2
Wall Mount Interconnect Center (SWIC3 & SWIC3G) Position the box in the desired location. Use the two upper mounting slots to hang the enclosure, then secure the box to the surface using all four mounting screws provided. Note: SWIC3 or SWIC3G enclosure shall be mounted with the Siemon logo in the upper left corner. 1 Install the fiber management clips into position. Simply insert into square cut-outs and twist 45 degrees into locking position as shown. There are eight holes available; it is recommended that a clip be inserted into the four corners at a minimum. 2 Strip outer jackets from cable to allow for 1 meter (3.3 ft.) of fiber slack. If a cable central member is present, screw strain relief lug to box using supplied #10-32 screw, cut the central member to length, insert into strain relief lug and tighten as shown. 5 If no cable central member is present, use the thumbscrew included to secure the aramid strength members as follows: Partially thread the thumbscrew onto one of the threaded studs in the enclosure floor, wrap aramid strength members clock- wise around the stud for one revolu- tion and tighten the thumbscrew. 6 If innerduct is used, cut grommet to form a gasket that closes the gap between the innerduct and the cover. 3 If innerduct is being used, route into enclosure and secure using cable tie provided. If innerduct is not used, insert fiber cable through the circular section of the dust-proof grommet. (For dustproofing see step #13). Note: Compression Clamps are also available — sold separately. 4 Terminate (or splice) fiber according to manufacturer’s specifications. Lace fiber strands into fiber management clips as shown. Use lower level of clip to store slack for adapter plates near the floor of enclosure and upper level for adapter plates closest to cover. 9 Mate terminated connectors to the appropriate ports on the Quick-Pack TM adapter plate. 10 If optional splice tray(s) is required (TRAY-M-X), install the standoff bracket (TRAY-B-XX) using the hardware provided. Then install the tray(s) over the threaded stud located in the center of the bracket and secure using the wingnut provided. 7 Snap adapter plates into place. Orient the wide edge of the adapter plates to be facing up as shown. Align the adapter plate latches with the respective cutouts in the mounting bracket and push adapter plate inward until it snaps into place. 8

Wall Mount Interconnect Center (SWIC3 & SWIC3G)files.siemon.com/int-download-installation-instructions/fi_wall-mount... · Wall Mount Interconnect Center (SWIC3 & SWIC3G) Mark port

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wall Mount Interconnect Center (SWIC3 & SWIC3G)files.siemon.com/int-download-installation-instructions/fi_wall-mount... · Wall Mount Interconnect Center (SWIC3 & SWIC3G) Mark port

Wall Mount Interconnect Center (SWIC3 & SWIC3G)

Position the box in thedesired location. Use the two

upper mounting slots to hang theenclosure, then secure the box tothe surface using all four mountingscrews provided.Note: SWIC3 or SWIC3G enclosure shall bemounted with the Siemon logo in the upperleft corner.

1 Install the fiber managementclips into position. Simply

insert into square cut-outs and twist45 degrees into locking position asshown. There are eight holes available; it is recommended that aclip be inserted into the four cornersat a minimum.

2

Strip outer jackets fromcable to allow for 1 meter

(3.3 ft.) of fiber slack. If a cable central member is present, screwstrain relief lug to box using supplied#10-32 screw, cut the central memberto length, insert into strain relief lugand tighten as shown.

5 If no cable central member ispresent, use the thumbscrew

included to secure the aramid strengthmembers as follows: Partially threadthe thumbscrew onto one of thethreaded studs in the enclosure floor,wrap aramid strength members clock-wise around the stud for one revolu-tion and tighten the thumbscrew.

6If innerduct is used, cutgrommet to form a gasket

that closes the gap between theinnerduct and the cover.

3 If innerduct is being used,route into enclosure and

secure using cable tie provided. Ifinnerduct is not used, insert fibercable through the circular section ofthe dust-proof grommet. (For dustproofing see step #13).Note: Compression Clamps are also available — sold separately.

4

Terminate (or splice) fiberaccording to manufacturer’s

specifications. Lace fiber strandsinto fiber management clips asshown. Use lower level of clip tostore slack for adapter plates nearthe floor of enclosure and upperlevel for adapter plates closest tocover.

9 Mate terminated connectors tothe appropriate ports on the

Quick-PackTM adapter plate.10If optional splice tray(s) is

required (TRAY-M-X), installthe standoff bracket (TRAY-B-XX)using the hardware provided. Theninstall the tray(s) over the threadedstud located in the center of thebracket and secure using the wingnutprovided.

7 Snap adapter plates intoplace. Orient the wide edge

of the adapter plates to be facing upas shown. Align the adapter platelatches with the respective cutoutsin the mounting bracket and pushadapter plate inward until it snapsinto place.

8

Page 2: Wall Mount Interconnect Center (SWIC3 & SWIC3G)files.siemon.com/int-download-installation-instructions/fi_wall-mount... · Wall Mount Interconnect Center (SWIC3 & SWIC3G) Mark port

Wall Mount Interconnect Center (SWIC3 & SWIC3G)

Mark port IDs on the enclo-sure label provided. Affix

round velcro-style coins to back ofclear plastic label holder and innerside of enclosure cover. Insert labelinto holder and affix to inner side ofcover.

11If SWIC3G is being installed a second set of stick-on labels

is also provided for the guard door.Label templates (Filename:SWIC2G.xls) available atwww.siemon.com

12 If SWIC3G (includes integratedjumper guard) is being

installed, install dust-proof grommetsinto the guard’s access holes.

13 Insert connector end of fiberjumpers through dust-proof

grommet and connect fiber.An option is to cut the grommet fromthe top down to the center of circularopening, thus allowing for the load-ing of jumper cables through the slit.

14

This photo shows a SWIC3Gwith cables and jumpers

completely installed.15 Affix DANGER label to

front cover of box or to wallnear box.16

Rev

. C

0

7/07

100.1

0457

© 2

007

Sie

mon

WARNING:OOppttiiccaall ttrraannssmmiitttteerrss aanndd ffiibbeerr ooppttiicc tteesstt eeqquuiippmmeenntt uusseedd iinn tthhee

tteelleeccoommmmuunniiccaattiioonnss iinndduussttrryy uusseess iinnvviissiibbllee iinnffrraarreedd eenneerrggyy..AAtt ssuuffffiicciieenntt ppoowweerr,, tthhiiss mmaayy ccaauussee eeyyee oorr sskkiinn ddaammaaggee..

If you work with fiber optic products, including test equipment, consider the following:1. Do not look into fibers or connectors. They may be ‘live’.2. Know what is happening with the fiber under test at the far end!3. When connecting a light source, try to make it the last element you connect!4. Whenever possible, switch off and disconnect your light source(s) before breakingany fiber connections.5. Always consider the hazard to other people:

a. Use warning signs, etc.b. Keep caps on unconnected fibers whenever possible.c. If using “live” optical beams, keep them low and facing away

from personnel.6. Don’t view optical outputs with a microscope, use a TV camera/monitor.7. Elect a safety officer to:

a. Train staffb. Maintain records of equipment classification, calibrations and

safety checks.8. Be careful of cut fibers. Remember they are sharp and difficult to see!

Global HeadquartersWatertown, Connecticut USA

Tel: (1) 866-548-5814

For a complete listing of our global offices visit our web site www.siemon.com