
strategic planning
through water
information Centre
IWRM Outreach and
Knowledge Sharing
Organize workshops for
RMCs on Bank IWRM
policy
Organize Regional and sub
regional water fora and
dialogue
RMCs have increased
awareness of IWRM
principles and
approaches
Regional and sub-
regional partnerships
strengthened or
established.
Common African
strategies for water
development adopted
RMC IWRM Awareness
RMCs and other African
stakeholders have
enhanced awareness of,
and commitment to
IWRM principles
Transfer of Best Practices
Identify, document and
disseminate lessons learned
from local actions and
instruments from AfDB
programs and projects
Awareness and adoption
of best practices in water
sector in AfDB and
RMCs increased
WPP 2010 ANNUAL PROGRESS REPORT
iv
MDWPP LOGICAL FRAMEWORK ANALYSIS
Hierarchy of
Objectives
Expected Results
By Sectors and
Corresponding
Themes
Reach Performance Indicators
Source and Methods
Indicative
Targets and
Time Frames
Assumptions/Risks
Goals
Build Bank‟s
IWRM
implementation
capacity and
increase awareness
of IWRM among
RMCs and other
Stakeholders
Improved
access to
water
resources in
Africa
through
enhanced
IWRM
capacities,
knowledge
and dialogue
Population
in RMCs
Indicator
Progress towards
meeting the MDG
targets related to
water.
Source
UN/JMP, Country
Reports, M&E
Reports
Method
Document review,
Water events
Target
MDG
Targets
Achieved
Time Frame
2015
Assumption: Full
funding received from
donors within
appropriate timeframe
Risk: Delayed
disbursement from
donor
Mitigation Strategy:
Revision of Program
implementation
schedule
Assumption: Bank
has capacity to
implement Program
plan within specified
timeframe
Risk: Failure by the
Bank to engage
additional staff and
consultants could lead
to under utilization of
funds
Mitigation Strategy:
Use of long –term
consultants and
arrangement for
Technical Assistant.
Objectives
Help operatio-
nalise Bank‟s
IWRM policy
Create
awareness
among RMCs
on Bank
IWRM
policies
AfDB IWRM
Capacity
AfDB water
sector
Programs and
policies are
strengthened
and expanded
to help
achieve MDG
targets
RMC IWRM
Awareness
RMCs and
other African
stakeholders
have en-
hanced
awareness of
and commit-
ment to,
IWRM
principles
AfDB
RMCs
AMCOW
Water
Basin
Organizatio
ns
Regional
and Sub-
Regional
Organizatio
ns
Indicator
AfDB water sector
interventions in
RMCs are based on
IWRM principles
Number of new
water initiatives /
strategies developed
% of RMCs
initiating IWRM
processes
Source
PPER, Country
assessment reports,
Stakeholders, water
events
Method
Document review,
Interviews,
Questionnaires, and
Proceedings
Target
Most of the
Bank
relevant
Programs
and projects
reflecting
IWRM
principles
Major
initiatives to
achieve
MDGs
developed
80% of the
RMCs
initiate
IWRM
policy
Time Frame
2010 at
Bank level
2015 at
RMC level
WPP 2010 ANNUAL PROGRESS REPORT
v
Hierarchy of
Objectives
Expected Results
By Sectors and
Corresponding
Themes
Reach
Performance
Indicators Source and
Methods
Indicative
Targets and
Time Frames
Assumptions/
Risks
Activities/Inputs
Support Bank
Operations Capacity
Conduct strategic
studies of water
sector operations,
Programs and
policies
Develop/revise
policies guidelines,
tools, checklists
Provide training and
forums for dialogue
for Bank staff
Support Bank
Operations
Capacity
1. IWRM main-
streamed in
Bank
policies,
Programs and
operations
2. Bank staff
have
increased
skills and
competences
in IWRM
AfDB
AMCOW
RMCs
Water Basin
Organizations
Regional and
Sub-Regional
Organizations
Bank Staff
Indicator
Extent to which
bank policies and
Programs reflect
IWRM approach
Number of IWRM
tools developed
and used in Bank
operations
Number of Bank
staff trained in
IWRM
Source
Bank policies,
Guidelines,
Appraisal reports,
Field mission
reports, Mid-term
reviews, PCR
Methods
Document review
Target
Increased
number of
policies and
Programs
adequately
reflecting
IWRM
principles
Time Frame
3 years
IWRM Outreach and
Knowledge Sharing
Organize
workshops for
RMCs on Bank
IWRM policy
Organize Regional
and sub regional
water forums and
dialogue
IWRM Outreach
and Knowledge
Sharing
1. RMCs have
increased
awareness of
IWRM
principles
and ap-
proaches
2. Regional and
sub-regional
partnerships
strengthened
or
established.
3. Common
African
strategies for
water
development
adopted
Indicator
Increased demand
by RMCs for TA
for development
of IWRM policy
Number and
quality of
partnerships that
have been
established or
strengthened
Number of
common African
strategies for
water
development
adopted
Source
WPP reports, Field
mission reports,
WSS events
Methods
Document
review,
proceedings
Target
Moderate
increase
Time Frame
5 years
WPP 2010 ANNUAL PROGRESS REPORT
vi
Hierarchy of
Objectives
Expected Results
By Sectors and
Corresponding
Themes
Reach Performance Indicators
Source and Methods
Indicative
Targets and
Time Frames
Assumptions/
Risks
Water Information &
Data Management at
AfDB
Collect and analyse
data and
information
generated by Bank
for Bank water
operations
Establish water
sector indicators
and benchmarks.
Water
Information &
Data Management
at AfDB
1. Bank staff has
increased
access to
information
and data for
strategic
planning and
programming
through water
information
Centre
Indicator
% of bank water staff
accessing database
for planning and
programming
purposes
Source
Database
Methods
Review of database
information
Target
80% of Bank
water staff
accessing
database
Time Frame
3 years
Transfer of Best
Practices
Identify, document
and disseminate
lessons learned
from local actions
and instruments
from AfDB
programmes and
projects
Transfer of Best
Practices
Awareness
and adoption
of best
practices in
water sector in
AfDB and
RMCs
increased
Indicator
Number of local
actions/instruments/-
practices identified
for scaling-up or
replication
Extent to which best
practices are
disseminated
Number of instances
in which best
practices are adopted
for scaling up or
replication
Source
National reports,
Field mission reports,
water events,
Methods
Document review
proceedings
Target
At least 3
local actions
identified per
annum
Dissemination
at national
and
community
level in all
RMCs
At least ***
best practices
adopted for
scaling up or
replication
each year
Time Frame
Annual
WPP 2010 ANNUAL PROGRESS REPORT
1
SUMMARY
1. The purpose of the Water Partnership Program (WPP) is “to promote effective water
management policies and practices, at regional and country levels, and to operationalize the
Bank‟s Integrated Water Resources Management (IWRM) Policy in the RMCs”. The Water
Partnership Program (WPP) was established in 2002 with an agreement between the Bank
and the Netherlands Government. The Canadian and Danish governments joined in March
2006.
2. Since its establishment, the WPP has been providing the AfDB with an opportunity to
enhance its knowledge and learning in the water sector, which has better enabled the Bank to
play a key role in promoting dialogue with key regional actors on critical water sector issues
such as water security and meeting the MDGs. Out of the 32 activities listed for
implementation in 2010 3 activities were cancelled and fourteen (14) activities were closed
and the remaining fifteen (15) activities are carried over to 2011. These activities are at
different stages of implementation six (6) activities were substantially completed and four (4)
other activities had good progress. However there were two (2) activities with slow progress
and three (3) activities at commencement stage. As of the end of December 2010 a total of
sixty (60) activities valued at €8.9 million have been funded, with 46 of them completed and
fifteen (15) under implementation. The main achievements resulting from the activities are
highlighted below.
Cumulative Achievements to End of 2009
3. The main achievements attained since inception up to the end of 2009 are:
i) IWRM Outreach and Knowledge Sharing: A series of activities in North, Eastern
and Southern Africa to promote IWRM awareness and enhance knowledge sharing
between countries and institutions on best practices has been supported by the
program, in collaboration with the Global Water Partnership. The WPP has facilitated
the advancement of key sector issues, including supporting Bank led preparation of an
operational strategy and action plan to implement political commitments on water
security and sanitation, which was endorsed by AMCOW in October 2009. The WPP
has been instrumental in facilitating Bank outreach and partnership efforts, as
evidenced by support to the preparation for the AU Heads of States Summit on water
and sanitation in Sharm-El Sheikh, the First and Second Africa Water Weeks, the 4th
and 5th
World Water Forums, the African Sanitation conference, and the Stockholm
Water Weeks; and promotion of dialogue on key sector issues between the AfDB and
various international/regional bodies.
ii) Enhanced Bank Operational Capacity: The program was instrumental in the
establishment of important special initiatives at the Bank including the Rural Water
Supply and Sanitation Initiative (RWSSI), the African Water Facility (AWF), and
support to activities of the ClimDev Programme - which are mainstreaming IWRM
and climate risk management processes in Bank operations, and making significant
contributions to enable Africa to meet its Millennium Development Goals.
iii) Increased Awareness and Adoption of Best Practices: The program has
supported the preparation of a number of key regional studies and reviews including
an agricultural water use study, a water sector governance study, the credit rating of
WPP 2010 ANNUAL PROGRESS REPORT
2
African water utilities undertaken jointly with the WSP/PPIAF, a joint review of the
Sanitation and Hygiene Status in 32 countries carried out with the World Bank/WSP,
and the African Regional Documents for the Fourth and Fifth World Water Forums.
It has also supported development of guidelines related to water user fees and cost
recovery, rainwater harvesting, school water supply and sanitation, water and poverty,
and management of wetlands; and sponsored activities aimed at sensitizing Bank staff
on innovative water and sanitation technologies, such as use of photovoltaic pumping
in rural water systems.
iv) Strengthened Information and Data Management: The WWP has been
supporting Bank efforts to manage water information effectively to enhance decision
making and improve operational effectiveness. A situation analysis of the water
information systems in the Bank has been undertaken. As well, a communication
approach and dissemination plan has been developed to strengthen sharing of water
sector information and knowledge.
Key Achievements in 2010
4. The major achievements in 2010 are:
i) Assessment of the Rural Water Supply and Sanitation Initiative - 2003-2009: A
report entitled “An Assessment of the RWSSI 2003-2009” that reports on lessons
learned to improve the approach to implementation of the initiative was prepared. The
report is a self-assessment and presents the achievements, key lessons learnt, the
challenges encountered, additional resources required and charts the way forward for
achieving the objectives of enhanced RWSSI implementation. In addition to serving
as a valuable knowledge product for OWAS, it will also serve as an input to the
organization of the 2nd
RWSSI conference to mobilise international support and
resources to accelerate the attainment of the MDGs in rural areas.
ii) Preparation of Country Status Overviews (CSOs): An Assessment of the
water sector in 32 countries was undertaken in collaboration with the WSP-World
Bank, UNICEF and WHO and the Bank resulting in 32 CSO reports. Through WPP
funding, the Bank undertook 4 of the 32 assessments. After consultations in country
and regional workshops the 32 Draft CSO Reports were discussed during a peer-to-
peer side event at the Third Africa Water Week. A leading participant from UNEP
commented that such a frank discussion among countries was a milestone, which was
unimaginable five years earlier.
iii) Scale up Agricultural Water Development: Support was provided to establish
a partnership called Agricultural Water Management in Africa (AgWA) among the
main actors in agricultural water management in Africa. AgWA was formed in March
2010 and its 2010-2011 work plan formulated. This is expected to contribute to
improving the mainstreaming of IWRM principles and practices and food security in
Africa.
iv) Support to Regional Dialogue on Water Security Issues: As a follow up to the
outcomes of the 5th
World Water Forum and the 2nd
African Water Week a
Background Paper on Financing Water Security for Economic Growth in Africa was
prepared. The paper supports the water finance dialogue on broad strategies to link
water and economic growth and poverty reduction through the financing of water
infrastructure in Africa.
WPP 2010 ANNUAL PROGRESS REPORT
3
v) WPP Medium-Term Approach (2010-2012): To support implementation of the
WPP, a draft Medium Term Approach Paper was prepared through a consultative
process involving Bank staff, the WPP Technical Working Group. The Approach
Paper took into account the various recommendations made from independent
evaluations, feedback from stakeholders and Bank partners with respect to addressing
contemporary sector development challenges and strengthening Bank‟s capacity to
engage effectively. The Approach Paper will be reviewed and updated in 2011 and
submitted to WPP Steering Committee for approval.
vi) Publication and Dissemination of WPP Products: The WPP products listed below
were published and disseminated during the 3rd African Water Week.
Water Sector Governance in Africa (Vol. 1): Theory and Practice
Water Sector Governance in Africa ( Vol. 2): Assessment and Guidelines
Guidelines for User Fees and Cost Recovery for Urban Networked Water and
Sanitation Delivery
Guidelines for User Fees and Cost Recovery for Rural Networked Water and
Sanitation Delivery;
Technical Summary of 2nd African Water Week.
vii) Launching of studies: Preparatory works for the launching of three studies
were undertaken. Contracts are expected to be signed in the first quarter 2011.
viii) Production of RWSSI films: Films on RWSS in 6 countries were produced and were
shown at the 3rd
African Water Week.
Challenges and Recommended Actions
7. Challenges faced by WPP are below and further discussed in Table 5.1.
i) Timely Utilization of Available Fund: At the end of the reporting period there
was an undisbursed amount of €3,051,706. The WPP need to prudently utilise these
funds on time and the portfolio review ought to be undertaken more frequently to
identify non-performing activities so as to take timely remedial action.
ii) Accelerating Implementation: The slow pace of implementation of WPP
activities has been recognised as a significant concern. OWAS to liaise with user
Departments and provide additional support to accelerate implementation and OWAS
to ensure long term support through assignment of a full-time staff and engagement of
a long term consultant is essential
iii) WPP Steering Committee Meeting: Due to various reasons the WPP Steering
committee which is composed of the Donors and the Bank has not met since March
2008. OWAS shall be approaching all donors and Bank management to organise such
a meeting in the near future.
iv) Increasing visibility of the WPP: To effectively carry out its mandate, it is
important that the WPP is well known and recognised both within the Bank and
among its external stakeholders. In order to improve its visibility the Program need to
strengthen the implementation of its communications approach.
v) Securing new funding: Ensuring adequate funding is the main medium term
challenge of the WPP. Two of the existing donors (Netherlands and Canada) have
indicated that they will not be continuing their involvement with the WPP after March
WPP 2010 ANNUAL PROGRESS REPORT
4
2010, and the third donor (Denmark) remains uncommitted. As a result no new funds
are available to support the operations of the WPP after the end of 2010. Bank
commitment to the program in the medium term will go a long way to determine the
intensity and success of the resource mobilization efforts.
vi) Mainstreaming outcomes: The mainstreaming of WPP findings sponsored
activities into Bank policies, and providing the support to enable water sector staff to
make use of WPP products in operational interventions is essential.
vii) Improving knowledge management: The Program has put in place plans to
increase its efforts to serve as an instrument for the Water Department to improve
knowledge management on water issues. In particular, several important studies and
guidelines that will add value to the AfDB‟s work will be widely disseminated both
within and outside the Bank, and the planned water information and data management
system will be established.
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 1
1 BACKGROUND
1.1 Introduction
1.1.1 The Bank-Netherlands Water Partnership Program (BNWPP) was established in
December 2002 between the Bank and the Netherlands Government. The BNWPP was
transformed into a Multi-Donor Water Partnership Program (MDWPP) with the participation
of the Canadian and Danish governments in March 2006. The Program is supported by USD
5 million from Netherlands, CAD 5.0 million from Canada and DKK 15 million from
Denmark. The Bank is responsible for the administration, management and co-ordination of
the program and provision of office space and office facilities for the execution of the
Program. Currently the Water and Sanitation Department (OWAS) is responsible for the
management of the WPP,
1.1.2 The goal of the Water Partnership Program (WPP) is “to promote effective Integrated
Water Resources Management (IWRM) policies and practices at regional and country level
and to operationalise the Bank‟s IWRM policy in the RMCs.” The main objectives and
associated program components of the WPP are:
Support to the Bank’s Operations Capacity: Mainstream the IWRM approach in the
Bank‟s water operations; develop new guidelines, checklists and manuals; strengthen
the capacity of Bank staff; and promote gender equality.
IWRM Outreach and Knowledge Sharing: Increase awareness in the region about
water issues and solutions, and the application of IWRM principles and tools.
Support Transfer of Best Practice and Experiences: Promote the transfer of
appropriate technologies to enhance efforts to meet the MDGs and AWV targets, and
to disseminate lessons of innovative water management approaches.
Water Information and Data Management: Development of Bank information
system to incorporate collection, analysis, and dissemination of information on all
aspects of water and sanitation.
1.1.3 In the short term, program activities are expected to achieve the following results:
IWRM mainstreamed in Bank policies, programs and operations;
Bank staff have increased skills and competences in IWRM;
Bank staff have increased access to information and data for strategic planning.
RMCs have increased awareness of IWRM principles and approaches;
Regional and sub-regional partnerships strengthened or established;
Common African strategies for IWRM plans and water development adopted;
Awareness and adoption of best practices in water sector in AfDB and RMCs.
1.1.4 In the long term the Program is expected to result in the following:
strengthening of AfDB water sector programs and policies;
better co-ordination of the Bank‟s new water initiatives/ strategies and activities
enhanced awareness of IWRM principles and approaches to RMCs and stakeholders
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 2
1.1.5 Strategic directions and implementation arrangements are guided by an overall 3 year
program approved by the WPP Steering Committee and an Annual Implementation Plan, and
Budget approved by the Vice President (OIVP) of the Bank and a detailed activity work plan
for each activity approved by the OWAS director. The program details on the institutional
set-up, roles, responsibilities as well as monitoring and evaluation arrangements are provided
in Annex 1. A 2010-2012 Medium Term Approach, which provides the strategic direction
and focus of the Program in the next three years was finalised in 2010. The approach
represents a continuation of the existing directions and is fully in accordance with the Bank‟s
Medium-Term Strategy. The 2010-2012 Medium Term Approach is yet to be indorsed by the
WPP Steering Committee.
1.1.6 This Annual Progress Report covers the period from 1st January to 31st December
2010 and provides an update on the status of the work program. This report is organized in 5
sections. The first section provides the background to the WPP and describes the main
contents of the report. The second section describes the overview of the WPP 2010
implementation plan and implementation arrangements. Progress made during the
implementing period is presented in section three. This is followed by a financial status
section at the end of the reporting period. Program management and evaluation is presented
in section four. The last section presents the achievements, major implementation issues and
recommendations.
1.2 WPP Strategic Contribution and Results
1.2.1 The WPP has to date served as an important facility for developing Bank capacity in
IWRM issues as well as promoting learning and innovation in a range of water sector issues.
The Strategic thrust of the Program embraces key themes including enhancing the Bank‟s
approach to sanitation and hygiene in RWSS operations, improving the Bank‟s understanding
of water governance issues underpinning sector reforms, use of innovative technologies, such
as solar pumping devices, in RWSS programs and investigating the health and socio-
economic impact from the provision of water supply and sanitation services.
1.2.2 The WPP has played an important role in facilitating the formulation of key water
sector initiatives such as the African Water Facility (AWF) and the Rural Water Supply and
Sanitation Initiative (RWSSI). To date, several studies, guidelines and strategy papers in
diverse areas relevant to the water sector such as agriculture, wetlands, water supply and
sanitation, institutional and policy reforms and financing have been successfully completed,
and are contributing to the pool of knowledge in the Bank. The full list of activities
undertaken is presented in Annex 2.
1.2.3 The WPP is contributing to innovative learning such as the use of Utility Credit
Rating and Access to Market Finance, Earth Observation Information, Water Governance.
The Program has also supported dialogue across the continent including events such as the
Workshop on strengthening IWRM Planning and Implementation for 31 Northern, Eastern
and Southern African Countries. In response to AMCOW‟s request to the AfDB the WPP
supported the preparation of an operational strategy and action plan which responds to
commitments made on Africa‟s water security issues at the AU Heads of States and
Governments Summit in Sharm El Sheikh Egypt and at various other ministerial and high-
level water events. As a follow-up, WPP also supported the preparation of a template for
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 3
reporting Delivery of Water Security and Sanitation Commitments, Action Plan and
Framework to the African Union‟
1.2.4 The Program has provided support to global events such as the World Summit on
Sustainable Development, the World Water Forum, the Pan-African Implementation and
Partnership Conference on Water, the AfricaSan+5 Conference and the Africa Water Week
events. These events have provided a platform for the exchange of ideas, experiences and
best practices to enrich the knowledge of Bank staff and various stakeholders for the effective
implementation of different regional water initiatives.
2 OVERVIEW OF WPP 2010 IMPLEMENTATION PLAN
2.1.1 The 2010 Implementation Plan and Budget was approved on 12th
March 2010 and
included a total of thirty one (31) activities excluding the WPP Program Management
activities. Four new priority activities, amounting to €570,000 were included for
commencement in 2010. In addition, €185,276 was approved for programme management of
ongoing and new activities (mainly consultant‟s services) and the administrative fee (5% of
commitments). One additional activity African Water Week 2010 and 2011 with a budget of
€1124,418 was introduced later in the year bringing the total activities to thirty-two (32).
Besides this, three new activities Facilitating Innovative Approaches for Water Sector Financing,
Capacity Building of Bank Staff in IWRM/TWRM, and Development of Networks with Specialised
Water Institutions and African Water Professionals were conditionally approved subject to the
availability of additional funds, amounting to €330,000.
2.1.2 Some of the important activities which were to have been undertaken during the
reporting period include revision of the Bank‟s IWRM policy, preparation of Bank sanitation
strategy paper, preparation of the CSOs, preparation of management model for rural water
supply, undertaking a study on community management of WSS, Implementation of Water
Information System at AfDB, and support to the formation of partnership among the principal
actors in agricultural water management (AgWA) and others.
2.1.3 Support to regional and global knowledge events and dialogue remains an important
part of the program. This has been done selectively, to ensure maximum impact on Bank
capacity building and knowledge development. A program co-ordinator was designated to
oversee the day-to-day implementation of the Program. Details on the institutional set-up,
roles, responsibilities as well as monitoring and evaluation arrangements are provided in
Annex 1.
3 PROGRESS OVER THE REPORTING PERIOD
3.1 Overview of Status of Implementation
3.1.1 Some key activities completed during the reporting period include the preparation of
the Assessment of the RWSSI over the period from 2003 to 2009, Background Paper on
Financing Water Security for Economic Growth in Africa and the preparation Country Sector
Overview CSOs for four countries.
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 4
3.1.2 Prior to the end of 2010, WPP had undertaken a portfolio review of all the 31
activities under implementation. Based on the findings of the review five (5) activities were
cancelled from the portfolio either because they were not performing well or because the
objectives of the activity was being realised through other interventions. At the end of 2010,
out of the remaining twenty six (26) activities twelve (12) were completed, six (6) activities
were substantially completed, four (4) activities had good progress while two (2) activities
were exhibiting slow progress and other three (3) activities were at commencement stage.
3.1.3 Table 3.1 below provides an overview of status of implementation and the
implementation status of each activity is provided in Annex 3.
Table 3.1: Overview of Status of Implementation
Status of Activities Number %
1) Completed 12 38%
2) Substantially completed 6 19%
3) Progressing well 4 13%
4) Progressing slowly 2 6%
5) At commencement stage 3 10%
6) Cancelled 5 16%
Total 32 100%
4 FINANCIAL STATUS
4.1 CONTRIBUTION TO THE FUNDS
4.1.1 The Bank Accounts for both BNWPP and MDWPP are kept in Euro currency. The
Netherlands made the 1st Tranche payment on 2nd December 2002 to the Bank to kick start
implementation. With the establishment of the MDWPP, Denmark and Canada also made
their contribution as shown on Table 4.1 below. The last payment was received from
Denmark on 11th January 2010. In addition €24,214 from SIDA IDB were received as a
contribution towards the preparation of the 1st African Water Week.
Table 4.1 Payment Date and Amount of Commitments in Euro
No. of
Tranche
Netherlands Denmark Canada
Date of
Payment
Amount Date of
Payment
Amount Date of
Payment
Amount
1st 03/12/02 1,477,314.00 30/12/05 267,866.00 24/05/06 1,391,556.00
2nd
20/12/04 1,910,076.00 30/12/06 402,014.00 17/-23/09 941,265.06
3rd
24/12/07 401,703.00 25/08/09 969,994.83
4th
31/12/08 469,062.00
5th
11/01/10 470,000.00
Total 3,387,390.00 2,010,645.00 3,302,815.89
4.1.2 Total contributions received as at 31st December 2010 is about €8.85 million
(approximately 94% of the pledged amount). Table 4.2 provides the details of the pledged
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 5
and paid up contributions in Euro. The various contributions received as a percentage of total
pledged funds are 86% for Netherlands, 100% for Denmark and 100% for Canada.
Table 4.2 Pledged Funds and Contributions in Equivalent Euro in Million
Funding Source Pledged Amount in Currency of Commitment Amount in Equivalent Euro
Currency Amount Paid Balance
Netherlands USD 5.00 3.39 0.54
Total BNWPP 3.39 0.54
Denmark DKK 15.00 2.01
Canada CAD 5.00 3.30
Total MDWPP 5.31 0 Total BNWPP &
MDWPP 8.70 0.54
SIDA
0.01
IDB
0.01
DFID
0.13
Grand Total
8.85 0.54
4.2 Fund Utilization as at 31st December 2010
4.2.1 The total funds made available including accrued interest as at 31st December 2010
was €9,055,790. The total cumulative committed amount on activities as at the end of the
reporting period is €7,885,201. The financial status as at 31st December 2010 is provided in
Table 4.3 below. The Netherlands Government has terminated its involvement in the BNWPP
as of the 31st March 2010. Accordingly the Netherlands government has requested the
balance of the fund €425,346 would not be available for any further commitment hence the
net fund available for commitment is €745,244.
4.2.2 The MDWPP disbursement during the reporting period was €206,313. Disbursements
of paid up contributions are summarised in Table 4.3, with detailed information on budgeted
activities and amount disbursed provided in Annex 4. The situation at the end of 2009 is also
provided in the table to show progress. The cumulative disbursement up to 31st December
2010 was €5,578,801 (approximately 62% of commitments and 61% of funds available).
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 6
Table 4.3: Financial Status as at 31st December 2010 in Euro
Description
Amount as at 31/12/10 in Euro Amount as at
31/12/09 in Euro
BNWPP
Fund
MDWPP
Fund
Total
WPP
Total
WPP
Funds Received
Total Contributions 3,387,390 5,337,870 8,725,260 8,255,064
Interest 168,567 161,963 330,530 330,612
Total Funds Available 3,555,957 5,499,833 9,055,790 8,585,676
Cumulative Commitments to Activities 3,130,612 4,754,589 7,885,201 8,150,393
Net Funds Available for commitment 425,345 745,244 1,170,589 435,283
Disbursement
Cumulative Disbursements 3,130,612 2,896,586 6,027,198 5,372,488
Ratio disbursed to committed 100% 61% 76% 66%
Ratio disbursed to funds available 88% 53% 67% 63%
* Includes contribution of € 24,214 received from SIDA and IDB towards the cost of the 1st Africa Water Week.
** As the BNWPP account is closed the balance of €425,346 would not be available for any further commitment.
4.2.3 The 2010 approved budget, cumulative disbursement and the percentage of
disbursement categorised according to implementation status as at 31/12/10 is as shown in
Table 4.4 below the information for each activity is provided in Annex 5.
Table 4.4: 2010 Budget and Cumulative Disbursement as at 31/12/10
Status of Activity
Amount in Euro % of
Disburseme
nt
Approved
2010 Budget
Disbursed up
to 31/12/10
Balance at
31/12/10
Completed Activities 1,345,977 1,114,010 231,967 83%
Substantially Completed Activities 885,000 514,403 370,597 58%
Activities with Implementation Progressing Well 647,145 319,122 328,023 49%
Activities with Slow Implementation 274,924 90,288 184,636 33%
Activities at Commencing Stage 720,000 0 720,000 0%
Activities Cancelled 956,358 101,429 854,929 11%
Programme Management and Administration 704,208 447,124 257,084 63%
Total 5,533,612 2,586,376 2,947,236 47%
5 ACHIEVEMENTS, IMPLEMENTATION ISSUES AND RECOMMENDATIONS
5.1 ACHIEVEMENTS AND IMPACT
5.1.1 As of the end of December 2010 a total of sixty (60) activities valued at €8.9 million
have been funded, with forty six (46) of them completed and fifteen (15) under
implementation. The impacts, results, outputs of the WPP vis-a vis the indicators and targets
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 7
set at the outset in the Logical Framework are provided in the table in Annex 6. Some of the
main achievements are highlighted below.
5.2 MAIN IMPACT
5.2.1 The major impact of the WPP operations is its valuable contributions to achievement
of MDG targets related to water in Africa. The WPP was instrumental in the establishment of
the Rural Water Supply and Sanitation Initiative (RWSSI), the African Water Facility
(AWF), ClimDev Programme in Africa and Agricultural Water Management in Africa
(AgWA) which are contributing to the improvement of the water supply and sanitation
provision, food security, climate risk management and the mainstreaming of IWRM
principles and practice in Africa.
5.3 CUMULATIVE ACHIEVEMENTS TO END OF 2009
5.3.1 The main achievements attained by the WPP since inception up to the end of 2009
are:
i) IWRM Outreach and knowledge sharing: A series of activities in North, Eastern and
Southern Africa to promote IWRM awareness and enhance knowledge sharing
between countries and institutions on best practices has been supported by the
program, in collaboration with the Global Water Partnership. The WPP has facilitated
the advancement of key sector issues, including supporting Bank led preparation of an
operational strategy and action plan to implement political commitments on water
security and sanitation, which was endorsed by AMCOW in October 2009. The WPP
has been instrumental in facilitating Bank outreach and partnership efforts, as
evidenced by support to the preparation for the AU Heads of States Summit on water
and sanitation in Sharm-El Sheikh, the First and Second Africa Water Weeks, the 4th
and 5th
World Water Forums, the African Water Week series, the African Sanitation
conference, and the Stockholm Water Weeks; and promotion of dialogue on key
sector issues between the AfDB and various international/regional bodies.
ii) Enhanced Bank operational capacity: The program was instrumental in the
establishment of important special initiatives at the Bank including the Rural Water
Supply and Sanitation Initiative (RWSSI), the African Water Facility (AWF), and
support to activities of the ClimDev Programme - which are mainstreaming IWRM
and climate risk management processes in Bank operations, and making significant
contributions to enable Africa to meet its Millennium Development Goals.
iii) Increased awareness and adoption of best practices: The program has supported the
preparation of a number of key regional studies and reviews including an agricultural
water use study, a water sector governance study, a credit rating of African water
utilities undertaken jointly with the WSP/PPIAF, a joint review of the Sanitation and
Hygiene Status in 32 countries carried out with the World Bank/WSP, and the African
Regional Documents for the Fourth and Fifth World Water Forums. It has also
supported development of guidelines related to water user fees and cost recovery,
rainwater harvesting, school water supply and sanitation, water and poverty, and
management of wetlands; and sponsored activities aimed at sensitizing Bank staff on
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 8
innovative water and sanitation technologies, such as use of photovoltaic pumping in
rural water systems.
iv) Strengthened information and data management: The WWP has been supporting
Bank efforts to manage water information effectively to enhance decision making and
improve operational effectiveness. A situation analysis of the water information
systems in the Bank has been undertaken, leading to the development of a framework
for the implementation of a water information and data management (WIDM) system.
As well, a communication approach and dissemination plan has been developed to
strengthen sharing of water sector information and knowledge.
5.4 KEY ACHIEVEMENTS IN 2010
5.4.1 The major achievements of 2010 are:
i) Assessment of the Rural Water Supply and Sanitation Initiative - 2003-2009: A
report entitled “An Assessment of the RWSSI 2003-2009” that reports on lessons
learned to improve the approach to implementation of the initiative was prepared. The
report is a self-assessment and presents the achievements, key lessons learnt, the
challenges encountered, additional resources required and charts the way forward for
achieving the objectives of enhanced RWSSI implementation. In addition to serving
as a valuable knowledge product for OWAS, it will also serve as an input to the
organization of the 2nd
RWSSI conference to mobilise international support and
resources to accelerate the attainment of the MDGs in rural areas.
ii) Preparation of Country Status Overviews (CSOs): An Assessment of the
water sector in 32 countries was undertaken in collaboration with the WSP-World
Bank, UNICEF and WHO and the Bank resulting in 32 CSO reports. Through WPP
funding, the Bank undertook 4 of the 32 assessments. After consultations in country
and regional workshops the 32 Draft CSO Reports were discussed during a peer-to-
peer side event at the Third Africa Water Week.
iii) Scale up Agricultural Water Development: Support was provided to establish
a partnership called Agricultural Water Management in Africa (AgWA) among the
main actors in agricultural water management in Africa. AgWA was formed in March
2010 and its 2010-2011 work plan formulated. This is expected to contribute to
improving the mainstreaming of IWRM principles and practices and food security in
Africa.
iv) Support to Regional Dialogue on Water Security Issues: As a follow up to the
outcomes of the 5th
World Water Forum and the 2nd
African Water Week a
Background Paper on Financing Water Security for Economic Growth in Africa was
prepared. The paper supports the water finance dialogue on broad strategies to link
water and economic growth and poverty reduction through the financing of water
infrastructure in Africa.
v) WPP Medium-Term Approach (2010-2012): To support implementation of the
WPP, a draft Medium Term Approach Paper was prepared through a consultative
process involving Bank staff, the WPP Technical Working Group. The Approach
Paper took into account the various recommendations made from independent
evaluations, feedback from stakeholders and Bank partners with respect to addressing
contemporary sector development challenges and strengthening Bank‟s capacity to
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 9
engage effectively. The Approach Paper will be reviewed and updated in 2011 and
submitted to WPP Steering Committee for approval.
vi) Publication and Dissemination of WPP Products: The WPP products listed below
were published and disseminated during the 3rd African Water Week.
Water Sector Governance in Africa (Vol. 1): Theory and Practice
Water Sector Governance in Africa ( Vol. 2): Assessment and Guidelines
Guidelines for User Fees and Cost Recovery for Urban Networked Water and
Sanitation Delivery
Guidelines for User Fees and Cost Recovery for Rural Networked Water and
Sanitation Delivery;
Technical Summary of 2nd African Water Week.
vii) Launching of studies: Preparatory works for the launching of studies on 1)
Health and Socio-Economic Impact of WSS Provision, 2) Enhancing PPP in the water
and Sanitation Sector and 3) Development of Bank‟s Urban Water supply and
Sanitation Framework were undertaken. Contracts will be signed in the first quarter
2011.
viii) Production of RWSSI films: Films on RWSS in 6 countries were produced and were
shown at the 3rd
African Water Week.
5.5 ISSUES AND RECOMMENDATIONS
5.5.1 A number of issues and recommendations regarding implementation of the WPP are
discussed below:
Table 5.1: Issues and Recommendations
Issues Actions
i) Timely Utilization of Available Fund
At the end of the reporting period €425,346 has to be
returned to the Netherlands Government since it has not
been used during the agreement period. In addition
€540,000 commitment was not paid into the BNWPP by
the same donor. The amount that could have been used
from the Netherlands is thus €965,346 which is about 10%
of the total program fund. Canada‟s Funding to WPP
ended with the conclusion of the current agreement on 31
March 2010. At the end of December 2010 there was
undisbursed amount of €2,946,462 from the Danish and
Canadian contribution to the MDWPP.
Available funds have to be prudently utilized
immediately. Accordingly, OWAS will
focus on completing ongoing activities and
expediting the commencement of new
activities.
ii) Accelerating Implementation
The slow pace of implementation of WPP activities has
been recognized as a significant concern. As most
activities were in the commencement stage and the WPP
the amount of fund disbursed during the reporting period
was only €206,313.
OWAS to liaise with user Departments and
provide additional support to accelerate
implementation through assignment of a
full-time staff and engagement of a long
term consultant
OWAS promote the increased involvement of
the Field offices in WPP activities as a way
of enhancing delivery.
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 10
Issues Actions
iii) Convening WPP Steering Committee Meeting
The WPP Steering committee which is composed of the
Donors and the Bank has not taken place since March
2008 due to various reasons.
OWAS to approach all donors and Bank
management to organize such a meeting in
the near future, either in Tunis or
elsewhere.
iv) Enhancing Visibility of WPP
To effectively carry out its mandate, it is important that the
WPP is well known and recognized both within the Bank
and among its external stakeholders. This will need
sustained communications support and a systematic
approach to publishing and dissemination. .
OWAS to provide sustained communications
support to enable the production of
completed studies.
WPP to publish and disseminate more WPP
products in hardcopy and softcopy formats.
v) Securing New Funding
Ensuring adequate funding is the main medium term
challenge of the WPP. Two of the existing donors
(Netherlands and Canada) have indicated that they will not
be continuing their involvement with the WPP after March
2010, and the third donor (Denmark) remains
uncommitted. As a result no new funds are available to
support the operations of the WPP.
OWAS to request Bank to allocate fund to
WPP from surplus accounts
Bank/OWAS to promote support for WPP
among donors
vi) Mainstreaming Outcomes
The mainstreaming of relevant WPP sponsored products
into Bank activities and policies, and providing the support
to enable water sector staff to make use of WPP products
in operational interventions is essential.
WPP to undertake an assessment of
mainstreaming of IWRM in Bank funded
projects and programs during revision of
IWRM policy
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 11
ANNEXES
ANNEX 1: IMPLEMENTATION ARRANGEMENTS, MONITORING &
ANNEX 2: SUMMARY OF COMPLETED AND ONGOING ACTIVITIES
ANNEX 3: IMPLEMENTATION STATUS OF ACTIVITIES AS AT 31ST
DECEMBER 2010
ANNEX 4: FINANCIAL STATEMENTS FOR MDWPP AND BNWPP
ANNEX 5: 2010 BUDGET AND CUMULATIVE DISBURSEMENT AS AT
31/12/10
ANNEX 6: EXPECTED RESULTS, TARGETS AND ACHIEVEMENTS
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A1 12
ANNEX 1: IMPLEMENTATION ARRANGEMENTS, MONITORING &
EVALUATION
1 IMPLEMENTATION ARRANGEMENTS
Implementation is guided by an overall program approved by the WPP Steering Committee.
Annual Implementation Plan and Budget prepared for each year on the basis of the Strategy
and approved by the Vice President (OIVP) of the Bank.
The Annual Implementation Plan and Budget are reviewed by a Technical Working Group
composed of representatives from different Departments and units of the Bank. The Director
of OWAS has overall responsibility for detailed implementation of the Plan and approves the
detailed work plan and budget elaborated for each activity. The Program Coordinator
oversees the day-to-day implementation of the Program. The responsibilities of the various
institutional units in the implementation process are shown in the Table 1 below.
Table 1: Responsibilities of Various Actors
Implementing Unit Responsibilities
Steering Committee Approves the Medium-Term Strategy
OIVP Approves Annual Implementation Plan and Budget
Assigns Technical Working Group (TWG)
Director of OWAS Approves individual activities and budget
Designate Program Coordinator
Oversees the implementation of the program
Technical Working Group
(TWG)
Reviews Annual Implementation Plan and Progress Reports
prior to submission to the Director of OWAS
Program Coordinator (PC) Oversees day-to-day implementation of the WPP
Task Managers (TM) Prepare detailed proposals and submit for approval by the
Director
Engage consultant(s) following Bank procedures
Prepare progress and completion reports for the activities
Follow-up the implementation of the individual activity
2 MONITORING
Monitoring of the Program is achieved through review of the semi-annual, annual and
program completion reports. Annual WPP Partners meeting are also held to review
implementation progress. A Results Based Management framework is being used to facilitate
monitoring and evaluation. A performance measurement framework and risk assumptions
and mitigation strategies are provided for in the LFA. As part of the closure of the BNWPP
the financial records of the WPP have been audited by an external auditor during the
reporting period.
3 EVALUATION
With respect to Program evaluation the Partners to MDWPP undertake an external evaluation
of the activities financed by the fund biennially. An evaluation was undertaken in 2006 and
2008. Another one is planned for 2011. An independent consultant shall carry out the
evaluation of the Program after the completion of the Program.
WPP 2010 SEMI-ANNUAL PROGRESS REPORT
A2-13
Annex 2: Summary of Completed and Ongoing Activities
WPP 2010 ANNUAL PROGRESS REPORT
A2-14
Annex 2A: Completed Activities Ref No.
Component Activity Objective Scope of Activity Output/ Value Added Disbursed Amount in Euro
1 SBOC Guidelines for Water User Fee and Cost Recovery
To prepare Guidelines for user fee and cost recovery for water supply, sanitation and irrigation in line with the IWRM principles that water has an ecological, social and economic use and that water management has to be optimised within these systems
Undertake a study on Water user fee and cost recovery
Prepare Guidelines
Organize a workshop to validate the study and the Guidelines
Guidelines for user fees and cost recovery for water supply, irrigation and sanitation prepared
Product will provide valuable resource to Bank staff and RMCs on the issue of cost recovery in WSS
114,288
2 SBOC Assessment of Best Practices and Experiences on Water Harvesting
To document recent developments in the application of water harvesting techniques and document best practices to assist Bank Task Managers and RMCs apply knowledge in this area to WSS programs.
Review and document experiences and successes in water harvesting, identify and document best practice.
Identify potential areas of application in Bank interventions in order to contribute to improvements in access to water for agricultural production and domestic use
Organize a workshop to validate the study and products
A Handbook on Water Harvesting produced.
Implement water harvesting components in Bank financed projects and programs with a holistic view of ensuring sustainable development
60,929
3 SBOC Preparation of a Handbook on Wetlands
To develop a resource on wetlands management for Bank staff
Assess, inventory and summarize the present knowledge of wetlands in Africa
Prepare a handbook of adaptation of good management practices of wetlands
Develop guidelines on wetlands management
Handbook on Wetlands produced.
Can be used as a tool in the future preparation of the Bank‟s policy on wetlands
26,633
4 SBOC Water and Poverty Link Assessment
To assess the link between Water and Poverty To develop typologies and check lists to ensure appropriate incorporation of poverty reduction objectives in all relevant water sector programs
Document recent developments in the analysis of water and poverty linkages
Develop typologies and check lists
Final report outlining findings on Water and Poverty linkages produced
112,432
5 SBOC Rural Water Supply and Sanitation Initiative Formulation
To address the challenge of providing accelerated access to safe drinking water supply and sanitation to rural populations in Africa.
Prepare a Framework for Implementation (FFI) of the RWSSI and country assessments and appraisal reports for the five countries selected for pilot phase implementation.
Undertake country assessments in selected countries to validate baseline data.
Assess financial and infrastructure requirements, as part of preparatory work for the launching of the program of the countries.
Submit RWSSI document to the AfDB Board for approval
Framework for Implementation of RWSSI developed
209,948
6 SBOC Studies on Financial Instruments to Facilitate Investments in the Water Sector
To develop a strategy for the Bank to support direct lending to sub-sovereign public sector organizations in the water sector. To find methodologies, modalities or instruments to facilitate Bank support for non-sovereign lending and to support lending to small and medium scale private sector
Assess the African situation with respect to sub-sovereign lending instruments
Develop a strategy on how the Bank can assist the sub-sovereigns in the water sector to have better access to financial resources and what steps are required to build institutional capacities for the promotion of sub-sovereign lending.
Organize a workshop to validate the study
Present the report to the Bank‟s Senior Management Committee
Strategy on Financial Instruments to Facilitate Investments for Water developed.
18,796
7 SBOC Agricultural Water Use Strategy Study
To diagnose trends and opportunities in agricultural water use. To formulate an investment strategy that would respond to the growing needs from the sector
Conduct studies and analysis on four of the eight selected themes
Prepare eight (8) thematic reports and a synthesis strategy report. Present for peer review
Present the results of the study at the 4th World Water Forum, March 2006 in Mexico.
Agricultural Water Use Strategy developed 2,685
8 SBOC Strengthening Staff To Strengthen Staff Competence and Organize an international water conference on RWSSI in collaboration with the Proceedings of the International Water 200,169
WPP 2010 ANNUAL PROGRESS REPORT
A2-15
Ref No.
Component Activity Objective Scope of Activity Output/ Value Added Disbursed Amount in Euro
Competence and Awareness (2004Bank Water Week, etc)
Awareness French government. conference on RWWSI produced.
9 SBOC Gender Mainstreaming in Water Operations
To prepare guidelines which would assist Bank staff to conceive, plan, and implement activities to create the technical, economic and social conditions for Gender Mainstreaming in Water Operations
Prepare an inception report
Prepare a report on the issue
Develop guidelines to mainstream gender in Bank water projects.
Organize training for Bank Staff
Document on Gender mainstreaming in Water Operations developed
58,366
10 IOKS The United Nations Secretary General Advisory Board on Water and Sanitation (UNSGAB) Africa Dialogue
To Formulate a framework of engagement of the UNSGAB in support of the ongoing African water initiatives and programs
Organize a dialogue
Exchange views on the Hashimoto Action Plan with African Stakeholders and
Formulate a framework of UNSGAB engagement
UNSGAB Africa Dialogue organized
A framework of UNSGAB engagement in support of the ongoing African water initiatives and programs articulated.
59,358
11 IOKS Workshop for Northern African Countries on IWRM
To create awareness among RMCs on the principles and approaches of IWRM and show IWRM's key links to meeting MDGs' poverty reduction objectives.
Assess the situation of water resources management in each of the 7 countries
Produce a regional document on where the countries stand with respect to IWRM.
Organize a workshop on IWRM for the North African Sub-region and present the regional document
Workshop for Northern African Countries on IWRM organized.
109,255
12 SBOC The New Paradigm Shift in Agricultural Water Development in Africa)
To elaborate a Shift in Agricultural Water development in Africa
Review of literature on current trends of agricultural water use with a view to tackling agriculture and food problems
Identify the emerging paradigm shift in Agriculture Water Development and Management in Africa
Elaborate a shift in Agricultural Water development in Africa
Present the result of the review at First AfDB Economic Conference
Report on the New Paradigm Shift in Agricultural Water Development in Africa developed
27,800
13 IOKS Rural Water Supply And Sanitation Network (RWSN) Forum 2006 In Ghana
To provide participants with an improved, in-depth understanding of the concepts, opportunities and challenges of scaling up local entrepreneurship to help achieve the MDGs for rural water supply
Organize a RWSN forum
Produce the forum proceedings
Forum provided for further dialogue and discussion on RWSS options involving self-supply.
A wider perspective on rural water supply is afforded participants.
54,554
14 IOKS Support to WaterDom at the WSSD
To enhance the use of water as a key to sustainable development and increase awareness on African water issues and challenges
Prepare Key note papers
Organize exhibitions around the themes of water
To support the organization of WaterDom at WSSD.
WaterDom at WSSD successfully organized
Commitments to action and financial support made by various donor agencies
96,357
15 IOKS Support to 4th World Water Forum
To coordinate the preparatory process and provide the Secretariat function for the 4th world water forum
Organize two preparatory meetings involving major stakeholders in the region
Assist in the preparation of the Africa Regional Document
Present the document “Water Resources Development in Africa”
Support to 4th World Water Forum provided
Africa‟s participation successfully coordinated.
200,000
16 IOKS Support to the Pan-African Conference on Water
Sustained dialogue on water issues in Africa To provide support to the Pan – African Conference on Water
Review commitments made by governments, donors and other institutions during previous conferences and meetings on water
Establish/strengthen partnerships to facilitate the implementation of programs.
Pan – African Conference on Water successfully organised
135,697
17 IOKS Nile Basin Initiative Stakeholder workshop
To organise a confidence-building workshop for the technical staff of the Nile Basin riparian countries with a view to deepening the partnership among these countries.
Issues and challenges for the NBI to be discussed
Recommendations to be made on key actions to provide invaluable resource and guidance for any organisation wanting to cooperate with the NBI in realizing a sustainable regional socio-economic development..
Workshop successfully held and recommendations for follow up produced.
Report on the outcome of the workshop prepared.
206,810
18 IOKS IWRM Implementation To create awareness among RMCs on the principles and approaches of IWRM and show IWRM's key links to meeting MDGs' poverty reduction objectives.
Support participation of RMCs on a workshop on IWRM Awareness on IWRM promoted 128,000
WPP 2010 ANNUAL PROGRESS REPORT
A2-16
Ref No.
Component Activity Objective Scope of Activity Output/ Value Added Disbursed Amount in Euro
19 IOKS Support to AMCOW Meeting To organize an AMCOW meeting to deliberate on the establishment Plan of the African Water Facility and the RWSSI
Coordinate the participation of AMCOW members
Prepare the discussion documents
AMCOW participation in deliberations on establishment plan for AWF and RWSSI successfully supported.
39,007
20 IOKS Joint Meeting of Bank, Government and NGOs on Moyen Bani Plane, Mali
To promote stakeholders‟ participation in the development of the Moyen Bani Plane
Provide financial support for the organisation of the meeting A joint meeting of Bank, Dialogue on challenges of Moyen Bani Plane in Mali conducted
8,587
21 IOKS Support to African Water Facility Formulation
To establish the African Water Facility Develop a conceptual note for the AWF
Present the document to the Board for approval
AWF successfully established 83,986
22 IOKS Support to African Water Facility Establishment
To establish the African Water Facility
Organize an inaugural meeting of the Governing Council of the AWF
Provide support for initial activities
AWF successfully established 79,840
23 TBPE Assessment of Water Supply and Sanitation Provision in Schools
To ensure that interventions undertaken by the Bank that target schools include a component for the provision of water and sanitation services.
Assess water supply and sanitation provision in schools in West Africa and make the information available to Bank staff.
Elaborate guidelines based on the findings.
Report on WSS provision in Schools prepared
Guidelines for the provision of water and sanitation services to schools developed.
24 WIDM Establishment of Bank Water information Centre
To develop the Bank‟s Water Information Centre for the collection, compilation, retrieval and dissemination of information on all aspects of water and sanitation
Investigate reports, statistics, maps, figures and various analyses to be systematically compiled, organized and disseminated in order to
Final Study Report identifying key issues and outlining recommendations for implementation
26,553
25 TBPE Assessment of use of Earth Observation Information
To assess the use of space-based earth observation information for water resources development
Assess the various types of EOI in the public and private domain.
Review the capacity and capability of the various systems; assess the potential use of the different types EOI for water resources development and monitoring and evaluation as well as the potential users of the information.
Share outcomes and organize a stakeholders‟ workshop in collaboration with TIGER project.
Final Report issued and findings disseminated 12,179
26 IOKS Strengthening partnership among regional actors
To encourage sharing of information and knowledge among regional actors and to co-ordinate joint activities.
Support the efforts of regional organizations to dialogue on critical issues related to integrated water resources management on the continent.
7th Partnership meeting on rural Development in West & Central Africa was successfully undertaken in November 2007
17,453
27 IOKS Scaling up Agricultural Water Development (AWD) in Africa
To increase the awareness of AWD needs
and potential and help promote strategic
planning and investment preparation in
countries to revitalize AWD investments.
Disseminate findings and recommendations of a new multi-partner AWD Strategy
Facilitate country/regional level actions to scale up AWD
Regional workshop successfully organised to disseminate findings and recommendations of the new AWD strategy and promote the establishment of national irrigation and drainage associations.
34,963
28 IOKS Workshop for Eastern African Countries on IWRM
To assess the current status of IWRM in the countries and to exchange opinions on key IWRM planning issues,
Undertake assessment status of IWRM application in each of the countries Organize a workshop to create awareness on IWRM and exchange experiences and good practices on IWRM planning issues
Status of IWRM in the countries documented
RMCs have increased awareness on IWRM principles and approaches.
198,000
29 Support to African Water Task Force
Support the development of IWRM polices and promote the water sector agenda
Support the deliberations towards a common agenda on the development of the IWRM polices in Africa in the various forums
Participation at the 3rd World Water Forum becomes effective
African countries present a common agenda at the various fora
513,777
30 SBOC Issues Paper on Water Governance
To assess the current water governance situation in Africa
Assess the water governance arrangements for sustainable management of water
resources and delivery of water services in Africa
Assess the pro-poor water governance situation in Africa
Final Report outlining findings and
recommendations on water governance in
Africa
Key issues analysed and reflected in water sector operations
91,933
31 SBOC Regional Study into the sustainable Livestock
To analyse current livestock management issues in the Region and propose short,
Collect, compile, analyse and synthesize the available information and data on the A framework which can guide future Bank interventions in the Region developed
192,861
WPP 2010 ANNUAL PROGRESS REPORT
A2-17
Ref No.
Component Activity Objective Scope of Activity Output/ Value Added Disbursed Amount in Euro
Development in the Greater Horn of Africa (GHA)
medium and long term mitigation measures as a basis for Bank intervention
different aspects of sustainable livestock development in the GHA
Undertake an inventory of the different interventions in the GHA to address drought-
related issues
Organize workshop to discuss results and disseminate findings
32 IOKS 2007 African Water Week To provide a platform for dialogue and learning on water security issues in Africa and provide appropriate input for key regional and international events such as the AU summit and the WWF-5.
Liaise with AMCOW and key stakeholders on preparation for the event, assemble Bank Team to deliver conference Mobilize resources to augment WPP budget Coordinate Technical input with Collaborating Institutions Commission Technical Papers Host event and prepare Final Outcomes
Final Outcomes and Ministerial Declaration of AWW-1 AfDB asserts its lead role in the water sector in Africa The main water challenges in the Region discussed Consensus reached on common strategies for water development
117,397
33 IOKS Workshop for Eastern African Countries on IWRM
To assess the current status of IWRM in the countries and to exchange opinions on key IWRM planning issues,
Undertake assessment status of IWRM application in each of the countries Organize a workshop to create awareness on IWRM and exchange experiences and good practices on IWRM planning issues
Status of IWRM in the countries documented RMCs have increased awareness on IWRM principles and approaches.
198,303.
34 SBOC Credit Rating of Water Utilities
To produce a shadow credit rating for seven African water utilities. This will provide insight on the capability of these utilities to absorb market debt and ways to improve their creditworthiness. The results of this project will be disseminated and debated in a regional workshop.
On-site dialogue and review process with participating utilities to arrive at a credit assessment score contextualized by an assessment of the local financial market and regulatory framework and indicating the credit worthiness of the entity. Preparation of diagnostic credit assessment reports that identify key strengths and weaknesses and the potential to access local finance. A regional learning event will be organized by the sponsors of this study to disseminate findings and to facilitate South-South leaning.
Seven credit worthiness assessments /utility diagnostics Regional comparative utility creditworthiness assessment report Formal credit ratings Regional learning event
46,212
35 IOKS Support to 5th World Water Forum
To coordinate the preparatory process and provide the Secretariat function for the 4th world water forum
Organize two preparatory meetings involving major stakeholders in the region Assist in the preparation of the Africa Regional Document Present the document “Water Resources Development in Africa”
Support to 5th World Water Forum provided Africa‟s participation successfully coordinated. Africa Regional Document produced
313,945
36 IOKS Workshop on best practices and experiences on rainwater harvesting
Promote rainwater harvesting as a viable and cost effective option to water supply
Undertake a situational analysis of RWH in Uganda Organize a workshop to share experience and the best practice in rainwater harvesting
AfDB RWH handbook introduced and disseminated Increased knowledge and awareness on RWH Increased use of RWH techniques
18,499
37 WIDM Implementation of the outcomes from the assessment of RWSSI achievements
To review the RWSSI Program and
synthesis the findings as an input
towards strengthening the approach to
RWSS implementation.
Review current RWSSI implementation strategy and identify constraints and opportunities for improvement
Provide recommendations for improving the Bank‟s approach to RWSS delivery.
Consult with stakeholders in countries implementing RWSSI
Develop guidelines for national RWSS programs Prepare a revised strategy incorporating comments and suggestions
Revised strategy completed and disseminated
Implementation of RWSS programs improved
Guidelines for national RWSS programs developed.
48,116
38 SBOC Review of RWSSI Implementation Strategy
82,746
39 SBOC Guidelines for the Development of National water sector &RWSS Program
40 IKOS Follow-up of Dialogue with USGAB on WSS
Ensure sustained follow up on AfDB- UNSGAB Dialogue on water sector issues on Africa
Support Technical input and reports in support of the ongoing dialogue with UNSGAB
Framework with UNSGAB sustained and strengthened to provide sound platform for high level dialogue on sector issues in Africa
62,403
41 WIDM RWSSI Programs Progress report
To review the RWSSI Program and
synthesis the findings as an input
towards strengthening the approach to
Review current RWSSI implementation strategy and identify constraints and opportunities for improvement
Provide recommendations for improving the Bank‟s approach to RWSS delivery.
Revised strategy completed and disseminated
Implementation of RWSS programs improved
Guidelines for national RWSS programs
81,011
WPP 2010 ANNUAL PROGRESS REPORT
A2-18
Ref No.
Component Activity Objective Scope of Activity Output/ Value Added Disbursed Amount in Euro
RWSS implementation.
Consult with stakeholders in countries implementing RWSSI
Develop guidelines for national RWSS programs Prepare a revised strategy incorporating comments and suggestions
developed.
42 TBPE ClimDev-Africa Needs Assessment Program, Support for Capacity Building
To improve the availability and use of climate information and services and mainstream climate risk management process in support of sustainable development and achievements of the MDGs.
Assess the magnitude of the likely impact of climate change on Africa‟s select sectors
Develop scenarios to be used for policy advocacy, donor mobilization and coordination
Awareness raising among local community
Promote Climate Risk Management (CRM) as a mechanism of sustainable development
Formulate how CRM and environmental risk analysis can justify “adaptation Investments” of ADB
Assess the institutional capacity in the domain
Institutional capacity assessed
Ecological Desk Survey and CRM
ClimDev-Africa Program and implementation strategy that will accompany the Program developed
Bank staffs trained in the use of climate information to climate proof the investment projects and integrate climate risk in Bank operations
40,036
43 WIDM Implementation of the outcomes from the RWSSI Assessment
Strengthening RWSS implementation.
Organize resources mobilization conference for RWSSI Revise RWSSI implementation strategy
RWSSI implementation strengthened Progress towards attaining MDG targets increased
48116
44 IOKS Vision africaine de l‟eau: bilan de la mise en œuvre
Establish a permanent mechanism for monitoring progress made at all levels in the implementation of the Vision.
Review of the implementation of the Vision
Under take status survey
Prepare status report
Outline mechanise for monitoring progress
Organize validation workshop Prepare final report
A status report of the implementation of the African Water Vision is available ;
A permanent mechanism for monitoring progress made at all levels in the implementation of the African Water Vision is put in place.
29,100
45 WIDM Implementation of the outcomes of the AfricaSan-5 conference
Ensure that the follow-up of the recommendations made at the AfricaSan-5 conference
Participate in the taskforce established for the follow-up of activities Progress towards attaining sanitation MDG target increased
3,439
46 IOKS Vision africaine de l‟eau: bilan de la mise en œuvre
Establish a permanent mechanism for monitoring progress made at all levels in the implementation of the Vision.
Review of the implementation of the Vision
Under take status survey
Prepare status report
Outline mechanise for monitoring progress
Organize validation workshop
Prepare final report
A status report of the implementation of the African Water Vision is available ;
A permanent mechanism for monitoring progress made at all levels in the implementation of the African Water Vision is put in place.
29,100
WPP 2010 ANNUAL PROGRESS REPORT
A2-19
Annex 2B: Activities with Active Budget Lines
Ref No.
Component Activity Objective Scope of Activity Output/ Value Added IO Approved Disbursed Available
1 SBOC Capacity building of Bank staff in innovative technologies
To facilitate the acquisition of new
knowledge and skills of Bank staff in
the area of innovative technologies
that can contribute meaningfully to
improving WSS service delivery
Organize seminars for Bank Staff on:
a. Eco-sanitation technologies
b. Photovoltaic Energy and Wind energy for Water Supply Schemes
Bank staff have increased skills and knowledge in innovative technologies for WSS
New technical solutions piloted in RWSSI operations with a view to scaling up successful approaches in RMCs
703081 74,924 22,788 52,136
2 SBOC Regional Study into the sustainable Livestock Development in the Greater Horn of Africa (GHA)
To analyse current livestock
management issues in the Region
and propose short, medium and
long term mitigation measures as a
basis for Bank intervention
Collect, compile, analyse and synthesize the available
information and data on the different aspects of sustainable
livestock development in the GHA
Undertake an inventory of the different interventions in the
GHA to address drought-related issues
Organize workshop to discuss results and disseminate findings
A framework which can guide future Bank interventions in the Region developed
703103 300,000 273,531 26,469
3 SBOC Study on the Health & Socio-Economic Impact of the Provision of Water Supply & Sanitation
To Gather information on the impact of
implementation of water supply and
sanitation projects in two countries
To develop tools and process for
continuous evaluation of indicators
for WSS projects and programs
implementation
Identify countries and specific areas where the sample study would take place
Using demographic data assess the change in morbidity rate (diarrhea among children) in an area before and after the provision of water supply and sanitation services
Analyses the number of cases averted and the cost saved for treatment
Put in place a monitoring and evaluation mechanism as well as indicator for regular assessment
Prepare conclusions recommendations
Health impact of the provision of WSS in the two countries assess
Information document on socio economic impact of WSS available
Tools and process for continuous evaluation of indicators for WSS programs developed
703851 350,000 0 350,000
4 SBOC Support to Agricultural Water Development
Support Bank‟s effort to scale up Agricultural water development to improve food security in Africa
Analytical work in support of the development of a Business plan for Agricultural Water Development
Support for the establishment of Partnership for Agricultural Water in Africa
Partnership among regional actors in the agricultural water development sector strengthened
795075 80,000 23,122 56,678
5 SBOC Development Aid and Access to WSS in Sub-Saharan Africa
Identifying factors determining countries‟ performance in providing access to safe water and sanitation and
Assess the role, significance and targeting of Development Aid in the provision of water and sanitation
Undertake three case studies
Field visit to selected countries
Provide knowledge that will assist the Regional Member Countries, the Bank‟s operations and donor agencies in the design and implementation of future Development Aid strategies and actions for increased access to WSS in SSA.
703811 75,000 34,256 40,744
WPP 2010 ANNUAL PROGRESS REPORT
A2-20
6 SBOC Revision of the Integrated Water Resources Management (IWRM) Policy of ADB
Build solid Body of Knowledge and
analysis allowing the Bank and
RMCs to proceed to successful
revision of the Bank‟s IWRM policy
on the basis of analyzed evidence
and well founded insight on
prevailing and future challenges and
trends that are likely to condition
IWRM in the African context for the
coming decade.
The study will among others:
Asses the changes in the overall context since the year 2000 and establish a list of new challenges to be address by a revised IWRM policy
Assess effective policy implementation, by the Bank and within a set of selected RMCs
Update the current policy on the basis of findings through a participatory process
Propose tools to build an effective monitoring and evaluation system of the Bank IWRM policy
An updated IWRM Policy that responds to contemporary sector challenges in Africa
710442 175,000.00 0.00 0.00
7 SBOC Enhancement of Public Private Partnership in Water Supply Services
Build a solid body of knowledge on the
potential and limitations of PPPs in
IWRM and other WSS related
projects, with the aim to enhance
AfDBs operation capacity to
incorporate where strategically
necessary, PPPs in its water sector
operations and to promote the
transfer of best practices and
experiences
Four country study that will enable the Bank among others to :
Identify ways to mainstream PPPs in AfDB‟s water and sanitation sector operation (investment and technical assistance)
Provide an overview of trends, experiences and successes and failures in Africa and lessons of applicability for the Bank
AfDB‟s operation capacity to incorporate where strategically necessary, PPPs in its water sector operations enhanced
710443 195,000.00 0.00 0.00
8 WIDM Implementation of Water Information System in AfDB
Improve the management of water
sector information within the Bank
to improve operational efficiency
Building a Corporate „Profile‟ on Water
Enhancement of the AfDB Water Web
Follow up on the reconciliation of Disclosure Policy and Practice
Facilitating the development of an Annual AfDB Water Report
Development of Country Water Profiles
Enlarging the Bank‟s PCM tools
Developing geographic information capacity
Setting up internal water library
Functional website for water
Electronic repository established
Improved management of water information
Physical library on water established
703815 200,000 67,500 132,500
9 WIDM General dissemination and information sharing
Ensure that the WPP products are well
documented and disseminated to
users
Review of all existing WPP products
Elaborate dissemination strategy
Disseminate WPP products
Enhanced Bank and RMCs‟ capacity to address major water issues in the region
Improved access to knowledge products for informed decision making
703819 50,000 0 50,000
10 WIDM Support to RWSSI Implementation
To review the RWSSI Program and synthesise the findings as an input towards strengthening the approach to RWSS implementation.
Review current RWSSI implementation strategy and identify constraints and opportunities for improvement
Provide recommendations for improving the Bank‟s approach to RWSS delivery.
Support tthe preparation of the 2nd RWSSI conference
Implementation of RWSS programs improved
2nd RWSSI conference held
Adttional fund for RWSSI moblised
795076 200,000 98,225 101,775
WPP 2010 ANNUAL PROGRESS REPORT
A2-21
11 WIDM Implementation on the outcome of the AWW-1
Ensure that the realization of some of
the recommendations made at the
AWW-1
Support the preparation of the Head of States and Governments Summit on water
High political support for water sector achieved
703816 221,327 93,368 127,959
12 IOKS Support to regional dialogue on water security issues
Ensure systematic follow up on the outcomes of the 5th World Water Forum
Support Bank participation to the Stockholm water week as part of systematic knowledge sharing and facilitating dialogue with regional and international
Support the preparation of the outcome of the WWF – 5
Support the preparation of the 2nd African Water Week
Outcomes from WWF-5 and the
AWW – 2 that have bearing on AfDB
water sector activities receive follow up.
WPP products and other relevant outputs presented at the Stockholm water week
795077 263,400 105,259 158,141
13 TBPE Study on community management of water supply and sanitation services
To assess the effectiveness and
failures of community managed
WSS services
Identify projects financed by AfDB with community-managed systems where the study can take place
Assess the socio-economic condition, institutional set up, legal instruments water supply and sanitation systems under which the communities are operating
Assess the effectiveness and or the failures of the communities in managing the system
Final study report outlining issues involved in CM and its strengths and weaknesses.
Better understanding achieved and knowledge on community managed systems strengthened
703083 85,000 10,437 74,563
14 TBPE Issues paper on contract management model for hand pump maintenance
To develop appropriate institutional
arrangements for contract
management of hand pump
maintenance
Asses the various arrangements in practice for the maintenance of hand pumps
Undertake field assessment of current contract management practices in selected countries in the region
Develop contract management models for hand pumps
Develop pilot to test the recommendation
An issues paper that clearly identifies the challenges and proposes viable solutions to address handpump maintenance in Africa
Sustainability of water supply projects based on hand pump improved
703084 145,000 0 145,000
32 IOKS African Water Week 2010 and 2011
To provide a platform for dialogue and learning and provide appropriate input on key regional issues
Liaise with AMCOW and key stakeholders on preparation for the event,
Coordinate Technical input with Collaborating Institutions
Commission Technical Papers
Host specific event
AfDB asserts its lead role in the water sector in Africa The main water challenges in the Region discussed Consensus reached on common strategies for water development
710022 112,418 16,518 95,900
Management Fees
703131 148,500 114,295 34,205
WPP Program Management
703858 395,677 270,106 125,571
WPP 2010 ANNUAL PROGRESS REPORT
A5-22
Annex 3: Implementation Status of Activities as at 31st December 2010
Ref. No.
Activity Status as at 31/12/10
Remark
Support Bank Operations Capacity (SBOC)
1 Review of RWSSI Implementation Strategy Completed
RWSSI (2003-2009) assessment report prepared
2 Guidelines for the development of national water sector & RWSSI programme
Completed
3 Issue paper on water governance Completed Report on the water sector governance in Africa theory & practice and assessment & guidelines were published
4 Regional study into the sustainable livestock development in the greater horn of Africa
Substantially Completed:
Final report prepared and validation Workshop to internalize the output is being organized.
5 Development aid and access to water and sanitation in sub-Saharan Africa
Substantially Completed:
Report is being finalised for publication
6 Capacity building of Bank staff on innovative technologies
Slow progress No activity in 2010
7 Bank Sanitation Strategy Cancelled The activity was approved in 2007 but since it did not commence it was cancelled
8 Support to agricultural water development Substantially Completed:
AgWA partnership among the principal actors in agricultural water management in Africa was formed and work plan for 2010-2011 was formulated.
9 Study on the health and socio-economic impact of WSS provision
Commencement Stage:
RFP sent to short listed consulting firms
10 Water and poverty link assessment Completed: Since the BNWPP account was closed the outstanding payment was settled from the MDWPP
11 Revision of Banks IWRM Policy Commencement Stage:
TOR is being revised
12 Scaling up delivery of water supply and sanitation services in fragile states
Cancelled: Since OWAS is providing input to a similar initiative under the Fragile States Unit this activity was cancelled.
13 Enhancing PPP in the water and sanitation sector
Commencement Stage:
TOR prepared and call for short listing of consultants about to be launched
Water Information and Data Management at AfDB (WIDM)
14 Credit Rating of water utilities Completed A report on how can reforming African water utilities tap local financial markets was published by WSP
15 Implementation of water information system in AfDB
Slow Progress No activity in 2010
16 Support to RWSSI implementation Substantially Completed:
RWSSI (2003-2009) assessment report prepared
17 General dissemination and sharing of information
Progressing well
Five WPP reports published and distributed at the AWW-3
IWRM Outreach and Knowledge Sharing (IOKS)
18 Workshop for Eastern and Southern African countries on IWRM
Completed Report on progress in integrated water resources management in eastern and southern Africa published
19 Bank input to the 5th World Water Forum Completed African regional report published report on delivering on Africa‟s water security commitments prepared
20 2007 African Water Week Completed The first African water Week organised proceedings published
WPP 2010 ANNUAL PROGRESS REPORT
A5-23
Ref. No.
Activity Status as at 31/12/10
Remark
21 Implementation of the outcomes from the assessment of RWSSI achievements
Completed RWSSI (2003-2009) Assessment report prepared
22 Vision Africaine de l'eau de la mise en oeuvre
Completed Inputs to the preparation of African Regional Report were made
23 Workshop on best practices & experiences on rainwater harvesting
Completed Workshop organised proceedings prepared
24 Follow up of dialogues with UNSGAB on water, sanitation
Cancelled The objective of the activity is being covered through other activities such as support to RWSSI Implementation and support to Regional Dialogue on Water Security Issues
25 Support to regional dialogue on water security issues
Progressing well:
A Background Paper on financing water security for economic growth in Africa was prepared
26 Implementation of the outcomes of the AWW-1
Progressing well:
Preparation of Country Sector Overview (CSO) reports for Sub-Saharan Africa undertaken Report presented at the AWW-3,
27 Implementation of the outcome of the AficanSan+5 conference recommendations
Completed AfDB‟s has actively participated in the AfricaSan Task Force
28 African Water Week 2010 and 2011 Progressing well:
5 WPP publications were disseminated, RWSSI films on six countries were shown and CSOs report was presented
Transfer of Best Practices and Experience (TBPE)
29 Support to African ClimDev Programme Cancelled The activity was approved in 2007 and had used only 11% of the fund after 4 years of operation hence it was cancelled.
30 Study on community management of WSS services
Completed Substantially
Consultant has submitted the final draft report.
31 Issues paper on management models for rural water supply
Completed Substantially
Consultant has submitted final report validation workshop will take place early in 2011
32 Collaborative Strategic IWRM planning in Africa
Cancelled: Did not commence and no detailed activity work programme was submitted hence it was cancelled
WPP 2010 ANNUAL PROGRESS REPORT
A5-24
ANNEX 4: FINANCIAL STATEMENTS FOR MDWPP AND BNWPP
WPP 2010 ANNUAL PROGRESS REPORT
A5-25
Annex 4A: Multi-Donor Water Partnership Programme (MDWPP):
AFRICAN DEVELOPMENT BANK
MULTI-DONOR WATER PARTNERSHIP PROGRAM
FINANCIAL STATEMENTS AS AT 31 DECEMBER 2010
TABLE OF CONTENTS
Statement of Financial Position
1
Statement of Commitment
2
Summary of Ongoing Activities (Annex 1)
3
Summary of Completed activities (Annex 2)
4
WPP 2010 ANNUAL PROGRESS REPORT
A5-26
AFRICAN DEVELOPMENT BANK
MULTI-DONOR WATER PARTNERSHIP PROGRAM
STATEMENT OF FINANCIAL POSITION AS AT 31 DECEMBER 2010
(Expressed in EUR)
CONTRIBUTIONS
Amount
Donors
Danish Government
2,010,841
Canadian Government
3,302,815
Total Donor contributions
5,313,656
SIDA Support to the First African Water Week
10,524
IDB Support to the First African Water Week
13,690
Total contributions
5,337,870
Add: Interest received
161,963
Total funds available
5,499,833
Less: Disbursements Ongoing activities (Annex 1)
(1,373,274) Completed activities (Annex 2)
(1,523,312)
(2,896,586)
Funds available
2,603,247
REPRESENTED BY: Cash in bank
2,685,382
Less: Net Amount payable
(82,135)
Funds balance
2,603,247
WPP 2010 ANNUAL PROGRESS REPORT
A5-27
AFRICAN DEVELOPMENT BANK
MULTI-DONOR WATER PARTNERSHIP PROGRAM
STATEMENT OF FUNDS COMMITMENT AS AT 31 DECEMBER 2010
(Expressed in EUR)
Total funds available
5,499,833
Less: Commitment
Ongoing activities (Annex 1)
(3,231,277) Completed activities (Annex 2)
(1,523,312)
(4,754,589)
Funds available for commitment
745,243
WPP 2010 ANNUAL PROGRESS REPORT
A5-28
AFRICAN DEVELOPMENT BANK
MULTI-DONOR WATER PARTNERSHIP PROGRAM
SUMMARYOF ONGOING ACTIVITIES AS AT 31 DECEMBER 2010
(Expressed in EUR)
Code Activity/Study
Budget
(2010
program)
Cumulative
Disburseme
nts at
31/12/09
Disburseme
nts from
01/01 to
31/03/010
Disburseme
nts from
01/04 to
30/06/010
Disburseme
nts from
01/07 to
30/09/010
Disburseme
nts from
01/10 to
31/12/010
Total
Disburseme
nts for the
year
Cumulative
Disburseme
nts at
31/12/010
Undisburs
ed
Balance
703081
23. SBOC: Capacity building of Bank staff on innovative
technologies 74,924
22,787 0 0 0 0 0 22,787 52,137
703103
21. SBOC: Regional study into the sustainable livestock development in the Greater Horn of Africa
300,000 139,006 53,854 0 80,670 0
134,524 273,531 26,469
703811
SBOC. Development Aid & Access to Water & Sanitation in Sub-
Saharan Africa 75,000
34,256 0 0 1,116 22,500 23,616 57,872 17,128
795075 Support to Agricultural Water Development 80,000 0 3,570 19,552 16,500 8,250 47,872 47,872 32,128
703851 Study on the Health & Socio-Economic Impact of WSS provision 350,000 0 0 0 0 0 0 0 350,000
710442 Revision of Banks IWRM Policy 175,000 0 0 0 0 0 0 0 175,000
710443 Enhancing PPP in the Water and Sanitation Sector 195,000 0 0 0 0 0 0 0 195,000
Support Bank Operations Capacity (SBOC) 1,249,924 196,050 57,424 19,552 98,286 30,750 206,012 402,062 847,862
703815 WIDM.Implementation of Water Information System in AFDB 200,000 67,500 0 0 0 0 0 67,500 132,500
703819 WIDM.General Dissemination & Sharing of Information 50,000 0 0 0 5,024 8,355 13,380 13,380 36,620
795076 Support to RWSSI Implementation 200,000 0 20,000 61,011 17,214 19,467 117,691 117,691 82,309
403812 SBOC. Issues paper on Urbanization, Water & Sanitation 0 0 0 0 0 0 0 0
Water Information and Data Management at AFDB (WIDM) 450,000 67,500 20,000 61,011 22,238 27,822 131,071 198,571 251,429
703816 IOKS.Implementation of the Outcomes of the AWW-1 25,877 221,327 34,984 1,195 57,189 37,354 34,345 130,082 165,066 56,261
795077 Support to Regional Dialogue on Water Security issues 263,400 95,659 9,600 0 0 18,803 28,403 124,062 139,338
IWRM Outreach and Knowledge Sharing (IOKS) 484,727 130,643 10,795 57,189 37,354 53,148 158,485 289,128 195,599
703083
49. TBPE: Study on community management of water supply and
sanitation services (A1) 85,000
0 10,437 0 0 0 10,437 10,437 74,563
703084
50. TBPE: Issues paper on contract management model for hand pump maintenance
145,000 0 0 0 0 9,350
9,350 9,350 135,650
Transfer of Best Pratices and Experience (TBPE) 230,000 0 10,437 0 0 9,350 19,786 19,786 210,214
703131 Management fee 167,432 114,295 0 0 53,137 53,137 167,432 0
703858 WPP Programme Management 536,776 245,666 18,381 6,059 0 9,584 34,025 279,691 257,086
Programme Management and Administration 704,208 359,961 18,381 6,059 0 62,721 87,161 447,122 257,086
710022 Africa Water Week 2010 & 2011 112,418 0 0 0 0 16,602 16,602 16,602 95,816
TOTAL 3,231,277 754,154 117,037 143,811 157,878 200,393 619,118 1,373,274 1,858,005
WPP 2010 ANNUAL PROGRESS REPORT
A5-29
AFRICAN DEVELOPMENT BANK
MULTI-DONOR WATER PARTNERSHIP PROGRAM
SUMMARY OF COMPLETED ACTIVITIES AS AT 31 DECEMBER 2010
(Expressed in EUR)
Code Activity/Study
Approved
Amount
(2008progr
am)
Cumulative
Disburseme
nts at
31/12/08
Disburseme
nts from
01/01/09 to
31/03/09
Disburseme
nts from
01/04/09 to
30/06/09
Disburseme
nts from
01/07/09 to
30/09/08
Disburseme
nts from
01/10/09 to
31/12/09
Cumulative
Disburseme
nts for the
period
Cumulative
Disburseme
nts at
31/12/010
Undisbur
sed
Balance
703075 36. IOKS: Strengthening partnership among regional actors 17,453 17,453 0 0 0 0 0 17,453 0
703076 26. WIDM: Establishment of Bank water information centre 26,533 26,533 0 0 0 0 0 26,533 0
703077 27. WIDM: RWSSI programmes progress report 58,929 58,929 0 0 0 0 0 58,929 0
703085 51. TBPE: Assessment of use of earth observation information 12,179 12,179 0 0 0 0 0 12,179 0
703086 35. IOKS: Scaling-up Agricultural Water Development in Africa 34,963 34,963 0 0 0 0 0 34,963 0
703088 18. SBOC: Capacity building of Bank staff on IWRM 1,436 1,436 0 0 0 0 0 1,436 0
703853 Africansan +5 Conference 156,380 156,380 0 0 0 0 0 156,380 0
703078 13. SBOC: Issue paper on water governance 100,104 91,933 0 0 0 8,171 8,171 100,104 0
703089 12. SBOC: Review of RWSSI implementation Strategy 82,746 82,746 0 0 0 0 0 82,746 0
703091
17. SBOC: Guidelines for the development of national water sector
and RWSS programme
73,194 73,194 0 0 0 0
0 73,194 0
703857 Credit Rating of Water Utilities 46,212 46,212 0 0 0 0 0 46,212 0
703087
34. IOKS: Follow-up of dialogue with UNSGAB on water and
sanitation 62,403
62,403 0 0 0 0 0 62,403 0
703821 IOKS. Bank input to the 5th World Water Forum 313,945 317,175 359 (3,590) 0 0 (3,230) 313,945 0
703094 33. IOKS: 2007 Africa Water Week 117,396 117,397 0 0 0 0 0 117,397 0
703097
32. IOKS: Workshop for Eastern and Southern African Countries on IWRM (B2)
198,303 198,303 0 0 0 0
0 198,303 0
703813
IOKS.Workshop on Best Pratices & Experiences on Rainwater
Harvesting 18,499
18,499 0 0 0 0 0 18,499 0
703817
IOKS.Implementation of the AfricanSan + 5 Conference
Recommandations
3,439 0 3,439 0 0 0
3,439 3,439 0
703818
IOKS.Implementation of the Outcomes from the Assessment of
RWSSI Achievement 48,116
48,116 0 0 0 0 0 48,116 0
703820 IOKS.Vision Africaine de l'eau:Bilan de la mise en œuvre 29,100 29,100 0 0 0 0 0 29,100 0
703852 Support to African ClimDev Programme 39,026 33,266 6,770 0 (1,009) 0 5,761 39,026 0
710444 Water and Poverty Link Assesssment 82,955 82,955 82,955 82,955 0
TOTAL 1,523,312 1,426,217 10,569 (3,590) (1,009) 91,126 97,096 1,523,312 0
WPP 2010 ANNUAL PROGRESS REPORT
A5-30
Annex 4B: Bank Netherlands Water Partnership Programme (BNWPP)
WPP 2010 ANNUAL PROGRESS REPORT
A5-31
WPP 2010 ANNUAL PROGRESS REPORT
A5-32
WPP 2010 ANNUAL PROGRESS REPORT
A5-33
WPP 2010 ANNUAL PROGRESS REPORT
A5-34
ANNEX 5: 2010 BUDGET AND CUMULATIVE DISBURSEMENT AS AT 31/12/10
Ref.
No. Activity
Amount in Euro
Approved
2010
Budget
Disbursed
up to
31/12/10
Balance at
31/12/10
I Completed Activities
1 Review of RWSSI Implementation Strategy 82,746 82,746 0
2 Guidelines for the development of national water sector &
RWSSI programme 73,194 73,194 0
3 Issue paper on water governance 120,000 100,104 19,896
4 Credit Rating of water utilities 46,680 46,212 468
5 Workshop for Eastern and Southern African countries on
IWRM 201,678 198,303 3,375
6 Bank input to the 5th World Water Forum 325,000 313,945 11,055
7 2007 African Water Week 241,679 117,397 124,282
8 Implementation of the outcomes from the assessment of
RWSSI achievements 50,000 48,116 1,884
9 Vision Africaine de l'eau de la mise en oeuvre 40,000 29,100 10,900
10 Workshop on best practices & experiences on rainwater
harvesting 50,000 18,499 31,501
11 Water and poverty link assessment 100,000 82,955 17,045
12 Implementation of the outcome of the AficanSan+5
conference recommendations 15,000 3,439 11,561
Sub Total 1,345,977 1,114,010 231,967
II Substantially Completed Activities 0
13 Regional study into the sustainable livestock development in
the greater horn of Africa 300,000 273,531 26,469
14 Development aid and access to water and sanitation in sub-
Saharan Africa 75,000 57,872 17,128
15 Support to agricultural water development 80,000 47,872 32,128
16 Support to RWSSI implementation 200,000 117,691 82,309
17 Issues paper on management models for rural water supply 145,000 7,000 138,000
18 Study on community management of WSS services 85,000 10,437 74,563
Sub Total 885,000 514,403 370,597
III Activities with Implementation Progressing Well 0
19 General dissemination and sharing of information 50,000 13,380 36,620
20 Support to regional dialogue on water security issues 263,400 124,074 139,326
21 Implementation of the outcomes of the AWW-1 221,327 165,066 56,261
22 African Water Week 2010 & 2011 112,418 16,602 95,816
Sub Total 647,145 319,122 328,023
IV Activities with Slow Implementation
23 Capacity building of Bank staff on innovative technologies 74,924 22,788 52,136
24 Implementation of water information system in AfDB 200,000 67,500 132,500
Sub Total 274,924 90,288 184,636
WPP 2010 ANNUAL PROGRESS REPORT
A5-35
V Activities at Commencing Stage
25 Revision of Banks IWRM Policy 175,000 175,000
26 Study on the health and socio-economic impact of WSS
provision 350,000 0 350,000
27 Enhancing PPP in the water and sanitation sector 195,000 195,000
Sub Total 720,000 0 720,000
Activities Canceled
28 Bank Sanitation Strategy 276,060 0 276,060
29 Support to African ClimDev Programme 297,695 39,026 258,669
30 Scaling up delivery of water supply and sanitation services in
fragile states 100,000 100,000
31 Collaborative Strategic IWRM planning in Africa 100,000 100,000
32 Follow up of dialogues with UNSGAB on water, sanitation 182,603 62,403 120,200
Sub Total 956,358 101,429 854,929
Total 4,829,404 2,139,252 2,690,152
VI Programme Management and Administration
Management Fee 167,432 167,432 0
WPP Programme Management 536,776 279,692 257,084
Total 704,208 447,124 257,084
GRAND TOTAL 5,533,612 2,586,376 2,947,236
WPP 2009 ANNUAL PROGRESS REPORT
A6-36
ANNEX 6: EXPECTED RESULTS, TARGETS AND ACHIEVEMENTS
Planned Results Performance Indicators Indicative Targets
and Time Frames
UPDATE TABLE Cumulative results of all
activities completed by end of 2010
Results of activities completed,
and expected results of ongoing activities, in 2010
IMPACT
Improved access to water
resources in Africa through
enhanced IWRM capacities,
knowledge and dialogue
Indicator: Progress towards
meeting the MDG
targets related to water.
Target
MDG Targets
Achieved
Time Frame
2015
RWSSI and AWF are making valuable contributions
to achievement of MDG targets related to water.
RWSSI and AWF are making valuable contributions to
achievement of MDG targets related to water.
OUTCOME
1. AfDB IWRM Capacity
AfDB water sector
programs and policies are
strengthened and expanded
to help achieve MDG
targets
2. RMC IWRM Awareness
RMCs and other African
stakeholders have enhanced
awareness of, and
commitment to, IWRM
principles
Indicator
1.1 AfDB water sector
interventions in RMCs are
based on IWRM principles
1.2 Number of new water
initiatives/strategies
developed
2.1 Percent of RMCs
initiating IWRM processes
Target
Most of the Bank
relevant programs
and projects
reflecting IWRM
principles
Major initiatives to
achieve MDGs
developed
80% of the RMCs
initiate IWRM
policy
Time Frame
2012 at Bank level
2015 at RMC level
OUTCOME
1.2 Number of new water initiatives or strategies
developed
Two major initiatives, AWF and RWSSI, have
become operational with WPP joint support.
OUTCOME
1.1 AfDB water sector interventions in RMCs are based on
IWRM principles
Extent of integration of WPP outputs into Bank IWRM
policies, strategies, programmes and projects yet to be
quantified.
1.2 Number of new water initiatives/ strategies developed
ClimDev programme operational and making significant
contributions to mainstreaming climate risk management
processes in Bank operations.
2.1 Percent of RMCs initiating IWRM processes
WPP co-funded assessments show that about half of
RMCs in Eastern and Southern Africa have made
substantial progress in putting in place appropriate IWRM
policies and legislation, but that considerable work
remains to be done in achieving IWRM in these regions.
WPP 2009 ANNUAL PROGRESS REPORT
A6-37
OUTPUT
1. Support Bank Operations
Capacity
1. IWRM mainstreamed in
Bank policies, programs
and operations
2. Bank staff have increased
skills and competences in
IWRM
Indicator
1.1 Extent to which bank
policies and programs
reflect IWRM approach
1.2 Number of IWRM
tools developed and used
in Bank operations
1.3 Number of Bank staff
trained in IWRM
Target
Increased number of
policies and
programs adequately
reflecting IWRM
principles
Time Frame
3 years
OUTPUT
1.1 Extent to which bank policies and programs reflect
IWRM approach
RWSSI Framework for Implementation developed
and used to guide the overall implementation of the
initiative and launch country level programmes.
Africa Water Facility quickly established within the
Bank and making significant contributions to
mobilising and applying resources for IWRM in
Africa.
1.2 Number of IWRM tools developed and used in
Bank operations
Guidelines to mainstreaming gender in Bank water
operations drafted and under review, with aim to
assist staff to better incorporate gender concerns in
projects to enhance the equitable sharing of project
benefits.
Strategy on financial instruments prepared and
facilitating AfDB direct lending to sub-sovereign
public and private sector organisations in the water
sector.
1.3 Number of Bank staff trained in IWRM
Solar and wind powered water pumping
technologies workshop organised for 41 participants
from the Bank and RMCs.
OUTPUT
1.1 Extent to which bank policies and programs reflect
IWRM approach
More effective delivery of the RWSS Initiative arising
from assessments and development of revised strategy
and guidelines for national programmes (ongoing)
African ClimDev programme established within the
Bank, resulting in improved availability and increased
use of climate information and services, and facilitating
the mainstreaming of climate risk management
processes in Bank operations (ongoing)
1.2 Number of IWRM tools developed and used in Bank
operations
Framework for sustainable livestock development in
the Greater Horn of Africa guiding Bank interventions
in the region (ongoing)
Urban water supply and sanitation framework guiding
the Bank‟s approach to urban WSS interventions
(ongoing)
AfDB sanitation strategy guiding and strengthening
Bank sanitation interventions in RMCs (ongoing)
WPP 2009 ANNUAL PROGRESS REPORT
A6-38
2. IWRM Outreach and
Knowledge Sharing
1. RMCs have increased
awareness of IWRM
principles and approaches
2. Regional and sub-regional
partnerships strengthened
or established
3. Common African
strategies for water
development adopted
Indicator
2.1 Increased demand by
RMCs for TA for
development of IWRM
policies
2.2 Number and quality of
partnerships that have been
established or strengthened
2.3 Number of common
African strategies for water
development adopted
Target
Moderate increase
Time Frame
5 years
OUTPUT
2.2 Number and quality of partnerships that have been
established or strengthened
Support to Bank outreach and partnership efforts
for the World Water Forum, African Water Week,
AfricanSan+5, Pan-African Conference on Water,
WaterDom, UNSGAB Africa Dialogue, leading to
enhancement of Bank‟s visibility and role in
development of Africa‟s water sector; and adoption
of common strategies and strengthened
commitments to action and financing.
International conference on RWSSI organised, in
collaboration with the French Government, to rally
international support and resources to accelerate the
attainment of the MDGs in rural areas.
Strategic partnerships established between the
Bank and GWP/IWMI on IWRM.
Nile Basin Initiative stakeholder workshop organised to strengthen the partnership among
riparian countries.
2.3 Number of common African strategies for water
development adopted
Approaches and strategies for agricultural water
development elaborated and disseminated through
regional workshops/conferences and international
forums.
OUTPUT
2.1 Increased demand by RMCs for TA for development of
IWRM policies
Increased awareness and knowledge of IWRM in 31
Northern, Eastern and Southern African countries due to
IWRM situation assessments and workshops undertaken
in collaboration with the GWP (completed)
2.2 Number and quality of partnerships that have been
established or strengthened
Bank participation in the 5th World Water Forum involving coordinating the process of regional dialogue
leading to the preparation of the African regional
document on water security (completed)
Enhanced partnership for Agricultural Water in
Africa (AgWA) strengthening regional capacity to
achieve food security) (ongoing)
Contribution to organisation of the 2nd RWSSI
conference to rally international support and resources
to accelerate the attainment of the MDGs in rural areas
(ongoing)
AfDB appropriately participating in harmonised joint
implementation of the recommendations and outcomes
of the AWW 1 and 2, the WWF-2, and the AfriSan+5
conference (ongoing)
2.3 Number of common African strategies for water
development adopted
Advancement of Africa’s water security agenda involving, at the request of AMCOW, Bank led
preparation of an operational strategy and action plan to
implement political commitments on water security and
sanitation (completed)
3. Water Information & Data
Management at AfDB
1. Bank staff have increased
access to information and
data for strategic planning
and programming through
water information Centre
Indicator
3.1 Percent of bank water
staff accessing database for
planning and programming
purposes
Target
80% of Bank water
staff accessing
database
Time Frame
3 years
3.1 Percent of bank water staff accessing database for
planning and programming purposes
Water Information and Data Management System
Framework developed and used to plan
implementation at the Bank.
3.1 Percent of bank water staff accessing database for
planning and programming purposes
Improved management of water sector information within the Bank (ongoing)
WPP 2009 ANNUAL PROGRESS REPORT
A6-39
4. Transfer of Best Practices
1. Awareness and adoption
of best practices in water
sector in AfDB and RMCs
increased
Indicator
4.1 Number of local
actions/instruments
/practices identified for
scaling-up or replicating
4.2 Extent to which best
practices are disseminated
4.3 Number of instances in
which best practices are
adopted for scaling up or
replication
Target
At least 3 local
actions identified per
annum
Dissemination at
national and
community level in
all RMCs
Time Frame
Annual
OUTPUT
4.1 Number of local actions, instruments or practices
identified for scaling-up or replicating
Review of the Sanitation and Hygiene Status in 32
countries, carried out with the World Bank/WSP,
leading to the preparation of a high profile report
„Can African afford to miss the sanitation MDG
target?”
Credit rating of African water utilities undertaken
jointly with the WSP/PPIAF, and a regional learning
event organised to disseminate findings.
Guidelines for user fees and cost recovery for
water supply, irrigation and sanitation prepared
and providing a valuable resource in optimising
water management based on IWRM principles that
water has an ecological, social and economic value
Rainwater harvesting handbook prepared and
assisting Bank TMs and RMCs in application of
RWH practices in their WSS projects/programs.
Handbook on wetlands produced and being used as
a resource on wetlands management.
Guidelines for water supply and sanitation
provision in schools prepared to ensure that
interventions undertaken by the Bank that target
schools include a component for the provision of
water and sanitation services.
Use of earth observation information for water
resource development assessed and findings made
available.
4.3 Number of instances in which best practices are
adopted for scaling up or replication
Rural Water Supply and Sanitation Network
(RWSN) forum organised to enhance knowledge on
options for self-supply and scaling up local
entrepreneurship.
OUTPUT
4.1 Number of local actions, instruments or practices
identified for scaling-up or replicating
Water sector governance study outcomes and strategic
tools enabling Task Managers to conduct governance
assessments and address weaknesses at various stages of
the project cycle (completed)
Rainwater harvesting workshop resulting in increased
awareness of best practices and techniques for RWH
(completed)
Best practices amongst RMCs in the provision of safe
water and sanitation identified and advising the design
and implementation of future development assistance
strategies and actions (ongoing)
Best practices for community management of WSS
services in Bank financed projects identified and
advising sector interventions (ongoing)
Health & socio-economic impact of the provision of
WSS study resulting in availability of improved tools
and processes for continuous evaluation of indicators for
WSS programs (ongoing)
Appropriate institutional arrangements for
management of rural hand pumps identified with study
outcomes advising OWAS projects (ongoing)
Country Sector Overview assessment made for 32 in
collaboration with WSP and the information made
available to all stakeholders
4.2 Extent to which best practices are disseminated
Communications approach and tools prepared,
enabling the WPP to better disseminate knowledge
(completed)
WPP products are well documented and disseminated to users within and outside the Bank (ongoing)